  • 8/17/2019 Boilers RLA

    1/60

    R.S.DAS,NALCO 1

    Residual Life Assessmentand

    Life Extension ProgrammeIn Power Boilers

    of Captive Power Plant of NALCO

    By

    R.S.DAS, Chief Manager (MECH),CPP,NALCO

  • 8/17/2019 Boilers RLA

    2/60

    R.S.DAS,NALCO 2

    National Aluminium Company is an integratedaluminium producing Public Sector Companyunder Govt . Of India with Bauxite Mines,

    Alumina Refinery Plant, Smelter Plant, CaptivePower Plant and Port Facility situated at differentlocations of Orissa and Andhra Pradesh .

    BRIEF ABOUT NALCO

    (National Aluminium Company Ltd)

  • 8/17/2019 Boilers RLA

    3/60

    R.S.DAS,NALCO 3

    METAL PRODUCTION CAPACITY: 3.45 lakh tones per annum

    NO OF METAL PRODUCING POTS: 720

    POWER CONSUMED BY THE POTS : 576 MW

    POWER GENERATING CAPACITY : 8 X 120 = 960 MW

    BOILER CAPACITY: 430 T/HR ( unit-1 -6),390T /HR( unit-7 & 8)

    BOILER TYPE:BALANCED DRAFT,NATURAL CIRCULATION,PULVERISED COAL,

    CORNER FIRED,WATER TUBE,REHEAT TYPE

    PRESENT STATUS OF THE COMPANY 

  • 8/17/2019 Boilers RLA

    4/60

    R.S.DAS,NALCO 4

    120 MW X 8

  • 8/17/2019 Boilers RLA

    5/60

    R.S.DAS,NALCO 5

    RAW WATER HP D/A LP HEATER GRIDCOHEATER BFP

    WATER TREATMENT

    HPT IPT LPT GENERATOR

    SMELTER

    COOLING 10.5 KV 220 KV

    TOWER

    CEPCW PUMP 6.6 KV

    CONDENSER UAT

    REHEATED STEAM

    GT 6.6 KV

    SAT

    CONDENSATE CHIMNEY

    STORAGE TANK

    BOILER

    COAL BUNKERS

    ECONOMISER

    ELECTRO STATIC

    PRECIPITATOR

    FUEL OIL TANK

    MILL ID FAN

    FD FANS

    PA FAN

    COAL CRUSHER

     ASH SLURRY PUMPS

  • 8/17/2019 Boilers RLA

    6/60

    R.S.DAS,NALCO 6

    Requirement of Residual Life AssessmentStudy (RLA )

    • To assess the present condition of theboiler pressure parts

    • To assess the remaining life of the Boiler

    Pressure parts

    • Statutory requirement as per IBR

    regulation “391A”

  • 8/17/2019 Boilers RLA

    7/60

    R.S.DAS,NALCO 7

    RLA Study of Boiler is a statutory requirement as per regulation “391A” 

    of “Indian Boiler Regulation-1950”, which says:-

    1. The Boilers which are operating at a temperature of 400oC & aboveincluding utility or industrial boilers & all boiler parts operating inthe creep range of boiler shall be non-destructively tested as perTable-1, after they are in operation for 1,00,000 hours forassessment of the remnant life of parts.

    2. The parts of a boiler when it completes a life of 25 years are to be

    tested as per Table-2 for assessment of remnant life of such parts.If results are acceptable as per the standards laid down by theCentral Boiler Board, a certificate shall be issued by the Chief Inspector of Boilers for extending the life of boiler for a furtherperiod of 10 years or such less period as recommended by theRemnant Life Assessment Organisation. The remnant life shall becarried out thereafter every five years by approved parties by theCentral boiler board.

  • 8/17/2019 Boilers RLA

    8/60

    R.S.DAS,NALCO 8

    PURPOSE OF RLA STUDY

    Evaluation of present condition of pressure

    parts & piping

    • Avoiding premature pressure parts failures

    and associated unforeseen outages

    • Identification of problem areas

    • Analysis of root cause of problems

    Estimation of balance life of pressure parts• Providing technically sound and viable

    proposal for implementation

  • 8/17/2019 Boilers RLA

    9/60

    R.S.DAS,NALCO 9

    RLA STUDY IN CAPTIVE POWER PLANT, NALCO

    UNIT YEAR

    2(part RLA of RH) 1997

    1 2000

    2 2003

    3 2004

    4 20045 2005

    6 2009( DUE)

    7 2015( DUE)

    8 2016(DUE)

  • 8/17/2019 Boilers RLA

    10/60

    R.S.DAS,NALCO 10

    Methodology adopted for Residual Life Assessment in NALCO,CPP By M/S BHEL

    • Review of the past data• Field Visual and dimensional inspection

    • UT

    • DP

    • Hardness Measurement

    • Replication for Metallography

    • Inside oxide scale thickness measurement

    •  Video Scopic Examination

    • Tube Sampling

    • Laboratory testing

    • Recommendation and life prediction

  • 8/17/2019 Boilers RLA

    11/60

    R.S.DAS,NALCO 11

    TIME PERIOD FOR THE STUDY : 10 TO 12 DAYS

    PRELIMINARY REPORT SUBMITTED IMMEDIATELY  AFTER THE STUDY 

    THE FINAL REPORT WITH RECOMMENDATIONSUBMITTED WITHIN 5 TO 6 MONTHS TIME.

    TEAM MEMBERS : 12 INCLUDING ONE TEAM LEADER 

  • 8/17/2019 Boilers RLA

    12/60

    R.S.DAS,NALCO 12

    Tests Done during RLA Study of ourBoilers

    • High temperature headers & piping – Ultrasonic, dye-penetrant tests

     – Video scope, Replication

     – Other inspections like

    • Dimensions,

    • Internal inspection

    • Insitu hardness

  • 8/17/2019 Boilers RLA

    13/60

    R.S.DAS,NALCO 13

    Tests Done during RLA Study of our

    Boilers (Cont. )

    • Superheater & reheater tubes

     – Tube samples, ultrasonic test

     – OD & Thickness

     – Deposit Analysis

     – Steam side oxide scale thickness

     – Life prediction

    •  Attemperators

     – Ultrasonic, dye penetrant tests

     – Replication, hardness

     – Fiber optics

  • 8/17/2019 Boilers RLA

    14/60

    R.S.DAS,NALCO 14

    Tests Done during RLA Study of our

    Boilers (Cont. )

    • Furnace & convection pass tubes – Tube sampling, ultrasonic test

     – Deposit analysis (Internal & External)

    • Drums & downcomers – Ultrasonic, dye-penetrant tests

     – MPI (Wet fluorescent & Dry)

     –  Video scope

  • 8/17/2019 Boilers RLA

    15/60

    R.S.DAS,NALCO 15

    Tests Done during RLA Study of our

    Boilers (Cont. )STEAM PIPING( MS,CRH,HRH & FW)

    •  Visual Inspection

    • Replication, Insitu Hardness• OD & thickness

    • Hangers & Supports Inspection

    General guidelines for selecting inspection points – High turbulence or velocity

     – Condensation points

     – Dead ends & high stressed points

     –  Areas immediately downstream of chemicalinjection points

     –  All supports

  • 8/17/2019 Boilers RLA

    16/60

    R.S.DAS,NALCO 16

    DIMENSIONAL MEASUREMENT AT CPP NALCO DURING

    RLA

  • 8/17/2019 Boilers RLA

    17/60

    R.S.DAS,NALCO 17

    DP TEST ON CRITICAL PIPING JOINTS AT CPP ,NALCO

  • 8/17/2019 Boilers RLA

    18/60

    R.S.DAS,NALCO 18

    DRUM INSPECTION AT CPP,NALCO

  • 8/17/2019 Boilers RLA

    19/60

    R.S.DAS,NALCO 19

    HANGER

    CHECKING ATCPP ,NALCO

  • 8/17/2019 Boilers RLA

    20/60

  • 8/17/2019 Boilers RLA

    21/60

    R.S.DAS,NALCO 21

    MICROSCOPIC EXAMINATION DURING REPLICATION

    AT CPP ,NALCO

  • 8/17/2019 Boilers RLA

    22/60

    R.S.DAS,NALCO 22

    INTERNAL OXIDE SCALE MEASUREMENT AT CPP ,NALCO

  • 8/17/2019 Boilers RLA

    23/60

    R.S.DAS,NALCO 23

    IOT AT CPP ,NALCO

    PROBE

  • 8/17/2019 Boilers RLA

    24/60

    R.S.DAS,NALCO 24

    VIDEO SCOPE AT CPP BOILER ,NALCO

    BOTTOM RING

    HEADER 

  • 8/17/2019 Boilers RLA

    25/60

    R.S.DAS,NALCO 25

    VIDEO SCOPE OF

    SH HEADER 

    STUB

  • 8/17/2019 Boilers RLA

    26/60

    R.S.DAS,NALCO 26

    TUBE SAMPLING AND LABORATORY TESTING

    TUBE SAMPLES WERE COLLECTED FROM DIFFERENTZONES OF OUR BOILERS FOR LABORATORY TESTING

    1. WATER WALL- 04 NO2. PLATEN SH- 02 NO

    3. CRH- 02

    4. RH INTER BANK-02

    5. HRH-02

    6. LTSH-027. ECO-01

  • 8/17/2019 Boilers RLA

    27/60

    R.S.DAS,NALCO 27

    Laboratory testing included thefollowingVisual Examination

    Dimensional measurementChemical composition analysis

    Flattening test for water wall tubes

    Hardness measurement

    Steam side oxide scale thickness measurement

    Micro examination of all the tube samples and

    insitu replicas ( 30 no) for spheroidisation level of

    PM,WELD &HAZ and creep level( PM only)

    Internal deposit analysis of water wall tubes and

    Boiler Drum

    Creep rupture testing for rupture life of Platen SH

    & RH coil tubes

  • 8/17/2019 Boilers RLA

    28/60

    R.S.DAS,NALCO 28

    General Recommendations Format of RLA

    FOR CPP, NALCO BY BHEL

    Residual life of RH and SH coil tubes

    Creep and Spheroidisation level of pressure partcomponents

    Parts needing replacements

    Parts needing repairsChemical cleaning advice & procedure

    Advice on water regimes

    Future plans of testsModifications required for life extension

    Any other specific observations

  • 8/17/2019 Boilers RLA

    29/60

    R.S.DAS,NALCO 29

    The internal deposit analysis of water wall andDrum (quantity and composition) were done for

    all the units .Norms of our OEM (BHEL)

    •< 15 mg/cm2  – Clean

    • 15-40 mg/cm2 – Moderately clean

    •>40mg/cm2  – Very dirty

     All our boilers were found in the moderately cleanzone after the deposit analysis.

    No immediate chemical cleaning was recommended.

    INTERNAL DEPOSIT ANALYSIS

  • 8/17/2019 Boilers RLA

    30/60

    R.S.DAS,NALCO 30

    Life Prediction Techniques Used

    • By using appropriate damage parameter

    • Using strain measurements

    • Post exposure testing

    • Using Steam Side Oxide scale thickness

  • 8/17/2019 Boilers RLA

    31/60

    R.S.DAS,NALCO 31

  • 8/17/2019 Boilers RLA

    32/60

    R.S.DAS,NALCO 32

    Life prediction based on Oxide Scale

    Thickness Analysis

    The steam side oxide scale thickness are measured at

    critical locations in the high heat flux zone and near the

    bottom bends of the super heater and re heater coils.

    These values are used as inputs to computer-based

    software BHELMOLT which accurately calculates thetube metal temperatures for the entire cross-section of

    tubes and calculates the residual life .

  • 8/17/2019 Boilers RLA

    33/60

    R.S.DAS,NALCO 33

    Oxide Scale Thickness AnalysisDATA INPUT TO THE SOFTWARE

    ORIGINAL TUBE OD

    ORIGINAL TUBE THICKNESS

    MATERIAL

    SERVICE HOURSPRESSURE

    OXIDE SCALE THICKNESS

    MINIMUM TUBE THICKNESS

    MINIMUM TUBE OD

  • 8/17/2019 Boilers RLA

    34/60

    R.S.DAS,NALCO 34

    OUT PUT• TOTAL RUPTURE LIFE

    • REMAINING LIFE

  • 8/17/2019 Boilers RLA

    35/60

    R.S.DAS,NALCO 35

    COIL WISE OXIDE THICKNESS

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    1.4

    1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47

    COIL NO

       O   X   I   D   E   T

       H   I   C   K   N   E   S   S

       I   N

       M   M

    OXIDE THICKNESS

    COILWISE OXIDE SCALE THICKNESS OF REHEATER 

  • 8/17/2019 Boilers RLA

    36/60

    R.S.DAS,NALCO 36

    COIL WISE TEMP

    500

    520

    540

    560

    580

    600

    620

    640

    1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47

    COIL NO

       T   E   M   P   E   R   A   T   U   R   E   I   N

       D   E   G   R   E   E

    TEMP

    COIL WISE REMAINING LIFE IN HRS

    0

    20000

    40000

    60000

    80000

    100000

    120000

    140000

    160000

    180000

    1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47

    COIL NO

       R   E   M   A   I   N   I   N   G

       L   I   F   E   I   N

       H   R

    REMAINING LIFE IN HRS

    COIL WISE

    SERVICE TEMP.

    COIL WISEREMAINING LIFE.

  • 8/17/2019 Boilers RLA

    37/60

    R.S.DAS,NALCO 37

    POST EXPOSURE TESTING

    The sample tubes, removed from Boiler SH and RH aresubjected to burst tests at accelerated temperature andservice pressure in the hot burst rig facility available atBHEL’s laboratory. The pressure and temperature arecontrolled very accurately.

    To predict the remaining life from the results of

    stress rupture tests, the following methods are adopted.

    1. Parametric extrapolation2. Application of Life fraction rule

  • 8/17/2019 Boilers RLA

    38/60

    R.S.DAS,NALCO 38EXTRAPOLATED LIFE OF SH COIL

  • 8/17/2019 Boilers RLA

    39/60

    R.S.DAS,NALCO 39

    LIFE PREDICTION OF OUR RH AND PLATEN SH TUBESWAS DONE BASED ON INSIDE OXIDE SCALE THICKNESSMEASUREMENT.

    IN UNIT-2 , 37 NO RH COILS WERE REPLACED IN 2001BASED ON LIFE PREDICTION DONE IN 1997.

    IN UNIT-1 , 34 NO RH COILS WERE REPLACED IN 2005BASED ON LIFE PREDICTION DONE IN 2000.

    IN OTHER UNITS THE PREDICTED LIFE OF RH AND SH

    COILS ARE AS BELOW.

    LIFE PREDICTION

    C O A S

  • 8/17/2019 Boilers RLA

    40/60

    R.S.DAS,NALCO 40

    DESCRIPTION PREDICTED LIFEUNIT-3 RH AND PLATEN SH

    COIL TUBES

    MORE THAN 1 LAKH HOUR 

    UNIT-4 PLATEN SH MORE THAN 1 LAKH HOUR  

    UNIT -4 HRH coil Coil 30 fifth

    ckt rear 

    54,500 Hrs

    Unit-4 HRH Coil 32 fifth ckt rear  47,500 Hrs

    Unit-4 HRH Coil 33 fifth ckt rear  56,500 Hrs

    Unit-4 all other RH coils MORE THAN 1 LAKH HOUR 

    Unit-5 HRH Coil 22 fifth ckt rear  59,100 Hrs

    Unit-5 HRH Coil 31 fifth ckt rear 56,100 Hrs

    Unit-5 HRH Coil 33 fifth ckt rear  66,100 Hrs

    PREDICTED LIFE OF RE HEATER TUBES

  • 8/17/2019 Boilers RLA

    41/60

    R.S.DAS,NALCO 41

    DESCRIPTION PREDICTED LIFE

    UNIT-1 PLATEN SH COILTUBES MORE THAN 2 LAKH HOUR 

    UNIT-2 PLATEN SH COIL

    TUBES

    MORE THAN 1 LAKH HOUR 

    UNIT-3 PLATEN SH COILTUBES

    MORE THAN 1 LAKH HOUR 

    UNIT-4 PLATEN SH COIL

    TUBES

    MORE THAN 1 LAKH HOUR 

    UNIT-5 PLATEN SH COILTUBES

    MORE THAN 1 LAKH HOUR 

    PREDICTED LIFE OF SUPER HEATER TUBES

  • 8/17/2019 Boilers RLA

    42/60

    R.S.DAS,NALCO 42

    Creep Cavity Level Classification System

    Proposed by Wedel & Neubauer

  • 8/17/2019 Boilers RLA

    43/60

    R.S.DAS,NALCO 43

    CREEP AND SPHEROIDISATION LEVEL

    THE CREEP AND SPHEROIDISATION LEVEL OF ALL THE PRESSURE PARTS WERE ANALYSED BY

    BHEL EXPERTS.NO MAJOR ABNORMALITIES WERE FOUND IN

    MOST OF THE CASES.

    ONLY IN UNIT-3 ISOLATED CREEP CAVITIESWERE OBSERVED ON THE GRAIN BOUNDARIESOF MS PIPE LINE . BHEL SUGGESTED FOR RE-EXAMINATION AFTER THREE YEARS WHICH IS

    TO BE DONE IN 2008.

    SUMMARY OF THE OBSERVATIONS OF RLA STUDIES OF DIFFERENT UNITS

  • 8/17/2019 Boilers RLA

    44/60

    R.S.DAS,NALCO 44

    SL.

     N

    O.

    AREA OFTHE

    BOILER PR

    PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNIT# 6

    (OR-

    513)

    UNIT# 7

    (OR-

    696)

    UNIT# 8

    (OR-

    713)

    01. RLA Study of

    Boiler after

    1,00,000 Hrs.

    of Operation

    Done in

    August’ 2000

    Done in

    December’

    2003

    Done April’

    2004

    Done in July’

    2004

    Done in June-

    2005

     Not

    due

    (runnin

    g hrs <

    100000

    )

     Not

    due

    (runnin

    g hrs <

    100000

    )

     Not

    due

    (runnin

    g hrs <

    100000

    )

    02. Boiler Drum

    - Visual

    -Insitu Replica

    -Hardness

    -UT

    -DP- Deposit

    analysis

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

    03. Water Wall

    -Visual

    -Sampling(

    internal

    deposit and

    hydrogen

    embrittlement)

    - Dimensions

    ( OD &

    thickness)

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

    SUMMARY OF THE OBSERVATIONS OF RLA STUDIES OF DIFFERENT UNITS

  • 8/17/2019 Boilers RLA

    45/60

    R.S.DAS,NALCO 45

    SL.

     NO

    .

    AREA OF

    THE BOILER

    PR PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNIT #

    6 (OR-

    513)

    UNIT #

    7 (OR-

    696)

    UNIT #

    8 (OR-

    713)

    04. Eco Coils;

    - Visual

    -Dimensional

    checks,

    -Sample check

    formetallography

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

    05. Low tem

    Header ( Eco

    in and

    out,Bottom

    ring header );

    - Visual

    -FibrovisionInspection

    -Hardness

    -DP

    -Dimensions

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

    06. LTSH Coils;

    - Visual

    - Hardness

    -Dimensional

    checks,

    -Sample check

    for

    metallography

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

  • 8/17/2019 Boilers RLA

    46/60

    R.S.DAS,NALCO 46

    SL.

     NO

    .

    AREA OF

    THE BOILER

    PR PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNIT #

    6 (OR-

    513)

    UNIT #

    7 (OR-

    696)

    UNIT #

    8 (OR-

    713)

    07. LTSH Outlet

    Header ( SHH

     – 9 );

    - Visual

    -Fibrovision

    Inspection

    -Insitu Replica

    -Hardness

    -UT

    -DP

    -Dimensions

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

    08. SH Inlet

    Header ( SHH

     – 10 );

    -Fibrovision

    Inspection

    -Insitu Replica

    -Hardness

    -UT-DP

    -Dimensions

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     NA NA NA

  • 8/17/2019 Boilers RLA

    47/60

    R.S.DAS,NALCO 47

    SL.

     NO

    .

    AREA OF THE

    BOILER PR PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNI

    T #

    6

    (OR 

    -

    513)

    UNI

    T #

    7

    (OR 

    -

    696)

    UNI

    T #

    8

    (OR 

    -

    713)

    09. SH Outlet Header (

    SHH – 11 );

    -Fibrovision

    Inspection-Insitu Replica

    -Hardness

    -UT

    -DP

    -Dimensions

     No specific

    recommendation

    and found o.k 

     No

    specific

    recommendati

    on and foundo.k 

     No specific

    recommendation

    and found o.k 

     No

    specific

    recommend 

    ation andfound o.k 

     No specific

    recommendation

    and found o.k 

     NA NA NA

    10. Platen SH Coil

    -IOT Measurement

    -DP-Dimension check,

    -Samples for Creep

    rupture &

    Metallography Test.

    - Hardness

    Predicted life :

    > 2,00,000 hrs

    Predicted

    life :

    > 1,00,000 hrs

    Predicted life :

    > 1,00,000 hrs

    Predicted

    life :

    > 1,00,000hrs.

    Predicted life :

    > 1,00,000 hrs.

     NA NA NA

    11. Desuperheater :-

    -Fibrovision

    Inspection.

    -Insitu Replica

    -Hardness

    -UT

    -DP

    -Dimension check 

     No specific

    recommendation

    and found o.k 

     No specific

    recommendati

    on and found

    o.k 

     No specific

    recommendation

    and found o.k 

     No specific

    recommend 

    ation and

    found o.k 

     No specific

    recommendation

    and found o.k 

     NA NA NA

    SL.

     NO

    AREA OF THE

    BOILER PR PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNI

    T # 6

    (OR

    UNI

    T #

    7

    UNI

    T #

    8

  • 8/17/2019 Boilers RLA

    48/60

    R.S.DAS,NALCO 48

    . (OR-

    513)

    7

    (OR-

    696)

    8

    (OR-

    713)

    12. Reheater Inlet Header( RHH – 1 )

    -Fibrovision

    Inspection

    -Insitu Replica

    -Hardness

    -UT

    -DP

    - Dimensions

     No specificrecommendation

    and found o.k 

     Nospecific

    recommendatio

    n and found o.k 

     No specificrecommendation

    and found o.k 

     No specificrecommendatio

    n and found o.k 

     No specificrecommendation

    and found o.k 

     NA NA NA

    13. Reheater Outlet

    Header ( RHH – 2 )

    -Fibrovision

    Inspection

    -Insitu Replica

    -Hardness

    -UT

    -DP

    - Dimensions

     No specific

    recommendation

    and found o.k 

     No

    specific

    recommendatio

    n and found o.k 

     No specific

    recommendation

    and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendation

    and found o.k 

     NA NA NA

    14. Reheater Coil :-

    -IOT Measurement

    -Samples for Creep

    rupture &

    Metallography Test

    -Dimension check.-Hardness

    Replacement of

    Reheater Coils

    (25 - 48) from

    Interbank outlet

    to HRH outlet

    header; ( RLA :-2000, Aug ) .

    Action taken :

    Reheater Coils

    (15 - 48) from

    Interbank outlet

    to HRH outlet

    header were

    replaced inMay –2005.

    Predicted life:

    i) Front coils >

    95,000 hrs

    ii) Rear coils >

    1,00,000 hrs

    Predicted life :

    > 1,00,000 hrs

    Predicted life :

    1. > 1,00,00 for

    all coils except

    HRH coil

    30,.32,33 in the

    fifth ckt rear.2. Coil 30 fifth

    ckt rear-

    54,500 hrs,

    3. Coil 32 fifth

    ckt rear-

    47,500 hrs

    4. Coil 33 fifth

    ckt rear-56,500 hrs,

    Predicted life :

    1. > 1,00,00 for

    all coils except

    HRH coil

    22,31,33 in the

    fifth ckt rear.2. Coil 22 fifth

    ckt rear- 59,100

    hrs,

    3. Coil 31 fifth

    ckt rear- 56,100

    hrs

    4. Coil 33 fifth

    ckt rear- 66,100hrs,

     NA NA NA

    SL.

     NO

    AREA OF THE

    BOILER PR PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNI

    T #

    6

    UNI

    T #

    7

    UNIT

    # 8

    (OR

  • 8/17/2019 Boilers RLA

    49/60

    R.S.DAS,NALCO 49

    . 6

    (OR 

    -

    513)

    7

    (OR 

    -

    696)

    (OR-

    713)

    15. a) MS Pipe line :-

    -Insitu Replica

    -UT

    -DP

    -Dimension checks.

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

    Reexamination

    in 2008

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendati

    on and found

    o.k 

     NA NA NA

     b) HRH Pipe line :-

    -Insitu Replica-UT

    -DP

    -Dimension checks.

     No specific

    recommendation and found o.k 

     No specific

    recommendation and found o.k 

     No specific

    recommendation and found o.k 

     No specific

    recommendation and found o.k 

     No specific

    recommendation and found

    o.k 

     NA NA NA

    c) CRH Pipe line :-

    -Insitu Replica

    -UT

    -DP

    -Dimension checks.

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No

    specific

    recommendati

    on and found

    o.k 

     NA NA NA

    d) MS Pipe line from

    MS-1 & MS-2

    up to Turbine stop

    valve.

    -Insitu Replica

    -UT

    -DP

    - Dimension

    checks.

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

    Reexamination

    in 2008

     No specific

    recommendatio

    n and found o.k 

     No

    specific

    recommendati

    on and found

    o.k 

     NA NA NA

    e) HP Bypass Pipe

    line

    -Insitu Replica

    -UT

    -DP

    -Dimension checks.

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommendatio

    n and found o.k 

     No

    specific

    recommendati

    on and found

    o.k 

     NA NA NA

  • 8/17/2019 Boilers RLA

    50/60

    R.S.DAS,NALCO 50

    S

    L. N

    O

    .

    AREA OF THE

    BOILER PR PARTS

    UNIT # 1

    (OR-369)

    UNIT #2

    (OR-370)

    UNIT # 3

    (OR-372)

    UNIT # 4

    (OR-382)

    UNIT # 5

    (OR-397)

    UNIT # 6

    (OR-513)

    UNIT #

    7 (OR-

    696)

    UNI

    T #

    8

    (OR 

    -

    713)

    f) Feed water Pipe

    line

    -Insitu Replica

    -UT-DP

    -Dimension checks.

     No specific

    recommenda

    tion and

    found o.k 

     No specific

    recommend 

    ation and

    found o.k 

     No specific

    recommendatio

    n and found o.k 

     No specific

    recommen

    dation and

    found o.k 

     No specific

    recommen

    dation and

    found o.k 

     NA NA NA

    16

    .

    RLA Study of Boiler

    after 1 lakh hrs of

    Operation

    DONE DONE DONE DONE DONE 2009 2015 2016

    17 Compete RLA Study

    of Boiler after 25Years of Operation

    2008 2009 2009 2009 2010

    BENEFITS OF RLA STUDIES IN CPP NALCO

  • 8/17/2019 Boilers RLA

    51/60

    R.S.DAS,NALCO 51

     A THOROUGH CHECK OF ALL THE PRESSURE PARTS,CRITICAL PIPE LINE AND HANGER SUPPORTS COULD BE MADE.

    THE SPHEROIDISATION LEVEL AND CREEP LEVEL OF THE PRESSURE PARTSINCLUDING THICK WALLED COMPONENTS LIKE DRUM, ALL HEADERS,PIPE LINES COULD BE ASSESSED.

    THE LIFE OF THE PLATEN SUPER HEATER AND REHEATER TUBES COULD BEPREDICTED.

    THE DEPOSIT INSIDE AND OUT SIDE OF THE TUBES COULD BE ANALYSED.

    THE CONDITION OF THE HANGERS COULD BE ASSESSED AND REMEDIAL

     ACTION COULD BE TAKEN.CORRECTIVE AND PREVENTIVE MEASURES LIKE TIMELY REPLACEMENTOF RH COILS IN UNIT-1( 34 NO) AND 2 (37 NO) COULD BE INITIATED.

    PLANT AVAILABILITY HAS BEEN INCREASED BY TIMELY REPLACEMENT OFPRESSURE PARTS.

    OPERATING PARAMETERS ARE NOW BETTER CONTROLLED ANDTEMPERATURE EXCURSIONS ARE ELEMINATED.

    BENEFITS OF RLA STUDIES IN CPP NALCO

  • 8/17/2019 Boilers RLA

    52/60

    R.S.DAS,NALCO 52

    EXPENDITURE FOR RLA STUDIES IN CPP

    NALCO

    (VALUE OF THE CONTRACTS ON BHEL)

    UNIT-1 : 20.5 LAKH

    UNIT-2 &3 : 20.5 LAKH X 2UNIT-4 &5 : 20.00 LAKH X 2

  • 8/17/2019 Boilers RLA

    53/60

    R.S.DAS,NALCO 53

    RH TUBE FAILURE IN UNIT-2

    0

    1

    2

    3

    4

    5

    6

    7

    1988-2002 2002-07

    YEAR

    NO

  • 8/17/2019 Boilers RLA

    54/60

    R.S.DAS,NALCO 54

    RH TUBE FAILURE IN UNIT-1

    0

    1

    2

    3

    4

    5

    6

    1988-2002 2002-07

    YEAR

    NO

  • 8/17/2019 Boilers RLA

    55/60

    R.S.DAS,NALCO 55

    LIFE EXTENSION MEASURES IN THE BOILERS OF NALCOCAPTIVE POWER PLANT

    1.FITMENT OF PROTECTIVE SHIELDS IN EROSION

    PRONE AREAS LIKE ECONOMISER TUBES , BENDS AND

    LOW TEMPERATURE SUPER HEATER HEADERS,SCREENTUBES,WATER WALL “S” PANEL ( TOP OF QUENCHING

    NOZZLE)

    2. FITMENT OF 6 MM SS RODS IN THE BURNER PANEL

    TUBES TO DIVERT THE SECONDARY AIR THUS

    PREVENTNG EROSION

  • 8/17/2019 Boilers RLA

    56/60

    R.S.DAS,NALCO 56

    3.GANGING OF ECONOMISER COILS TO MAKE ECO COIL

    SPACING UNIFORM.

    4.REPLACEMENT OF TUBES ON THE BASIS OF

    THICKNESS MEASUREMENT

    5. SETTING SOOTBLOWER STEAM BLOWING POSITION

    7MM MORE THAN THE DESIGNED VALUE TO MINIMISE

    STEAM EROSION

    6. REPLACEMENT OF REHEATER TUBES ON THE BASIS

    OF VISUAL INSPECTION OF “FIRE SIDE” OXIDE SCALES

    AND THICKNESS CHECKING OVER A LONGER SPAN OF

    THE TUBES(NEAR TO THE ROOF)

    7. METAL SPRAYING(TAFA) WAS TRIED OVER SOME

    EROSION PRONE PRESSURE PARTS EXPERMENTALLY.

  • 8/17/2019 Boilers RLA

    57/60

    R.S.DAS,NALCO 57

    TREND OF TUBE FAILURES DUE TO ASH,SEC AIR,STEAM

    EROSION UPTO 31.3.2007

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    YEAR

       N   O

    NO OF TUBE LEAKAGES

    NO OF TUBE LEAKAGES   9 8 4 6 3 4 1 3 5 3 4 2 4 4 2

    92-93 93-94 94-95 95-96 96-97 97-98 98-99  99-

    2000

    2000-

    01

    2001-

    02

    2002-

    03

    2003-

    04

    2004-

    O5

    2005-

    06

    2006-

    07

  • 8/17/2019 Boilers RLA

    58/60

    R.S.DAS,NALCO 58

    TREND OF TUBE FAILURES IN BOILER

    0

    2

    4

    6

    8

    10

    12

    14

    16

    YEAR

       N   O

    NO OF FAILURES

    NO OF FAILURES   9 10 12 5 8 9 8 3 9 9 10 6 6 15 14 12

    91-

    92

    92-

    93

    93-

    94

    94-

    95

    95-

    96

    96-

    97

    97-

    98

    98-

    99

    99-

    2000

    2000-

    01

    2001-

    02

    2002-

    03

    2003-

    04

    2004-

    05

    2005-

    06

    2006-

    07

    `

  • 8/17/2019 Boilers RLA

    59/60

    R.S.DAS,NALCO 59

    INSIDE OXIDE SCALE THIKNESS MEASUREMENT OF

    RE HEATERS & SUPER HEATERS DURING ANNUALOVERHAULING SO THAT REPLACEMENT CAN BEDONE ON REGULAR BASIS TO REDUCE BREAK DOWN.

    INTERNAL CORROSION MAPPING OF BOILER TUBES

    METAL SPRAYING OVER EROSION PRONE AREAS

    RLA OF BOILERS WHICH HAVE RUN FOR MORE THAN

    25 YEARSMAJOR REPLACEMENT OF COILS /TUBES BASED ONRLA STUDIES

    OUR FUTURE PLANNING

  • 8/17/2019 Boilers RLA

    60/60

    R.S.DAS,NALCO 60

    Thank You