BIM – IPD SYMPOSIUM Breakout Session on Permitting & Inspection
Process Support of BIM-IPD Service
James N. Bartl, AIA
Director of Code Enforcement
Mecklenburg County Government
704-336-3827
AIA – CHARLOTTE & UNCC SOA
Consolidated Authority Data
2
Current Staff Level • 165 Full Time Employees
Annual Workload • 75,000 permits/year • 200,000 inspections/year • 350,000 customer service events
3
CONTRACTOR PASS RATES
Contractor Pass Rate
AE Pass Rate
Mecklenburg Technology
Development Timeline
4
Electronic Plan Submittal – Electronic Plan Review (EPS-EPR)
Five Year Development Strategy
5
6
28,550 sq. ft one story
emergency department pavilion with new parking deck bay above the emergency department
‘B’ occupancy for emergency department and ‘S-2’ for parking garage
Construction type II-A; fully sprinklered
Schedule: Early site work commenced; foundation work start in February
CMC – MORROCROFT PAVILION
7
CMC – MORROCROFT PAVILION
8
79,471 sq. ft.
behavioral health facility, two story slab on grade; 66 beds plus outpatient component and supporting food service
‘I-2’ occupancy; construction type I-B; fully sprinklered
Schedule: site clearing and construction to start by the end of February
CMC – BEHAVIORAL HEALTH IN
DAVIDSON
9
CMC – BEHAVIORAL HEALTH IN
DAVIDSON
Construction vs. Manufacturing Productivity
10
Growth in the use of BIM
11
12
12
13
13
14
14
16
Current Org. Chart
Team Based
Org. Chart
17
Team based service delivery on the commercial side with earlier involvement of plan review and inspections.
Changes in Commercial Construction Delivery
18
19
• Joint submittal by City of Raleigh & Mecklenburg
• Six months of work by 19 person stakeholders group
• Group Focus • Find a simple process fix • Emphasis on code compliant end product
• Approved by the BCC on August 22, 2011
BIM-IDP Administrative Code Change
Proposal to NC Building Code Council
20
BIM-IDP Administrative Code Change
Proposal to NC Building Code Council
• Identified BIM-IPD as different service delivery method • Specific definitions for BIM and IPD • Provides option to conventional dbb permitting process, using a
three step process • Emphasis on voluntary option • Commentary specifics
• AHJ to work collaboratively on the project • Applies to projects with 3d modeling & collaborative delivery
21
TEAM PLAN REVIEW (TPR)
As process off spring of…
Subject to approval by Code Enforcement Directors Now available on BIM-IPD Projects
22
How Team Plan Review Works
• Owner e-mails interest to management /Directors
• Preliminary meeting, with specific goals of: a) Agreement TPR benefits project b) Agreement field inspector can manage the work or get
backup c) Rough estimate of hours required and cost d) Letter of understanding signed by the owner and
Department.
• If go ahead, owners team uses Inspection by Appointment (IBA) to schedule inspectors time.
23
AIA – CHARLOTTE & UNCC SOA
BIM – IPD SYMPOSIUM
Breakout Session on Permitting & Inspection
Process Support of BIM-IPD Service