bechtel engineer 프로젝트 수행기행
DESCRIPTION
experience with bechtelTRANSCRIPT
-
ll
2010 34 99
1 UAE 4(4 Units) . , .
1976 LosAngeles Norwalku Bechtel, Maanshan Plant 5&6 Project Plant DesignDiscipline Engineering Supervisor . ( 3&4)
Bechtel . Bechtel Maanshan 900MW Plant , Plant Copy Engineering Manhours Saving .
34 . 3&4 1~2 3&4
( 1&2) Bechtel . 3&4 1978 1986 6
100% Power Test &Verification Bechtel .
Bechtel 3&4
3&4 Feasibility StudyTeam Bechtel ( (KHNP) ).
1961 California State Poly TechnicUniversity California State University LongBeach California (PE)ASME Bechtel Power Corporation (70~87) - 3,4 REO
-
3&4- UAE -
KTI Engineering & Services
-
ll
2010 34100
( , Plant Copy Project MaanshanProject Engineering Supervisor ). Bechtel
Project Team Bechtel 3&4, . (KNE, KOPEC)
b Copy . Maanshan Project ,
Georgia Power Project 3&4 . . 1983 2 Bechtel Expatric
Engineering Group Supervisor . Maanshan Project CopyProject . Design Documents Project tytle
Maanshan KEPCO-KORI 3&4 . Bechtel
. Bechtel Engineering Manhours . 3&4 Bechtel . REO Bechtel ResidentialEngineering Organization Team .
, () . . . Bechtel
. Typical 3&4 . . Bechtel
Advisory . 3&4 .
( Pumps, Valves, Vessels, Equipments) Wall to Wall . . Scope Code . . Major Scope ,
Sub-contractors . ,ASME-Class 1 System Safety Analysis() Westinghouse, ASME Class 2&3, Critical System Safety Analysis BechtelScope, (Piping Supports) PC , Non-Qand PC (KOPEC, KNE). .
..Sub-contractorsCoordination
Bechtel REO(). REO()
, . As-Built Verification REO( )
( As-Built verification 3Miles Island NRC Code).
-
-
ll
2010 34 101
Bechtel Engineers 4 KNE( KOPEC) 50 Engineer .
. REO-K.Kim( ) , ( , ).
FCR/NCR
. REO FCR(FieldChange Notice) NCR(Non-conformanceChange Notice) . Q.A. Final Approval
() , Bechtel Q.A.Engineering Approval Final Sign. Bechte Engineering
Design Code . As-BuiltEngineering . Bechtel Manhours . FCR/NCR
Engineering As BuiltAnalysis Code Equation As-Built Approval BechtelQ.A. Release . Dollars .2~3,
2 ( , ).
200 54
, Scope of Work , NRC Code As-BuiltVerification Report , , Proposal Power Piping TestVerification . Commercial Power., As-Built Verification Scope
(PiPe Supports) Design Analysis . ASME Code Class 1 System
Westinghouse Contract Safety Analysis, Westinghouse As-Built Walk-Down Manhours . REO Walk-down
As-Built Reports Westinghouse . Westinghouse . Westinghouse As-Built
Analysis , Engineeringmanhours . BechtelREO K.Kim Re-analysis Re-Analysis . Manhouse Saving .ASME Class 2&3 Critical System
Analysis Scope Bechtel, As-Built-Walk-Down Report Re-Analysis Manhours . REO Bechtel Re-Analysis . Scope of WorkWestinghouse
Analysis Scope 26 Line Bechtel Scope 160 Lines .
3&4
-
ll
2010 34102
manhours Engineering Scope. Scope
Peak Load 200 2 . (KOPEC) 50 Bechtel Engineer 4 2 .
12
Engineer Engineer 2, 3. . .
. 12 . . 3&4 . ,
2,000 manhours proposal . Scope of Work Scope 100% Power Test Verification, . ( )
Experience Resume . 2 Keulung NuclearPower 100% Power Test 3 100% Power Test . Bechtel . Bechtel Engineer K.Kim Test
Scope , TestEngineer . Bechtel Letter( , Bechtel .) 2Manhours Save .Bechtel 4 Engineers KNE
( KOPEC) 50 4 As-Built Verification . . KOPEC , Work-Down Containment .
. As-Built Engineering . Engineering EngineeringAnalysis . 4. .
Staffs .
UAE
. . .
. 3&4 34 UAE .
Project .
3&4