Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte Ltd Strike Electrical Engineering Pte Ltd Key Features Prototype Unit Plans with Coordination among different disciplines Ptototype Assembles for Prefabricated Bathroom Units (PBU) Virtual Design and Construction Metric Intelligent BIM Content and Custom Application Programming Interface (API) Simulation Studies Underground Services Coordination Block Level Services Coordination Weekly Integrated Concurrent Engineering (ICE) Sessions Integrated and Coordinated Model

Upload: others

Post on 04-Aug-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Blossom Spring @ Yishun Platinum

Housing & Development Board

Surbana Jurong Consultants Pte Ltd

Straits Construction Pte Ltd

Sin Hong Yong Pte Ltd

Strike Electrical Engineering Pte Ltd

Key Features

Prototype Unit Plans with

Coordination among different

disciplines

Ptototype Assembles for

Prefabricated Bathroom Units (PBU)

Virtual Design and Construction

Metric

Intelligent BIM Content and Custom

Application Programming Interface

(API)

Simulation Studies

Underground Services Coordination

Block Level Services Coordination

Weekly Integrated Concurrent

Engineering (ICE) Sessions

Integrated and Coordinated Model

Page 2: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Changi General Hospital Medical Centre Platinum MOH Holdings Pte Ltd

RDC Architects Pte Ltd

Parsons Brinckerhoff Pte Ltd

Kimly-Shimizu Joint Venture

Ngee Cheng Electric Co (Pte) Ltd

L & K Engineering Co. Ltd.

Deluge Fire Protection (S.E.A.) Pte. Ltd.

Fattheng Construction Pte. Ltd.

Hexamine Sdn Bhd (Singapore Branch)

Son Heng Interiors Pte Ltd

Fujitec Singapore Corporation Ltd

Stream Environment (S) Pte. Ltd.

Hetat Pte Ltd

LHL International Pte Ltd

Fast Flow Singapopre Pte Ltd

Ecogen Asia Pacific Pte ltd

Key Features

Design Options Studies with BIM

Massing Models

6D Sustainability and Analysis

Virtual Design and Construction

Integrated and Coordinated Model

2D + 3D, 4D, 5D, 6D Simulation

Studies

Construction Documentation with

BIM

Weekly Integrated Concurrent

Engineering (ICE) Sessions

Complex Integration the new and

existing building

Monitoring

Page 3: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Gospel Light Christian Church Platinum

Gospel Light Christian Church

LAUD Architects Pte Ltd

LSW Consulting Engineers Pte Ltd

PTP Engineers Pte Ltd

Hong Kiat Construction Pte Ltd

Key Features

Site Planning and Studies with BIM

Model

Luffing Crane Simulation

Clash detection to avoid reworks

Underground excavation and

services studies with BIM approach

Construction documentation with

BIM

Integrated services with upfront

collaboration

Improved Communication

Reduced 30% manpower

Improved Productivity

Page 4: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Commonwealth Towers GoldPlus

Wealthall Development Pte Ltd

Kimly Construction Pte Ltd

DLE M&E Pte. Ltd.

Nan Fang Co. (Pte) Ltd

Key Features

Integrated Concurrent Engineering

(ICE) Sessions

Visualisation and Quantity Take off

BIM approach for Tender and

Construction Stages

Clash Detection

Reduced RFIs (Request for

Information) during Construction

Stage to avoid reworks

Site Planning and Studies with BIM

Models

Detail Construction Documentation

with BIM platform

Theory of Constraint (TOC)

application together with BIM

approach

Strategized BIM Process

Management at different levels

Page 5: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Corals at Keppel Bay Keppel Land International Ltd

DCA Architects Pte Ltd

TYLin International Pte Ltd

Woh Hup (Private) Limited

Jangho Group Co., Ltd (Singapore Branch)

Key Features

Large Scale, Complex Residential

Development

Productivity gain with reduced man

hours on construction drawings

production

Collaborative Work Process at

Design and Construction Stages

Temporary works and Construction

Schedule with BIM for costing and

Sequence Planning

Computational Design with Visual

Programming Approach

Panel Modulation and Labelling for

Pre-fabrication

Multi-Disciplinary Technical

Coordination with BIM Approach

Digital Mock-up with the use of

Smart-Board for Virtual Visits

Coordination for more than 17,000

Different Glass Panels and 81,000

Different Aluminum Panels

GoldPlus

Page 6: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

GoldPlus

HSBC Institutional Trust Services (Singapore)

Limited as Trustee of Mapletree Logistic Trust

3HP Architeects Pte Ltd

BECA Cater Hollings & Ferner (S.E. Asia) Pte Ltd

Lum Chang Building Contractors Pte Ltd

Key Features

Strategized BIM Process

Management at different levels

Strategized BIM Project Delivery

with BIM approach

BIM for Construction Documentation

Asset Data

BIM for Construction Simulation

Productivity Analysis with BIM

Integrated Concurrent Engineering

(ICE)

Data Management with COBie

BIM Quantified on Savings for Cost,

Time, Manpower and Resources

Mapletree Logistic Hub - Toh Guan

Page 7: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Gold Mapletree Industrial Trust Management Ltd

P&T Consultants Pte Ltd

LSW Consulting Engineers Pte Ltd

BECA Carter Hollings & Ferner (S.E.A) Pte Ltd

Tiong Seng Contractors Pte Ltd

Deluge Fire Protection Pte Ltd

Markpoint Engineering Pte Ltd

Kinden Corporation Singapore Branch

Steeltech Industries Pte Ltd

Key Features

Communication via BIM Platform

Documentation with BIM approach

Design Studies with BIM Models

Visualisation with BIM Models

Collaboration among Executive

Teams

Earthwork Calculation and Planning

Prefabrication

BIM Library and Templates

Multi-disciplinary Coordination

Accuracy and Productivity

Improvement

Hamptons

Page 8: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Gold Fernvale Development Pte Ltd

P&T Consultants Pte Ltd, (Archi)

P&T Consultants Pte Ltd, (C&S)

Rider Levett Bucknall LLP

United Project Consultants Pte Ltd

China Construction (SP) Dev’t Co. Pte Ltd

China Construction Realty Pte Ltd

Great Resources M&E Contractor Pte Ltd

Jin Cheng Pte Ltd

Key Features

Developer Initiated BIM adoption

BIM Coordinated Models

Linked for Architectural and

Construction BIM Models

Construction Simulations

BIM to Field and Field to BIM

Cost Monitoring with Payment

Evaluation in BIM Models

Overall Planning and Progress

Monitoring

Virtual Mockups and Virtual Visits

Virtual Design and Construction

(VDC) with Integrated Concurrent

Engineering (ICE) sessions

High Park Residences

Page 9: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Gold

CapitaLand Limited

MKPL Architects Pte Ltd

KTP Consultants Pte Ltd

Squire Mech Pte Ltd

Tiong Aik Construction Pte Ltd

Key Features

Revised Work Flow with Virtual

Design and Construction (VDC)

approach

Reduced Time with compact BIM

Processes

Visualisation and Walkthrough

Unit Virtual Mockup

Building Maintenance Simulation

Integrated Concurrent Engineering

(ICE) sessions

As-Built Management with BIM

approach

Reduced RFIs (Request for

Information)

Reduced Mandays and Reworks

Quantified Savings

Marine Blue

Page 10: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Gold

MCC Land Singapore Pte Ltd

AGA Architects Pte Ltd

Group8asia Singapore Pte Ltd

KTP Consultant Pte Ltd

United Project Consultants Pte Ltd

China Jingye Engineering Corp Ltd

Key Features

BIM Project Workflow

Data Exchange Platform

Issue Management Platform

Architectural BIM Model Extent

Structural BIM Model Extent

MEP BIM Model Extent

Virtual Design & Construction (VDC)

Site and Progress Management with

BIM approach

Quantified Outcome and Output

The Alps Residences

Page 11: Blossom Spring @ Yishun Platinum · Blossom Spring @ Yishun Platinum Housing & Development Board Surbana Jurong Consultants Pte Ltd Straits Construction Pte Ltd Sin Hong Yong Pte

Gold

Housing & Development Board

P&T Consultants Pte Ltd

Rankine & Hill (S) Pte Ltd

Teambuild Engineering & Construction Pte Ltd

Integrated Precast Solutions Pte Ltd

Key Features

Process Management

Design with BIM approach

Cost Monitoring with BIM approach

Construction Documentation with

BIM

Parametric Modelling

Centralized Collaboration Platform

Site Planning and Construction

Sequencing with BIM

Prefabrication

Site Coordination with BIM

Augmented Reality

Prefabricated Volumetric

Construction (PVC) with BIM

Quantified Output and Productivity

Gain

West-Terra @ Bukit Batok