SAP BASIS Requirement For Euro Bond Pvt. Ltd. Version: V000 Prepared By: Mr. Suraj Mahangare Prepared Date: 17.01.2015 File Name: BASIS_Requirement_For_Euro_Bond_Pvt._Ltd_17012015.pdf

Upload: donna-schmidt

Post on 19-Nov-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

SAP Support services for Rieco Industries Limited By Pranav Systtech Pvt Ltd

SAP BASIS RequirementForEuro Bond Pvt. Ltd.

Version:

V000 Prepared By:

Mr. Suraj Mahangare Prepared Date:

17.01.2015 File Name:

BASIS_Requirement_For_Euro_Bond_Pvt._Ltd_17012015.pdfSystem Landscape:SAP ECC 6.01. Two System Landscape:

2. Three System Landscape

Questionnaire for the System Built up

1) System Landscape

A) Two Tire System Landscape (Production & Quality)

B) Three Tire System Landscape (Production, Quality & Development)

2) No of SAP User Licence required.

3) During working peak hours on daily basis.4) Average working days out of 365 days.5) Operating System for ex - Windows, UNIX, Linux, etc.6) Database for ex - SQL, Oracle, DB2, Sybase, HANA, etc7) Functional Modules Requirement for ex- FICO, MM, SD, PP, PM, QM, HR, PS.8) Advance Modules requirement for ex: -SCM, BI,CRM9) Solution Manager.10) Backup system: -Tape Drive (Recommended), HDD.Note: -

On the basis of above mention points we will create project on SAP Portal through which we can give best possible hardware solution in detail.