Presentation #4: Proposal Penn State Ice Hockey Arena The Pennsylvania State University FACADE HPR INTEGRATED DESIGN Jeremy Heilman CONSTRUCTION Josh Progar STRUCTURAL Nico Pugliese LIGHTING/ELECTRICAL James Rodgers MECHANICAL HPR Integrated Design combines innovative, cutting edge concepts with a collaborative multi-disciplinary approach through the utilization of state-of-the-art BIM technologies to exceed owner expectations both in system efficiencies and the enrichment of the human experience within its aesthetic. Mission Statement:

Upload: josh-progar

Post on 02-Dec-2014

415 views

Category:

Technology


2 download

DESCRIPTION

This is HPR Integrated Design's BIM/IPD Senior Thesis Proposal Presentation.

TRANSCRIPT

Page 1: HPR Integrated Design - BIM/IPD Proposal Presentation

Presentation #4:Proposal

Penn State Ice Hockey ArenaThe Pennsylvania State University

FACADE

HPR INTEGRATED DESIGNJeremy HeilmanCONSTRUCTION

Josh ProgarSTRUCTURAL

Nico Pugliese

LIGHTING/ELECTRICAL

James RodgersMECHANICAL

HPR Integrated Design combines innovative, cutting edge concepts with a collaborative multi-disciplinary approach through the utilization of

state-of-the-art BIM technologies to exceed owner expectations both in system efficiencies and the enrichment of the human experience within

its aesthetic.

Mission Statement:

Page 2: HPR Integrated Design - BIM/IPD Proposal Presentation
Page 3: HPR Integrated Design - BIM/IPD Proposal Presentation

BIM Uses & Process

Page 4: HPR Integrated Design - BIM/IPD Proposal Presentation

BIM PROCESS

Daylighting

Electrical COORDINATED BIM MODEL

Page 5: HPR Integrated Design - BIM/IPD Proposal Presentation

Redesign Focuses

Page 6: HPR Integrated Design - BIM/IPD Proposal Presentation

Team & Individual Focus Schedules

Page 7: HPR Integrated Design - BIM/IPD Proposal Presentation

Team Schedule

KEY MILESTONES:

January 27th, 2012: Initial Architectural Modeling Completed

February 13th, 2012: Air Handler Relocation & Event Level Design Completed

March 2nd, 2012: Cost, Schedule & LEED Analysis Baselines Completed

March 22nd, 2012: All Redesign Focuses Completed.

April 4th, 2012: Final Report Submission

April 9th, 2012: Final Presentation

Page 8: HPR Integrated Design - BIM/IPD Proposal Presentation

AIR HANDLER RELOCATION & EVENT LEVEL REDESIGN

MAIN ARENA ROOF SYSTEMS FAÇADE REDESIGN

Redesign Focus Schedules

Page 9: HPR Integrated Design - BIM/IPD Proposal Presentation

Scheduled Timeline

Page 10: HPR Integrated Design - BIM/IPD Proposal Presentation

Friday, January 27th, 2012

MILESTONE: Architectural Modeling Completed

Team Schedule

Design Authoring, Structural AnalysisTwo Way Flooring Redesign & Arena Roof Modeling

Event Level Daylighting & Electrical Load Calculations

Event Level Load Calcs, AHU & Ductwork Sizing

Existing Conditions Estimate & Scheduling Analysis

Design Authoring, Lighting Analysis

Design Authoring, Mechanical Analysis

Cost Estimation, 4D Modeling

Air Handler Relocation

Arena Roof

Facade

SO

FTW

AR

E

MA

JOR

BIM

USE(S

)

Progress

Page 11: HPR Integrated Design - BIM/IPD Proposal Presentation

Tuesday, February 13th, 2012

MILESTONE: Air Handler Relocation Completed

Team Schedule

Structural AnalysisGravity Column Redesign & Long Span Truss Design

Façade Daylighting Controls & Finalize Event Lvl. Design

Finalize Event Level Designs & AHU Relocations

LEED Analysis & Crane Placement Study

Design Authoring, Lighting Analysis

Design Authoring, Mechanical Analysis

Site Utilization, LEED Analysis

Air Handler Relocation

Arena Roof

Facade

SO

FTW

AR

E

MA

JOR

BIM

USE(S

)

Progress

Page 12: HPR Integrated Design - BIM/IPD Proposal Presentation

Friday, March 2nd, 2012

MILESTONE: Cost, Schedule & LEED Baselines

Team Schedule

Design Authoring, Structural Analysis, 3D CoordinationLong Span Truss Design & Façade Glazing Analysis

Arena Lighting Layout & Finalize Electrical Redesign

Main Arena Mechanical Design & Coordination

Update Cost, Schedule & Perform Clash Detection

Design Authoring, Lighting Analysis

Design Authoring, Mechanical Analysis, 3D Coordination3D Coordination, Cost Estimation, 4D Modeling

Air Handler Relocation

Arena Roof

Facade

SO

FTW

AR

E

MA

JOR

BIM

USE(S

)

Progress

Page 13: HPR Integrated Design - BIM/IPD Proposal Presentation

Thursday, March 22nd, 2012

MILESTONE: Redesign Focuses Completed

Team Schedule

Structural Analysis, 3D CoordinationColumn Analysis & Façade Analysis/Redesign

Finalize Arena Lighting Design & Façade Redesign

Main Arena Mechanical & Life Safety Designs

Finalize Cost Estimates, Schedule & LEED Analysis

Design Authoring, Lighting Analysis

Design Authoring, Mechanical Analysis, 3D Coordination3D Coordination, Cost Estimation, 4D Modeling

Air Handler Relocation

Arena Roof

Facade

SO

FTW

AR

E

MA

JOR

BIM

USE(S

)

Progress

Page 14: HPR Integrated Design - BIM/IPD Proposal Presentation

Wednesday, April 4th, 2012

MILESTONE: Final Report Submission

Team Schedule

None.Finalize Final Report

Finalize Final Report

Finalize Final Report

Finalize Final Report

None.

None.

None.

Air Handler Relocation

Arena Roof

Facade

SO

FTW

AR

E

MA

JOR

BIM

USE(S

)

Progress

Page 15: HPR Integrated Design - BIM/IPD Proposal Presentation

Monday, April 9th, 2012

MILESTONE: Final Presentation

Team Schedule

None.Finalize & Practice Final Presentation

Finalize & Practice Final Presentation

Finalize & Practice Final Presentation

Finalize & Practice Final Presentation

None.

None.

None.

Air Handler Relocation

Arena Roof

Facade

SO

FTW

AR

E

MA

JOR

BIM

USE(S

)

Progress