Kazakhstan Project
Pietro CavannaDeputy Chief Operating Officer
E&P Division
October 3, 2003
Eni in Kazakhstan
Agip Karachaganak B.V. 32.5 % PSA
Agip Caspian Sea B.V. 20.37% PSA
G R O U P
G R O U P
Agip Kazakhztan North Caspian Operating Co. N.V.
Karachaganak Petroleum Operating B.V.
(Agip Karachaganak BV: 32,5%)
KarachaganakFPSA
Eni Upstream Participations
Co-operators
15%
20%
32,5%
32,5%
North Caspian Sea PSA
At present
Eni Upstream Participations
Next
Operator
20.4%
20.4%
20.4%
10.2%20.4%
8.3%
16.6%
16.6%
16.6%
16.6%
16.6%
8.3%
8.3%
! North Caspian Sea PSA(valid up to 2041)
PRODUCTION SHARING
AGREEMENTS
" Kashagan field
Typology of Contracts
! PSA (valid up to 2037)
" Karachaganak field
1992: Eni gained the exclusive right to negotiate the development of Karachaganak field under PSA regime
1993: The KCS Consortium Agreement was signed, this later provided 11 blocks in the North Caspian Sea with acreage 5.500 km2
1995/ Eni engaged for Karachaganak in the frame of the1997: Producton Sharing Principle Agreement (PSPA) in field
production and maintenance1997: Both the Karachaganak and the North Caspian PSA
were signed1999: Karachaganak field expansion
(Phase 2) started2000: Kashagan discovery
Eni’s History in Kazakhstan
2001: Agip Caspian Sea selected as “Sole Operator” on North Caspian Sea PSA
2002: Declaration of Kashagan Commercial Discovery in June
2002: Presentation of Kashagan Development Plan & Budget in December
2003: The Karachaganak Phase 2 of development completed
2003: NCS exploration campaign still ongoing
2003: NCS appraisal campaign on Kashagan field near to conclusion
2003: Kashagan field development activities started
Eni’s History in Kazakhstan
Kazakhstan
Karachaganak Field
AKSAI
TUNGUSH VillageTUNGUSH Village
UNIT 2 AND GAS RE-INJECTIONRE-INJECTION
KPCKPC
UNIT 3UNIT 3
THIRD PARTY REFINERY
THIRD PARTY REFINERY
LIQUID/GAS EXPORT
TO ORENBURG
LIQUID EXPORT TO CPC
RAILWAY CONNECTION
Gas PipelineOil PipelineRoadRailwayRiver
Field boundaries
Facilities
30 km
Karachaganak PSA Contract Area
Karachaganak Project
# Discovered in 1979
# Development concept: Orenburg satellite field
# Production since 1984
# Project objectives
" Increase oil and gas production to 350,000 boepd
" Access higher value markets for oil
" Upgrade safety
" Environmental protection
# Develop additional gas and liquid reserves
SUPER GIANT OIL AND GAS CONDENSATE FIELD
Phase 2: production target and costs
# July 15th, 2003: first oil from the new Karachaganak Processing Centre for export
# Full production capacity:
225,000 bopd of liquids150,000 bopd (7 Mton/y) exported via the CPC66,000 bopd (3 Mton/y) to Orenburg9,000 bopd (0.4 Mton/y) to the MiniRefinery
7 Bcm/y of gas exported to Orenburg
# F&D cost ~$2.5/boe (full field)# Opex ~$1.8/boe (full life, escluding CPC)
Phase 1
Liquid Production
FPSA – Contractor ObligationsPhase 2
# Carry out workovers/drilling 98 wells
# Construct facilities, increase capacity to 8 million t/yr
# Install gas re-injection equipment
# Construct pipeline from Karachaganak to Atyrau, 635 km
# Construct a Power Plant, 20 MW to community
# Undertake Social Expenditure, $10 million/yr
0
50.000
100.000
150.000
200.000
250.000
300.000
350.000
400.000
450.000
500.000
2.001
2.003
2.005
2.007
2.009
2.011
2.013
2.015
2.017
2.019
2.021
2.023
2.025
2.027
2.029
2.031
2.033
2.035
2.037
BOE/
d
100% Eni share
Karachaganak Production ProfilePhase 2
0
5.000
10.000
15.000
20.000
25.0002.
001
2.00
22.
003
2.00
42.
005
2.00
62.
007
2.00
82.
009
2.01
02.
011
2.01
22.
013
2.01
42.
015
2.01
62.
017
2.01
82.
019
2.02
02.
021
2.02
22.
023
2.02
42.
025
2.02
62.
027
2.02
82.
029
2.03
02.
031
2.03
22.
033
2.03
42.
035
2.03
62.
037
M S
m3/
y
Gas Injection Sweet Gas Gas sales 100%
Karachaganak Gas Production ProfilePhase 2
Phase 2 – Operations & Outputs
SamaraOrenburg
Tengiz
CaspianSeaBlack
Sea
Atyrau
Karachaganak
Uzb
ekis
tan
KazakhstanRussian
FederationUkraina
Novorossiysk
Georgia
Kropotkien
Komsomolsk
BolshoiChagan
Orenburg existing pipeline
Smara-Atyrau pipeline
CPC
KPO export pipeline
KPO Export Pipeline
24 “ Pipeline
L = 635 kmKPK – Balshoi Chagan: 181 km
Balscioi Ch. – Atyrau: 454 km
Nr 2 pumping stations (KPK,
Bolshoi Chagan)
Karachaganak Export Pipeline Routes
KAZAKHSTANKashagan Field
AKT OT E
KAIRAN
KAL AMKAS
KASHAGAN SW
KASHAGAN
AKT OT E
KAIRAN
KAL AMKAS
KASHAGAN SW
KASHAGAN
North Caspian Sea PSA Area
Project Main Challenges
# HSE CHALLENGES" Very shallow waters (1.7m at Kairan) " Harsh environment (4-5 months of iced sea per year)" Environmental sensitivity" Minimum discharge " Sulphur management
# TECHNICAL & TECHNOLOGICAL COMPLEXITY" High reservoir pressure" High H2S content " Raw gas re-injection (pressure of 800 bars)" Carsic reservoir
NCS - Environmental Challenges
Bathymetry:
" Water depth ranges 1.5-10m across main prospects
" Storm induced surges of+/- 1.5m common
1
12
3
1
1
1
4
5
6
6
8
7
9
9
9
9
8
88
8
8 8
8
88
8
8
8
8
8
8
7
7
7
7
77
6 6
6
6
6
6
6
5
5
5
5
5
5
5
4
4
44
44
5
5
5
5
4
4
4
4
4
4
4
3
3
3
3
3
3
3
3
3
3
3
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
11
1
1
1
1
1
1
1
1
5
6
5.198.000
5.178.000
5.158.000
5.138.000
5.118.000
5.098.000
5.198.000
5.178.000
5.158.000
5.138.000
5.118.000
5.098.000
5.078.0005.078.000
9.51
0.00
0
9.53
0.00
0
9.55
0.00
0
9.57
0.00
0
9.59
0.00
0
9.61
0.00
0
9.63
0.00
0
9.65
0.00
0
9.67
0.00
0
9.69
0.00
0
9.51
0.00
0
9.53
0.00
0
9.55
0.00
0
9.57
0.00
0
9.59
0.00
0
9.61
0.00
0
9.63
0.00
0
9.65
0.00
0
9.67
0.00
0
9.69
0.00
0
5 1 º 3 0 5 2 º 0 0 5 2 º 3 0 5 3 º 0 0 5 3 º 3 0
4 6 º 3
4 6 º 0
4 6 º 3 0
4 6 º 0 0
5 1 º 3 0 5 2 º 0 0 5 2 º 3 0 5 3 º 0 0 5 3 º 0 0
Site A
Site B
Site C
Regional Bathym
etry Map (based on KC
S exploration data) - Survey AreasFigure 1
0 1 2
NORTH CASPIAN SEA Tengiz
Contour interval: 0.5 m
ONSHOREKAZAKHSTAN
NCS – Sea Level Variations
# Long-term changes in sea level# Seasonal changes in sea level# Short-term surges and retreats
Kashagan – Temperature and Ice
# Temperature in summer above +30 °C
# Minimum temperature registered in winter -°37 C
# 100% of ice in winter
# Seabed scouring
NCS - Environmental Sensitivity
Sulphur Management Strategy
Resource
Gas Re-injection
Long term storage & possible re-use
Reservoir Prevent
Industrial Use, or sales
" Road gravel & paving
" Concrete component
" Fertilizer’s industry
" Chemical industry(H2SO4)
" Leatherware industry
" Others
" Exausted uraniumclaystone open mines
" Depleted cap-rock integer onshore reservoir
" Licenced area
Pumping Water at High Pressure (up to 7,500 psi)
Filling Annulus with Heavy Mud
Rotating Preventer
Mud Cap
Casing
Drill String
Drill Bit
Mud Cap Drilling Schematic
Year 2000 – Kashagan Discovery
DEP
TH
(m
) S.
S.L.
(Ba
ltic
sea
)
40 Km
SWSW NE
4000
4500
5000
T .D .5172.0m
(-5175.5)
UNIT - 1
UNIT - 2
UNIT - 3
4036m (-4042)
4402m (-4406)
4482m (-4485)4536m (-4539) ODT
4623m (-4625) OW C
4844m (-4844)
T IGH TUNIT - 2
UNIT - 3
4311m (-4318.5)
T .D . 4982 m
(-4991 m)
4690m (-4703)
4782m (-4795)
KE-1KW-1
DEP
TH
(m
) S.
S.L.
(Ba
ltic
sea
)
40 Km
SWSW NE
4000
4500
5000
T .D .5172.0m
(-5175.5)
UNIT - 1
UNIT - 2
UNIT - 3
4036m (-4042)
4402m (-4406)
4482m (-4485)4536m (-4539) ODT
4623m (-4625) OW C
4844m (-4844)
T IGH TUNIT - 2
UNIT - 3
4311m (-4318.5)
T .D . 4982 m
(-4991 m)
4690m (-4703)
4782m (-4795)
KE-1KW-1
Distance between the two wells 40 km
5000m4500m
4350m
Platforminterior
Platforminterior
Platformmargin
Platformslope
contour lines depthP2 horizon
4km distance to 4350m tour line of P2 horizon
stance to 4650m contourP2 horizon
KEKE--11
KWKW--11
" In year 2000, the first NFW, well KE-1, has been successfully drilled with the Sunkar Rig, resulting in the Kashagan East discovery
" The second exploratory well on Kashagan West, KW-1, terminated in may 2001 confirming the world class of the North Caspian Sea discoveries
Carbonatic Platform withextension of about 1,200 km2Average Depth: 4,300 m slmMax. Oil Column: 600 mOIP: 38.2 GstbOil reserves (gas re-inj.): up to 13 GstbInitial pressure: 11,500 psi
Carbonatic Platform withextension of about 1,200 km2Average Depth: 4,300 m slmMax. Oil Column: 600 mOIP: 38.2 GstbOil reserves (gas re-inj.): up to 13 GstbInitial pressure: 11,500 psi
Kashagan Fieldfollowing the KCD in June 2002
Undersaturated oil (Pb 3,600 psi)
API gravity: 46°API
Productivity/well: 10 – 30 kbopd
GOR: 2,800 scuft/bls
H2S: 16-18%
Undersaturated oil (Pb 3,600 psi)
API gravity: 46°API
Productivity/well: 10 – 30 kbopd
GOR: 2,800 scuft/bls
H2S: 16-18%
Concepts for KashaganDevelopment Plan
# Gas reinjection of the associated gas
# Development by phases
# Artificial island construction in offshore
# Two phase transfer onshore to oil & gas treatment
Kashagan Field – Development Schematics
EP – Offshore Facilities
CompressorsOperator
Kashagan Gas Re-injection# Each unit designed for 2.2 BCMY and 800 Bar, driven by a FRAM
5 gas turbine# The Kashagan units are an evolution of the Karachaganak ones
(already in operation) and of the Tengiz one (already successfully tested at full load)
Karachaganak Acid Gas Compression Complex (550 bars)
A Comparison between Karachaganak & Kashagan compression requirements
Characteristic Karachaganak Kashagan
Pressure: 550 bar 800 bar
H2S Content: 5% 16-18%
Environment: continental marine
Offshore
Drilling Operations
Drilling Activities
0
1
2
3
4
5
1998 1999 2000 2001 2002 2003
Nr. Drilling Rigs
Since 1999 the well operations activities have increased continuously. In year 2003, four Rigs are being operated
during the Ice free season
0
5000
10000
15000
20000
25000
1998 1999 2000 2001 2002 2003
MetersDrilled
AKTOTE PROJECT
1st WELL drilling
Bautino Base & Marine
KALAMKAS PROJECT1 WELL drilled in
2002
KAIRAN PROJECT1st WELL drilling
KASHAGAN PROJECT7 WELLS
1st WELL drilled in 1999/2000
KASHAGAN SW PROJECT1 WELL drilled in 2003
Wells Drilled or Being Drilled
Transportation
Atyrau to Samara
Aktau
Teheran
Makhachkala
Astrakhan
Baku
NekaTo Ceyhan
Novorossiysk
B TC
CPC
Trasneft 1
T ransneft 2
Atyrau
Bautino
Supsa
Oil Transportation Routes for ExportFrom Samara
Social Infrastructure
Projects
Social & Infrastructure Projects
# NCS in Mangistau and Atyrau region are beingspent ~ $ 24 million for projects such as:" New schools" Medical equipment for rural hospitals" Gas distribution in a number of communities" New & renovated sport facilities for youth schools,
etc.# KPO in West Kazakhstan spent $ 50 million for the
same type of projects as outlined above
Of particular importance is the projects of water supply and electrical power in Aksai
Agip KCO Atyrau Training Center Project
Pilot plants
Oil Production & Demo areas
Oil Production
Plant
Well area Equipment& Demonstration
Practical Area
Simulator of Process
Laboratories
Workshops
13000 Square Meters
Theoretical Training Area
Classrooms
Conference Room
Common areasOffices
CanteenRecreationCar park
Green area
“Baldauren” Children Center
Located in Shchuchinsk on the Chuchye lake, with hospitality for 280 children (500 people with child-care. Works started in August 2001 and are now completed
Health centre for vacation/treatment in the Burabai National Park, excellent for air quality and spring water, includes 7 buildings. Worksstarted in September 2001 and are now completed
The 5-floor building will consist of a reading room for 500 people, audio room, internet room, and an availability of 1,100,000 books. Works started in December 2001 and will be completed by Spring 2004
The National Library
Eni’s Social Projects
Sanatorium “Ok-Zephtes”
Local Content
Karachaganak PSA
North CaspianSea PSA
Karachaganak Phase 2Value of assigned contracts
30,0%70,0%
Non Kazak Kazak
Occupation generated10,000 Workers & Employees
20,0%
80,0%
Non Kazak Kazak
Value of assigned contracts
52,0% 48,0%
Non Kazak Kazak
Forecast of direct and induced Occupation 15,000 Workers &
Employees18,0%
82,0%
Non Kazak Kazak
Local Content