Bernardo Avenue Undercrossing
Joint BPAC MeetingDec. 2, 20205 to 6:30 p.m.
![Page 2: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/2.jpg)
2Joint BPAC Meeting – December 2020
City of SunnyvaleNabilah Deen, Transportation Engineer
Ralph Garcia, Senior Transportation EngineerAngela Obeso, Principal Transportation Engineer
City of Mountain ViewRia Hutabarat Lo, Transportation ManagerRey Rodriguez, Senior Project Manager
Introductions
![Page 3: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/3.jpg)
3Joint BPAC Meeting – December 2020
Project Team ConsultantsDave Dickinson, WMH – Project ManagerSteve Loupe, WMH – Civil Design Lead
Introductions
![Page 4: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/4.jpg)
4Joint BPAC Meeting – December 2020
• Presentation (~10 minutes)
• BPAC Clarifying Questions (~15 minutes)
• Public Comments (~15 minutes)
• BPAC Comments (~40 minutes)
Agenda
![Page 5: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/5.jpg)
5Joint BPAC Meeting – December 2020
• 2004 – Bernardo Avenue Bicycle Undercrossing Feasibility Study Report
• 2016 – One Bay Area Grant funding award
• 2017 – WMH Corporation hired for preliminary design and environmental analysis
• 2018 – Cost Sharing Agreement with Mountain View
• 2020 – Measure B funding award (for design and construction phase)
• Current – Development of preliminary designs
Project Background
![Page 6: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/6.jpg)
6Joint BPAC Meeting – December 2020
Project Limits
![Page 7: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/7.jpg)
7Joint BPAC Meeting – December 2020
Existing Conditions
![Page 8: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/8.jpg)
Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box
Max. H
eight
Eastern Alignment
![Page 9: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/9.jpg)
9Joint BPAC Meeting – December 2020
Eastern Option 1(Utilize Portion of Central Expressway)
![Page 10: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/10.jpg)
Partner Logo Placeholder in Slide Layout: Align with Left Edge of This Box
Max. H
eight
Western Alignments
![Page 11: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/11.jpg)
11Joint BPAC Meeting – December 2020
Western Option 1(With Bike Ramp Access to Central Expressway)
No Tunnel Opening
Bicycle ramp
![Page 12: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/12.jpg)
12Joint BPAC Meeting – December 2020
Western Option 1(Without Bike Ramp Access to Central Expressway)
Tunnel Opening
No bicycle ramp
![Page 13: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/13.jpg)
13Joint BPAC Meeting – December 2020
Western Option 2(With Stair access to 280 N. Bernardo)
Stairway connection to 280 N. Bernardo
Ramp landing connection to 280 N. Bernardo
280 N. Bernardo
![Page 14: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/14.jpg)
14Joint BPAC Meeting – December 2020
Western Option 2(Without Stair access to 280 N. Bernardo)
No stairway connection to 280 N. Bernardo
Ramp landing connection to 280 N. Bernardo
280 N. Bernardo
![Page 15: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/15.jpg)
15Joint BPAC Meeting – December 2020
Western Option 3(With Stair access to Evelyn Avenue)
Stair access to undercrossing
Dual crosswalk access points to undercrossing
![Page 16: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/16.jpg)
16Joint BPAC Meeting – December 2020
Western Option 3(Without Stair access to Evelyn Avenue)
Single crosswalk access to undercrossing (no stair access).
Less impact to Evelyn Avenue
![Page 17: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/17.jpg)
17Joint BPAC Meeting – December 2020
Upcoming Project Milestones
Select Project
AlternativeSummer 2021
Community Meetingand BPAC Meeting
Spring 2021
Environmental Phase
Summer 2021 to
Summer 2022
Final DesignSummer 2022 To
Fall 2024
Begin ConstructionLate 2024
![Page 18: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/18.jpg)
18Joint BPAC Meeting – December 2020
How to Participate Today
![Page 19: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/19.jpg)
19Joint BPAC Meeting – December 2020
1. What are the most important existing safety issues that concern you?
2. What features should be prioritized in the selected project alternative?
3. What additional features would you like to see included in the project alternatives and what features would you recommend for removal?
Discussion Questions
![Page 20: Bernardo Avenue Undercrossing](https://reader034.vdocuments.site/reader034/viewer/2022051204/6277e675be515d22b419c1f6/html5/thumbnails/20.jpg)
20Joint BPAC Meeting – December 2020
Thank You!
Questions or Comments?
Contact Nabilah Deen
Email: [email protected]
Visit Sunnyvale.ca.gov
Search for Bernardo Undercrossing
Stay informed by Subscribing to the Mailing List