beginning scheduling workshop€¦ · • 9 – kazakhstan 1,049,154 • 10 – algeria 919,594 28...
TRANSCRIPT
Beginning Scheduling Workshop
PRESENTED BY:
Craig Dillon & Greg Linton
Schedulers & Dispatchers Conference | San Jose, CA | February 3 – 6, 2015
Friday, February 6 | 1:30 p.m. – 3:30 p.m.
Introductions
2
Objectives
• Understand the requirements of a trip
• Learn the pain points of scheduling
• Develop trip planning thought processes
3
Intro to Case Study
4
Airport Selection Criteria
5
Luton
Stansted Heathrow
London City
Gatwick
Airports of Entry
6
General Aviation vs. Commercial
7
Ground Handling Services
8
Parking
9
Fuel
10
Hours of Operation
11
• Airport Operations Hours
• FBO Operations Hours
• Customs Operation Hours
• Curfews
• Noise Restrictions
Security
12
Stansted / EGSS Luton / EGGW
Airport Selection
13
Case Study – Airport Selection
14 *Disclaimer: Parking and fuel costs provided were updated XX-XXX-XX and may not reflect current rates.
Stansted EGSS
Luton EGGW
Runway Length 10,003 FT 7,087 FT
Hours of Operation 24 hrs 24 hrs
Customs/Immigrations Yes Yes
Slots Required Yes Yes
Parking (24H)* £600.00 £1315.00
Fuel* $XXXX per USG $XXXX per USG
Distance to/from Central London
40 miles 55 to 80 minutes
32 miles 60 to 75 minutes
Handlers Universal Aviation Harrods Aviation Inflite Jet Centre
Servisair
Signature Flight Support Harrods Aviation
RSS Jet Centre Gulfstream Service Centre
Route of Flight
15
Case Study – Route of Flight
16
CYFB
CYQX KBGR
CYYR
Crew Requirements
• Qualifications
• Training
• Duty Days
17
Pilot and Crew Availability
Crew Requirements
• Pilot License
• Medical Certificate
• Passports
• Visas
– On Arrival or Pre-flight
– Lead Time
– Validity
• Vaccinations
18
Documentation
Crew Requirements
19
Hotels
Crew Requirements
20
Ground Transportation
Crew Requirements
21
Catering
Crew Requirements
22
Security (Transportation / Aircraft)
Crew Requirements
23
Flight Plans & Weather
Special Services
• Lav and Water
• Fuel
– On arrival
– On departure
• GPU
• Ground Stairs
• Ladder
• Cleaning
24
Case Study
25
Crew Requirements
26
Ice Breaker
27
10 largest countries by land mass
Ice Breaker Answers
• 1 – Russia 6,592,768
• 2 – Canada 3,851,807
• 3 – United States 3,717,811
• 4 – China 3,705,405
• 5 – Brazil 3,286,486
• 6 – Australia 2,967,908
• 7 – India 1,269,345
• 8 – Argentina 1,068,301
• 9 – Kazakhstan 1,049,154
• 10 – Algeria 919,594
28
10 largest countries by land mass (Sq. Mi):
Passenger Requirements
29
Documents
• Passports
• Visas
– On Arrival or Pre-flight
– Lead Time
– Validity
• Vaccinations
Passenger Requirements
30
Hotels
Passenger Requirements
31
Ground Transportation
Passenger Requirements
32
Catering
Passenger Requirements
33
Security (Transportation / Armed Guard)
Case Study
34
Passenger Requirements
Passenger Manifest
Name Title DOB PPN Expiration
Date
Issuing Country
Nationality
Case, Tiffany
CEO 22-Oct-60 745384564 9-Jul-18 U.S. American
Fleming, James
VP 5-Sep-56 359204910 13-Apr-15 U.S. American
Regulatory Requirements
35
Regulatory Requirements Timeline
36
1975 - 1995
1975
U.S. Border Overflight
Exemption Program
1985
Visa Waiver Program
1995
Regulatory Requirements Timeline
37
1995 - 2005
1995
2001
Commercial APIS in U.S.
TSA Waiver / Airspace Access
Program
Master Crew List
2005
Regulatory Requirements Timeline
38
2005 - Today
2005
2006
2008
2010
2012
Today
SMS
SAFA Ramp Check
Private U.S. APIS
FAA Special Routing
Auth.
ESTA
EU-ETS
Australian TSP
Shannon, IE Pre-Clearance
EU Importation
Changes
Argentinian Reciprocity
Fees
UK APD
EU-ETS Carbon Trading
Electronic CBP I-94 System
Requirements
Mexico SENEAM Fees
CARICOM APIS Mexico APIS
CANPASS
Future Regulatory Requirements
39
2015
Russian / Dominican Republic APIS
Expanded Global APIS Requirements
Expanded EU Noise and Passenger Tax
Requirements
TSA – Expanded GA Secure Program
Aircraft Documents
• Insurance
• Registration
• Airworthiness
• Noise Certificate
• Color Photograph
40
Case Study Regulatory Requirements
41
2005
2006
2008
2010
2012
Today
SMS
SAFA Ramp Check
Private U.S. APIS
FAA Special Routing
Auth.
ESTA
EU-ETS
Australian TSP
Shannon, IE Pre-Clearance
EU Importation
Changes
Argentinian Reciprocity
Fees
UK APD
EU-ETS Carbon Trading
Electronic CBP I-94 System
Requirements
Mexico SENEAM Fees
CARICOM APIS Mexico APIS
CANPASS
Case Study Regulatory Requirements
42
2005
2006
2008
2010
2012
Today
SMS
SAFA Ramp Check
Private U.S. APIS
FAA Special Routing
Auth.
ESTA
EU-ETS
Australian TSP
Shannon, IE Pre-Clearance
EU Importation
Changes
Argentinian Reciprocity
Fees
UK APD
EU-ETS Carbon Trading
Electronic CBP I-94 System
Requirements
Mexico SENEAM Fees
CARICOM APIS Mexico APIS
CANPASS
Miscellaneous Requirements
43
• Weather
• Special Events
• Approval Letters
• Pets
• Medical Issues
• Maintenance Issues
• Unforeseen Events
Wrap Up
44
• Open Communication
• Accurate and Timely Information
• Changes and Updates