big iron consulting life cycle costing services

12
Big Iron Consulting Pty Ltd LIFE CYCLE COSTING SERVICES +61 8 8121 4368 www.big-iron.com.au

Upload: stuart-burckhardt

Post on 14-Aug-2015

48 views

Category:

Business


0 download

TRANSCRIPT

Big Iron Consulting Pty LtdLIFE CYCLE COSTING SERVICES

+61 8 8121 4368

www.big-iron.com.au

big-iron.com.au

Introduction

Big Iron Consulting brings substantial Life Cycle Costing experience to projects.

We have worked on costing projects with many of the worlds leading mining and mining related companies including Anglo American, BHP Billiton, Caterpillar, Downer EDI Mining, Glencore, Kinross, Newmont, Rio Tinto and Xstrata.

We have a substantial and relevant Body of Knowledge that will quickly delivery results for your asset costing project.

big-iron.com.au

Why Big Iron Consulting?

Specialised ‘AMT’ Life Cycle Costing software from iSolutions

Structured process to develop risk adjusted life cycle cost models

Comprehensive mining cost benchmarking database for reference and validation

Qualified asset management personnel with mining industry experience

big-iron.com.au

Life Cycle Costing Software

Big Iron uses iSolutions AMT life cycle costing software to develop life cycle cost models and budgets

• Developed for mining and construction assets

• Life cycle models from maintenance strategies

• Scenario and sensitivity analysis

• 100+ packaged industry standard reports

• Cloud based software, access from anywhere

• For more information visit www.isipl.com

big-iron.com.au

Proven Methodology

Big Iron has a proven methodology for developing life cycle cost models

• Mature process for developing life cycle models from maintenance strategies

• Incorporate contextual risk using a structured risk review and benchmarking process

• Output as Gross Cost, NPV Cost, Cost per tonne, Discounted cost per tonne, Equivalent Unit Cost (ECU)

big-iron.com.au

Cost Benchmarking

Big Iron has developed a comprehensive cost database for mobile mining equipment and process plant

• Our benchmarking database covers mobile equipment, process plant, infrastructure and support assets

• Cost models are updated and benchmarked with latest cost data quarterly

• Different duty cycles, operating environments and risk profiles are considered

big-iron.com.au

Subject Matter Experts

Big Iron’s people are from the mining industry and have held senior roles with OEMs, mining companies and mining contractors

• Network of consultants with mining asset management experience

• Executed projects for Anglo American, BHP Billiton, Glencore, Peabody, Kinross, Newcrest, Newmont, Xstrata Copper

• ISO55000 certified assessors and auditors through World Partners in Asset Management

big-iron.com.au

Case Study: BHP ODX Mine

One of the largest feasibility projects in the world used Eskko life cycle costing methodologies to model costing scenarios for the mines assets

CUSTOMER PROFILE

BHP Billiton is the world’s largest diversified resource company. BHP Billiton undertook a feasibility study into the possible expansion of Olympic Dam Copper/Uranium mine in Northern South Australia.

PROJECT OVERVIEW

Being the largest projects of its type in the world meant that the risks involved in equipment selection and cost estimation are high. A small variance in input costs can make a large absolute dollar difference to the overall project cost.

Expertise and systems were provided to build detailed life cycle models of the equipment. iSolutions AMT Modelling and Budgeting Tool was used to build the models and the base manufacturer data was validated against the cost and performance of existing BHP Billiton equipment.

Many scenarios were run to model the risks identified by the project team and provide a complete estimate of the maintenance department budget and resources.

big-iron.com.au

Case Study: Tritton Copper

In an Uncertain Copper Market, Tritton Needed to Accurately Understand Future Mine Costs

CUSTOMER PROFILE

Tritton Copper Mine is an underground mine in New South Wales owned and operated by Straits Resources. Ore is hauled from 900m vertical below surface by diesel truck. The ore is processed in a mill and paste plant and further refined in a cementation plant.

PROJECT OVERVIEW

Big Iron developed a full mine maintenance budget covering mobile plant, mine infrastructure and processing facilities. Tritton’s two process plants, 148 items of mobile equipment as well as mine infrastructure were included in the budget. The complete budget was developed from first principles in only 5 days.

Big Iron used pre-built life cycle models and cost structures to greatly speed up the development of the budget.

iSolutions AMT budgeting software was used to build and store the budget. AMT also allowed the budget to be tracked against actual costs during the year.

big-iron.com.au

Case Study: Wilpinjong Mine

As a Low Cost Producer, Wilpinjong Needs to Continually Understand the Cost of Running Mining Equipment

CUSTOMER PROFILE

Peabody Energy‘s Wilpinjong Mine near Mudgee in NSW is a low cost producer of high quality thermal coal. The mine produces approximately 12.5mt of thermal coal per annum for local and export markets.

PROJECT OVERVIEW

Wilpinjong had used an earthmoving contractor to mine for a number of years. In 2013 they decided to purchase their own equipment and do the mining themselves.

We used AMT life cycle cost modelling software to build detailed life cycle cost models for each type of equipment on site.

The dynamic life cycle cost models (updated monthly from SAP work orders) allow Wilpinjong to see how they are performing against their cost assumptions and make changes to the maintenance strategy as required to achieve the lowest cost per tonne and optimal availability.

big-iron.com.au

Clients

Ahafo Gold MineNewmont Gold CorpGhana

Akyem Gold MineNewmont Gold CorpGhana

Boddington Gold MineNewmont Gold CorpAustralia

Cadia Hill Gold Mine Newcrest MiningAustralia

Carrington Coal MineBHP BillitonAustralia

Cerro Corona Gold MineGoldfieldsPeru

Christmas Creek MineFortescueAustralia

Conga Gold ProjectNewmont Gold CorpPeru

El SolderoAnglo American SurChile

Jack Hills Iron Ore MineCrosslands ResourcesAustralia

Las Bambas CopperXstrata CopperPeru

Los Bronces CopperAnglo American SurChile

Mt Arthur CoalBHP BillitonAustralia

Olympic Dam Expansion BHP BillitonAustralia

Prodeco Copper MineGlencoreColombia

Tasiast Gold MineKinross GoldMauritania

Telfer Gold Mine Newcrest MiningAustralia

Tritton Copper MineStraits ResourcesAustralia

Valedero Gold MineBarrick GoldArgentina

Wilpinjong Coal MinePeabody EnergyAustralia

Yanacocha Gold MineNewmont Gold CorpPeru

Zamin Iron Ore MineAnglo AmercianBrazil

big-iron.com.au

Contacts

STUART BURCKHARDT

MANAGING DIRECTOR

[email protected]

+61 8 8121 4368

www.big-iron.com.au