Minutes of 12th meeting of Expert Appraisal Committee for the proposal involving violation of EIA Notification, 2006 to be held on 28th-29th August 2018 at Conference Hall (Brahmaputra), First Floor, Vayu Wing, Ministry of Environment, Forest and Climate Change, Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003
Day 1: Tuesday, 28th August, 2018 Time: 10:00 AM
12.1. Opening remarks of the Chairman 12.2. Confirmation of the minutes of the 11th meeting held on 31st July, 2018, 1-2
August, 2018 at Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi The EAC also noted that no other comments were offered on minutes of its 11th meeting held on 31stJuly, 2018, 1-2 August, 2018 and confirmed the same.
12.3. Consideration of proposals
S. No. Proposals
12.3.1 Stone & Metal Quarry over an area of 3.39 Ha at Sy. No. 132, Malgi Village, Nyalkal Mandal, Sangareddy District and Telangana State by Sri Gurnath M Kollur Mine, Telangana - for Terms of Reference
[IA/TG/MIN/68612/2017 dated 12.09.2017] [F. No.23-218/2018-IA.III (V) ]
12.3.1.1 Project proponent did not attend the meeting.
12.3.2 Proposed project of Adityana Limestone mine (97.61 Ha) of M/s Saurashtra Chemicals Division of Nirma Ltd. located at Survey No. 5 & 6, Village Adityana, Taluka Ranavav, District Porbandar, Gujarat - for Terms of Reference
[IA/GJ/MIN/68604/2017 dated 12.09.2017] [F. No.23-219/2018-IA.III (V) ]
12.3.2.1 M/s Saurashtra Chemicals Division of Nirma Ltd. has made online application vide proposal no. IA/GJ/MIN/68604/2017 dated 12.09.2017 seeking Term of References for the above mentioned proposed project. The proposed project activity is covered under ‘B’ category of item 1(a) of the Schedule to the EIA Notification, 2006 and the proposal was appraised at Central level as general condition applies.
12.3.2.2 Details of the project as per the submission of project proponent:
1. The Project Proponent and the accredited consultant M/s Envirocare Technocrats Pvt. Ltd. made a detailed presentation on the salient features of the project.
12.3.6.3 Observations and recommendations of committee:
The EAC, after detailed deliberations observed that based on the documents
submitted by PP, project is only 0.5 km from boundary of Barda wildlife
Sanctuary. However, on analysing the KML/SHAPE file on the DSS, the instant
mine lease is at some places 0.26 km from the boundary of the Sanctuary and
major portion of the mine lease area is falling within 1 km of the Sanctuary.
The Committee noted that Hon’ble Supreme Court in its interim order dated
04.08.2006 in IA 1000 WP 202 of 1995 (T.N. Godavaram Vs. Union of India) had
directed inter alia, that no mining activity should be granted within the safety zone
and as an interim measure 1 Km. safety zone shall be maintained subject to the
orders that may be made in this IA regarding Jamua Ramgarh Sanctuary. This
clearly suggests that no mining activity can be carried out within 1 Km. boundary
of any sanctuary. Besides, Eco-Sensitive Zone has been notified of Barda Wildlife
Sanctuary on 28.04.2017 which also clearly suggests at para 4 (1) that the
“mining operation shall be carried out in accordance with the orders of Hon’ble
Supreme Court dated 04.08.2006 in the matter of T.N. Godavaram Thirumulpad
Vs. Union of India in WP 202 of 1995 and dated the 21.04.2014 in the matter of
Goa Foundation Vs. Union of India in WP (C) 435 of 2012”.
In view of above, as the location of mine in question is within 1 km of The Barda wildlife Sanctuary, Committee therefore rejected the proposal for issue of TOR.
12.3.7 Baga- Bhalag Limestone and Shale mine (expansion from 3.10 MTPA to 5.25 MTPA) within existing lease area (331.424 Ha) located at Village Baga&Bhalag, Taluka Arki, District Solan, Himachal Pradesh by M/s UltraTech Cement Ltd. For Terms of Reference
[IA/HP/MIN/69006/2017 dated 13.09.2017] [F. No.23-224/2018-IA.III (V)]
12.3.7.1 M/s Ultra Tech Cement Ltd has made online application vide proposal no. IA/HP/MIN/69006/2017 dated 13.09.2017 seeking Term of References for the above mentioned proposed project. The proposed project activity is covered under ‘A’ category of item 1(a) of the Schedule to the EIA Notification, 2006.
12.3.7.2 Details of the project as per the submission of project proponent:
1. The Project Proponent made a detailed presentation on the salient features of the project.
2. The project involves extraction of Limestone & Shale of production capacity (5.25 Million TPA ) by M/s Ultra Tech Cement Limited an area of 331.424 ha hectare at Village Baga & Bhalag, Taluka Arki, District Solan, Himachal Pradesh.
3. The said project/activity is covered under category “A” of item 1 (a) column 3 of the Schedule to the EIA Notification, 2006, and requires prior EC from the MoEF&CC / SEIAA based on the appraisal by Expert Appraisal Committee.
4. Whether project attracts the General Condition specified in the Schedule of EIA Notification (Yes/No): Yes, Bandli Wild Life Sanctuary at distance of 8.5 km in
12.3.7.3 Observations and recommendations of committee:
The EAC, after detailed deliberations recommended to defer the proposal for want of following information
1. The Project Proponent shall give an undertaking by way of affidavit to comply with all the statutory requirements and judgment of Hon’ble Supreme Court dated the 2nd August 2017 in Writ Petition (Civil) No. 114 of 2014 in the matter of Common Cause versus Union of India and Ors. before grant of ToR/ EC. The undertaking interalia include commitment of the PP not to repeat any such violation in future.
2. Status of Forest Clearance and copy.
3. Documentary proofs for the credible action already taken by the state Government.
4. Detailed presentation to be made on violation of the before the EAC.
5. Status of Wild Life Clearance.
6. Certified production details since inception of mines from department of State Mines and Geology.
12.3.8 Manufacturing of fine chemicals, bulkdrug intermediates at No. 11/2, KIADB Industrial Area, Attibele Hobli, Anekal Taluk, Bangalore (Karnataka) by M/s Sonia Organics - Further consideration of Terms of Reference
[IA/KA/IND2/66973/2017 dated 26.07.2017] [F. No. 23-102/2018-IA.III (V) ]
12.3.8.1 M/s Sonia Organics has made online application vide proposal no. IA/KA/IND2/66973/2017 dated 26.07.2017seeking Term of References for the above mentioned proposed project. The proposed project activity is covered under ‘B’ category of item 5(f) of the Schedule to the EIA Notification, 2006 and the proposal was appraised at Central level as general condition applies.
12.3.8.2 Details of the project as per the submission of project proponent:
The project involves manufacturing of Active Pharmaceuticals Ingredients, Speciality Chemical and Intermediates of production capacity of 10 MT by M/s Sonia Organic in an area of 4552 sqm at No 11/2, Attibele Industrial Area, Balagaranahalli Village, Anekal Taluk District Bangalore South, Karnataka 562107
The project activity is listed at S.N. 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates) of the Schedule to the EIA Notification, 2006, and requires prior EC from the MoEF&CC as the project site is falling within
INDEX
Sr. No. Particulars Page No.
1. Reply of ADS 1-2
2. Annexure 3-71
3. Annexure 1 – Affidavit in compliance of judgmentof Hon’ble Supreme Court dated 02.08.2017
3-5
4. Annexure 2 – Letter regarding Status of ForestClearance
6-10
5. Annexure 3 –Documentary proof of credibleactions taken up by the Government of HimachalPradesh
11-58
6. Annexure 4 – Presentation on violationpresented before EAC
59-66
7. Annexure 5 – Letter regarding Status of WildlifeClearance
67-69
8. Annexure 6 – Certified Production Details 70-71
ADS Reply
M/s UltraTech Cement Ltd.
Baga- Bhalag Limestone and Shale mine (expansion from 3.10 MTPA to 5.25 MTPA) within existing lease
area (331.424 ha) located at Village Baga & Bhalag, Taluka Arki, District Solan, Himachal Pradesh by M/s.
UltraTech Cement Limited
Ref.: 1. Proposal Number- IA/HP/MIN/69006/2017; File No. – 23-224/2018-IA.III (V)
2. MOM of 12th EAC Meeting held during 28th -29th August, 2018
Point No. 1 - The Project Proponent shall give an undertaking by way of affidavit to comply with all the
statutory requirements and judgment of Hon’ble Supreme Court dated the 2nd August 2017 in
Writ Petition (Civil) No. 114 of 2014 in the matter of Common Cause versus Union of India and
Ors. before grant of ToR/ EC. The undertaking interalia include commitment of the PP not to
repeat any such violation in future.
Reply - The affidavit in Compliance of judgment of Hon’ble Supreme Court dated the 2nd August 2017
is enclosed as Annexure –1.
Point No.2- Status of Forest Clearance and copy
Reply - Forest Clearance for diversion of 239.5096 ha Forest Land for Limestone Mining purpose was
obtained from MoEF&CC (FC Division) vide letter no. F.No. 8-72/2005-FC dated: 2nd June, 2006
in the name of M/s. Jaypee Himachal Cement Limited and the same has been transferred by
MOEF CC in the name of M/s. UltraTech Cement Limited vide letter dated 26. 07. 2017. Copy of
the same is enclosed as Annexure – 2.
Point No.3- Documentary proofs for the credible action already taken by the state Government.
Reply - Details of credible action taken by State Government are as under:
Action taken by the State Government for violation of the EIA Notification, 2006:
a) HP State Pollution Control Board has filed a Complaint in the Hon’ble Court of Chief Judicial
Magistrate, Arki under section 15, 16 & 19 of the Environment Protection Act, 1986 for the
violation of the provision of EIA Notification 2006 and under Section 22- A, 37, 39 40 & 43 of
the Air Act 1981 against the company M/s Jaiprakash Associates Limited, vide case No.
Environment Protection Act/0000001/2018.
b) The matter is pending for disposal in the Hon’ble Court.
Copy Enclosed as Annexure- 3 A
Details of action taken by the State Government/IBM in respect of illegal Mining:
a) State Govt. of Himachal Pradesh has sent a letter to the Indian Bureau of Mines on
22.08.2015 to initiate suitable action as per the provision of MCDR 1988.
Copy Enclosed as Annexure- 3 B
b) In pursuant to the above communication Indian Bureau of mines has filed a petition No.
4717/2016 in the Hon’ble court of Chief Judicial Magistrate, Dehradun on 24.11.2016 in
respect of violation of rule 13(1) of MCDR.
ADS Reply
M/s UltraTech Cement Ltd.
c) The case got disposed of on 10.02.2017, Copy Enclosed as Annexure- 3 C
Further Environmental Clearance for enhanced capacity of 5.25 Million TPA was obtained
from MoEF & CC vide letter Ref. no: J-11015/105/2013-IA II (M) dated 26th May, 2016.
Copy Enclosed as Annexure- 3 D
Point No.4- Detailed presentation to be made on violation of the before the EAC.
Reply - The presentation on violation was presented in 12th EAC (violation) Meeting on 28.08.2018.
Copy of the same is enclosed as Annexure – 4.
Point No.5- Status of Wild Life Clearance.
Reply - Letter regarding Wildlife Clearance has been obtained from Himachal Pradesh Forest
Department vide Letter No. WL (Misc.) – Jaypee Cement/WLM/ 6684 Dated: 09.03.2016 in the
name of M/s Jaiprakash Associate Limited, Jaypee Himachal Cement Limited and application
for transfer of the same to M/s. UltraTech Cement Limited has been submitted vide letter No.
UTCL/Baga/ENV/WL/2017/05 dated: 28.06.2017. Copy of same is enclosed as Annexure – 5.
Point No.6- Certified production details since inception of mines from department of State Mines and
Geology.
Reply - Production details since inception of mines is certified from department of State Mines and
Geology vide letter no. UDYOG/SLN/MM/Lease/Ultra Tech/Vol-II/2017-805 dated: 25.08.2018 is
enclosed as Annexure – 6.
=
ANNEXURE - 1AFFIDAVIT IN COMPLIANCE OF JUDGMENT OF HON’BLE
SUPREME COURT DATED 02.08.2017
3
4
5
ANNEXURE - 2LETTER REGARDING STATUS OF FOREST CLEARANCE
6
7
8
9
10
ANNEXURE -3DOCUMENTARY PROOF OF CREDIBLE ACTIONS
TAKEN UP BY THE GOVERNMENT OF HIMACHAL PRADESH
Documentary proofs for the credible action already taken by the state Government.
Action taken by the State Government for violation of the EIA Notification, 2006:
a) HP State Pollution Control Board has filed a Complaint in the Hon’ble Court ofChief Judicial Magistrate, Arki under section 15, 16 & 19 of the EnvironmentProtection Act, 1986 for the violation of the provision of EIA Notification 2006and under Section 22- A, 37, 39 40 & 43 of the Air Act 1981 against the companyM/s Jaiprakash Associates Limited, vide case No. Environment ProtectionAct/0000001/2018.
b) The matter is pending for disposal in the Hon’ble Court.
Copy Enclosed as Annexure- 3 A
Details of action taken by the State Government/IBM in respect of illegal Mining:
a) State Govt. of Himachal Pradesh has sent a letter to the Indian Bureau of Mineson 22.08.2015 to initiate suitable action as per the provision of MCDR 1988.
Copy Enclosed as Annexure- 3 B
b) In pursuant to the above communication Indian Bureau of mines has filed apetition No. 4717/2016 in the Hon’ble court of Chief Judicial Magistrate,Dehradun on 24.11.2016 in respect of violation of rule 13(1) of MCDR.
c) The case got disposed of on 10.02.2017 with the penalty of Rs. 20000/-.
Copy Enclosed as Annexure- 3 C
Further Environmental Clearance for enhanced capacity of 5.25 Million TPA was obtained fromMoEF&CC vide letter Ref. no: J-11015/105/2013-IA II(M) dated 26th May, 2016.
Copy Enclosed as Annexure- 3 D
11
4/19/2019 Home - eCourt India Services
https://services.ecourts.gov.in/ecourtindia_v6/# 1/2
Back
Chief Judicial Magistrate, TC ArkiCase Details
Case Type ENVIRONMENT PROTECTION ACT,
Filing Number 304/2018 Filing Date 26-03-2018
RegistrationNumber
1/2018 Registration Date 03-08-2013
CNR Number HPSO050003042018 (Note the CNR number for futurereference)
View QR Code / CauseTitle
Case Status
First Hearing Date 11th April 2018
Next Hearing Date 26th August 2019
Stage of Case Evidence of Applicant
Court Number and Judge 1-Judicial Magistrate First Class
Petitioner and Advocate
1) State of HP Pollution Control Board
Respondent and Advocate
1) M/s Jai Prakash Associate Ltd. 2) M/s Jai Prakash Associate Ltd. through its plant Incharge, manager, Jaypee Himcahcl Cement Plant at Village Bagga P.O.
Kandhar, Tehsil Arki, Distt. Solan, H.P.
Acts
Under Act(s) Under Section(s)
Environment (Protection) Act 15,16
History of Case Hearing
Judge Business On Date Hearing Date Purpose of hearing
Judicial Magistrate First Class 11-04-2018 21-06-2018 Evidence of Applicant
Judicial Magistrate First Class 21-06-2018 03-10-2018 Evidence of Applicant
Judicial Magistrate First Class 03-10-2018 06-11-2018 Reply
12
4/19/2019 Home - eCourt India Services
https://services.ecourts.gov.in/ecourtindia_v6/# 2/2
Judge Business On Date Hearing Date Purpose of hearing
Judicial Magistrate First Class 06-11-2018 19-12-2018 Considration
Judicial Magistrate First Class 19-12-2018 11-03-2019 Considration
Judicial Magistrate First Class 11-03-2019 08-04-2019 Considration
Judicial Magistrate First Class 08-04-2019 26-08-2019 Evidence of Applicant
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Scanned by CamScanner 48
Scanned by CamScanner 49
Scanned by CamScanner 50
51
52
53
54
55
56
57
58
ANNEXURE -4Presentation on violation presented before EAC
WelcomesWelcomes
The MoEFCC Expert Appraisal Committee (Violation)
Baga- Bhalag limestone and shale mine
(Expansion from 3.10 to 5.25 Million TPA)
Lease area (331.424 Ha)At
Villages: Baga & Bhalag, Arki Taluka, Solan District, Himachal Pradesh
1
The MoEFCC Expert Appraisal Committee (Violation)
Baga- Bhalag limestone and shale mine
(Expansion from 3.10 to 5.25 Million TPA)
Lease area (331.424 Ha)At
Villages: Baga & Bhalag, Arki Taluka, Solan District, Himachal Pradesh
PROJECT PROPONENTM/s. UltraTech Cement Ltd.
Ahura Centre, ‘A’ Wing,
1st Floor,, Mahakali Caves Road,
Andheri (East), Mumbai - 400 093
e-mail: [email protected]
Phone: 022-66917400, Fax: 022- 28244970
Date: 28th August, 2018
(Agenda Item No. : 12.3.7 )
59
INTRODUCTIONINTRODUCTION OF PROJECTOF PROJECT
• Jaypee Himachal Cement Plant (JHCP) of M/s Jaiprakash AssociatesLimited was taken over by M/s UltraTech Cement Limited with effectfrom 29th June 2017 as per the scheme of arrangement approved byNational Company Law Tribunal.
• Environmental Clearance for Baga-Bhalag Limestone & Shale mineover an area of 331.424 Ha with production capacity of 3.10 MillionTPA obtained on 7th Sept. 2006, to meet the limestone requirementfor Cement Plant.
• Environmental Clearance for expansion Baga-Bhalag limestone Minesfrom 3.10 to 5.25 Million TPA was obtained on 26th May, 2016 .
• Consent to Establish for enhanced capacity (5.25 MTPA) was grantedby HPSPCB vide ref. No. PCB [130] M/s JPH Mining/14118/2016-/3347-51 dated 15.10.2016 and Consent to Operate was issued byHPSPCB for the enhanced capacity (5.25 Million TPA) vide ref. No.PCB [130] M/s JPH Mining/14118/2016-132-36 dated 03.04.2017.
2
• Jaypee Himachal Cement Plant (JHCP) of M/s Jaiprakash AssociatesLimited was taken over by M/s UltraTech Cement Limited with effectfrom 29th June 2017 as per the scheme of arrangement approved byNational Company Law Tribunal.
• Environmental Clearance for Baga-Bhalag Limestone & Shale mineover an area of 331.424 Ha with production capacity of 3.10 MillionTPA obtained on 7th Sept. 2006, to meet the limestone requirementfor Cement Plant.
• Environmental Clearance for expansion Baga-Bhalag limestone Minesfrom 3.10 to 5.25 Million TPA was obtained on 26th May, 2016 .
• Consent to Establish for enhanced capacity (5.25 MTPA) was grantedby HPSPCB vide ref. No. PCB [130] M/s JPH Mining/14118/2016-/3347-51 dated 15.10.2016 and Consent to Operate was issued byHPSPCB for the enhanced capacity (5.25 Million TPA) vide ref. No.PCB [130] M/s JPH Mining/14118/2016-132-36 dated 03.04.2017.
60
CHRONOLOGYCHRONOLOGY
PARTICULAR DETAILS
Application for EC in expansion ofLimestone production ( 3.10 to 5.25Million TPA)
2nd April 2013
ToR Letter issued on 3rd Feb. 2015
Baseline Study March- May 2015
3
Baseline Study March- May 2015
Public Hearing Conducted on 31st Oct. 2015
Final EIA Submission on 28th Jan. 2016
Proposal considered in EAC meeting held
on21st March 2016
EC granted for expansion of Limestone &
Shale production ( 3.10 to 5.25 Million
TPA)
26th May, 2016
61
Details of violation
Baga – Bhalag Limestone & Shale mine (331.424 Ha.) comes
under the violation due to higher production, for certain period
from 2010 to 2015, beyond the 3.10 Million TPA capacity
granted in Environmental Clearance dated 7th September, 2006.
However, Environmental Clearance for expansion of Baga-
Bhalag Limestone & Shale mine (from 3.10 MTPA to 5.25 MTPA)
was obtained on 26th May, 2016.
4
Baga – Bhalag Limestone & Shale mine (331.424 Ha.) comes
under the violation due to higher production, for certain period
from 2010 to 2015, beyond the 3.10 Million TPA capacity
granted in Environmental Clearance dated 7th September, 2006.
However, Environmental Clearance for expansion of Baga-
Bhalag Limestone & Shale mine (from 3.10 MTPA to 5.25 MTPA)
was obtained on 26th May, 2016.
62
ACTIONS TAKEN STATUS
Action taken by State Pollution Control Board under EP Act and AirAct:-
• Himachal Pradesh Pollution Control Board had filed a petition in the
Hon’ble Court of Chief Judicial Magistrate, TC Arki District Solan, H.P.
under Section 15, 16 & 19 of the Environment Protection Act, 1986 for the
violation of the provision of EIA Notification 2006 and under Section 22-
A, 37, 39 40 & 43 of the Air Act 1981 against the company M/s Jaiprakash
Associates Limited, vide case No. Environment Protection
Act/0000001/2018.
• The matter is pending for disposal in the Hon’ble Court.
Action taken by State Govt. under MCDR :-
• State Govt. of Himachal Pradesh has forwarded the matter to the Indian
Bureau of Mines on 22.08.2015 to initiate suitable action as per MCDR,
1988.
• Indian Bureau of mines has filed a petition No. 4717/2016 in the Hon’ble
court of Chief Judicial Magistrate, Dehradun on 24.11.2016 in respect of
violation of rule 13(1) of MCDR.
• The case got disposed off on 10.02.2017.
5
Action taken by State Pollution Control Board under EP Act and AirAct:-
• Himachal Pradesh Pollution Control Board had filed a petition in the
Hon’ble Court of Chief Judicial Magistrate, TC Arki District Solan, H.P.
under Section 15, 16 & 19 of the Environment Protection Act, 1986 for the
violation of the provision of EIA Notification 2006 and under Section 22-
A, 37, 39 40 & 43 of the Air Act 1981 against the company M/s Jaiprakash
Associates Limited, vide case No. Environment Protection
Act/0000001/2018.
• The matter is pending for disposal in the Hon’ble Court.
Action taken by State Govt. under MCDR :-
• State Govt. of Himachal Pradesh has forwarded the matter to the Indian
Bureau of Mines on 22.08.2015 to initiate suitable action as per MCDR,
1988.
• Indian Bureau of mines has filed a petition No. 4717/2016 in the Hon’ble
court of Chief Judicial Magistrate, Dehradun on 24.11.2016 in respect of
violation of rule 13(1) of MCDR.
• The case got disposed off on 10.02.2017.
63
Action Taken Status
6
64
M/s. UTCL has submitted the application for
compliance of MoEF&CC Gazette Notification
S.O.804 (E) dated 14th March, 2017.
7
M/s. UTCL has submitted the application for
compliance of MoEF&CC Gazette Notification
S.O.804 (E) dated 14th March, 2017.
65
88
66
ANNEXURE -5LETTER REGARDING STATUS OF WILDLIFE CLEARANCE
67
68
69
ANNEXURE -6CERTIFIED PRODUCTION DETAILS
70
71