board three boneyard creek intervention
TRANSCRIPT
MATERIALITY
PATH
Stone WallProvides retention of earth along lower path.
Corten Steel ScreenProvides shading for occupants above and and a disconnect with the the street.
Concrete PathCreates a structurally sound path impervious to the rising of the creek.
Douglas Fir Timber Con-structionUsed in the post and lintel con-struction of the raised path and bridge nodes.
Lower Path
Street Level Path
Raised Path
Creek Bed