Ministry of Works and Human Settlement
Service Delivery Standards
2009
Compiled By: Pravat Rai, Keasang Deki and Karma Sonam
MoWHS Service Delivery Standards 2009 Page 2
ACRONYMS
BCCI Bhutan Chamber of Commerce and Industry
BSR Bhutan Schedule of Rates
CAB Construction Association of Bhutan
CDB Construction Development Board
CID Citizenship Identity
DoR Department of Roads
DUDES Department of Urban Development and Engineering Services
ESD Engineering Services Division
MoHCA Ministry of Home and Cultural Affairs
MoWHS Ministry of Works and Human Settlement
NAC National Arbitration Committee
NLCS National Land Commission Secretariat
NOC No Objection Certificate
OC Occupancy Certificate
PCC Phuentsholing City Corporation
PUDP Phuentsholing Urban Development Plan
TCC Thimphu City Corporation
UPDD Urban Planning and Development Division
MoWHS Service Delivery Standards 2009 Page 3
Table of Contents
DEPARTMENT OF URBAN DEVELOPMENT AND ENGINEERING SERVICES ............................................................................... 6
1. Building approval for Municipal and rural areas ............................................................................................................................................................................................................................................ 6
CONSTRUCTION DEVELOPMENT BOARD ........................................................................................................................................... 7
2. New Registration of Contractors…………………………………………………………………………………………………………………………………………………………………………………………………7 3. Revalidation of Contractors........................................................................................................................................................................................................................................................................................ 8 4. Up‐gradation of Contractors/New Registration of Class C Contractors .............................................................................................................................................................................................. 9 5. Registration of Consultant ....................................................................................................................................................................................................................................................................................... 10 6. Registration of Architect ........................................................................................................................................................................................................................................................................................... 10 7. Arbitration cases between ………........................................................................................................................................................................................................................................................................... 11
STANDARD & QUALITY CONTROL AUTHORITY ............................................................................................................................. 13
8. Laboratory Testing Service...................................................................................................................................................................................................................................................................................... 13 9. Field Testing ServicE ................................................................................................................................................................................................................................................................................................... 14 10. Product Certification (Indian or other foreign country products) ....................................................................................................................................................................................................154 11. *Standard Laboratory and Field Testing Durations ..................................................................................................................................................................................................................................165
DEPARTMENT OF ROADS ........................................................................................................................................................................ 18
12. Approach Road Take‐off point approval........................................................................................................................................................................................................................................................... 18 13. Payment of Contractor's Bills ................................................................................................................................................................................................................................................................................. 19
THIMPHU CITY CORPORATION ............................................................................................................................................................ 19
14. Land transaction ........................................................................................................................................................................................................................................................................................................... 20 15. Building construction approval ............................................................................................................................................................................................................................................................................. 20 16. Clearance for issuance of ownership certificate (by NLCS) .................................................................................................................................................................................................................... 22
MoWHS Service Delivery Standards 2009 Page 4
17. Issuance of site plan .................................................................................................................................................................................................................................................................................................... 22 18. Water Services ............................................................................................................................................................................................................................................................................................................... 22 19. Sewerage services ........................................................................................................................................................................................................................................................................................................ 23 20. Maintenance of street light ...................................................................................................................................................................................................................................................................................... 23 21. New stall registration for Farmers Market...................................................................................................................................................................................................................................................... 23 22. Census ................................................................................................................................................................................................................................................................................................................................ 23
PHUENTSHOLING CITY CORPORATION ............................................................................................................................................ 24
23. Process for availing Lag Thram ...........................................................................................................................................................................................................................................................................243 24. Noting of lien (Mortgage) .......................................................................................................................................................................................................................................................................................244 25. Process for correction of name in the Thram ................................................................................................................................................................................................................................................. 24 26. Updating omitted land in the Thram record ................................................................................................................................................................................................................................................... 25 27. Process for correction of Plot number in the Thram .................................................................................................................................................................................................................................. 26 28. Land Conveyance .......................................................................................................................................................................................................................................................................................................... 26 29. Land Consolidation and Sub‐division................................................................................................................................................................................................................................................................. 27 30. Lease land ......................................................................................................................................................................................................................................................................................................................... 28 31. Obtaining Official Site Plan ...................................................................................................................................................................................................................................................................................... 28 32. Obtaining Survey site plan for land transaction ........................................................................................................................................................................................................................................... 29 33. Issue of digital copy of cadastral site plan of the extended area .......................................................................................................................................................................................................... 29 34. Obtain Building Permit .............................................................................................................................................................................................................................................................................................. 29 35. Valuation of Building .................................................................................................................................................................................................................................................................................................. 30 36. Permit/Approval for Major renovations/constructions(Roofing, Internal modifications, retaining wall, fencing, gate, temporary shed etc) .......................................... 30 37. Permit/Approval for Minor renovations/constructions(Whitewashing, painting, changing door‐window shutters, ceilings, plinth protection, drainage etc) ...... 30 38. Monitoring of building construction at various stages.............................................................................................................................................................................................................................. 30 39. Obtaining Occupancy Certificate (OC) ............................................................................................................................................................................................................................................................... 31 40. Obtain Location Clearance for Trade License ................................................................................................................................................................................................................................................ 31 41. Request for Tree cutting ........................................................................................................................................................................................................................................................................................... 31 42. Lodging any water complaint ................................................................................................................................................................................................................................................................................. 31 43. Processing for water bill cross checking........................................................................................................................................................................................................................................................... 31
MoWHS Service Delivery Standards 2009 Page 5
44. Processing for water meter testing ..................................................................................................................................................................................................................................................................... 31 45. Requesting for new or duplicate bill for water/sewerage and vegetable shed ............................................................................................................................................................................ 32 46. Processing for new water connection ................................................................................................................................................................................................................................................................ 32 47. Processing for alteration of existing water connection............................................................................................................................................................................................................................. 32 48. Processing for shifting or modification of water supplyline .................................................................................................................................................................................................................. 33 49. Lodging any sanitation complaint (complain related to solid waste, water, sewerage) .......................................................................................................................................................... 33 50. Request for emptying septic tank where water supply is meterd ....................................................................................................................................................................................................... 33 51. Request for emptying septic tank where there is no municipal water supply .............................................................................................................................................................................. 33 52. Processing for new sewerage connection ........................................................................................................................................................................................................................................................ 34 53. Processing for alteration of existing sewerage connection..................................................................................................................................................................................................................... 34 54. Processing for shifting or modification of sewerage line ......................................................................................................................................................................................................................... 34 55. Request for lifting animal carcass and unclaimed dead bodies ............................................................................................................................................................................................................ 34 56. Obtain clearance for cutting of metalled road for services like water supply, electricity, TV cable, Telecom cable etc .......................................................................................... 34 57. Settlement of bills for contractors and suppliers ......................................................................................................................................................................................................................................... 35 58. Processing birth registration to Department of Civil Registration and Census (DCRC) ........................................................................................................................................................... 35 59. Processing New CID card.......................................................................................................................................................................................................................................................................................... 35 60. Processing for correction of name or date of birth ..................................................................................................................................................................................................................................... 35 61. Processing for Inter dzongkhag census transfer (Introducing new candidate in existing household in P/ling Throm .......................................................................................... 36 62. Processing for Inter dzongkhag census transfer or within Phuentsholing (Introducing new candidate in existing household in P/ling Throm ..................................... 36 63. Processing death report ............................................................................................................................................................................................................................................................................................ 37 64. Processing Special Resident Permit (SRP).....................................................................................................................................................................................................................................................376 65. GRIEVANCE REDRESSAL MECHANISM…………………………………………………………………………………………………………………………………………………………………………………………………...36 66. DOWNLOAD FORMS…………………………………………………………………………………………………………………………………………………………………………................................................................37
MoWHS Service Delivery Standards 2009 Page 6
Sl. No.
Type of Service
Procedure for accessing service
Time frame for service
delivery Contact/ Coordinating inmates
DEPARTMENT OF URBAN DEVELOPMENT AND ENGINEERING SERVICES
1 Building approval for Municipal and rural areas
Fill the application form and submit 3 sets of
Architectural Drawings and 1 set each of
Structural, Electrical, Water Supply and
Sewerage Drawings, and other documents
required as listed in the checklist to the
concerned Municipality.
On the spot Concerned Municipal Engineer
Municipal Engineer will forward the applicant’s proposal to the DUDES
2 days to 5 days if done by the
Municipality or the applicant can take the drawings to
DUDES themselves.
Concerned Municipal Engineer/applicant
a. Architectural, water supply and sewerage
Architectural, water supply and sewerage drawing scrutiny at UPDD, DUDES
5 days Tshering Dorji (Architect) Room No. 33 Old MoWHS Bldg. Phone No. (02)328173 ext 140
Damber Gurung (Asstt. Architect)
Phone No. (02)328173
MoWHS Service Delivery Standards 2009 Page 7
b. Structural* Structural drawing scrutiny at ESD, DUDES 5 days Karma Namgay (EE) Phone No.
(02)328173
c. Electrical* Scrutiny by an Electrical Engineer at ESD, DUDES
Niran Rai (Dy. EE) Residential Buildings 3 days Tel# (02)328173 ext 107 Residential or
commercial Buildings 3 days Namgay Wangchuk (AE)
Commercial Buildings
3 days Tel#(02)328173 ext 107 or 17645738
Office/Institution Buildings
3 days
d. Note sheet preparation and approval
2 days Tshering Dorji (Architect) Room No. 33 Old MoWHS Bldg. Phone No. (02)328173 ext 140
Total 17 days
* These processes can happen simultaneously.
CONSTRUCTION DEVELOPMENT BOARD
1 New Registration of
Contractors
Attend an induction Course conducted by
CDB
3 days
Mr. Tashi Tshering / Mr. Tashi
Phuntsho Ph# (02) 326035
Apply for CDB registration - submit forms
along with Induction Course Certificate On the spot
Mr. L.B. Bhujel (Dispatch Section)
Ph# (02) 326035
Assessment/Scrutiny of form and entry into
CDB database 1 - 2 hrs
Mr. Tshering Nidup/Mr. Chungdu
Tshering - Mr. Chengay Ph#
(02) 326035
MoWHS Service Delivery Standards 2009 Page 8
Payment of registration fees at Account
Section, MoWHS 0.5-1 hrs
Ms. Sonam Pelden (Accounts,
MoWHS)
Final verification by EE, RD and acording
approval of Executive Director and the
Hon'ble Chairman, CDB
1-2 days
(depending on
the availabity of
Hon'ble
Chairman)
Mr. Tshering Nidup /Chungdu
Tshering Ph# (02) 326035
Issuance of CDB Certificate to the applicant
on production of money receipt On the spot Mr. L.B. Bhujel Ph# (02)
326035
Total Days 5 days
2 Revalidation of Contractors Submission of duly filled form along with
necessary documents required for
revalidation
On the spot Mr. L.B. Bhujel
Phone # (02)326035
Assessment/Scrutiny of form and entry into
CDB database
1 - 3 hrs
(depending on
the
completeness of
documents)
Mr. Tshering Nidup/Mr. Chungdu
Tshering - Mr. Chengay, Tashi
Tshering, Tashi Phuntsho
Phone # (02)326035
Payment of registration fees at Account
Section, MoWHS 0.5-1 hrs
Ms. Sonam Pelden (Accounts,
MoWHS)
Final verification by EE, RD and acording
approval of Executive Director and the
1-2 days
(depending on
the availabity of
Mr. Tshering Nidup/Mr. Chungdu
Tshering - Mr. Chengay
MoWHS Service Delivery Standards 2009 Page 9
Hon'ble Chairman, CDB Hon'ble
Chairman)
Phone # (02)326035
Issuance of CDB Certificate to the applicant
on production of money receipt On the spot Mr. L.B. Bhujel
Phone # (02)326035
Total Days 2.5 Days
3
Up-gradation of Contractors
/ Direct Entry of Class 'C'
(those with technical
background)
Submission of duly filled form along with
necessary documents required for up-
gradation / Direct entry
On the spot Mr. L.B. Bhujel
Phone # (02)326035
Assessment of form, field verification (if
any) and Data entry into CDB database
1/2 - 5 days
(depending on
the
completeness of
documents &
the need for site
verification)
Mr. Tshering Nidup/Mr. Chungdu
Tshering - Mr. Chengay, Tashi
Tshering, Tashi Phuntsho
Phone # (02)326035
Payment of registration fees at Account
Section, MoWHS 0.5-1 hrs
Ms. Sonam Pelden (Accounts,
MoWHS)
Phone # 02-322182
Final verification by EE, RD and acording
approval of Executive Director and the
Hon'ble Chairman, CDB
2 ½ days
(depending on
the availabity of
Chairman)
Mr. Chungdu Tshering
Phone # (02)326035
MoWHS Service Delivery Standards 2009 Page 10
Issuance of CDB Certificate to the applicant
on production of money receipt On the spot
Mr. L.B. Bhujel
Phone # (02)326035
Total Days (2-5) Days
4 Registration of Consultant Submission of duly filled form along with
necessary documents required for
registration
On the spot Mr. L.B. Bhujel
Phone # (02)326035
Assessment of form and Data entry into CDB
database 1 - 2 hrs
Mr. Tashi Tshering
Phone # (02)326035
Payment of registration fees at Account
Section, MoWHS 0.5-1 hrs
Ms. Sonam Pelden (Accounts,
MoWHS)
Phone # (02)326035
Final verification by PE, PD and acording
approval of Executive Director and the
Hon'ble Chairman, CDB
2 ½ days
(depending on
the availabity of
Chairman)
Mr. Tashi Tshering
Phone # (02)326035
Issuance of CDB Certificate to the applicant
on production of money receipt On the spot
Mr. L.B. Bhujel
Phone # (02)326035
Total Days 2 - 4 Days
5 Registration of Architect Collection of CDB Registration form (from
RBIA or download from CDB web site) On the spot RBIA/CDB Office
Endorsement from RBIA Office 1 - 4 hrs RBIA Office
MoWHS Service Delivery Standards 2009 Page 11
Submission of duly filled form along with
necessary documents required for
registration
On the spot Mr. L.B. Bhujel
Phone # (02)326035
Assessment of form and Data entry into CDB
database 1 hrs
Mr. Tashi Tshering
Phone # (02)326035
Payment of registration fees at Account
Section, MoWHS 0.5-1 hrs
Ms. Sonam Pelden (Accounts,
MoWHS)
Phone # (02)322182
Final verification by PE, PD and acording
approval of Executive Director and the
Hon'ble Chairman, CDB
2 days
Mr. Tashi Tshering / Tashi
Phuntsho
Phone # (02)326035
Issuance of CDB Certificate to the applicant
on production of money receipt On the spot
Mr. L.B. Bhujel
Phone # (02)326035
Total Days 2 - 4 Days
6 Arbitration cases Submit an application in writing pertaining
to the case On the spot CDB Office
Upon receipt of an application, CDB will
issue request for arbitration form to the
Claimant.
1 hrs
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
Claimant shall fill up the form and submit to
CDB for further follow up actions On the spot
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
MoWHS Service Delivery Standards 2009 Page 12
Upon receipt of duly filled form, CDB will
issue reply to request for arbitration form to
the Defendant
1 - 2 hrs
(depend upon
the submission
of form by
Claimant)
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
Defendant has to submit reply to the request
for arbitration form (if the defendant fails to
submit the form in prescribed time,
arbitration shall not processed)
7 - 10 days
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
Upon receipt of acceptance letter from
Defendant for arbitration and completion of
all the above procedures. CDB will collect
an arbitration fee of Nu. 3000 from Claimant
and deposit to CDB account and shall start
compliling all the complaints and
documents to be put up for NAC meeting
5 - 10 days
(depending on
the complexity
of the case)
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
Preparation of notesheet to Chairman, NAC
for his availability to attend and conduct the
meeting. Based on the availability and date
given by Chairman, CDB request all the
NAC members to attend the meeting.
3 - 5 days
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
Preparation of NAC meeting's minutes &
Circulation for further comments and
amendments
5 - 10 days
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
MoWHS Service Delivery Standards 2009 Page 13
Issuance of Arbitral award 4 - 5 days
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
If arbitral award is acceptable by both the
parties, disputes is declared as settled and
resolved and case closed permanently
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
If arbitral award is not acceptable by one of
the party, in some cases the case is kept for
review in next NAC meeting
varies
depending on
the nature and
complexity of
the cases
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
If the decision of NAC is not acceptable by
one of the party even after review, the case
is declared as failed. Any party (ies) may
appeal to a Court of Law.
Mr. T.R. Gurung / Mr. Sonam
Wangchuk
Phone # (02)326035
Total Days Varies
STANDARD & QUALITY CONTROL AUTHORITY
1 Laboratory Testing Service
Put up a letter of request with the samples to
the Engineer
On the spot Tashi Wangchuk (Chief Engineer)
or Leki Choden (Engineer)
Pay the test fees and handover the payment reciept to the Engineer
1 hour Accounts, MoWHS
Request with sample handed over to the Distributor
On the spot Wangda Jamtsho or Cheki Gyeltshen
MoWHS Service Delivery Standards 2009 Page 14
Samples distributed to the Technicians On the spot Wangda Jamtsho or Cheki
Gyeltshen
Samples tested by Technicians As per the standard
durations* required for
individual test
Wangda Jamtsho or Cheki Gyeltshen
Test Reports received by the Engineer for analysis and checking
1-2 hours Tashi Wangchuk (Chief Engineer) or Leki Choden (Engineer)
Report handed over to the distributor On the spot Tashi Wangchuk (Chief Engineer) or Leki Choden (Engineer)
Distributor hands over the official test reports to the clients
On the spot Wangda Jamtsho or Cheki Gyeltshen
Total Varies 2 Field Testing Service Submit a letter of request to the Engineer On the spot Tashi Wangchuk (Chief Engineer)
or Leki Choden (Engineer)
Engineer checks the schedule of the personnel informs the client on available date to carryout the field testing
On the spot Tashi Wangchuk (Chief Engineer) or Leki Choden (Engineer)
Junior Engineers visits the site and carries out the tests
Varies Wangda Jamtsho or Cheki Gyeltshen
Report check and analysis by Engineer 1-2 hours Tashi Wangchuk (Chief Engineer) or Leki Choden (Engineer)
Report handed over to the client On the spot Wangda Jamtsho or Cheki Gyeltshen
Total Varies
MoWHS Service Delivery Standards 2009 Page 15
3 Product Certification
(Indian or other foreign country products)
Submit an application either directly or
through a dealer
Submit the following documents: 1. Copy of latest BIS certificate/endorsement letter 2. Copy of latest ISO Certificates if any 3. Copy of any other certificates from international standards bodies/institutions such as IEC, CAS, BS, etc 4. Company profile and complete address 5. Product Catalogue and price list 6. Proof of approval/enlistment in other countries 7. Test Reports (own testing and/or third party testing) 8. Samples of products wherever feasible
1 day D.R. Chhetri Ph# (02)325104/328298/326905
Scrutiny of documents by a committee 1 day D.R. Chhetri Ph# (02)325104/328298/326905
Visit to the company wherever possible and report preparation
Varies depending the location of the company and the number of products to be
inspected
D.R. Chhetri Ph# (02)325104/328298/326905
Review of company visit report and other documents
Varies depending on
the number and type of products
D.R. Chhetri Ph# (02)325104/328298/326905
MoWHS Service Delivery Standards 2009 Page 16
Accord of product/brand approval Varies
depending on the number and type of products
D.R. Chhetri Ph# (02)325104/328298/326905
Total Varies
*Standard Laboratory and Field Testing Durations
1 Soil Testing
i. SPT Test - Bearing Capacity
Test Varies depending on the location of
site
ii. Direct Shear Test Test 2 days
iii. Bulk/Dry density Test 2 days
iv. Moisture content Test 2 days
v. Atterberg limits Test 2 days
vi. Shrinkage Limits Test 2 days
vii. Specific gravity Test 4 hours
viii. Sieve Analysis Test 2 days
ix. Field density by core cutter
Test 2 days
x. Consolidation test Test 7 days
xi. Proctor Compaction test Test 1 day
xii. CBR Test (Lab Test) Test 7 days
xiii. Plate Load Test Test 2 days 2 Tests on coarse aggregates
MoWHS Service Delivery Standards 2009 Page 17
i. Abrasion Test Test 2 hours
ii. Impact Test Test 1 hour ii. Aggregate Crushing Value Test
Test 1 hour
iv. Specific Gravity Test 1 day v. Flakiness/elongation Test 3 hours vi. Slake durability Test 1 day vii. Soundness test Test 10 days viii. Water absorption test Test 2 days ix. Bulk density Test 1 day
3 Tests on fine aggregates
i. Bulking of sand Test 1 day ii. Grain size analysis Test 2 days iii. Fineness modulus of sand
Test 2 hours
iv. Bulk density Test 1 day 4 Test on Bitumen
i. Penetration Test Test 1 day ii. Flash and fire point test Test 1 day iii. Softening Test Test 1 day iv. Residue by heating/evaporation
Test 1 day
v. Bitumen Content Test Test 1 day vi. Stripping Value test Test 2 days
5 Test on Steel
i. Tensile Strength on mild/Tor steel
Test 6 hours
ii. Tensile Strength on water pipes
Test 4 hours
MoWHS Service Delivery Standards 2009 Page 18
iii. Bending Test on pipes Test 5 hours
iv. Unit weight and dimensional tolerance
Test 1 hour
6 Physical Test on Cement
i. Compressive Strength Test 30 days
ii. Fineness Test Test 3 hours
iii. Consistency Test Test 1 day
iv. Setting Time-Initial & final
Test 2 days
v. Soundness test Test 4 days 7 Compressive Strength on
Building Materials
i. Concrete cubes (standard size)
Test 2 hours
ii. Bricks (standard sizes) Test 5 days iii. Hollow Blocks (standard sizes)
Test 1 day
iv. Masonry Blocks (standard sizes)
Test 1 day
8 Test on cement concrete
i. Concrete Mix Design Test 14 days ii. Slump test Test 1 hour
DEPARTMENT OF ROADS
1 Approach Road Take‐off point approval
Apply to the Field Division Office with the
proposal of an approach road and its take-
off point with drawings and sketches
On the spot Concerned Field Division
MoWHS Service Delivery Standards 2009 Page 19
Field Division Office will field concerned
site engineers to study and verify the proposal and make recommendations
1-5 days Concerned Field Division
Field Division Office will approve the proposal if feasible along with measures to be implemented
1 day Concerned Field Division
An agreement will be signed between the Field Division office and the applicant
Same day Concerned Field Division
Total 2-6 days 2 Payment of Contractor's
Bills Submit the bills directly to the site engineer
after joint measurement or to the person
receiving the goods in case of supplies
On the spot Concerned Site Engineer
Concerned Site Engineer will verify the bills and enter into the MB and forward the bill for further verification to the Field Division Office or Project Office
1-5 days Concerned Site Engineer
Field Division/Project Office will verify the bills checking the technical appropriateness including arithmetical errors and forward to Accounts Section
1-10 days Concerned Field Division or Project Office
Accounts Section will make payments after checking the arithmetical errors and ensuring that the payment is as per the contract and as the procurement rules
1-6 days Accounts Section of the concerned Field Division or Project Office
Total 3-21 days THIMPHU CITY CORPORATION
MoWHS Service Delivery Standards 2009 Page 20
1 Land transaction i) Registration of the completed application
form for Thromde Land Conveyance
prepared by NLCS
Documents to be submitted: a) Internal
agreement of the parties involved in
original; b) NOC from family members of
the transferor for family land or co-owner in
case of joint ownership; c)
total land holding declaration of the
transferee; d) Census record of the
transferee; e) Copy of
transferee CID;
f) Original Lag Thram; and
g) Site Plan of the plot.
48 days for
unplanned area
and 35 days for
the planned
area
Thinley Choden &
Tshewangla Land
Registration Officer Land
Registration Office Contact no.
324587
ii) Land Registration Officer then fills in the TCC Land Transfer Verification from for further verification by various division/section such as Land a) Record Section, b) Revenue Section, c) Planning Division, d) Survey Section and e) Building Section for respective verification in the format prepared by TCC (it is for TCC record and does not go to NLCS)
iii) After the verification and observation period is over, the Land Registration Officer compiles and forward to NLCS
MoWHS Service Delivery Standards 2009 Page 21
2 Building construction
approval i) Registration of the completed application
form for building construction Documents
to be submitted: a) Latest Ownership
Certificate; b) Latest Official Site Plan; c) 3-
sets each of architectural, structural,
plumbing/water supply connection,
sewerage drawings and electrical
drawings; d) Environmental Impact Report
where applicable; and e) Registration no. of
the Architect and certificates of
Structural/Electrical Engineer.
Architectural checking 5 days Mr. Gonpo Younten & Mr. Thinley Jurmin Architects, DCD, Contact no. 337144
Structural checking
10 days
Lakey Tshering, Palden Khandu & Kinga Gyeltshen, Engineers, DCD Contact no. 337144
Electrical check 5 days Mr. Luv Kumar Chhetri, Dy. E.E., Electrical Section Contact no. 336310
Plumbing/water supply check 5 days Mr. Dawa Penjor, Junior Engineer, Water Supply Section Contact no. 322757
Sewerage drawing check 5 days Ms. Kinley Zam, Junior Engineer, Sewerage Section Contact no. 322757
Note sheet approval 2 days Issue receipt of scrutiny fee, amenity fee on the spot
MoWHS Service Delivery Standards 2009 Page 22
Total 23 days 3 Clearance for issuance of
ownership certificate (by NLCS)
Revenue Section verifies the mortgage
details of the plot/land and its taxes paid
on the spot
4 Issuance of site plan 1) Submit requisition form for official
siteplan/demarcation Documents to be
submitted: (a) Latest Ownership Certificate
4 days
Mr. Tshering Penjor, Survey
Engineer for areas outside the
Local Area Plan (LAP)
2) Verification carried out sequentially by following sections/divisions:-
i) Land Record ii) Survey Section
iii) Revenue Section For LAP areas, concerned Urban Planner, Planning Division iv) Planning Division
v) Building Section vi) Engineering Division
3) Survey and demarcation of Plot/land
4) Prepare Site plan 5) Issue receipt of Fees deposit
6) Issue site plan Contact no. 324587 5 Water Services
a)
New water connection Submit filled application form 3 days Pema Lhamo, Junior
Engineer, Water Supply Section Contact no. 322757
Visit site for feasibility verification
Connection work
b)
Water-Reconnection 1) Give clearance from concerned divisions/sections 2 hours
Pema Lhamo, Junior Engineer, Water Supply Section Contact no. 322757 2) Deposit fee/charges
MoWHS Service Delivery Standards 2009 Page 23
6 Sewerage services
a)
New sewer connection
1) Give clearance from concerned
divisions/sections
Carried out by
building owner
under the
supervision of
TCC
Mr. Karma Dawa, Assistant
Engineer, Sewerage Section
Contatc no. 322757
2) Applicant deposits fee
b) Septic Tank cleaning/emptying
1) Receive the filled application form
'Vacuum Tanker Service' 5 days
7
Maintenance of street light
complain 2 days
Mr. Sonam Tobgay, AE-II,
Electrical section Contact no.
336310
8
New stall registration for Farmers Market
1) Receive filled/completed TCC
application form along with 2-passport size
photographs, CID copy
1 day
Market Manager Contact no.
337465
2) Sign the tenant agreement
9 Census
a)
New census
1) Receive filled/completed application form along with Birth Certificate, Health Card copy and parents marriage certificate
1 day
Census Officer Contact no. 322265 Office located near Lungtenzampa
b)
Census transfer to Thimphu Throm
Receive the filled 'Census Transfer Form' along with ownership certificate and authorization from head of the family
1 day
c) Census transfer from Thimphu Throm
Receive a letter from the concerned dzongkhag requesting for census transfer
1 day
MoWHS Service Delivery Standards 2009 Page 24
Letter of agreement from both the transferor
and transferee
d)
Census cancellation
Deceased, produce death certificate from hospital, letter with witness if deceased at home in case of double census, confirmation letter with full personal information from respected agency
1 day
PHUENTSHOLING CITY CORPORATION
Urban Planning Division
1 Process for availing Lag Thram
Submits an application along with the
following document
3 days
Mr. Karna Ghaley, Assistant Land
Registrar, Land Record Section a. Copy of New CID card
b. Surrender back the original
ownership certificate if issued by PCC
2 Noting of lien (Mortgage) 1. Submits the mortgage deed issued by
financial institution to PCC
2 days
Mr. Karna Ghaley, Assistant Land
Registrar, Land Record Section 2. PCC Verifies the plot details, ownerships, registered area, type of structure and location.
3. Check the record whether it has been already mortgaged with other financial institutions or not.
3 Process for correction of
Submits an application to PCC along with 3 days Mr. Karna Ghaley, Assistant Land
MoWHS Service Delivery Standards 2009 Page 25
name in the Thram the following documents Registrar, Land Record Section
a. New CID card
b. To Whom it May Concern issued by
MoHCA regarding the changes in the name.
c. Original Lag Thram/Ownership
Certificate
4 Updating omitted land in the Thram record
Submit an application to PCC fulfilling the
following:
15 days
Mr. Karna Ghaley, Assistant Land
Registrar, Land Record Section
1. As provided in the Land Act 2007, landowner may submit an application for reinstatement of an omitted land to Thromde. The application shall be in the prescribed form OL (1).
2. Thromde shall not entertain any application for reinstatement of omitted land if the period of omission of land from current thram is more than 5 years. 3. The landowner shall produce the lag thram of old thram before the thromde. Upon evaluation of the lag thram and cross verification of the old thram preceding the current thram, if the thromde finds that it is in contravention of the sl.no 1 and 2 of these rules, the landowner shall not be entitled to the land in question.
4. If the period of omission is within 5 years, the Thromde shall verify the case and submit the report to the secretariat within 15
MoWHS Service Delivery Standards 2009 Page 26
days.
5 Process for correction of Plot number in the Thram
Submit an application to PCC along with
following documents:
3 days
Mr. Karna Ghaley, Assistant Land
Registrar, Land Record Section a. New CID card
b. Original Lag Thram
c. Copy of updated cadastral map
6 Land Conveyance 1. Download the Transfer Form from our
website
45 days
Mr. Karna Ghaley, Assistant Land
Registrar, Land Record Section
www.pcc.bt or get it from Land Record Section and then submit the filled up Form to Land Record Section.
2. The form should be attached with the following documents:
a. ID card copy of the Plot owner (Transferor) and the Transferee. b. Internal Agreement (Original)
c. Latest Ownership Certificate (Lag Thram) issued by NLCS in original. d. NOC from family members(Original)
e. Census details of both the transferor and transferee
f. Site plan/cadastral map of the plot under transaction
g. If the land is mortgaged then clearance from the concerned financial
MoWHS Service Delivery Standards 2009 Page 27
institutions.
3. The completed filled up form should be submitted to the Land Record Section where both the Transferor and the Transferee should be present in person.
4. The Land Record Section will record the received date and provide transaction ID No. and send the documents for verification to various Section and Divisions 5. The land record section prepares and checks the documents.
6. PCC forward's the documents after having reviewed here in original to NLCS for further endorsement and approval.
7 Land Consolidation and Sub‐division
The application for sub division or
consolidation shall include the following
information and documents:
15 days
Chief Urban Planner/Survey
Officer/Asst. Land Registrar
1. Lag Thram
2. No objection certificate from family
members of 18 years of age and above.
3. Plot, building and/or unit identification
and area and
4. A plan of sub-division or consolidation,
which for the landed property shall include
site plan of the plot(s) and for building
property shall include building plan with
MoWHS Service Delivery Standards 2009 Page 28
unit(s) indicated and unit plans
8 Lease land
1. Temporary Lease ( maximum of six months)
Submit an application with the following:
10 days
Mr. Dorji Wangchuk, Land Record
Officer, Land Record Section
a. Copy of Trade License
b. Specify the purpose, duration and the area of government land for lease
c. Sketch map of location. 2. Short Term Lease ( maximum of 3 years)
Submit an application with the following:
10 days
Mr. Dorji Wangchuk, Land
Record Officer, Land Record Section
a. Copy of Trade License
b. Specify the purpose, duration and the area of government land for lease
c. Sketch map of location. 3. Long Term Lease (maximum of 30 years)
Submit an application with the following:
30 days
Mr. Dorji Wangchuk, Land
Record Officer, Land Record Section
a. Copy of Trade License
b. Specify the purpose, duration and the area of government land for lease
c. Sketch map of location. 9 Obtaining Official Site Plan 1. Applicant submits the filled form B
15 days
Mr.C.B Chettri, Survey
Officer
2. Survey section verifies the plot details
3. Visits the site
4. Architect/Planner prepares the official
site plan for final issuance
MoWHS Service Delivery Standards 2009 Page 29
10 Obtaining Survey site plan
for land transaction 1. Applicant submits the filled form C
10 days
Mr.C.B Chettri, Survey
Officer
2. Survey section verifies the plot details
3. Visits the site
4. Architect/Planner prepares the official
site plan for final issuance
11 Issue of digital copy of cadastral site plan of the extended area
1. Applicant submits the filled form C
along with one empty CD(RW) 1 day
Mr.C.B Chettri, Survey
Officer
2. Verify the thram and plot details from the map and issue accordingly
Development Control Division
12 Obtain Building Permit 1. Applicant submits dully filled form D
along with 2 sets of building drawing as per the checklists
2. Building drawing scrutiny a. Architectural 10 days Mr.Ugyen Chophel, Architect
b. Structural
10 days
Mr. Karma Dupchuk/ Mr.Karma Tshering/Mrs. Jangchuk Choden ( Structural Engineers)
c. Electrical 10 days
Mr.Nakchung, Electrical Engineer
d. Water supply and sewerage 10 days
Mr.Namgay Phuntsho/ Mr.Santosh Subha, 05- 252887/253306
MoWHS Service Delivery Standards 2009 Page 30
3. Signing of construction agreement,
issue bills and receipts for scrutiny fee and final issuance of approval
5 days Mr.Karma Dupchuk, Head DCD, 05-252168
Total 15 days per
drawing
Note: Since PCC has a system of maintaining diary number and receipt date punched on each applicants drawings, the timeline shall remain applicable in case of single building drawing scrutiny. However if one applicant submits more than one building at a time on a single day, separate diary number shall be issued for each building drawing and accordingly approval timeline shall be intimated/informed.
Mr.Karma Dupchuk, Head DCD
13 Valuation of Building 1. Applicant submits building valuation
and as-built drawings
10 days
Structural Engineer, DCD 2. Structural Engineer visits the site,
scrutinizes the valuation as per urban norms
15 Permit/Approval for Major renovations/constructions (Roofing, Internal modifications, retaining wall, fencing, gate, temporary shed etc)
1. Submits the application along with
proposed darwings
7 days Structural Engineer, DCD
2. Site verification and inspection
3. Drawing scrutiny for approval
16 Permit/Approval for Minor
1. Submits the application 5 days Structural Engineer, DCD
MoWHS Service Delivery Standards 2009 Page 31
renovations/constructions
(Whitewashing, painting, changing door‐window shutters, ceilings, plinth protection, drainage etc)
2. Site verification and inspection
17 Monitoring of building construction at various stages
1. Verify building layout plan before
starting the construction works
Routine
Inspection
Building Inspectors, DCD
2. Check for reinforcement and casting
on footings and columns
3. Check and verify for reinforcement
and casting on plinth beams as per
approved drawings
4. Check and verify slab casting for each
floors
5. Verify roof projection and CGI
sheeting
18 Obtaining Occupancy Certificate (OC)
1. Submits dully filled application form K
along with completion certificate form J 7 days Mr.M.C Joseph, Chief Building
Inspector, DCD
2. PCC and owner jointly verifies the
completed building for issuance of OC
19 Obtain Location Clearance
1. Applicant submits Trade License Form 3 days Building Inspector, DCD
MoWHS Service Delivery Standards 2009 Page 32
for Trade License where PCC verifies Land use
20 Request for Tree cutting 1. Submits an application with proper
contact address
3 days
Building Inspector, DCD
2. Verify the site and prepare a report for onward submission to Department of Forest for further approval
Environment Division
21 Lodging any water complaint
Call complain cell over phone (No.05-
252877) or put up complain letter 7 days Complaint receiver at water
supply office
22 Processing for water bill cross checking
Report to water supply office with water bill 1 day Billing In-charge
23 Processing for water meter testing
- Report to water supply office with water
meter number
2 days
Billing In-charge
- Pay nominal charge for meter testing ( subject to change)
24 Requesting for new or duplicate bill for water/sewerage and vegetable shed
- Report to water supply office with water
meter number or vegetable shed number
on the spot
Billing In-charge
- Pay nominal charges ( subject to change) 25 Processing for new water Submit the filled and completed application 7 days In-charge water supply section
MoWHS Service Delivery Standards 2009 Page 33
connection form which is available in PCC at free of
cost (but shall be charged Nu.25 if your
proposal is approved) along with other
relevant documents such as : Building
approval or work order for construction
works
26 Processing for alteration of existing water connection
Submit the filled and completed application
form which is available at free of cost along
with other relevant documents such as:
Building approval and reasons for alteration
7 days
In-charge water supply section
27 Processing for shifting or modification of water supply line
Submit an application justifying the reasons
for the request. Need to
deposit the cost for shifting/modification of
the line
3 months
In-charge water supply section
28 Lodging any sanitation complaint (complain related to solid waste, water, sewerage)
Can call at complaint cell Phone No. 05-
252877/253636/253306/252168/254609 or
submit a letter giving specific details of
nature of complaint along with proper
address and location.
3 months
In-charge water supply section
29 Request for emptying septic tank where water supply is metered
Submit an application with water meter
number
7 days In-charge sewerage section
30 Request for emptying septic tank where there is
Submit an application with detail contact
address and location 14 days In-charge sewerage section
MoWHS Service Delivery Standards 2009 Page 34
no municipal water supply
31 Processing for new sewerage connection
Submit an application along with other
relevant documents such as : Building
approval
7 days In-charge sewerage section
32 Processing for alteration of existing sewerage connection
Submit an application along with other
relevant documents such as: Building
approval and reasons for alteration
7 days
In-charge sewerage section
33 Processing for shifting or modification of sewerage line
Submit an application justifying the reasons
for the request. Need to
deposit the cost for shifting/modification of
the line
3 months
In-charge sewerage section
34 Request for lifting animal carcass and unclaimed dead bodies
Can call at complaint cell Phone No. 05-
252877/253636/253306/252168/254609 or
submit a letter giving specific address and
location.
on the spot
Complaint receiver at complaint
cell
Engineering Division
35 Obtain clearance for cutting of metalled road for services like water supply, electricity, TV cable, Telecom cable etc
1. Proponent submits an application
mentioning the site location
4 days
Mr. Karma Thinley/Mr.Verghese
(Urban road section) 2. PCC verifies the site and prepares estimate for reinstatement
3. Approval issued upon receipt of money for reinstatement
Administrative and Finance Division
MoWHS Service Delivery Standards 2009 Page 35
36 Settlement of bills for
contractors and suppliers
1. Contractor/Supplier submits the bills on spot
Division Head/Concern site
engineer/procurement officer
2. Concern Division verifies the bills 20 days
Division Head/Concern site engineer/procurement officer
3. Account section process for final payment
10 days AFD/Accounts Section
37 Processing birth registration to Department of Civil Registration and Census (DCRC)
1. Fill up the form no.BCRS-BR-01 with
Affix legal stamp
1 day
Mr.Karma Galey, Census Section 2. Documents required:
a. Parents CID copy b. Birth document c. Health card
d. Parent court marriage certificate if not statement from concerned Tshogpa
38 Processing New CID card 1. Fill up th form No BCRS-CID-01 A with
Affix legal stamp and attach 2.5cm x 3.0cm
picture verified by concern Tshogpa if in
case the applicant is applying for CID for
the first time.
1 day
Mr.Karma Galey, Census Section
2. Document required: a. Parents CID copy b. Birth document
39 Processing for correction of name or date of birth
1. For Civil Servants/Corporate
Employees/Armed Forces: 1 day
Mr.Karma Galey, Census Section
a. Dully filled up the form no.BCRS- NC/DOB-01
MoWHS Service Delivery Standards 2009 Page 36
b. Recommendation letter from concerned organization/RCSC/Court verdict along with copy of first page of the services book record supplemented by academic transcription as per their qualification.
2. For students:
a. Dully filled up the form no.BCRS- NC/DOB-01
b. Academic transcription/birth certificate/health card/ketsee along with recommendation letter from head of school/institution.
3. For others:
a. Dully filled up the form no.BCRS- NC/DOB-01
b. Recommendation letter from concerned Mitsi Tshogpa with other relevant documents like health card/birth certificate/Ketsee.
40 Processing for Inter dzongkhag census transfer (Introducing new candidate in existing household in P/ling Throm
1. Fill up the form no.BCRS-CS-01
1 day
Mr.Karma Galey, Census Section
2. Application stating acceptance from the receiving family head
41 Processing for Inter dzongkhag census transfer or within Phuentsholing
1. Fill up the form no.BCRS-CS-01
1 day
Mr.Karma Galey, Census Section 2. Fill up the form no.BCRS-CS-03
3. Lag thram copy to authenticate that he/she hold a land in Throm
MoWHS Service Delivery Standards 2009 Page 37
(Introducing new
candidate in existing household in P/ling Throm
4. Application stating acceptance from the receiving and relieving HoF
5. Building Approval for New House Number
42 Processing death report 1. Fill up the form no.BCRS-CS-01
1 day
Mr.Karma Galey, Census Section 2. Death certificate from the Hospital or
BHU 3. Tshogpa's report
4. Photocopy of applicant's CID or CID number
43 Processing Special Resident Permit (SRP)
1. Fill up the form no.BSCR-NC-03-A 1 day Mr.Karma Galey, Census Section
2. Document required: a. Parents CID copy b. Copy of health card c. Marriage Certificate d. Any other relevant documents
44
Grievance Redressal Mechanism
”The Applicants may express their grievances in writing addressed to the Head of Department, PCC which shall be discussed and addressed in the PCC Technical Committee".
Download Forms 1. Form B, Obtaining official site plan
2. Form C, Obtaining cadastral map and site plan for transactions.
3. Form D, Building Plan processing .
4. Checklist for building applicant.
5. Form K, Application for Occupancy Certificate.
6. Form J, Completion Certificate from site engineer.
MoWHS Service Delivery Standards 2009 Page 38
7. Land Transfer form
REDRESSAL MECHANISM
For any queries, grievances, complaints or information on the status of the service, contact the designated official. This Ministry's related service grievances will be acknowledged on the same day and action taken will be communicated within 3 days under normal circumstances. If the official fails to assist you within 3 days, the concerned Head of the Agency or the Ministry's Secretary should be informed.
WHAT YOU CAN EXPECT
Visitors to our office will be treated with Courtesy, Professionalism, Sensitiveness, Patient hearing and Prompt response.
ADDRESS
Ministry of Works & Human Settlement Post Box No. 791 Thimphu Phone No. 00975-2-327998/322182/326451/322871 Fax No. 00975-2-323122/323121/322270/323144 Website:www.mowhs.gov.bt
MoWHS Service Delivery Standards 2009 Page 39