BIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation Mode 1 Madhya Pradesh Gwalior Jhansi 83 419 EPC 2 Madhya Pradesh Gwalior Shivpuri (Mohana Town Portion) 4 23 EPC 3 Madhya Pradesh Simariya Tekari - Haripur Tiraha - Jaunsi Mandir Approach Road 10 67 EPC 4 Madhya Pradesh Churhat Bypass of Rewa Sidhi Section 15 621 HAM 5 Madhya Pradesh Bamitha-Khajuraho 10 102 EPC 6 Madhya Pradesh Kannod to Ashta Section of SH-41 from km. 0.000 to km. 48.860 48.86 703.07 HAM 7 Madhya Pradesh Indore Harda section of NH- 59A (New NH-47) 47.95 699.05 HAM 8 Madhya Pradesh Harda - Betul (Pkg-III) from km 81.00 to km 121.24 Section of NH-47 40 717.64 HAM 9 Madhya Pradesh Sagar Banda Chhatarpur Kabrai from km 8.00 to Mohari km 50.300 pkg-I section of NH-934 42.3 608.78 HAM 10 Madhya Pradesh Indore -Edlabad upto Maharashtra Border section of SH-27 58 652.24 HAM 11 Madhya Pradesh Ujjain to Badnawar Section of SH-18 46.9 693.26 HAM 12 Rajasthan Gagaria-Baori-Kalan-Serwa- Sata-Bakhasar & Sata to Gandhav 197 903 EPC 13 Rajasthan Jaisalmer Bhadasar-Ramgarh- Tanot and Badhasar- Sarkaritala 194 742 EPC 14 Rajasthan Raisinghnagar - Poogal (Pkg II) 162 717 EPC 15 Rajasthan Khajuwala-Poogal Section and Poogal-Dantour -Jaggasar- Gokul- Goddu-Ranjeetpura- Charanwala-Naukh-Bap section of NH-911 217 857 HAM 16 Rajasthan Munabao (NH-25E)-Tanot from Km 0.000 to 46.000 and Km 82.600 to 310.467 273.87 1158.35 HAM

Upload: buidang

Post on 18-May-2018

239 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

BIDS INVITED

Sr State Project Stretch Length

(km) Cost (Rs

crs) Implementation

Mode

1 Madhya Pradesh

Gwalior Jhansi 83 419 EPC

2 Madhya Pradesh

Gwalior Shivpuri (Mohana Town Portion)

4 23 EPC

3 Madhya Pradesh

Simariya Tekari - Haripur Tiraha - Jaunsi Mandir Approach Road

10 67 EPC

4 Madhya Pradesh

Churhat Bypass of Rewa Sidhi Section

15 621 HAM

5 Madhya Pradesh

Bamitha-Khajuraho 10 102 EPC

6 Madhya Pradesh

Kannod to Ashta Section of SH-41 from km. 0.000 to km. 48.860

48.86 703.07 HAM

7 Madhya Pradesh

Indore Harda section of NH-59A (New NH-47)

47.95 699.05 HAM

8 Madhya Pradesh

Harda - Betul (Pkg-III) from km 81.00 to km 121.24 Section of NH-47

40 717.64 HAM

9 Madhya Pradesh

Sagar Banda Chhatarpur Kabrai from km 8.00 to Mohari km 50.300 pkg-I section of NH-934

42.3 608.78 HAM

10 Madhya Pradesh

Indore -Edlabad upto Maharashtra Border section of SH-27

58 652.24 HAM

11 Madhya Pradesh

Ujjain to Badnawar Section of SH-18

46.9 693.26 HAM

12 Rajasthan Gagaria-Baori-Kalan-Serwa-Sata-Bakhasar & Sata to Gandhav

197 903 EPC

13 Rajasthan Jaisalmer Bhadasar-Ramgarh-Tanot and Badhasar-Sarkaritala

194 742 EPC

14 Rajasthan Raisinghnagar - Poogal (Pkg II) 162 717 EPC

15 Rajasthan Khajuwala-Poogal Section and Poogal-Dantour -Jaggasar-Gokul- Goddu-Ranjeetpura- Charanwala-Naukh-Bap section of NH-911

217 857 HAM

16 Rajasthan Munabao (NH-25E)-Tanot from Km 0.000 to 46.000 and Km 82.600 to 310.467

273.87 1158.35 HAM

Page 2: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

17 Uttar Pradesh

Varanasi Ring Road (Pkg-II) 27 1248 EPC

18 Uttar Pradesh

Aligarh-Kanpur (Pkg II): Bhadwas to Kalyanpur

45.2 868 HAM

19 Uttar Pradesh

Varanasi-Degamapur (Pkg-I) 34 1023 EPC

20 Uttar Pradesh

Behta Bypass (km 0.00 to km 32.00/31.489)

32 904 EPC

21 Uttar Pradesh

Behta-Sitapur Bypass (km 32.00/31.49 - km 64.9)

33 907 EPC

22 Uttar Pradesh

Dagamagpur to Lalganj Pkg-II 47.7 963 EPC

23 Uttar Pradesh

Aligarh – Kanpur (Pkg III) (Kalyanpur – Naviganj)

61.2 1227 HAM

24 Uttar Pradesh

Aligarh Kanpur Pkg I : Aligarh-Bhadwas

46 761 HAM

25 Uttar Pradesh

Lalganj-Hanumanha Section of NH-7 (Pkg-3)

43.4 870.87 EPC

26 Uttar Pradesh

Hapur Bypass -Moradabad including Hapur Bypass (km 50.00 - km 148.277)

100 2141 TOLL

27 Uttar Pradesh

Jagdishpur-Faizabad Section from km 47.930 to km 107.680 of NH-330A

59.75 1240.71 HAM

28 Uttar Pradesh

Meerut-Nazibabad section from Km 11.500 to Km 39.240 and from Km 86.590 to Km 112.545

54 1204.03 HAM

29 Uttar Pradesh

Aligarh-Kanpur section (Package-IV from Naviganj- Mitrasen) of NH-91

67 1947.92 HAM

30 West Bengal Farakka- Raiganj (Ganga Bridge)

5.5 517 EPC

31 West Bengal Raiganj-Dalkola km 398 - km 452.75 NH 34

49 823 EPC

32 West Bengal JH/WB Border -Purulia - Balrampur - JH/WB Border at Chandil

73 593 EPC

33 West Bengal Dhupguri- Salsalabari (Pkg IIA) [ Ghoshkpukur - Salsabari km 83.785 - km 154.85]

42 1079 EPC

34 West Bengal Talai-Teghari-Barjumla- Lalgola-Bhagwangola- Sabjikatra Section(Pkg-1)

52.2 2206.61 HAM

Sub Total : 2321.83 30207.53

Page 3: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

Sr State Project Stretch Length

(km) Cost (Rs

crs) Implementation

Mode

1 Expressway (Bangalore - Chennai)

Bangalore-Chennai Expressway from Km 0.00 to Km 26.400 (Bangalore to Malur Section)

26.4 1119.62 EPC

2 Expressway (Dwarka Exp-way)

Dwarka Expressway - Package 2 [from Road under Bridge (RuB) near Sector 21 Dwarka to Delhi/HR border (Km 5.300 To Km 9.500) ]

4 2067 EPC

3 Expressway (Dwarka Exp-way)

Dwarka Expressway Package III (from Delhi/HR Border to Start of RoB Gurugram

10 2228 EPC

4 Expressway (Dwarka Exp-way)

Dwarka Expressway Package IV (from Rail Over Bridge (ROB) to NH-8-SPR Intersection,

9 1859 EPC

5 Expressway (Dwarka Exp-way)

Dwarka Expressway from Shiv Murti Intersection of NH 8 till Rail under Bidge RuB near Dwarka Sector 21 PKG I

5 1461.82 EPC

6 Expressway (Vadodara - Mumbai)

Vadodara-Mumbai Expressway Pkg.I (Padra to Vadodara Section)

23.74 1509 HAM

7 Expressway (Vadodara - Mumbai)

Vadodara Mumbai Expressway Pkg II - Sanpa to Padra Section

32 1201 HAM

8 Expressway (Vadodara - Mumbai)

Vadodara Mumbai Expressway Pkg III (Manubar to Sanpa Section)

31 1009 HAM

9 Expressway (Vadodara - Mumbai)

Vadodara Mumbai Expressway Pkg IV (Ankleshwar to Manubar Section)

13 1227 HAM

10 Expressway (Vadodara - Mumbai)

Vadodara Mumbai Expressway Pkg V (Kim to Ankleshwar Section)

24.57 935 HAM

11 Haryana Gurgaon - Sohna Pkg I 9 689 HAM

12 Haryana Gurgaon - Sohna Pkg II - from existing km 11.682 to existing km 24.400

13 524 HAM

Page 4: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

13 Haryana Sonipat Jhajjar (Pkg II) [Rohna/Hassangarh to Jhajjar]

35.45 552 HAM

14 Haryana Sonipat-Jhajjar (Pkg I) [UP/Haryana Border to Rohna Section]

44.8 712 HAM

15 Haryana Jhajjar-Loharu Section from km 130.770 to km 228.630

98 181.78 EPC

16 Haryana Jind Karnal from Design Chainage Km 68.660 to Km 148.962

80.3 388.92 EPC

17 Haryana Bhiwani Mundal-Jind Road from Design Chainage Km 6.875 to Km 68.857 of NH-709A

61.98 268.44 EPC

18 Himachal Pradesh

Solan - Kaithlighat Section of NH-22 Now NH-5 from Km. 106.139 to Km.129.05

23 569 EPC

19 Himachal Pradesh

Pinjore Bypass Baddi-Nalagarh section in the State of Haryana/Himachal Pradesh

31 472 HAM

20 Himachal Pradesh

Pathankoat - Mandi (Pkg-I) [Punjab HP Border to Sihuni]

37.1 1082 EPC

21 Himachal Pradesh

Shimla to Mataur Section (Pkg V) [Upgradation from Jwalamukhi Bypass to Kangra Bypass up to intersection of NH 154]

39.5 968 EPC

22 J&K Srinagar bypass from Km 0.000 (Galander) to Km 42.100 (Crossing of Sumbel Road) in Srinagar

42 991 EPC

23 Port Connectivity

Six Laning of dedicated Port road to Krishnapatnam Port (Package-I) Km 0.000 to Km18.000

18 314.51 EPC

24 Port Connectivity

Chintavaram to Turpu Kanpur and Tarpu Kanpur to Port South Gate with Spur to Varagali Pkg III

21.24 484.1 EPC

25 Port Connectivity

Varagali Road from Chillakur Cross to Chintawaram Package II Km 0.000 To Km 16.450

16.45 332.87 EPC

Page 5: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

26 Port Connectivity

Six Laning of Road Connecting to NH16 at Gajuwaka to Gangavaram Port and Four laning of Road Connecting Gangavaram Port to Beach Road in Visakhapatnam

11.5 266.3 EPC

27 Port Connectivity

Road Connecting from Gangavaram Port to proposed SEZ at Atchuthapuram in Visakhapatnam

14.5 138.06 EPC

28 Port Connectivity

Belakeri Port to Kumta - Sirsi road from km 0.00 - km 4.265 of Belekeri Port Road Link Rd. & km 4.965 - km 60.00 of SH-69

58.9 370.04 EPC

29 Punjab Talwandi-Ferozepur 24 261 EPC

30 Punjab Greenfield Jalandhar Bypass From Km 0.000 (Km 11.665 Of NH-71) To Km 29.275 (Km 11.280 Of NH-70)

29.28 651 HAM

31 Punjab Khemkaran - Gurdaspur (Pkg. I) [Khemkaran to start of Amritsar Bypass]

49 196 EPC

32 Punjab Khemkaran - Gurdaspur (Pkg. II) [Ramdaspur to Gurdaspur Pkg V]

48.82 200 EPC

Sub Total : 985.53 25228.46

Sr State Project Stretch Length

(km) Cost (Rs

crs) Implementation

Mode

1 Chattisgarh Bilaspur-Pathrapalli 53.3 812 HAM

2 Gujarat Pipli Bhavnagar- Section Package 1 from km 136/025 to 169/328 Near Adhelai Village to Nari Junction

33.31 799 HAM

3 Gujarat Shamla ji to Motachilodha from km 401.200 to km 494.410

93.21 1052 HAM

4 Gujarat Dwarka (Kuranga)-Khambhaliya -Devariya Section from km 203/500 to 176/500 and from km 171/800 to km 130/000 (

66.89 929 HAM

5 Gujarat Dhrol-Bhadra -Patiya section from km 0.000 to 13.600 of SH-25 and Bhadra-Patiya- Pipaliya section from km73.000 to km24.000 of CSH-6

62.6 813 HAM

Page 6: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

6 Gujarat Bhimasar Junction of NH-41 to Anjar-Bhuj up to Airport Junction from km 0.000 to km 65.478 of NH-341

65.48 894 HAM

7 Gujarat Patan to Gojariya section from km 52.700 (Design Chainage) to km 123.700 (Design Chainage) of NH-68

71 1012.96 HAM

8 Jharkhand Gorhar to Khairatunda Section of NH-2 from Km. 320.810 to Km.360.300

39.4 704 HAM

9 Jharkhand Khairatunda to Barwa Adda Section of NH 2 from km. 360.300 to km. 400.132

40 793 HAM

10 Jharkhand Gandhigram to Hansdiha section of NH-133 from Km 50.800 to Km 95.770

45 611 EPC

11 Jharkhand Pirpaiti from Km.1.700 of NH-80 to Km.50.80 Gandhigram, Godda of NH-133

49 513 EPC

12 Jharkhand Palma Gumla Section of NH-23 from Km 26.00 to Km 89.170

63.17 690 HAM

13 Jharkhand Rudwa-Hariharganj Km. 23.284 to Km. 57.00 of NH 98

33 0 HAM

14 Odisha Balance Work of 4-Laning Puri By Pass Road of Bhubaneswar-Puri Section

11 57 EPC

15 Odisha Ichhapuram to Puintola (Km. 233.000 to Km. 284.000) of NH-5 (New NH 16)

51 824.66 HAM

16 Odisha Puintola to Tangi (km. 284.000 to km. 355.000) of NH 5 (New NH 16)

71 616.99 EPC

17 Odisha Tangi to Bhubaneshwar (km 355.0 to km 414.0) of NH 5 (New NH-16)

59 966.81 EPC

Sub Total : 907.36 12088.42

Sr State Project Stretch Length

(km) Cost (Rs

crs) Implementation

Mode

1 Andhra Pradesh

Visakhapatnam Port Road from Km.0.000 to Km.12.700

12.7 393 HAM

2 Andhra Pradesh

Giddalur-Vinukonda section of NH-544D from Design km 212.983 to Design km 322.800

112.8 565 HAM

Page 7: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

3 Andhra Pradesh

Anandapuram Pendurthi Anakapalli section of NH-5 new NH-16

50.78 1959 HAM

4 Andhra Pradesh

Bugga to Kaipa section of NH 544D

57.4 859 EPC

5 Andhra Pradesh

Gundugolanu Devarapalli Kovvuru section of NH-16

69.88 1533 HAM

6 Andhra Pradesh

Anantapur-Giddalur (Pkg. IV) [Kaipa to Giddalur]

78 697 EPC

7 Andhra Pradesh

Atmakur to Dornala 58.95 226 EPC

8 Andhra Pradesh

Chittor (Design Km 0.000-Existing Km 158.000 of NH-4) to Mallavaram (Design Km 61.128-Existing Km 41.800 of NH-140)

66 1536.47 HAM

9 Bihar Majhauli to Charout 64 496 EPC

10 Bihar 2ND FLYOVER (LCW) PARALLEL TO EXISTING FLYOVER IN KISHANGANJ TOWN

3.18 146 EPC

11 Telengana Repallewada - Telengana/MH Border

53 829 EPC

12 Telengana Sangareedy - Nanded - Akola (Pkg-I) [From Kandi to Ramsanpalle]

40 858 EPC

13 Telengana Mangloor to Telangana Maharashtra Border

49 803 HAM

14 Telengana Mancherial-Repallewada 42 1009 HAM

15 Telengana Sangareddy - Nanded (Pkg. II) Ramsanpalle to Mangloor

47 951 HAM

16 Telengana Kodad - Khammam 32 839 HAM

17 Telengana Suryapet to Khammam 59.3 1224 HAM

18 Telengana Hyderabad - Maneguda 46.39 779.79 HAM

Sub Total : 942.38 15703.26

Sr State Project Stretch Length

(km) Cost (Rs

crs) Implementation

Mode

1 Karnataka Bangalore-Nidagatta (Pkg. I) 56 1984 HAM

2 Karnataka Nidagatta-Mysore (Pkg II) 61 2169 HAM

3 Karnataka Belgaum-Khanapur Pkg I (Km 0.000-Km 30.800) of NH-4A

30 897 HAM

4 Karnataka Khanapur-KN/Goa Border (Pkg II)

54 487 EPC

5 Karnataka Tumkur-Shimoga (Pkg-II) from km 65.195 (Karadi) to km 121.900 (Banawara) of NH-206

57 1083 HAM

Page 8: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

6 Karnataka Tumkur-Shimoga (Pkg-III) - from Km 121.900 (Banwara) to Km 170.415 (Bettadahalli) of NH-206

48 940 HAM

7 Karnataka Tumkur-Shimoga (Pkg-I) - from Mallasandra to Karadi village of NH-206

53 842 HAM

8 Karnataka Bellary to Byrapura Section of NH-150A from km 253.600 to km 308.550

54.89 1027.62 HAM

9 Karnataka Byrapura to Challakere Section from km 308.550 to km 358.500 of NH-150 A,

49.95 643.98 HAM

10 Karnataka Challakere to Hariyur section from km 358.500 to km 414.205 of NH-150 A

55 910 HAM

11 Karnataka Tumkur Shivamogga (Pkg IV) from Ch.170.415 km to Ch.226.750 Km,Bettadahalli Shivamogga of NH-206

56.34 1344.7 HAM

12 Kerala Kozhikode Bypass (Calicut) 28 1289 HAM

13 Kerala Chengala to Kalikadevu section of NH-17 (New NH-66) from km 57.200 (Design km 56.200) to km 104.000 (Design km 101.165)

44.19 1745 HAM

14 Kerala Thalapady to Chengala section of NH17 from km 17.200 to km 57.200

39 1688 HAM

15 Maharashtra Integrated structure at Chandni chowk Flyover

2 442 EPC

16 Maharashtra Nagpur-Wainganga - Bhandara-Nagpur Section of NH-53 Old NH-6

44.55 1053 HAM

17 Maharashtra Loha-Waranga Section of NH-361 from km 176.800 to km 244.369

68 1013 HAM

18 Maharashtra Chakur Loha Section of NH-361 from km 114.600 to km 176.800

62.2 973 HAM

19 Maharashtra Up-gradation of Old NH-6 passing through Khamgaon City

8 70.67 EPC

20 Maharashtra Flyovers in Akola City 0 176 EPC

Page 9: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

21 Maharashtra Akola City -Shivar-PKV Square-Nehru Park Square - Dakshata Nagar Square-Nimwadi Chowk -Washim Bypass -Ridhora Bypass road

0 136 EPC

22 Maharashtra Satara-Kagal (Pkg II) from km 678.500 to km 725.000

46.5 958 HAM

23 Maharashtra Ratnagiri-Kolhapur-Solapur(Pkg II) [Kerle to Paijarwadi]

37 855 HAM

24 Maharashtra Ratnagiri-Kolkapur-Solapur(Pkg III) [Pajjarwadi to Kerle and new construction of Kolhapur Bypass from Kerle to Chokak]

33 837 HAM

25 Maharashtra Ratnagiri-Kolkhapur-Solapur(Pkg I) [Mirya to Hathkambi]

48 1067 HAM

26 Maharashtra Nagpur Katol Section of NH 353J from existing ch. 2.830 to ch. 50.700

60 991 EPC

27 Maharashtra Ausa-Chakur Section of NH-361 from km 55.835 to Km 114.345

59 869 HAM

28 Maharashtra Tunnel at Khambataki Ghat Section of NH-4 and its approaches from existing Km. 771.730 to existing Km. 782.000

6 736 EPC

29 Maharashtra Satara-Kagal (Pkg I) from km 639.000 to km 678.500

39 581 HAM

30 Maharashtra Nagpur Umred Section of NH 353D (Package IA km 7/300 to km 54/385)

41 655 EPC

31 Maharashtra Lakhani Flyover 3.5 292 EPC

32 Maharashtra Mohol-Warkhi (Pkg I) on Mohol Alandi Section

45 962 EPC

33 Maharashtra Wakhri Khudus (Pkg II) on Mohol Alandi Section

33 545 EPC

34 Maharashtra Nashik - Phata to Khed (from Design chainage km. 12.190 to Km 42.127)

29.94 978 HAM

35 Maharashtra Akkalkot to Solapur from km. 99.400 to km. 138.352 of NH-150 Extn including Akkalkot Bypass

40 690 HAM

Page 10: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

36 Maharashtra Ahmednagar Bypass 44 758 HAM

37 Maharashtra Warora - Wani section of NH-930 from km 313.850 to km 332.160

18 493 EPC

38 Maharashtra Saoner - Dhapewada - Kalmeshwar - Gondkhairi section of NH-547(E) from km 4.700 to km 33.575

29 744 EPC

39 Maharashtra Sangli - Solapur (Pkg IV) [Watambare-Mangalwedha km 276.0 - km 321.6]

46 954 HAM

40 Maharashtra Sangli - Solapur (Pkg III) [Mangalwedha-Solapur km 321.6 - km 378.1]

56 1151 HAM

41 Maharashtra Alibag to Vadkhal (Package 1) from Km 0/000 to Km 14/000 and Km 16/200 to Km 21/589 of NH 166 A

19.39 990 HAM

42 Maharashtra Sangli - Solapur (Pkg I) [Sangli - Borgaon km 182.556 - km 224.00]

41 1061 HAM

43 Maharashtra Vadape to Thane from km 539.202 to km 563.000 section of NH-3 new NH-848

23.8 998 HAM

44 Maharashtra Sangli - Solapur (Pkg II) [Boregaon-Watambare]

52 1031 HAM

45 Maharashtra Sinnar-Shidi from Design Ch km 0/000 to km 50/943 (including Sinnar Bypass)

51 880 HAM

46 Maharashtra Flyovers from Old Pune Naka to Satrasta chowk till ROB at Vijayapura Road,

12 423 EPC

47 Maharashtra Akola to Medshi from Km 0.000 to Km 47.700 (Design Chainage) of NH-161 including Bypasses at Patur and Medshi

47.7 732.12 EPC

48 Maharashtra Washim to Pangare including Bypasses at Kanergaon and Hingoli

42.3 666.73 EPC

49 Maharashtra Medshi to Washim from km 47.700 to km 92.200 (Design Chainage) of NH-161 including Bypasses at Malegaon and Washim

44.5 799.77 EPC

Page 11: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

50 Maharashtra Khudus to Dharmapuri (Pkg-III) on Mohol-Alandi section

37.55 878 EPC

51 Maharashtra AhmednagarMirajgaon -Karmala-Tembhurni Section (Pkg I)

38.77 816.52 HAM

52 Maharashtra Satara-Kagal Pkg-III from km 592.240 to km 639.000

42.95 874.81 HAM

53 Maharashtra Ahmednagar -Mirajgaon-Karmala -Tembhurni (Pkg II) Ghogargaon to Ahmednagar-Solapur District Border

41.17 782 HAM

54 Maharashtra Baramati to Indapur (Ch. 0.000 to Ch. 48.500) section of NH-965G Package-I,

48 892 EPC

55 Maharashtra Indapur to Tondle (Ch.48.500 to Ch. 95.020) section of NH-965G Package-II

46 972 EPC

56 Maharashtra Patas-Vasunde Phata - Baramati Bypass

56 1210 EPC

57 Tamilnadu Chinnaiyan Chathiram to Sriperumbudur Section of NH-4 (New NH-48) from Km. 59.800 to Km. 35.800

24 481 HAM

58 Tamilnadu Walajapeth to Chinnaiyan Chathiram Section of NH-4 (New NH-48) from km 107.091 to Km 59.800

47 911 HAM

59 Tamilnadu Trichiraopalli (Km.000) to Kallagam (Km.38.700) Section of NH-227

39 991 HAM

60 Tamilnadu Meensurutti (Km. 98.433) to Chidambarm (Km.129.965.) Section of NH-227

31 434 HAM

61 Tamilnadu Villupuram (Km 0.000) to Puducherry (Km 29.000) Section of NH-45A ( New NH-332)

29 831 HAM

62 Tamilnadu Puducherry (Km 29.000) to Poondiyankuppam (Km 67.000) Section of NH-45A (New NH-332)

38 984 HAM

63 Tamilnadu Kallagam (Km.38.700) to Meensurutti (Km.98.433) Section of NH-227

60 949 HAM

Page 12: BIDS INVITED (km) Gwalior Jhansi 83 419 EPC Gwalior ...164.100.117.97/WriteReadData/userfiles/Bids Invited.pdfBIDS INVITED Sr State Project Stretch Length (km) Cost (Rs crs) Implementation

64 Tamilnadu Sattanathapuram to Nagapattinam (Design Ch Km 123.800 to Km 180.624) section of NH-45A (New NH -332)

57 1391.47 HAM

65 Tamilnadu Poondiankuppam to Sattanathapuram

56.8 1391 HAM

Sub Total : 2610.99 58400.39

GRAND TOTAL 7768.09 141628.06