bechtel lecture- highlights of 4 special projects henry h. bardakjian

28
Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian Arial View of the Carlsbad Desalination Plant

Upload: phungmien

Post on 08-Dec-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Bechtel Lecture- Highlights of 4 Special Projects

Henry H. Bardakjian

Arial View of the Carlsbad Desalination Plant

Page 2: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

144-inch Diameter RCCP Bay Subaqueous Aqueduct from

Saddle Island to the Main Land

2

Saddle Island

Lake Mead Intakes

Page 3: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

144-inch Diameter RCCP for the 600 MGD Bay

Aqueduct near Las Vegas

3

Page 4: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

12 inch wall, 5/8 inch steel cylinder and three reinforcement cages

Page 5: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Triple 144-inch RCCP assembly weighing 180 tons with two

temporary bulkheads in the launch way saddles on rails. The

assembly is ready to be launched into the water.

5

Page 6: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

The floating assembly was pulled by a tug from the

launching site up to the laying barge.

6

Page 7: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

The assembly was positioned in the laying barge.

7

Page 8: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

The hoisting frame

and saddles were

positioned on top

of the assembly.

One bulkhead

would later be

removed and the

assembly lowered

into 90-ft. deep

water for

installation

8

Page 9: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Laying Barge and Hoisting Frame and Saddles

9

Page 10: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Test Pipe with deflection and radial tension monitors

Page 11: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

The hoisting frame

and saddles were

positioned on top

of the assembly.

One bulkhead

would later be

removed and the

assembly lowered

into 90-ft. deep

water for

installation

11

Page 12: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Radial tension and diagonal tension shear crack

at the first test pipe

12

Page 13: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

L = 19,884’ (3.8 Miles)

L = 22,458’ (4.3 Miles)

Previous Contract Complete = 8,008’

Arrowhead Tunnels- A 144-Inch-Diameter

Composite Steel-and-Concrete Tunnel Liner Designed For External Heads Up to 1200 feet.

Page 14: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Arial View of the Carlsbad Desalination PlantWaterman Portal

Page 15: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Initial Concrete Gasketed-Segmental Liner

Page 16: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Bechtel Award PresentationFinal Lining Installation

Arrowhead East Tunnel 1999

Page 17: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Components of the composite wall tunnel liner

Figure 2. Components of the Composite Wall Tunnel Liner

CO

NC

RE

TE C

OR

E

NELSON STUD

OUTER CAGE

INNER CAGE

Page 18: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Reinforcing Cages and Nelson Studs Inside The Steel

Cylinder

Page 19: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Special Project Requirements

Hauling Two Pipe Sections into Tunnel

Page 20: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Load Deflection Tests with Some of the

Instrumentation Shown

Figure 4. 3-Edge Bearing Load-Deflection Test

Page 21: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

21

Measured vs. Calculated Deflections

Measured Deflections

Core

Thick.

Deflections at 50%

Impact Load, in.

Deflections at First

Crack Load, in.

Deflections at 0.01”

Crack Load, in.

Horizontal Vertical Horizontal Vertical Horizontal Vertical

10 in. 0.024 0.02 0.081 0.09 0.42 0.47

12 in. 0.01 0.007 0.044 0.040 0.24 0.27

Calculated Deflections

Core Thick. Maximum Deflection, in.

Uncracked Cracked

Horizontal. Vertical Horizontal Vertical

10 in. 0.041 0.018 0.061 0.027

12 in. 0.031 0.014 0.034 0.015

Page 22: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Bechtel Award Presentation

Page 23: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Olivenhain-Lake Hodges 120-inch Diameter Penstock

Wye Section

Page 24: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Olivenhain-Lake Hodges 120-inch Diameter Penstock

Page 25: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Material Selection Challenge-

Voestalpine Steel Producer in Leinz, Austria

Page 26: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Leinz, Austria

Page 27: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

Fabrication Challenges

Page 28: Bechtel Lecture- Highlights of 4 Special Projects Henry H. Bardakjian

120 inch steel penstock