bangor waterfront park plans by shadley 12-2010

43
Bangor Waterfront Park Waterfront Park December 22, 2010 Prepared By: City of Bangor & Shadley Associates, P.C.

Upload: stephen-bolduc

Post on 26-May-2015

567 views

Category:

Real Estate


0 download

DESCRIPTION

Plans for the development of the Bangor (Maine) Waterfront Park by Shadley Assoc.

TRANSCRIPT

Page 1: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Waterfront Park

December 22, 2010

Prepared By:

City of Bangor &

Shadley Associates, P.C.

Page 2: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Presentation Agenda

• Historic site photos

•Summary of Waterfront Master Plan

and completed work

•Current project

•Next Steps

Page 3: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Paul Bunyan, commemorating Bangor’s 125th

birthday in 1959

1853 lithograph

1887 ad: all specimens cured with arsenic, the only

preventative against moths.

Page 4: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Tall ships taking on lumber, 1880’s Steamer “City of Rockland” launched 1990

Early 20th

Century postcard

Page 5: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Flood of 1902

“Bangor Tiger” river drivers

Ice harvesting, shipped to Buenos Aires

Page 6: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Page 7: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

The Bangor Waterfront was a former railroad switching yard (1986).

Page 8: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

The 36 acre Project area acquired by the City was occupied by leaking fuel oil tank farms, unused or

underutilized industrial warehouses and distribution facilities, rail yards, vacant manufacturing buildings and

coal yards.

Circa

1985

Page 9: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Page 10: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Railroad Street

Improvements, 2004

Water’s Edge Improvements,

2005Front Street Improvements,

2003

Open Space Improvements,

2003

Park Improvements, 2009 -

2010

Page 11: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Front Street

2003

Page 12: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Page 13: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Railroad Street

2004

Page 14: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Water’s Edge

2005

Page 15: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Water’s Edge

2005

Page 16: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Water’s Edge

2005

New Heavy Vessel Dock:

• Federal Channel with a depth of 16 feet• Access to vessels with vertical clearance of up

to 79 feet• Fully ADA compliant

American Glory docked at

Bangor Landing’s heavy vessel docking facility

Page 17: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Folk Festivals

Page 18: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Page 19: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Stormwater Treatment as approved by the DEP

Page 20: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

• Tar from 100+ yrs of manufacture and handling of tar in and near Cove

• Area of tarry sediment near Old Stone Sewer

• Tar migration from sediment in warm weather in Active Zone

Coal Tar River

PollutionSlides by RMT, Madison, WI

Page 21: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Maximum slopes of 3.5:1

Does not encroach on channel

Gas discharges to surface of cap

Plan View of Sediment

Cap

Page 22: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Coal Tar Remediation, Fall 2009

Area to be loamed and seeded, and later planted

Page 23: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Page 24: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Phase I Park Under Construction, 2009 -

2011

Railroad Street Parking Lot with drainage chambers, lights

Waterfront Parking Lot with drainage chambers, lights and access drive

Multiuse trails and grading for amphitheater

Compass Rose

Trail connection to Dutton Street with lights

Fencing and planting along RR Right of Way

Page 25: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Water front Park Existing ConditionsLooking north from hotel December 2008

Park Construction

2009-2011

Page 26: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

June 2009

Park Construction

2009-2011

Compass Rose

Page 27: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

August, 2010

Park Construction

2009-2011

Page 28: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Bangor Waterfront Development Project Costs to Date

Front Street $ 1,441,309 Railroad Street $ 3,167,531 Water's Edge / Bulkhead Replacement $

3,998,599 Heavy Vessel Dock $ 817,083 WF Park Construction $ 2,087,697  Total Waterfront Project Cost $ 11,512,220

Page 29: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

HUD - Appropriation HUD Economic Development Initiative (FY 2000)

$ 997,800

Transportation Spending Bill (FY 2001) $ 562,460

HUD - Appropriation HUD Economic Development Initiative (FY 2004)

$ 248,525

Federal Highway Admin. Ferry Boat Discretionary Program - Heavy Vessel Dock

$ 520,417

Boating Infrastructure Grant Heavy Vessel Dock '06 $ 100,000

Boating Infrastructure Grant Heavy Vessel Dock '07 $ 100,000

CDBG - Heavy Vessel Dock, local match $ 219,333

CDBG - Infrastructure/ ADA/ Park Design '07 & '08 $ 143,405

Treasury and Judiciary, and HUD EDI Bill FY 2006 $ 321,750

HUD EDI Grant 2008 $ 257,250

Total Federal Appropriations 3,470,940$ 30%

Federal GrantsEDA (FY2002) $ 1,200,000

Total Federal Funds $ 1,200,000 10%

TOTAL FEDERAL FUNDING $ 4,670,940 40%

FEDERAL FUNDING

Page 30: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

State of Maine

1999 State Transportation Bond Issue $ 1,200,000 2001 State Transportation Bond Issue $ 1,000,000 Maine Municipal Investment Fund - 2003 $ 500,000 DECD Riverfront Bond Grant - 2009 $ 675,000

Total State Funds $ 3,375,000 29%

STATE FUNDING

Page 31: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

LOCAL FUNDING

Local - City of Bangor (non-federal)

Bond Issue FY01 $ 500,000 Bond Issue FY03 $ 500,000 City Bond Reallocated Proceeds (FY03) $ 285,000 Bond Interest Earned $ 37,655 General Fund FY04 $ 800,000 FY 2009 TIF Funds $ 1,000,000 FY 2010 TIF Funds $ 400,000

Total City Funds $ 3,522,655 30%

Page 32: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Bangor Waterfront Development Project

Total Federal Funding $4,670,940 40%

Total State Funds $3,375,000 29%

Total City Funds $3,522,655 30%

Total Funding $ 11,568,595 100%

Page 33: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Presentation Agenda

• Historic site photos

•Summary of Waterfront Master Plan

and completed work

•Current project

•Next Steps

Page 34: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Construction Estimate (11/09):

$674,860

Construction Estimate (11/09):

$1,348,960Construction Estimate (11/09):

$1,770,710

Total Constr. Estimate (11/09):

$3,794,530

Page 35: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Area 1

Northern End of Park

Restrooms

Equipment

New Building:

• Public Restrooms

• Equipment Room to both replace existing building and to house the sprayground equipment

Page 36: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Area 1

Northern End of Park

Dry and Wet Playground

Page 37: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Area 1

Northern End of Park

Dry and Wet Playground

Page 38: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Area 2

Amphitheater and

Open Space to the North

Page 39: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Area 3

Southern End of Park

Page 40: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Construction Estimate (11/09):

$674,860

Construction Estimate (11/09):

$1,348,960Construction Estimate (11/09):

$1,770,710

Total Constr. Estimate (11/09):

$3,794,530

Page 41: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Part 1:

$1,448,636

Construction Estimates December 2010

Part 2:

$278,933Part 3:

$366,113

Part 4:

$520,478Part 5:

$239,892

Part 6:

$243,630 Part 7:

$841,585

Construction Estimate (12/22):

$3,939,267

Page 42: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park

Part 1:

$1,448,636

Part 2:

$278,933Part 3:

$366,113

Part 4:

$520,478Part 5:

$239,892

Part 6:

$243,630 Part 7:

$841,585

Recommendation for Spring 2011 Bid:

Part 5, Restroom Building: $239,892

Part 6 Waterfront Walkway at Coal Tar Area: $243,630

Total Estimated Base Bid:$483,522

Add Alternate Part 3: $366,133

Construction Estimates December 2010

Page 43: Bangor Waterfront Park Plans by Shadley 12-2010

Bangor Waterfront Park