before starting the project listings for the coc … › ... ›...

25
Before Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC Consolidated Application requires TWO submissions. Both this Project Priority Listing AND the CoC Application MUST be submitted prior to the CoC Program Competition deadline as required by the FY 2016 CoC Program Competition NOFA. The FY 2016 CoC Priority Listing includes the following: - Reallocation forms – must be fully completed if the CoC is reallocating eligible renewal projects to create new permanent housing – permanent supportive housing or rapid rehousing, new HMIS, or new SSO specifically for Coordinated Entry projects. - New Project Listing – lists all new project applications created through reallocation and the permanent housing bonus that have been approved and ranked or rejected by the CoC. - Renewal Project Listing – lists all eligible renewal project applications that have been approved and ranked or rejected by the CoC. - UFA Costs Project Listing – applicable and only visible for Collaborative Applicants that were designated as a Unified Funding Agency (UFA) during the FY 2016 CoC Program Registration process. Only 1 UFA Costs project application is permitted and can only be submitted by the Collaborative Applicant. - CoC Planning Project Listing – Only 1 CoC planning project is permitted per CoC and can only be submitted by the Collaborative Applicant. - Grant Inventory Worksheet (GIW) – Collaborative Applicants must attach the final HUD- approved GIW. - HUD-2991, Certification of Consistency with the Consolidated Plan – Collaborative Applicants must attach an accurately completed, signed, and dated HUD-2991. Things to Remember: - All new and renewal projects must be approved and ranked or rejected on the Project Listings. - Collaborative Applicants are responsible for ensuring all project applications are accurately appearing on the Project Listings and there are no project applications missing from one or more Project Listings. - Collaborative Applicants are strongly encouraged to list all project applications on the FY 2016 CoC Ranking Tool located on the FY 2016 CoC Program Competition: Funding Availability page on the HUD Exchange as this will greatly simplify and assist Collaborative Applicants while ranking projects in e-snaps by ensuring no rank numbers or duplicated and that all rank numbers are consecutive (e.g., no missing rank numbers). - If a project application(s) is rejected by the CoC, the Collaborative Applicant must notify the affected project applicant(s) no later than 15 days before the CoC Program Competition application deadline outside of e-snaps and include the reason for rejection. - For each project application rejected by the CoC the Collaborative Applicant must select the reason for the rejection from the dropdown provided. - If the Collaborative Applicant needs to amend a project application for any reason after ranking has been completed, the ranking of other projects will not be affected: however, the Collaborative Applicant MUST ensure the amended project is returned to the applicable Project Listing AND re-rank the project application BEFORE submitting the CoC Priority Listing to HUD in e-snaps. Additional training resources are available online on the CoC Training page of the HUD Exchange at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition- resources/ Applicant: County of San Bernardino CA-609 Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439 Project Priority List FY2016 Page 1 09/09/2016

Upload: others

Post on 25-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Before Starting the Project Listings for the CoCPriority Listing

The FY 2016 CoC Consolidated Application requires TWO submissions.Both this Project Priority Listing AND the CoC Application MUST besubmitted prior to the CoC Program Competition deadline as required bythe FY 2016 CoC Program Competition NOFA.

The FY 2016 CoC Priority Listing includes the following: - Reallocation forms – must be fully completed if the CoC is reallocating eligible renewalprojects to create new permanent housing – permanent supportive housing or rapid rehousing,new HMIS, or new SSO specifically for Coordinated Entry projects. - New Project Listing – lists all new project applications created through reallocation and thepermanent housing bonus that have been approved and ranked or rejected by the CoC. - Renewal Project Listing – lists all eligible renewal project applications that have been approvedand ranked or rejected by the CoC. - UFA Costs Project Listing – applicable and only visible for Collaborative Applicants that weredesignated as a Unified Funding Agency (UFA) during the FY 2016 CoC Program Registrationprocess. Only 1 UFA Costs project application is permitted and can only be submitted by theCollaborative Applicant. - CoC Planning Project Listing – Only 1 CoC planning project is permitted per CoC and can onlybe submitted by the Collaborative Applicant. - Grant Inventory Worksheet (GIW) – Collaborative Applicants must attach the final HUD-approved GIW. - HUD-2991, Certification of Consistency with the Consolidated Plan – Collaborative Applicantsmust attach an accurately completed, signed, and dated HUD-2991.

Things to Remember: - All new and renewal projects must be approved and ranked or rejected on the Project Listings. - Collaborative Applicants are responsible for ensuring all project applications are accuratelyappearing on the Project Listings and there are no project applications missing from one or moreProject Listings. - Collaborative Applicants are strongly encouraged to list all project applications on the FY 2016CoC Ranking Tool located on the FY 2016 CoC Program Competition: Funding Availability pageon the HUD Exchange as this will greatly simplify and assist Collaborative Applicants whileranking projects in e-snaps by ensuring no rank numbers or duplicated and that all rank numbersare consecutive (e.g., no missing rank numbers). - If a project application(s) is rejected by the CoC, the Collaborative Applicant must notify theaffected project applicant(s) no later than 15 days before the CoC Program Competitionapplication deadline outside of e-snaps and include the reason for rejection. - For each project application rejected by the CoC the Collaborative Applicant must select thereason for the rejection from the dropdown provided. - If the Collaborative Applicant needs to amend a project application for any reason after rankinghas been completed, the ranking of other projects will not be affected: however, theCollaborative Applicant MUST ensure the amended project is returned to the applicable ProjectListing AND re-rank the project application BEFORE submitting the CoC Priority Listing to HUDin e-snaps.

Additional training resources are available online on the CoC Training page of the HUDExchange at: https://www.hudexchange.info/e-snaps/guides/coc-program-competition-resources/

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 1 09/09/2016

Page 2: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

1A. Continuum of Care (CoC) Identification

Instructions:The fields on this screen are read only and reference the information entered during the CoCRegistration process. Updates cannot be made at this time. If the information on this screen isnot correct, contact the HUD Exchange Ask A Question (AAQ) athttps://www.hudexchange.info/ask-a-question/.

Collaborative Applicant Name: San Bernardino Office of Homeless Services

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 2 09/09/2016

Page 3: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

2. Reallocation

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

2-1. Is the CoC reallocating funds from one ormore eligible renewal grant(s) that will expire

in calendar year 2017 into one or more newprojects?

Yes

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 3 09/09/2016

Page 4: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

3. Reallocation - Grant(s) Eliminated

CoCs that are reallocating eligible renewal project funds to create a newproject application – as detailed in the FY 2016 CoC Program CompetitionNOFA – may do so by eliminating one or more expiring eligible renewalprojects. CoCs that are eliminating eligible renewal projects entirely mustidentify those projects on this form.

Amount Available for New Project:(Sum of All Eliminated Projects)

$723,652

Eliminated ProjectName

Grant NumberEliminated

Component Type AnnualRenewalAmount

Type of Reallocation

San Bernardino Pa... CA0687L9D091508 TH $158,521

Regular

San Bernardino Tr... CA0877L9D091503 TH $292,203

Regular

Restore To Hope 2015 CA1023L9D091503 TH $84,346 Regular

Gatekeeper2015 CA1142L9D091504 TH $165,610

Regular

St. Martins Too CA1021L9D091502 TH $22,972 Regular

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 4 09/09/2016

Page 5: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: San Bernardino Path To Prosperity

Grant Number of Eliminated Project: CA0687L9D091508

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $158,521

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The CoC and the CoC Board have made a commitment to ending CH and toincreasing PSH beds for chronically homeless individuals and families.THprojects no longer fill a gap in the community as the length of time clients canremain in the program is limited and not a best practice for the CH population.The decision to reallocate was reviewed and approved by the CoC andGoverning Board on 6/15/16 and Path To Prosperity was notified of thereallocation via electronic mail on 7/7/16.

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant Inventory

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 5 09/09/2016

Page 6: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Worksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: San Bernardino Transitional Living Center

Grant Number of Eliminated Project: CA0877L9D091503

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $292,203

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The CoC and the CoC Board have made a commitment to ending CH and toincreasing PSH beds for chronically homeless individuals and families.THprojects no longer fill a gap in the community as the length of time clients canremain in the program is limited and not a best practice for the CH population.The decision to reallocate was reviewed and approved by the CoC andGoverning Board on 6/15/16 and Transitional Living Center was notified of thereallocation via electronic mail on 7/7/16.

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: Restore To Hope 2015

Grant Number of Eliminated Project: CA1023L9D091503

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $84,346

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 6 09/09/2016

Page 7: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

The CoC and the CoC Board have made a commitment to ending CH and toincreasing PSH beds for chronically homeless individuals and families.THprojects no longer fill a gap in the community as the length of time clients canremain in the program is limited and not a best practice for the CH population.The decision to reallocate was reviewed and approved by the CoC andGoverning Board on 6/15/16 and Restore To Hope 2015 was notified of thereallocation via electronic mail on 7/7/16.

3. Reallocation - Grant(s) Eliminated Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: Gatekeeper2015

Grant Number of Eliminated Project: CA1142L9D091504

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $165,610

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The CoC and the CoC Board have made a commitment to ending CH and toincreasing PSH beds for chronically homeless individuals and families.THprojects no longer fill a gap in the community as the length of time clients canremain in the program is limited and not a best practice for the CH population.The decision to reallocate was reviewed and approved by the CoC andGoverning Board on 6/15/16 and Gatekeeper2015 was notified of thereallocation via electronic mail on 7/7/16.

3. Reallocation - Grant(s) Eliminated Details

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 7 09/09/2016

Page 8: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

* 3-1. Complete each of the fields below for each eligible renewal grant thatis being eliminated during the FY 2016 reallocation process. CollaborativeApplicants should refer to the final HUD-approved FY 2016 Grant InventoryWorksheet to ensure all information entered on this form is accurate.

Eliminated Project Name: St. Martins Too

Grant Number of Eliminated Project: CA1021L9D091502

Eliminated Project Component Type: TH

Eliminated Project Annual Renewal Amount: $22,972

3-2. Describe how the CoC determined that this project should beeliminated and include the date the project applicant was notified. (limit 750 characters)

The CoC and the CoC Board have made a commitment to ending CH and toincreasing PSH beds for chronically homeless individuals and families.THprojects no longer fill a gap in the community as the length of time clients canremain in the program is limited and not a best practice for the CH population.The decision to reallocate was reviewed and approved by the CoC andGoverning Board on 6/15/16 and St. Martins Too was notified of the reallocationvia electronic mail on 7/7/16.

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 8 09/09/2016

Page 9: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

4. Reallocation - Grant(s) Reduced

CoCs that are reallocating eligible renewal project funds to create a newproject application – as detailed in the FY 2016 CoC Program CompetitionNOFA – may do so by reducing one or more expiring eligible renewalprojects. CoCs that are reducing eligible renewal projects entirely mustidentify those projects on this form.

Amount Available for New Project(Sum of All Reduced Projects)

Reduced ProjectName

Reduced GrantNumber

AnnualRenewalAmount

AmountRetained

Amount availablefor new project

Reallocation Type

This list contains no items

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 9 09/09/2016

Page 10: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

5. Reallocation - New Project(s)

Collaborative Applicants must complete each field on this form thatidentifies the new project(s) the CoC created through the reallocationprocess.

Sum of All New Reallocated Project Requests(Must be less than or equal to total amount(s) eliminated and/or reduced)

$723,652

Current Priority # New ProjectName

ComponentType

Transferred Amount Reallocation Type

24 SBC Rapid Re... RRH $438,172 Regular

21 Keys for Suc... RRH $285,480 Regular

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 10 09/09/2016

Page 11: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 24

Proposed New Project Name: SBC Rapid Re-Housing Network

Component Type: RRH

Amount Requested for New Project: $438,172

5. Reallocation - New Project(s) Details

Instructions:For guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

5-1. Complete each of the fields below for each new project createdthrough reallocation in the FY 2016 CoC Program Competition. For list ofall eligible types of new projects that may be created through thereallocation process, see the FY 2016 CoC Program Competition NOFA.

FY 2016 Rank (from Project Listing): 21

Proposed New Project Name: Keys for Success

Component Type: RRH

Amount Requested for New Project: $285,480

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 11 09/09/2016

Page 12: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

6. Reallocation: Balance Summary

InstructionsFor guidance on completing this form, please reference the FY 2016 CoC Priority ListingDetailed Instructions. Submit technical question to the e-snaps HUD Exchange Ask A Question(AAQ) at https://www.hudexchange.info/get-assistance/.

6-1. Below is a summary of the information entered on the eliminated andreduced reallocation forms. The last field on this form, “RemainingReallocation Balance” should equal zero. If there is a positive balanceremaining, this means the amount of funds being eliminated or reducedare greater than the amount of funds requested for the new reallocatedproject(s). If there is a negative balance remaining, this means that morefunds are being requested for the new reallocated project(s) than havebeen reduced or eliminated from other eligible renewal projects, which isnot permitted.

Reallocation Chart: Reallocation Balance SummaryReallocated funds available for new project(s): $723,652

Amount requested for new project(s): $723,652

Remaining Reallocation Balance: $0

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 12 09/09/2016

Page 13: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Continuum of Care (CoC) New Project Listing

Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the FY2016 CoC Priority Listing Detailed Instructions and the CoC Priority Listing Instructional Guide.

To upload all new project applications that have been submitted to this CoC Project Listing, clickon the "Update List" button. This process may take a few minutes based upon the number ofnew projects submitted that need to be located in the e-snaps system. The CollaborativeApplicant may update each of the Project Listings simultaneously. The Collaborative Applicantcan wait for the Project Listings to be updated or can log out of e-snaps and come back later toview the updated list(s). To review a project on the New Project Listing, click on the magnifyingglass next to each project to view project details. To view the actual project application, click onthe orange folder. If there are errors identified by the Collaborative Applicant, the project can beamended back to the project applicant to make the necessary changes by clicking on the amendicon. The Collaborative Applicant has the sole responsibility for ensuring all amended projectsare resubmitted and appear on this project listing BEFORE submitting the CoC Priority Listing ine-snaps.

Project Name DateSubmitted

Grant Term ApplicantName

BudgetAmount

Rank Comp Type

Step Up inSan Be...

2016-09-0113:19:...

1 Year Step Up onSecond...

$361,002 23 PH

The SalvationArm...

2016-09-0516:23:...

1 Year The SalvationArmy

$200,002 22 PH

Keys forSuccess

2016-09-0700:41:...

1 Year Knowledgeand Edu...

$285,480 21 PH

SBC RapidRe-Hous...

2016-09-0710:40:...

1 Year InlandTemporary ...

$438,172 24 PH

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 13 09/09/2016

Page 14: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Continuum of Care (CoC) Renewal Project Listing

Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the FY2016 CoC Priority Listing Detailed Instructions and the CoC Priority Listing Instructional Guide.

To upload all renewal project applications that have been submitted to this Renewal ProjectListing, click on the "Update List" button. This process may take a few minutes based upon thenumber of renewal projects that need to be located in the e-snaps system. The CollaborativeApplicant may update each of the Project Listings simultaneously. The Collaborative Applicantcan wait for the Project Listings to be updated or can log out of e-snaps and come back later toview the updated list(s). To review a project on the Renewal Project Listing, click on themagnifying glass next to each project to view project details. To view the actual projectapplication, click on the orange folder. If there are errors identified by the CollaborativeApplicant, the project can be amended back to the project applicant to make the necessarychanges by clicking on the amend icon. The Collaborative Applicant has the sole responsibilityfor ensuring all amended projects are resubmitted and appear on this project listing BEFOREsubmitting the CoC Priority Listing in e-snaps.

The Collaborative Applicant certifies thatthere is a demonstrated

need for all renewal permanent supportivehousing and rapid

re-housing projects listed on the RenewalProject Listing.

X

The Collaborative Applicant does not haveany renewal permanent

supportive housing or rapid re-housingrenewal projects.

Project Name DateSubmitted

Grant Term ApplicantName

BudgetAmount

Rank Comp Type

Step Up inSan Be...

2016-09-0113:37:...

1 Year Step Up onSecond...

$1,544,888 13 PH

PermanentHousing...

2016-09-0119:28:...

1 Year Central CityLuth...

$76,455 7 PH

New Hope,Too! (2...

2016-09-0118:17:...

1 Year New HopeVillage,...

$39,145 1 PH

Homes ofHope

2016-09-0217:09:...

1 Year Time ForChange F...

$361,001 2 PH

Hope ForHeroes 2...

2016-09-0318:43:...

1 Year LightHouseSocial...

$328,896 8 PH

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 14 09/09/2016

Page 15: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Hope forHeroes F...

2016-09-0318:44:...

1 Year LightHouseSocial...

$487,237 5 PH

HMIS Renewal2016

2016-09-0618:53:...

1 Year County of SanBer...

$250,158 19 HMIS

InfiniteHorizons...

2016-09-0710:36:...

1 Year InlandTemporary ...

$518,002 6 PH

Cornerstone 2016-09-0715:36:...

1 Year HousingAuthority...

$400,415 14 PH

WhisperingPines

2016-09-0716:43:...

1 Year HousingAuthority...

$194,141 15 PH

ProjectGateway

2016-09-0716:44:...

1 Year HousingAuthority...

$182,550 4 PH

New Horizon 2016-09-0717:14:...

1 Year HousingAuthority...

$1,865,076 12 PH

SteppingStones

2016-09-0717:07:...

1 Year HousingAuthority...

$331,739 11 PH

LanternWoods

2016-09-0717:33:...

1 Year HousingAuthority...

$225,214 18 PH

LaurelbrookEstates

2016-09-0717:22:...

1 Year HousingAuthority...

$357,984 9 PH

KEYS for Life 2016-09-0718:05:...

1 Year Knowledgeand Edu...

$241,021 17 PH

2016 FastLinkage...

2016-09-0719:20:...

1 Year Inland EmpireUni...

$403,136 20 SSO

TAYPermanentSup...

2016-09-0812:58:...

1 Year Global OneDevelo...

$187,011 3 PH

U.S.VETS -Inland...

2016-09-0814:23:...

1 Year United StatesVet...

$1,021,292 10 PH

Hope Partners'Fa...

2016-09-0817:44:...

1 Year Inland ValleyCou...

$141,137 16 PH

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 15 09/09/2016

Page 16: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Continuum of Care (CoC) Planning Project Listing

Instructions:Prior to starting the New Project Listing, Collaborative Applicants should carefully review the FY2016 CoC Priority Listing Detailed Instructions and the CoC Priority Listing Instructional Guide.

To upload the CoC planning project application that has been submitted to this CoC PlanningProject Listing, click on the "Update List" button. This process may take a few minutes as theproject will need to be located in the e-snaps system. The Collaborative Applicant may updateeach of the Project Listings simultaneously. The Collaborative Applicant can wait for the ProjectListings to be updated or can log out of e-snaps and come back later to view the updated list(s).To review the CoC Planning Project Listing, click on the magnifying glass next to view the projectdetails. To view the actual project application, click on the orange folder. If there are errorsidentified by the Collaborative Applicant, the project can be amended back to the projectapplicant to make the necessary changes by clicking on the amend icon. The CollaborativeApplicant has the sole responsibility for ensuring all amended projects are resubmitted andappear on this project listing BEFORE submitting the CoC Priority Listing in e-snaps.

Only one CoC Planning project application can be submitted and it must match the CollaborativeApplicant information on the CoC Applicant Profile. Any additional CoC Planning projectapplications must be rejected.

Project Name Date Submitted Grant Term Applicant Name Budget Amount Comp Type

CoC PlanningProj...

2016-09-0618:51:...

1 Year County of SanBer...

$336,602 CoC PlanningProj...

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 16 09/09/2016

Page 17: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Funding Summary

InstructionsFor additional information, carefully review the FY 2016 CoC Priority Listing Detailed Instructionsand the CoC Priority Listing Instructional Guide.

This page contains the total budget summaries for each of the project listings for which theCollaborative Applicant approved and ranked or rejected project applications. The CollaborativeApplicant must review this page to ensure the totals for each of the categories is accurate. The"Total CoC Request" indicates the total funding request amount the Collaborative Applicant willsubmit to HUD for funding consideration. As stated previously, only 1 UFA Cost projectapplication (for UFA designated Collaborative Applicants only) and only 1 CoC Planning projectapplication can be submitted and only the Collaborative Applicant designated by the CoC iseligible to request these funds.

Title Total Amount

Renewal Amount $9,156,498

New Amount $1,284,656

CoC Planning Amount $336,602

Rejected Amount $0

TOTAL CoC REQUEST $10,777,756

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 17 09/09/2016

Page 18: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Attachments

Document Type Required? Document Description Date Attached

1. Certification of Consistencywith the Consolidated Plan

Yes Certificate of Co... 09/09/2016

2. FY 2016 HUD-approvedGrant Inventory Worksheet

Yes FY 2016 HUD-appro... 08/29/2016

3. FY 2016 Rank (from ProjectListing)

No FY 2016 Rank Docu... 09/09/2016

4. Other No

5. Other No

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 18 09/09/2016

Page 19: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Attachment Details

Document Description: Certificate of Consistency with the ConsolidatedPlan

Attachment Details

Document Description: FY 2016 HUD-approved Grant InventoryWorksheet

Attachment Details

Document Description: FY 2016 Rank Document

Attachment Details

Document Description:

Attachment Details

Document Description:

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 19 09/09/2016

Page 20: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Submission Summary

WARNING: The FY2016 CoC Consolidated Application requires 2submissions. Both this Project Priority Listing AND the CoC Consolidated

Application MUST be submitted.

WARNING: The FY2016 CoC Consolidated Application requires 2submissions. Both this Project Priority Listing AND the CoC Consolidated

Application MUST be submitted.

Page Last Updated

Before Starting No Input Required

1A. Identification 08/12/2016

2. Reallocation 09/01/2016

3. Grant(s) Eliminated 09/01/2016

4. Grant(s) Reduced No Input Required

5. New Project(s) 09/01/2016

6. Balance Summary No Input Required

7A. CoC New Project Listing 09/07/2016

7B. CoC Renewal Project Listing 09/08/2016

7D. CoC Planning Project Listing 09/07/2016

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 20 09/09/2016

Page 21: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC

Attachments 09/09/2016

Submission Summary No Input Required

Applicant: County of San Bernardino CA-609Project: CA-609 CoC Registration FY2016 COC_REG_2016_135439

Project Priority List FY2016 Page 21 09/09/2016

Page 22: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC
Page 23: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC
Page 24: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC
Page 25: Before Starting the Project Listings for the CoC … › ... › CA_6092016ProjectPriorityListing.pdfBefore Starting the Project Listings for the CoC Priority Listing The FY 2016 CoC