Introduction
The evolution mobile phones as Personal Communication Devices and the explosion of devices
such as tablets have created a challenge for the mobile networks, starting from the Base Station and
the Mobile Backhaul. New initiatives such as Small Cells reduce the pressure of capacity crunch
and coverage limitations, but the importance of Macro Base Stations remains very high. With the
transition to the packet based backhaul mechanisms, the synchronization implementations havebecome extremely challenging.
Base Station Synchronization Requirements
Traditionally Base Stations were connected to the core network through circuit switched network
connections delivering data and the frequency synchronization. When Phase information was
required because of the air interface requirements, a GPS based system was used and a combination
of GPS and line extracted frequency were used for synchronizing base stations. We can generalize
the requirements to network side requirements and radio side requirements.
The network recovered clock had to meet the limit of 16ppb to the network and the air interface had
a frequency accuracy requirement of 50ppb and phase accuracy requirement of few S whenever
required. The 16ppb requirement is derived from the Stratum 2 frequency accuracy levels of and ina scenario where the network or GPS synchronization were lost, the base station be able to maintain
its accuracy within the air interface limits.
The following table shows the frequency accuracy requirement of most commonly used air
interface requirements.
Radio Technology BTS TypeFrequencyAccuracy
Phase/Time Accuracy
GSM Macro BTS 50ppb
CDMA2000 Macro BTS 50ppb3s (norm)10s (max)
WCDMA-FDD Wide Area BTS 50ppb
WCDMA-TDDTD-SCDMA
Wide Area BTS 50ppb 2.5s
LTEFDD & TDD
Wide Area BTS 50ppb
LTE-TDD
Wide area BTS, >3kmradius
10s
Wide area BTS, 3kmradius
3s
Home BTS, >500m rad. 1.33 +Tprop s
Home BTS, 500m rad. 3s
NetworkInterface
Modem
Timing &Synchronization
GPS
RadioInterface
-
7/29/2019 Base Station TimingV2
2/2
Base Station Synchronization Challenges
The challenges in Macro Base Station Synchronization are multi fold. GPS or other GNSS methods
are no longer preferred as a primary source of network timing because of the fear of signal loss or
jamming in various situations. Secondly, the circuit switch network is transitioning to packet
switched network forcing the Base Stations to use Synchronous Ethernet and Precision Time
Protocol based synchronization techniques. ITU-T has finalized the standards for frequency onlyPacket Equipment Slave Clocks and are working to finalize the network and equipment
requirements for phase and frequency. Many implementations are relying on a combination of
GNSS and packet clock methods to achieve the synchronization requirements.
Rakon Oscillators for Base Station Timing applications
Two main aspects of the oscillators are considered for Base Station synchronization designs. The
holdover requirement is one of the primary objectives. The service impact on the service provider is
the turnaround time to attend to and repair the systems, if anything were to disturb synchronizationmechanisms. Holdover time is required by the operator so that they system remains operations
within the time limit in which it can be attended to. Depending on the air interface requirements,
constraints may be placed on frequency only or frequency and phase to achieve certain holdover
time periods. In a synchronizer design, the holdover time depends on the oscillator, specifically on
the frequency versus temperature characteristics and the slope performances of frequency with
temperature. Secondly, Packet based networks impose extremely low bandwidths on clock recovery
PLLs, due to the varying nature of PDVs. Depending on the loop bandwidth, very stable oscillators
(MTIE and TDEV on such bandwidths ) are required for implementation of such PLLs. Oscillator
selection is carefully done identifying the holdover and loop bandwidth requirements, along with
other considerations such as phase noise.
At Rakon we have the expertise to help determine the best oscillator solution for our customers
systems requirements. Oscillator solutions require knowledge of the differential in frequency versus
the differential in temperature. Full characterization is determined by defining the temperature ramp
and measurement rate and a detailed analysis over the characterization time period. Rakon has
characterized various types of oscillators under changing environmental conditions for the loop time
periods relevant to IEEE 1588v2. Rakon has also performed extended tests on the holdover phase
movement performance of the OCXOs and features devices that has holdover performance of 1uS
over the temperature range over 24 hours. Rakon has wide range of OCXOs that economically fit a
wide range of holdover requirements of 1us to 10us across 8hours to 24 hours.
[ 3 OCXO families -2 ROX families with 1uS over 24 hours, 1 us over 8 hours with holdover performance plots. MTIE
and TDEV plots with 0.05mHz with G.8263 masks. Phase noise curves]
1 STP family. Performance maps and plots
Other products available Mercury and XO VCXOs for the solution]