  • ANNUAL DEVELOPMENT PLANANNUAL DEVELOPMENT PLANANNUAL DEVELOPMENT PLAN

    200920092009---101010

    BASIRHAT MUNICIPALITYBASIRHAT MUNICIPALITYBASIRHAT MUNICIPALITY NORTH 24 PARGANASNORTH 24 PARGANASNORTH 24 PARGANAS

  • Acknowledgement   I  would  like  to  take  this  privilege  to  inform  you  that  the  Basirhat  Municipality  has  finished  the preparation of Annual Development Plan for the financial year 2009‐10.The information provided in the document is absolutely flawless and reliable.   In  this  regard  I  would  like  to  thank  Vice‐chairman,  members  of  Standing  Committee,  Councillors, Executive Officer, Finance officer, Urban Planner, Accounts and Finance Co‐ordinator, members of DPG and DTG‐1,DTG‐2 and DTG‐3, municipal Staffs who have rendered their valuable services towards the completion of Annual Development Plan  report. Above all,  I would  like  to  thank officials  of DLB and CMU for their guidance and technical support as and when it was required.  I wish that this Annual Development Plan will enable the ULB to design comprehensive development of its jurisdiction.   

             Narayan Mukherjee  

        Chairman                 Basirhat Municipality  

  • i  

    TABLE OF CONTENTS 

    Contents  Page No. 

    Introductory Note of Chairperson  1 

    Executive Summary  2 

    Sub Component wise distribution of Project Proposals  4 

    List of Projects of ADP for 2009‐10  6 

    Introduction to the ADP  12 

    Key features of the ADP  13 

    Brief Description on Component‐1  15 

    Subcomponent‐1.1 : Slum Infrastructure Improvement Plan  16 

    Brief Description on Slum Infrastructure Improvement plan  17 

    List of Slum Pockets  17 

    List of Projects of Slum Infrastructure Improvement plan    18 

    Details of Slum Infrastructure Improvement plan Projects  18 

    Subcomponent‐1.2 : Intra‐Municipal Improvement Plan  55 

    Brief Description on Intra – Municipal Improvement Plan  56 

    List of Projects of Intra – Municipal Improvement Plan  56 

    Details Project Proposal of Intra – Municipal Improvement Plan     58 

    Subcomponent‐1.4 : Land Use Development Control Plan  71 

    Brief Description on Land Use Development Control Plan  72 

    List of Projects of Land Use Development Control Plan  72 

    Details Project Proposal of Land Use Development Control Plan  73 

    Subcomponent‐1.5 : Environment Management Plan  76 

    Brief Description on Environment Management Plan  77 

    List of Projects of Environment Management Plan  78 

    Details Project Proposal formats of Environment Management Plan    79 

    Component‐2 Social and Livelihood Development  83 

    Brief Description on Component – 2    84 

    Subcomponent‐2.1 : Livelihood & Poverty Alleviation Plan  85 

    Brief Description on livelihood & Poverty Alleviation Plan  86 

  • ii  

    List of Projects of Livelihood & Poverty Alleviation Plan  86 

    Details Project Proposal of Livelihood & Poverty Alleviation Plan  87 

    Subcomponent‐2.2 : Local Economic Development Plan  91 

    Brief Description on Local Economic Development Plan  92 

    List of Projects of Local Economic Development Plan  92 

    Details Project Proposal of Local Economic Development Plan  93 

    Subcomponent‐2.3 : Health Care Delivery Improvement Plan  95 

    Brief Description on Health Care Delivery Improvement Plan  96 

    List of Projects of Health Care Delivery Improvement Plan    96 

    Details Project Proposal of Health Care Delivery Improvement Plan  97 

    Subcomponent‐2.4 : Primary Education Improvement Plan  106 

    Brief Description on Primary Education Improvement Plan  107 

    List of Projects of Primary Education Improvement Plan    108 

    Details Project Proposal of Primary Education Improvement Plan    108 

    Component‐3 Municipal Institutional Strengthening  111 

    Brief Description on Component – 3  112 

    Subcomponent‐3.1: Organization Development Plan  113 

    Brief Description on Organisation Development Plan  114 

    List of Projects of Organization Development Plan  115 

    3.1.3 Details Project Proposal of Organization Development Plan  115 

    Subcomponent‐3.3 : Internal Process and System Improvement Plan  118 

    Brief Description on Internal Process and System Improvement Plan  119 

    List of Projects of Internal Process and System Improvement Plan  119 

    Details Project Proposal formats of Internal Process and System Improvement Plan 

    120 

    Subcomponent‐3.3 : Citizen Interface Plan  123 

    Brief Description on Citizen Interface Plan  124 

    List of Projects of Citizen Interface Plan  124 

    Details Project Proposal formats Citizen Interface Plan  125 

    Subcomponent‐3.4 : Financial Plan  128 

    Brief Description on Financial Plan  129 

  • iii  

    List of Projects of Financial Plan  130 

    Details Project Proposal formats Financial Plan  130 

    Financial Statements  131 

    Respective portion of FinPro from DDP  132 

    Sub‐component wise ISF distribution  137 

    Financial Statement as per Book‐16 of DDP Guidelines  138 

    Operational Strategy  149 

    Mid Term Review  151 

    Linkage of ADP’2009‐10 with Budget  152 

    Annexure  155 

    Quality Review  170  

    LIST OF TABLES 

    Table 01, Sub Component wise distribution of Project Proposals Table 02, List of Projects of ADP for 2009‐10 1.1.1   List of Slum Pockets (According to the IHSDP Scheme) 1.2.1   List of Intra Municipal Infrastructure Projects 1.4.1    List of Land Use Development Projects 1.5.1    List of Environment Management Projects  2.1.1    List of Livelihood & Poverty Alleviation Projects 2.2.1   List of Local Economic Development Projects 2.3.1   List of Health Care Delivery Improvement Projects 2.4.1   List of Primary Education Improvement Projects 3.1.1   List of Organization Development Plan Projects 3.3.1   List of Citizen Interface Plan Projects 3.4.1   List of Financial Plan Projects  

    LIST OF FIGURES Figure 01, Process Flow Diagram of ADP Preparation Figure 02, Sub Component wise distribution of Project Proposals Figure 03, Sub Component Wise Distribution of Investible Surplus Fund Figure 04, Component Wise Distribution of Investible Surplus Fund Figure 05, The ADP Cycle 

  • iv  

    ABBREVIATION  

    List of Abbreviations used in the ADP  

    AADP  Annual Development Plan 

    BBoC  Board of Councillors BSNL  Bharat Sanchar Nigam Limited BMS  Basic Minimum Services 

    CCAGR  Compounded Annual Growth Rate CO  Community Organizers CDS  Community Development Society CBO  Community Based Organization CBPHC  Community Based Primary Health Care Services CMU  Change Management Unit CIC  Chairman‐in‐Council  CPHEEO  Central Public Health and Environmental Engineering Organization 

    DDDP  Draft Development Plan DTG 1  Draft Technical Group 1  DPG  Draft Policy Group DWCUA  Development of Women and Children in Urban Area DFID  Department For International Development  DPC  District Planning Committee DLB  Directorate of Local Bodies 

    EEMP  Environment Management Plan EO  Executive Officer 

    FFTS  Full‐time Technical staff FO  Finance Officer FGD  Focused Group Discussion  FinPro  Municipal Financial Planning Software  FP  Financial Plan 

    GGIS  Geographic Information Systems GoWB  Government of West Bengal  

    HHHW  Honorary Health Officer  HR  Human Resource  HoD  Head of Department  

    IIHSDP  Integrated Housing & Slum Development Programme IDBI  Industrial Development Bank of India  IPP  Intensive Population Project 

  • v  

    JJNNURM  Jawaharlal Nehru National Urban Renewal Mission  

    KKUSP  Kolkata Urban Services for the Poor  KMA  Kolkata Metropolitan Area  KMDA  Kolkata Metropolitan Development Authority  

    LLPCD  Litres Per Capita Per Day LED  Local Economic Development  

    MMED  Municipal Engineering Directorate  MIS  Management Information System  MLD  Million Litres per Day MB  Measurement Book  M.A. Dept.   Municipal Affairs Department  

    NNGO  Non‐Government Organization  NHC  Neighborhood Committee NHG  Neighborhood Group 

    OO&M  Operation & Maintenance  OD  Organization Development  

    PPPH  Persons Per Hector  PHED  Public Health Engineering Department  PPP  Public Private Partnership  PMRY  Pradhan Mantri Rojgar Yojna  PPA  Participatory Poverty Assessment PWD  Public Works Department  PTMO  Part Time Medical Officer 

    QQSS  Quick Slum Survey  

    RRCH  Reproductive Child Health  RCV  Resource Community Volunteers  

    SSOE  State of Environment SUDA  State Urban Development Agency  SFC  State Finance Commission  SJSRY  Swarna Jayanti Saheri Rojgar Yojna  SWM  Solid Waste Management  SHG  Self Help Group  SSA  Sarva Sikhsa Abhijan  

    TTOR  Terms of Reference  TPO  Town Project Officer  TCG  Thrift & Credit Group  

  • vi  

    UULBs  Urban Local Bodies  UPE Cell   Urban Poverty Eradication Cell  UDD  Urban Development Department UDPFI  Urban Development Plan Formulation & Implementation Guidelines UWEP  Urban Wage Employment Programme 

    WWBFC  West Bengal Financial Corporation WBSEDCL  West Bengal State Electricity Distribution Company Limited  WBIDC  West Bengal Industrial Development Corporation WCs  Ward Committees WECs  Ward Education Committees    

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 1  

    Introductory Note of Chairperson  With  a  view  to  implementing  the  various  development programmes  incorporated  in  the Draft  Development  Plan (DDP) under the programme of Kolkata Urban Services for the  Poor  (KUSP),  Basirhat  Municipality  has  prepared  an Annual Development Plan (ADP) for the period of financial year  2009‐10.  The  aims  and  objectives  of  ADP  are  to undertake  different  development  programmes  for  the overall  betterment  of  municipal  area  and  to  fulfill  and materialize  those development programmes  successfully within  the  stipulated  time of one year.   The West Bengal Municipal Act, 1993 requires municipalities to prepare ADP by the Board of Councillors of this municipality in accordance with the Section 300 of the said Act. The ADP is prepared by the Board of Councillors of the Municipality covering the relevant portioned of the DDP in consultation with the District Planning Committee.  The ADP covers  the  functions of better water supply arrangements proper maintenance of drainage, widening and improvement of roads, basic infrastructure services primary health, public  health,  organizational  requirements,  primary  education  including  “Sarba  Siksha Mission”,  Community  development  schemes,  creation  of  poverty  alleviation  programme, social  livelihood,  maintenance  of  healthy  environment  ,  better  waste  management antipollution measures etc.  The ADP document  is a complete set of schemes prioritized and made ready by the Policy Groups and Technical Groups of this municipality having a significant linkage with the DDP in its each component.  In implementing the plan this municipality commits to deliver the stated plan and empower the citizens to participate the programmes and expects mass communications to achieve the target.  I hope, the Second Annual Development Plan for the year 2009‐10 of this Municipality would be materialized in time with great success wishing on overall and although improvement of Basirhat Municipality area. I thank to all concerned who are directly or indirectly involved in preparing the ADP. 

      

                               Narayan Mukherjee                          Chairman                     Basirhat Municipality

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 2  

    Executive Summary  As per the West Bengal Municipal Act 1993, Basirhat Municipality has prepared the Annual Development Plan or ADP covering a period of one financial year (April’2009 to March’2010) and that addresses a range of municipal functions as laid down in the Act.   

    Figure 01, Process Flow Diagram of ADP Preparation  

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 3  

    Basirhat Municipality has prepared the Annual Development Plan or ADP for the financial year  2009‐10 where  the  annual  segment picked up  for  the  respective years  from  the DDP document.  In Annual Development Plan, Basirhat Municipality has taken total 63 numbers of projects to implement  in  2009‐10  financial  year.  Where  30  numbers  of  projects  has  taken  from Component‐1,  21  numbers  of  projects  has  taken  from  Component‐2  and  12  numbers  of projects has taken from Component‐3.  Slum  Infrastructure  Improvement  Plan  contains  1  number  of  projects,  Intra‐municipal Infrastructure  Improvement Plan  contains  19  number  of  projects, Land Use Development and Control Plan contains 4 number of projects, Environment Management Plan contains 5 number of projects, Livelihood and Poverty Alleviation Plan contains 5 number of projects, Local Economic Development Plan contains 2 number of projects, Health Care Plan contains 11 number of projects, Primary Education Improvement Plan contains 3 number of projects, Organization Development Plan contains 4 number of projects, Internal Process and System Improvement Plan contains 3 number of projects, Citizen Interface Plan contains 4 number of projects and lastly Financial Plan contains 1 number of project.  Total Investible Surplus is Rs.69.85 lakh in ADP’2009‐10. From total Investible Surplus fund Rs. 44.50 lakh is allocated for Component‐1, Rs.14.00 lakh is allocated for Component‐2 and Rs.11.35 lakh is allocated for Component‐3. The Investible Surplus fund is allocated 64% for Component‐1, 20% for Component‐2 and 16% for Component‐3.   

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 4  

    Figure 02, Sub Component wise distribution of Project Proposals  

      

    Table 01, Sub Component wise distribution of Project Proposals 

    Sub Component Plans  No. of Projects with Tied/ Assured Funds 

    No. of Projects without Tied/ Assured Funds 

    Total 

    1.1 Slum Infrastructure  1 0 11.2 Intra Municipal  14 6 19

    1.4 Land use Development  2 2 41.5 Environment Management  0  5  5 

    Component 1 17 13 302.1 Livelihood and Poverty 

    Alleviation 5  0  5 

    2.2 Local Economic Development

    2  0  2 

    2.3 Health Care Service Delivery Improvement Plan 

    10  2  12 

    2.4 Primary Education Improvement   Plan 

    2  1  3 

    Component 2 18 3 213.1 Organization Development  0 4 4

    3.2 Internal Processes and Systems Improvement Plan 

    1  2  3 

    3.3 Citizens Interface Plan  0 4 43.4 Financial Plan  1 0 1Component 3 2 10 12

    Total  37  26  63 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 5  

    Figure 03, Sub Component Wise Distribution of Investible Surplus Fund  

       

    Figure 04, Component Wise Distribution of Investible Surplus Fund 

     

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 6  

     Table 02, List of Projects of ADP for 2009‐10 

    The sub‐component wise list of projects of Annual Development Plan (ADP) is listed below.  

    Sub‐component name 

    Project Name 

    Project Cost (in 

    lakhs) 

    Source of fund 

    Slum Infrastructure Improvement 

    Plan 

    Comprehensive development of the slum under IHSDP 

    500.00  IHSDP 

    Intra‐Municipal 

    Infrastructure Improvement 

    Plan  

    Conversion of Kuccha drains and up gradation of section 

    40.00  EGS 

    Improvement in maintenance ‐ Desilting & Regular Cleaning 

    of Drains 5.00  EGS 

    Construction of Guest house and circuit house by the side of river Ichchamati at Hawkerʹs 

    Market 

    22.00  KUSP+ MF 

    Purchase of Dumping ground  25.00  12th FC (SWM) Improvement of Canal  20.00  12th FC 

    Improvement in maintenance of variuos Markets 

    30.00  SFC 

    Improvement in maintenance ‐ Renovation and up gradation 

    of Rabindra Bhawan 12.00  SFC 

    Improvement in maintenance ‐ Regular & periodic 

    maintenance of roads (all types) 

    100.00 12thFC,BMS,EGS,Flood 

    Grant,SFC,11 th FC, M.V.Tax 

    Modernization of Solid Waste management System 

    65.00  12th FC (SWM) 

    Construction of Bus Terminus  25.00  WBSTD Construction of new drains.  100.00  BMS,EGS,M.V.TAX,SFC,IDSMT

    Water Treatment Plant  3.00  UIDSSMT Martin Burn Rail road 

    development (Construction of By‐pass) 

    100.00  ADF 

    Improvement and maintenance of Crematorium 

    4.50  Investible Surplus 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 7  

    Sub‐component name 

    Project Name 

    Project Cost (in 

    lakhs) 

    Source of fund 

    Improvement in maintenance ‐ Regular cleaning & 

    maintenance of market premises (Sweeping /  

    Electrical) 

    4.00  Investible Surplus 

    Improvement in maintenance of Municipal Town Hall 

    1.00  Investible Surplus 

    Installation of new light‐posts fitted with energy saving 

    devices 3.50  Investible Surplus 

    Electrification and street lighting improvement 

    18.50  12th FC + Investible Surplus 

    Improvement of roads‐ BB Bose, SN Mazumdar, Asthana 

    Rd., Dharma Das Rd., 20.00  Investible Surplus 

    Land Use Development 

    Plan 

    Land use planning for disaster management 

    0.50  Investible Surplus 

    Development and maintenance of parks and playgrounds 

    4.00  Investible Surplus 

    Preparation of an overall urban dvelopment Master plan for 

    the ULB 1.00  12th FC 

    Development of pay & use toilet in public places in all 

    wards 5.00  SFC 

    Environment Management 

    Plan 

    Community Awareness for environmental issues like air pollution, water pollution, different diseases &banning use of plastic carry bags etc 

    1.00  Investible Surplus 

    Promotion of cultural fairs  0.50  Investible Surplus 

    Capacity building of NGO / CBOs and promotion of local 

    initiatives for disaster preparedness 

    1.00  Investible Surplus 

    Tree plantation on river side, road side and parks 

    1.00  Investible Surplus 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 8  

    Sub‐component name 

    Project Name 

    Project Cost (in 

    lakhs) 

    Source of fund 

    Social Forestry Project  0.50  Investible Surplus 

    Livelihood & Poverty 

    Alleviation Plan 

    Better Functioning of  CO/CDS Members/Group Secretaries 

    1.00  SJSRY 

    Formation and facilitation of DWCUA Groups 

    1.50  SJSRY 

    Vocational Training for enhancement of Skills for 

    women ‐ Computer, Sebika, Physiotherapy, beautician, 

    tailoring, food processing, etc. 

    3.00  SJSRY 

    Vocational Training for enhancement of Skills for 

    Youth on Computer / mobile repaire, 3 wheeler repair, 

    motor winding 

    2.00  SJSRY 

    Market linkage of SHG developed products / services ‐ 

    yearly fair & tie‐up with retailing organisations 

    1.50  SJSRY 

    Local Economic 

    Development 

    Setting up call centres for BPL women in working as Nursing Aid for providing employment 

    information 

    1.00  SJSRY 

    Development of KIOSK and marketing center for 

    promotion of SHG products. 2.00  SJSRY 

    Health care delivery 

    improvement plan  

    Development of Health Management Information 

    System, 2.00  CBPHC 

    Training/Upgradation of all health service providers of the 

    ULB 1.00  CBPHC 

    Child Health Care campaign in schools 

    1.00  CBPHC 

    Awareness on Prevention and Control TB, Leprosy, 

    HIV/AIDS, Malaria and other 2.10  CBPHC 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 9  

    Sub‐component name 

    Project Name 

    Project Cost (in 

    lakhs) 

    Source of fund 

    communicable diseases. 

    Purchase of medicines  8.00  CBPHC 

    Primary school student health check up 

    5.00  CBPHC 

    Procurement of new Ambulance 

    6.00  BEUP 

    Mobile clinic in slum  12.00  CBPHC 

    Purchase of equipments for Matri Sadan 

    8.00  Investible Surplus 

    Reconstruction and remodelling of “ Matri Sadan” 

    14.00  Investible Surplus + SFC 

    Primary Education 

    Improvement Plan 

    Creating kitchen shed for Mid‐day meal 

    2.00  MDM 

    Scholarship to Deserving students 

    0.80 GoWB, Backward Class 

    Department Awareness campaign to check drop out, universal education 

    1.00  Investible Surplus 

    Organization Development 

    plan  

    Implementation of reward system in municipal 

    governance 1.00  Investible Surplus 

    Introduction of Performance Appraisal system 

    1.00  Investible Surplus 

    Setting up of Public Relation & Communication Cell 

    0.50  Investible Surplus 

    Strengthening Grievance Redressal Cell 

    0.25  Investible Surplus 

    Internal Process and System 

    Improvement Plan 

    Constitute committee to check unauthorized construction (illegal water connections) 

    0.10  Investible Surplus 

    Inter‐departmental coordination and 

    communication system 0.50  KUSP 

    Implementation of computerization, local area 

    network and other IT support 6.50  12TH FC, KUSP 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 10  

    Sub‐component name 

    Project Name 

    Project Cost (in 

    lakhs) 

    Source of fund 

    in the ULB (WEBSITE) 

    Citizen Interface Plan 

     

    Hoarding at project site details and completion dates 

    0.50  Investible Surplus 

    Clean / Green ward campaign and award 

    1.00  Investible Surplus 

    Publication of biannual Municipal bulletin 

    0.50  Investible Surplus 

    Collection of user charges / fees / taxes by WCs (commission to 

    tax collectors) 6.00  Investible Surplus 

    Financial Plan  Computerization of Property Tax record 

    1.00  12TH FC 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 11  

     

     

     

     

     

     

     

    INTRODUCTION

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 12  

    Introduction to the ADP  The West Bengal Municipal Act 1993 requires municipalities and municipal corporations in the  state  to prepare Annual Development Plans  (ADP)  covering  a period of one  financial year and that addresses a range of municipal functions as laid down in the Act.   Section  300  of  the  Act  states  that  the  Board  of  Councillors  shall  prepare  an  Annual Development Plan for the period of one financial year covering only the relevant portions of the  Draft  Development  Plan  for  the  concerned  period,  in  consultation  with  the  District Planning Committee, and submit the same to the State Government within the last week of the month of October of the year preceding the period for which the Annual Development Plan shall be prepared. The approval of the ADP is to be received from the State Government in light of the availability of funds.   It is well recognized that in preparing the first generation DDP and ADPs, there are likely to be  some  inadequacies  in  the overall development plans. Such  inadequacies may be  in  the nature  of  gaps  in  thematic  integration  of  various  proposals,  and,  linkages  between  the proposed development plan and the overall resource availability. However, some of the key guiding principles that should be adhered to are: 

     Thus,  the  ULB  commits  itself  to  deliver  the  stated  plan  and  empower  the  citizens  to participate in the implementation of the plan.  The  Annual  Development  Plan  is  therefore  only  the  annual  segment  picked  up  for  the respective  years  from  the DDP  document. There  are  not  any  significant  changes  in  the 

    Some of the key principles guiding the preparation of the ADP are: o The DDP is a useful instrument for the ULBs for integrated planning and guiding

    balanced development. The ADP is a part of the same process but for a period of one year. Like the DDP, the ADP should seek to integrate and balance the: • The need of various sectors of ULBs functions (basic infrastructure services, primary

    health, public health, organisational requirements, etc.) in a span of one year. • The financial resources required with that already available. • The organisational capacity of the Municipality to execute the ADP in one year period.

    o The capital investments versus requirements for improved operations and maintenance in each year.

    o The ADP should be in complete concurrence with the DDP. The ADP will be the annual segment picked up for the respective years from the DDP document. The proposals should be realistic and implementable within a year and should be within the financial, human resource and delivery capabilities of the Municipality.

    o The process of preparation of the ADP should be transparent and the document should be available to all, along with the financial statement.

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 13  

    project proposals in the ADP. The objective of preparing an ADP  is to put together a plan for  the  resources  required during one  financial year. The ADP will  finalise  these  resource requirements taking into account recent/emergency needs and changed circumstances if any.   Within six months of receipt of the grant for the ADP, the Board of Councillors will need to submit a report stating the progress of work towards implementing the ADP. The Board of Councillors may modify or revise the ADP, but not more than once, with the approval of the State Government.   Key features of the ADP 

     Basirhat Municipality  has  prepared  their ADP  (2009‐10)  in  complete  accordance with  the DDP, following the same Vision and Objectives. ADP have considered the component wise Development Plan  ranging  from  Infrastructure  Improvement  in  slum and municipal  level, Land  Use  Development,  Environment Management,  Livelihood  and  Poverty  Alleviation, Local  Economic  Development,  Health  Care  Delivery  Improvement,  Primary  Education Improvement,  Organization  Development,  Systems  and  Process  improvement,  Citizen Interface improvement and even improvement of Financial Capacity of the Municipality.   

    Overall Municipal Vision for efficient and effective municipal performance VISION   

     Proposals for ADP (2009‐10) have been picked up from the DDP according to the priority set, serial  set  and  in  consideration  that  each proposal  should  be  realistic  and  implement  able within a year and should be within the financial, human resource and delivery capabilities of the Municipality. 

    Municipality is also committed to adopt financial interventions proposed in Financial Plan of DDP to increase revenue earning for the health of own source fund (General fund – Untied nature).  

    The Municipal Vision statements of Basirhat Municipality are:

    • To provide all its citizens a humane social order based on truth, justice, freedom, equity and integrity in which basic human rights and the dignity of every individual is upheld, with sustained access to improved health, adequate and equitable basic services,

    • To provide livelihood opportunities in an environmentally sustainable urban area, which upholds social justice and practices democratic and secular values, including human rights

    • To provide right to information coupled with balanced development supported by an advanced, transparent and sustainable Urban Local Body, making Basirhat Municipality an attractive and secure place for investment and to eradicate poverty.

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 14  

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    COMPONENT – 1 Infrastructure, Land Use and Environment Development  

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 15  

    Brief Description on Component – 1 Component – 1 refers to physical planning which is supposed to form the base of any such planning  activity.  Physical  planning  deals  with  physical  resources.  The  physical  sub‐components are  Infrastructure, Land Use and Environment Development. The objective of the  Infrastructure,  Land  Use  and  Environment  Development  is  to  augment  existing infrastructure  at  both  slum  and  municipal  levels,  propose  projects  for  effective  use  of municipal land and improve environmental condition across the ULB.   

    The Slum Infrastructure sub‐component plan refers to planning for all infrastructure projects and services located within the boundaries of slum settlements. It essentially refers  to  the  ‘in‐slum’  infrastructure development  in  the ULB,  including providing linkages of the infrastructure within slums with the main city / municipal networks.  

      The Intra‐municipal infrastructure sub‐component of the DDP refers to planning for infrastructure projects and services at the ULB level, viz. projects or services that are either  wholly  located  within  a  ward  or  cut‐across more  than  one  ward,  but  are entirely located within the ULB boundaries. 

      Trans‐municipal infrastructure sub‐component plan refers to projects which by size, scale, nature, demand and coverage go beyond  the boundaries of one municipality. Trans‐municipal  infrastructure  sub‐component  of  the  DDP  therefore  refers  to identifying  and  proposing  infrastructure  projects  and  services  at  the metropolitan level serving more than one ULB or the entire metropolitan area. 

      Land  use  planning  assumes  all  the  more  significance  of  land  due  to  increasing pressure of urbanisation. The purpose of  land use planning  is to regulate the use of land to prevent misuse, overuse and abuse of this resource. Thus land use planning is mainly done for meeting the consumption needs of growing population by efficiently using  the  resource,  by  identifying  the  prospective  uses  of  land,  conservation  and development of land and devising suitable regulatory control over development. 

    Traditionally,  municipalities  have  been  performing  environment  management functions  in  terms of supply of basic services, water supply, sanitation, solid waste management  and  community  health.  The  municipality  now  has  to  deal  with challenges  such  as  that  of  sustainability  of  these  resources.  An  Environment Management Plan is important to the municipality because it is very closely linked to the economy,  infrastructure, productivity, poverty and environmental health of  the people. 

     

     

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 16  

     

      

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

       

    SUB-COMPONENT – 1.1

    Slum Infrastructure Improvement Plan

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 17  

     

    SSLLUUMM IINNFFRRAASSTTRRUUCCTTUURREE IIMMPPRROOVVEEMMEENNTT PPLLAANN ((SSUUBB--CCOOMMPPOONNEENNTT 11..11))

     Brief Description on Slum Infrastructure Improvement Plan  The Slum Infrastructure sub‐component of the DDP refers to planning for all infrastructure projects and services located within the boundaries of slum settlements. It essentially refers to the ‘in‐slum’ infrastructure development in the ULB, including providing linkages of the infrastructure within slums with the main city / municipal networks.   Slum Infrastructure Improvement Plan also aims at providing basic minimum services to the informal  squatter  settlements. Generally,  these  clusters  lying outside  the demarcated  slum areas of the ULB are located on service land (i.e. land beside main roads, pavements, canals, railway  tracks,  etc.).  Sometimes  the population  resident  in  such  settlements with no  land entitlements tend to be very high. They include sections of populations such as short‐term / seasonal migrants, recent migrants, street children, rag pickers, etc. Projects undertaken as a part of the Slum Infrastructure Improvement Plan therefore seek to provide services to urban poor, resident in notified and non notified slums, and squatter settlements in the ULB.   There  are  total  50  slum  pockets  were  covered  under  IHSDP  during  2006  in  Basirhat municipal area. The comprehensive development works of slum pockets are discussed below in detail format.   List of Slum Pockets under IHSDP within Basirhat Municipal area is given below.  Table 1.1.1 List of SLUM Pockets (According to the IHSDP Scheme)  There are 50 slums in the Municipality.  

    Sl No.  Name of slum  Ward No.    Sl No.  Name of slum Ward No. 

    1  Dhaltitha Das Para  1    26  Muslim Pally  11 2  Muslim Para (East)  1    27  Muslim  Para  12 3  Muslim Para (west)  1    28  Nikari Para South  12 4  Das para  2    29  Nikari Para North  12 5  Teor Para  2    30  Math Para  12 6  FulBari Das Para  3    31  Sardarati Muslim Para  13 7  Dandirhat Kaharpara  3    32  Dalal Para Das Para  13 8  Barui Para  4    33  Bhabhaniour Das Para  14 9  Das Para  4    34  Nabapally Das Para  14 10  Badartala Das Para  5    35  Taparchar Jeliapara  15 11  Naihati Das Para  5    36  Sardar Para  15 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 18  

    Sl No.  Name of slum  Ward No.    Sl No.  Name of slum Ward No. 

    12  Ashrampara Das Para  6    37  Harishpur Charpara  16 13  Dandirhat Parui Para  6    38  Harishpur mandalpara  16 14  Tantghar Das Para  6    39  Bagati Das Para  17 15  Goalpota Mathpara  7    40  Sardarati Mathpara  17 16  Goalpota Kharpara  7    41  Bhabhla Mathpara  18 17  Munshibagan Kaharpara  8    42  Newra purba Mathpara  19 18  Sainpala Kaharpara  8    43  Newra purba Muslimpara  19 19  Pranabananda Das Para  9    44  Newra Das para  19 20  Taki Road Muslim Para  9    45  Tantra Rajakpara  20 21  Jamrultala Das Para  10    46  Tantra Kaharpara  20 22  Kaharpara (K.B. road)  10    47  Mathpara (Ganesh Colony)  21 23  Bazar  Para (West)  11    48  Dhopa Para  21 24  Bazar Para (North)  11    49  Khanpara ( Muslim Para)  22 25  Bazar Para (East)  11    50  Chandirbagan (Rajakpara)  22 

     

    The list of Slum Infrastructure Improvement projects for 2009‐10 is listed below.  Table 1.1.2 List of Slum Infrastructure Improvement Projects in ADP’2009‐10  

    Sl. No 

    Project Name Project Cost (in lakhs) 

    Year  of commencement 

    Year  of completion 

    Source of fund 

    1. Comprehensive  development  of the slum under IHSDP 

    500.00  2009‐10  2009‐10  IHSDP 

      

     

    Detail Project Proposal Formats of Intra‐Municipal Infrastructure Improvement projects 

    Detail Project Proposal Formats of Intra‐Municipal Infrastructure Improvement projects are given below. 

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 19  

    Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Dhaltitha Das Para, Slum No. 1 

    Project location (provide location map where applicable): Dhaltita Das Para Slum, Ward No. 1 

    Current situation / standards of service:  650, 14785 sq. m, 60 hect, 88 dwelling units  

    Targeted situation / standards of service:Detailed below 

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP  

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,133,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements: ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Dhaltita Das Para Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project: 20% of the collection of user charges should be contributed by the beneficiaries.  

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project: As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  88  11 Physical Infrastructure         

    Distribution Line  M  210   Stand Post  Nos.  0   Drainage  M  200   

    Concrete Roads  Sq. M  540   Street Lights  Nos.  8   Garbage Bins  Nos.  1   

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 20  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Das Para, Slum No. 4 

    Project location (provide location map where applicable): Das Para Slum, Ward No.2 

    Current situation / standards of service: 660, 6652 sq. m, 104 hect, 69 dwelling units 

    Targeted situation / standards of service:Detailed below 

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP 

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,115,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements: ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required: As per need 

    Quantify benefits of project:  • Improvement of Das Para Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure   

    Dwelling Units  Nos.  69  11 Physical Infrastructure         

    Distribution Line  M  45   Stand Post  Nos.  2   Drainage  M  110   

    Concrete Roads  Sq. M  312   Street Lights  Nos.  4   Garbage Bins  Nos.  1           

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 21  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Das Para, Slum No. 9 

    Project location (provide location map where applicable): Das Para Slum, Ward No.4 

    Current situation / standards of service:   620, 8503 sq. m, 95 hect, 81 dwelling units 

    Targeted situation / standards of service:Detailed below 

    Project size / land area / capacity / process flow / list of equipment: As per IHSDP 

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,229,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements: ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required: Annexed 

    Quantify benefits of project: • Improvement of Das Para Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP  

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  81  3 Physical Infrastructure         

    Distribution Line  M  81   Stand Post  Nos.  2   Drainage  M  123   

    Concrete Roads  Sq. M  149   Street Lights  Nos.  3   Garbage Bins  Nos.  1   

    Community Bath  Nos.  0   Community Toilets  Nos.  0          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 22  

     

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Badartala Das Para, Slum No.10 

    Project location (provide location map where applicable): Badartala Das Para Slum, Ward No.5 

    Current situation / standards of service:   670, 9803 sq. m, 96 hect, 94 dwelling units   

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP 

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,477,500 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 18 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Badartala Das Para Slum. • To improve the living standard of the dwellers 

    of the slum and manage their essential needs. Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  94  7 Physical Infrastructure         

    Distribution Line  M  185   Stand Post  Nos.  3   Drainage  M  165   

    Concrete Roads  Sq. M  349   Street Lights  Nos.  5   Garbage Bins  Nos.  2   

    Community Bath  Nos.  0   Community Toilets  Nos.  1          

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 23  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Ashrampara Daspara, Slum No. 12 

    Project location (provide location map where applicable): Ashrampara Daspara Slum, Ward No.6 

    Current situation / standards of service:  700, 24626 sq. m, 41 hect, 102 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP 

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,496,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 18 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required: As per need 

    Quantify benefits of project: • Improvement of Ashrampara Daspara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs.

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project: As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  102  3 Physical Infrastructure         

    Distribution Line  M  266   Stand Post  Nos.  3   Drainage  M  245   

    Concrete Roads  Sq. M  324   Street Lights  Nos.  4   Garbage Bins  Nos.  3   

    Community Bath  Nos.  0   Community Toilets  Nos.  0          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 24  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Goalpota Kaharpara, Slum No.16 

    Project location (provide location map where applicable): Goalpota Kaharpara Slum, Ward No.7 

    Current situation / standards of service:  610, 34434 sq. m, 28 hect, 95 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP  

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,615,500 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 24 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Goalpota Kaharpara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs.

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure   

    Dwelling Units  Nos.  95  16 Physical Infrastructure         

    Distribution Line  M  274   Stand Post  Nos.  3   Drainage  M  392   

    Concrete Roads  Sq. M  800   Street Lights  Nos.  5   Garbage Bins  Nos.  2   

    Community Bath  Nos.  0          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 25  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Munshibagan Kaharpara, Slum No.17 

    Project location (provide location map where applicable): Munshibagan Kaharpara Slum, Ward No.8 

    Current situation / standards of service:  680, 10243 sq. m, 89 hect, 91 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP 

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,360,500 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 18 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required: As per need 

    Quantify benefits of project: • Improvement of Munshibagan Kaharpara 

    Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  91  19 Physical Infrastructure         

    Distribution Line  M  240   Stand Post  Nos.  4   Drainage  M  125   

    Concrete Roads  Sq. M  455   Street Lights  Nos.  3   Garbage Bins  Nos.  2   

    Community Bath  Nos.  0   Community Toilets  Nos.  1       

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 26  

        Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Pranabananda Daspara, Slum No.19 

    Project location (provide location map where applicable): Pranabananda Daspara Slum, Ward No.9 

    Current situation / standards of service:  680, 10971 sq. m, 82 hect, 90 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP 

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,272,000 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Pranabananda Daspara 

    Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  90  7 Physical Infrastructure         

    Distribution Line  M  273   Stand Post  Nos.  5   Drainage  M  263   

    Concrete Roads  Sq. M  730   Street Lights  Nos.  5   Garbage Bins  Nos.  2   

    Community Bath  Nos.  0       

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 27  

        

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Jamrultala Daspara, Slum No.21 

    Project location (provide location map where applicable): Jamrultala Daspara Slum, Ward No.10 

    Current situation / standards of service: 740, 9650 sq. m, 70 hect, 68 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,077,750 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Jamrultala Daspara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  68  13 Physical Infrastructure         

    Distribution Line  M  249   Stand Post  Nos.  4   Drainage  M  263   

    Concrete Roads  Sq. M  363   Street Lights  Nos.  3   Garbage Bins  Nos.  1          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 28  

      Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Sardarati Muslimpara, Slum No. 31 

    Project location (provide location map where applicable): Sardarati Muslimpara Slum, Ward No.13 

    Current situation / standards of service: 660, 16069 sq. m, 49 hect, 78 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,553,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 24 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  Annexed 

    Quantify benefits of project: • Improvement of Sardarati Muslimpara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  63  12 Physical Infrastructure         

    Distribution Line  M  150   Stand Posts  Nos.  3   Drainage  M  88

    Concrete Roads  Sq. M  82   Street Lights  Nos.  7   Garbage Bins  Nos.  0   

    Community Toilets  Nos.  0        

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 29  

      Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Bhabanipur Daspara, Slum No. 33 

    Project location (provide location map where applicable): Bhabanipur Daspara Slum, Ward No.14 

    Current situation / standards of service: 650, 10437 sq. m, 69 hect, 72 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,219,500 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Bhabanipur Daspara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  72  16 Physical Infrastructure         

    Distribution Line  M  141   Stand Posts  Nos.  3   Drainage  M  127

    Concrete Roads  Sq. M  643   Street Lights  Nos.  3   Garbage Bins  Nos.  1          

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 30  

      Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Harishpur Charpara, Slum No. 37 

    Project location (provide location map where applicable): Harishpur Charpara Slum, Ward No.16 

    Current situation / standards of service: 680, 8754 sq. m, 95 hect, 83 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,086,000 

    Time required forproject completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required: As per need 

    Quantify benefits of project: • Improvement of Harishpur Charpara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  83  10 Physical Infrastructure         

    Distribution Line  M  208   Stand Posts  Nos.  4   Drainage  M  196

    Concrete Roads  Sq. M  260   Street Lights  Nos.  3   Garbage Bins  Nos.  1           

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 31  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Bagati Daspara, Slum No. 39 

    Project location (provide location map where applicable): Bagati Daspara Slum, Ward No.17 

    Current situation / standards of service: 680, 6675 sq. m, 123 hect, 82 dwelling units  

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 911,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Bagati Daspara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project: As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  82  8 Physical Infrastructure         

    Distribution Line  M  67   Stand Posts  Nos.  3   Drainage  M  36

    Concrete Roads  Sq. M  162   Street Lights  Nos.  3   Garbage Bins  Nos.  1          

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 32  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Bhabla Mathpara, Slum No. 41 

    Project location (provide location map where applicable): Bhabla Mathpara Slum, Ward No.18 

    Current situation / standards of service: 685, 8490 sq. m, 92 hect, 78 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,177,500 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Bhabla Mathpara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs.

    Plans for collection of user charges / fees from beneficiaries of the project: 20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project: Annexed 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  78  3 Physical Infrastructure         

    Distribution Line  M  42   Stand Posts  Nos.  2   Drainage  M  103

    Concrete Roads  Sq. M  248   Street Lights  Nos.  3   Garbage Bins  Nos.  1   

    Community Toilets  Nos.  0          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 33  

      Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Newra Daspara, Slum No. 44 

    Project location (provide location map where applicable): Newra Daspara Slum, Ward No.19 

    Current situation / standards of service: 700, 9564 sq. m, 109 hect, 104 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,677,750 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 24 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Newra Daspara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  104  5 Physical Infrastructure         

    Distribution Line  M  127   Stand Posts  Nos.  2   Drainage  M  243

    Concrete Roads  Sq. M  584   Street Lights  Nos.  4   Garbage Bins  Nos.  1   

    Community Toilets  Nos.  0          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 34  

      Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Tantra Rajakpara, Slum No. 45 

    Project location (provide location map where applicable): Tantra Rajakpara Slum, Ward No.20 

    Current situation / standards of service: 680, 10188 sq. m, 88 hect, 90 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment: As per IHSDP     

    Key considerations for detailed design:As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,398,750 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 18 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:   As per need 

    Quantify benefits of project: • Improvement of Tantra Rajakpara Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  90  12 Physical Infrastructure         

    Distribution Line  M  190   Stand Posts  Nos.  5   Drainage  M  100

    Concrete Roads  Sq. M  456   Street Lights  Nos.  5   Garbage Bins  Nos.  2   

    Community Baths  Nos.  0   Community Toilets  Nos.  0       

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 35  

        Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Math Para (Ganesh Colony) , Slum No. 47 

    Project location (provide location map where applicable): Math Para (Ganesh Colony) Slum, Ward No.21 

    Current situation / standards of service: 710, 9690 sq. m, 97 hect, 94 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list ofequipment:  As per IHSDP     

    Key considerations for detailed design: As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,177,500 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:   As per need 

    Quantify benefits of project: • Improvement of Math Para (Ganesh Colony) 

    Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs. 

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party:  Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  94  13 Physical Infrastructure         

    Distribution Line  M  117   Stand Posts  Nos.  3   Drainage  M  143

    Concrete Roads  Sq. M  351   Street Lights  Nos.  5   Garbage Bins  Nos.  1          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 36  

     

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Chandirbagan (Rajakpara) , Slum No. 50 

    Project location (provide location map where applicable): Chandirbagan (Rajakpara) , Ward No.22 

    Current situation / standards of service: 690, 7509 sq. m, 125 hect, 94 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design: As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,148,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:   As per need 

    Quantify benefits of project: • Improvement of Chandirbagan (Rajakpara) 

    Slum. • To improve the living standard of the dwellers 

    of the slum and manage their essential needs. Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  94  16 Physical Infrastructure         

    Distribution Line  M  93   Stand Posts  Nos.  2   Drainage  M  50

    Concrete Roads  Sq. M  0   Street Lights  Nos.  4   Garbage Bins  Nos.  0          

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 37  

     Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Muslim Para (East) , Slum No. 2 

    Project location (provide location map where applicable): Muslim Para (East) Slum, Ward No.1 

    Current situation / standards of service: 700, 6792 sq. m, 107 hect, 73 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design: As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 902,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:   As per need 

    Quantify benefits of project: • Improvement of Muslim Para (East) Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs.

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  Annexed 

    Options for contribution to capital cost by beneficiaries / private party: Annexed 

    Likely sources of finance for the capital investment: Tied (IHSDP) 

    Infrastructures  Units  Total TargetedHousing Infrastructure       

    Dwelling Units  Nos.  73  11 Physical Infrastructure         

    Distribution Line  M  54   Stand Posts  Nos.  2   Drainage  M  60

    Concrete Roads  Sq. M  240   Street Lights  Nos.  6   Garbage Bins  Nos.  1           

     

  • Annual Development Plan 2008  

    Basirhat Municipality   Page 38  

    Theme 2: Project proposals for significant capital investments 

    Project Title: Comprehensive slum development project of Teor Para, Slum No. 5 

    Project location (provide location map where applicable): Teor Para Slum, Ward No.2 

    Current situation / standards of service: 710, 8322 sq. m, 95 hect, 79 dwelling units    

    Targeted situation / standards of service:Detailed below    

    Project size / land area / capacity / process flow / list of equipment:  As per IHSDP     

    Key considerations for detailed design: As per IHSDP 

    One time investments (capital investments), including phasing plan where applicable: Rs. 1,238,250 

    Time required for project completion / commissioning: Apr 09 to Mar 10 Expected life of project: 12 months 

    O & M requirements:ULB Operating / recurring costs: Staff and skill requirements for O & M: 

    Technical linkages with preceding and succeeding elements of the network / projects or facilities that should precede this project / preparatory work required:  As per need 

    Quantify benefits of project: • Improvement of Teor Para Slum. • To improve the living standard of the 

    dwellers of the slum and manage their essential needs.

    Plans for collection of user charges / fees from beneficiaries of the project:  20% of the collection of user charges should be contributed by the beneficiaries. 

    Opportunity for private parties / CDS / citizens’ associations to manage O & M of the project:  As per IHSDP 

    Options for cont