Blowout Preventer (BOP) Maintenance Schedule

for Optimal Cost and Reliability

Yang-Denis Su-Feher

PhD Student, Chemical Engineering

Mary Kay O’Connor Process Safety Center

[email protected]

Page 2: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Outline

• Motivation

• Methodology

• Results

• Conclusion

• Acknowledgement

• References

2

Page 3: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Motivation

3

Page 4: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Deepwater Horizon Blowout (2010)1,2

4

• 11 fatalities

• 17 injuries

• $40 billion loss

Page 5: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Location Incidents3,4

Macondo Prospect, USA Deepwater Horizon, 2010

Santa Barbara Channel, USA Union Oil, 1969

North Sea, UK Ocean Odyssey, 1988

North Sea, Norway

Ekofisk B, 1977

West Vanguard, 1985

Snorre A, 2004

Gullfaks C, 2010

Campos Basin, Brazil Enchova, 1984

Frade, 2011

Bay of Campeche, Mexico Ixtoc, 1979

5

Page 6: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Blowout Preventer5

6

Page 7: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Statistics of BOP failure

• 292 blowouts from 1980 to 20146

• Corrective maintenance downtime:

– Approximately 1-2 weeks per corrective maintenance7

– 2% offshore rig operational time lost8

7

Page 8: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Methodology

8

Page 9: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

9

Page 10: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Components List 19

10

Serial Number Category of Component Components

1

BOP Stack

Annular Preventer

2 LMRP Connector (LMRPC)

3 Shear Ram

4 Pipe Ram

5 Test Ram

6 Wellhead Connector

7

Surface Control System

Hydraulic Power Unit (HPU)

8 Uninterruptible Power Supply (UPS)

9 MUX Cable Reel

10 Rigid Conduit & Hotline System

11 100 HP Pumps

12 Driller Control Panel

13 Rig Manager Control Panel

14 Central Control Console (CCC)

Page 11: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Components List 29

11

Serial Number Category of Component Components

15

Subsea Control System

Subsea Engineer Panel (SEP)

16 Subsea Electronic Module (SEM)

17 Subsea Electrical Power

18 LMRP Stack Accumulators

19 Power Distribution Panel

20 Choke/Kill System

Choke/Kill (CK) Lines

21 Choke/Kill (CK) Valves (8)

Page 12: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Assumptions

• Preventative maintenance is performed before each drilling job is started, and not during jobs

• Preventative maintenance downtime is negligible compared to the time between drilling jobs

• Overall reliability of the BOP system should be kept above a minimum threshold

• Constant failure rate

• It is possible to replace components at any time in between drilling jobs

• Maintenance fully restores component reliability to a value of one

• All components will either fail or work perfectly

• Components will be replaced on time by the beginning of the next drilling job

12

Page 13: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Pareto-Optimal Multi-Objective Optimization10

13

• minimize𝑥 𝐶𝑜𝑠𝑡 𝑥

• 𝑠. 𝑡. −𝑅𝑒𝑙𝑖𝑎𝑏𝑖𝑙𝑖𝑡𝑦 ≤ 𝜖

• 𝑔 𝑥 ≤ 0

• ℎ 𝑥 = 0

Page 14: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Results

14

Page 15: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Test Parameters

• BARON solvers

• 32-27 inch HP systems

• 3.2 GHz quad Xeon-E3 processors and

8GB RAM running Windows 7

• Maintenance Horizon: 1 year

– Mean computation time: 2.61 Hours

• Drilling jobs take 61 days

15

Page 16: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Maintenance Schedules

16

Page 17: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Sr No. Job 2 Job 3 Job 4 Job 5 Job 6 Job 7

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

17

Rlow=0.600

Page 18: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

18

Rlow=0.700

Sr No. Job 2 Job 3 Job 4 Job 5 Job 6 Job 7

1

2

3

4

5

6

7

8

9

10

11 1

12

13 1

14

15 1

16

17

18

19

20

21

Page 19: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

19

Rlow=0.800

Sr No. Job 2 Job 3 Job 4 Job 5 Job 6 Job 7

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

Page 20: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

20

Rlow=0.900

Sr No. Job 2 Job 3 Job 4 Job 5 Job 6 Job 7

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

Page 21: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

21

Rlow=0.950

Sr No. Job 2 Job 3 Job 4 Job 5 Job 6 Job 7

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

Page 22: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

22

Rlow=0.980

Sr No. Job 2 Job 3 Job 4 Job 5 Job 6 Job 7

1 1 1 1 1 1 1

2 1 1 1

3 1 1 1 1 1 1

4 1 1 1 1 1 1

5 1 1 1 1 1 1

6 1 1 1

7 1 1 1 1 1 1

8

9 1 1 1 1 1 1

10

11 1 1 1 1 1 1

12 1 1 1

13 1 1 1 1 1 1

14 1 1 1 1 1 1

15 1 1 1 1 1 1

16 1 1 1 1 1 1

17

18 1 1 1

19 1 1 1

20 1 1 1 1 1 1

21 1 1 1 1 1 1

Page 23: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Findings

23

Page 24: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Model Reduction

• From 𝑹𝒍𝒐𝒘 = 𝟎. 𝟔𝟎𝟎 to 𝑹𝒍𝒐𝒘 = 𝟎. 𝟗𝟗𝟎:

– UPS (8), rigid conduit & hotline system (10),

and subsea electrical power (17) components

were never maintained in this one-year period

– Except at 𝑹𝒍𝒐𝒘 = 𝟎. 𝟗𝟔𝟎, the LMRP stack

accumulators (18) were never maintained

24

Page 25: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Model Reduction

• From 𝑹𝒍𝒐𝒘 = 𝟎. 𝟔𝟎𝟎 to 𝑹𝒍𝒐𝒘 = 𝟎. 𝟗𝟗𝟎: – Choke/kill valves (21) were maintained for every

time step

• From 𝑹𝒍𝒐𝒘 = 𝟎. 𝟖𝟓𝟎 to 𝑹𝒍𝒐𝒘 = 𝟎. 𝟗𝟗𝟎: – Choke/kill lines (20) were maintained for every

time step

• From 𝑹𝒍𝒐𝒘 = 𝟎. 𝟗𝟐𝟎 to 𝑹𝒍𝒐𝒘 = 𝟎. 𝟗𝟗𝟎: – 100 HP pumps (11), rig manager control panel

(13), and CCC (14) were maintained for every time step

25

Page 26: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Trends

• Hydraulic components were maintained

more than electric components

• Although subsea control elements are the

most likely to cause incidents1, they are

not maintained as often because of the

high associated cost

26

Page 27: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Reliability vs Time

27

Page 28: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

28

Rlow=0.600

Page 29: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

29

Rlow=0.980

Page 30: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Cost vs Minimum Reliability

30

Page 31: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

With a given budget, you can choose your

desired reliability

31

Page 32: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Incremental Cost for Risk-Efficient Decision

Making

32

Page 33: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Conclusions

• An optimization formulation has been developed for BOP maintenance scheduling that can: – Minimize overall maintenance cost

– Maintain reliability above a required threshold

– Generate maintenance schedules that prioritize components that are cost-efficient to maintain

– Allow decision-makers to determine the optimal maintenance schedule based on the cost and the minimum reliability.

– Allow decision-makers to determine the cost-effectiveness of changing minimum reliability.

33

Page 34: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Acknowledgements

• Nilesh Ade

• Dr. Mannan

• Dr. Koirala

• Dr. Liu

• Dr. Rogers

• Captain James Pettigrew

• Leon Schwartz

• Ms. Valerie Green

• Alanna Scheinerman

• All members of the MKOPSC

• All members of the OESI Advisory Committee

34

Page 35: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

References

35

1) American Bureau of Shipping and ABSG Consulting Inc. , 2013. Blowout preventer reliability, availability

and maintainability analysis for Bureau of safety and environmental enforcement, s.l.: s.n.

2) J. Witthaus, "https://www.bizjournals.com/houston/morning_call/2016/07/bp-estimates-total-cost-of-

deepwater-horizon.html," BP estimates total cost of Deepwater Horizon disaster at $61.6B, 15 July 2015.

3) J. Vinnem and J. Erik, Offshore Risk Assessment, 3rd ed., Springer, 2014.

4) Arnold & Ipkin LLP, "Major Offshore Accidents of the 20th and 21st Century," 2017. [Online]. Available:

http://www.oilrigexplosionattorneys.com/Oil-Rig-Explosions/History-of-Offshore-Accidents.aspx.

[Accessed 23 July 2017].

5) R. Almeida, "BOP Blowout! $4.5 Billion Surge in Orders for 400-Ton Subsea Failsafe," gCaptain, 10

August 2012. [Online]. Available: http://gcaptain.com/blowout-4-5-billion-surge-orders/. [Accessed 2017

July 21].

6) SINTEF, SINTEF Offshore Blowout Database, 2013.

7) E. Draegebo, "Reliability Analysis of Blowout Preventer," Norwegian University of Science and

Technology, Department of Marine Technology, Trondheim, 2014.

8) Holand, "Reliability of Subsea BOP Systems for Deepwater Application & Fault tree analysis," SINTEF,

Trondheim, 1997.

9) American Bureau of Shipping and ABSG Consulting Inc., 2013. BLOWOUT PREVENTER (BOP)

FAILURE EVENT AND MAINTENANCE, INSPECTION AND TEST (MIT) DATA ANALYSIS FOR THE

BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT (BSEE), s.l.: Bureau of Safety and

Environmental Enforcement.

10) "What Is Multiobjective Optimization?," Mathworks, 2017. [Online]. Available:

https://www.mathworks.com/help/gads/what-is-multiobjective-optimization.html. [Accessed 20 July 2017].

Page 36: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

36

Questions?

Comments? [email protected]

Page 37: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Backup Slides

37

Page 38: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Objective Function

minimize𝑅 𝑐𝑜𝑠𝑡 = 𝑐𝑖,𝑡 ∗ 𝑥𝑖,𝑡 ∗ 𝑚𝑖

𝑛

𝑖=1

𝑇

𝑡=1

𝑐𝑖,𝑡: Cost of maintenance for component i at time t ($)

xi,t: Binary variable used to determine which, if any, component i is maintained at time t

i: Index of component

t: Time step (days)

𝑚𝑖: Number of parallel components of component i

38

Page 39: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Reliability at each Time Step

𝑅𝑖,𝑡 ≤ 𝑒− 𝜆𝑖𝑅𝑖,𝑡−1 + 𝑥𝑖,𝑡𝑀 ∀ 𝑖, 𝑡

𝑅𝑖,𝑡 ≥ 𝑒−𝜆𝑖𝑅𝑖,𝑡−1 − 𝑥𝑖,𝑡𝑀 ∀ 𝑖, 𝑡

𝑅𝑖,𝑡 ≤ 1 + 1 − 𝑥𝑖,𝑡 𝑀 ∀ 𝑖, 𝑡

𝑅𝑖,𝑡 ≥ 1 − 1 − 𝑥𝑖,𝑡 𝑀 ∀ 𝑖, 𝑡

39

𝑅𝑖,𝑡: Reliability of component, i, at time t

𝜆𝑖: Failure rate of component i xi,t: Binary variable used to determine which, if any,

component i is maintained at time t M: Big M formulation constant; M = 1

Page 40: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Reliability of Parallel Components

𝑅𝑝,𝑖,𝑡 = 1 − 1 − 𝑅𝑖,𝑡𝑚𝑖 ∀ 𝑖, 𝑡

𝑚𝑖: Number of parallel components of

component i

Rp,i,t: Reliability of parallel subsystem of

component i at time t

𝑅𝑖,𝑡: Reliability of component, i, at time t

40

Page 41: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Reliability of BOP Stack (Series)

𝑅𝑠,𝑡 = 𝑅𝑝,𝑖,𝑡

𝑛

𝑖=1

∀ 𝑡

Rp,i,t: Reliability of parallel subsystem of

component i at time t

Rs,t: Reliability of BOP system at time t

41

Page 42: Blowout Preventer (BOP) Maintenance Schedule for …oesi.tamu.edu/wp-content/uploads/2017/07/Denis_OESI_7.25.2017.pdfBlowout Preventer (BOP) Maintenance Schedule for Optimal Cost and

Reliability Constraint

𝑅𝑙𝑜𝑤 ≤ 𝑅𝑠,𝑡 ≤ 1 ∀ 𝑖, 𝑡

0 ≤ 𝑅𝑖,𝑡 ≤ 1 ∀ 𝑖, 𝑡

Rlow: Minimum reliability threshold of BOP

system (epsilon constraint)

𝑅𝑖,𝑡: Reliability of component, i, at time t

42