beisel road paving

9
Beisel Road Paving Presented By Kyle L. Nash Director of Public Works Newberry County

Upload: vartan

Post on 22-Feb-2016

64 views

Category:

Documents


0 download

DESCRIPTION

Beisel Road Paving. Presented By Kyle L. Nash Director of Public Works Newberry County. Beisel Road - Overview. 0.8 mile dirt and gravel road off a major state road (Mt. Bethel Garmany Rd.) Dead-end at USFS property 31 different parcels on this road or accessed from it. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Beisel  Road Paving

Beisel Road PavingPresented ByKyle L. Nash

Director of Public WorksNewberry County

Page 2: Beisel  Road Paving

Beisel Road - Overview0.8 mile dirt and gravel road off a major state

road (Mt. Bethel Garmany Rd.)Dead-end at USFS property31 different parcels on this road or accessed

from it

Page 3: Beisel  Road Paving

Beisel Rd – Aerial View

Page 4: Beisel  Road Paving

Beisel Road - History In 1981, non-exclusive easement acquired by USA for a

portion of what is now Beisel Rd In 1990, through a land exchange USA conveyed property

to William C. Sullivan, but retained ingress-egress rights along what was designated Forest Service System Road FSSR-1011

Subsequently, a cooperative agreement was made between USFS and Newberry County for maintenance along FSSR-1011 (Beisel Rd)

In 2009, residents requested paving of Beisel Rd through USFS and Newberry County, however, the road was not a County road

USFS supported the County assuming full maintenance of the road

By Ordinance, Newberry County no longer accepts new roads into its system that are not paved

Page 5: Beisel  Road Paving

Beisel Road – History (continued)Newberry County Council amended its Road

Paving Ordinance to allow the acceptance of unpaved roads that have been maintained continuously for at least 3 years by a government authority

In August 2010, 100% of property owners on Beisel Rd granted right-of-way required for Newberry County to accept the road and make it eligible for paving

October 20, 2010 Newberry County Council unanimously accepted Beisel Rd into its road system

Page 6: Beisel  Road Paving

Paving of Beisel RdWiden and Pave with Triple Treatment

20 ft driving surface6 ft shoulders6 in stone basePavement markings: lines and reflectors

Proposed Project CostsEngineering $39,000Construction $232,900TOTAL $271,900

Page 7: Beisel  Road Paving

Paving of Beisel RdProposed Source of Funds

USFS Title II Grant $135,950.00CTC C-Funds $135,950.00TOTAL $271,900.00

CTC has already committed $39,000 to initiate the engineering portion of this

project

Page 8: Beisel  Road Paving

Beisel Road – Program Oversight & Schedule

Newberry County will manage procurement & oversee construction in conjunction with a CTC Consultant

All payments, reimbursements, & recordkeeping will be processed by the Newberry County Finance Director

Proposed Schedule:Schedule Item Start Finish Duration

Engineering Phase 3/1/2011 5/1/2011 2 monthsAdvertise Construction Solicitation 5/1/2011 6/1/2011 1 month

Construction Bid Opening 6/1/2011 6/1/2011 0 days

Bid Award By County Council 6/1/2011 6/1/2011 0 days

Construction 7/1/2011 9/1/2011 2 months

Project Completion 9/1/2011 9/1/2011 0 days

Page 9: Beisel  Road Paving

ConclusionNewberry County requests USFS Title II

grant funding of $135,950 toward this projectBalance will be paid with C-FundsThis proposed project will provide a durable,

low-maintenance access road to USFS property

Questions?