Sustainable Drainage Report
Revision B
Gainsford Road - Waltham Forest
11757
For Pocket Living (2013) LLP
Engineering at its Best
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 2 of 8
Report For
Scheme No: 11757
Pocket Living (2013) LLP
Gainsford Road - Waltham
Forest
Revision B
Sustainable Drainage Report
Main Contributors
May 2016
Andrew Picton
Issued By
Approved By
Tully De’Ath Consultants, Sheridan House, Forest Row, East Sussex, RH18 5EA Tel: 01342 828000 Fax: 01342 828001 Email: [email protected] Web: www.tullydeath.com
Copyright and Non-Disclosure Notice The contents and layout of this report are subject to copyright owned by Tully De’Ath (© Tully De’Ath Limited 2009) save to the extent that copyright has been legally assigned by us to another party or is used by Tully De’Ath under licence. To the extent that we own the copyright in this report, it may not be copied or used without our prior written agreement for any purpose other than the purpose indicated in this report. The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties without the prior written agreement of Tully De’Ath. Disclosure of that information may constitute an actionable breach of confidence or may otherwise prejudice our commercial interests. Any third party who obtains access to this report by any means will, in any event, be subject to the Third Party Disclaimer set out below.
Third-Party Disclaimer Any disclosure of this report to a third-party is subject to this disclaimer. The report was prepared by Tully De’Ath at the instruction of, and for use by, our client named on the front of the report. It does not in any way constitute advice to any third-party who is able to access it by any means. Tully De’Ath excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability.
Andrew Picton
Paul Tittle
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 3 of 8
Contents
Sustainable Drainage Report Revision B
1.0 Introduction
2.0 Site Location
3.0 Existing Conditions
4.0 Development Proposals
5.0 Sustainable Drainage Options
6.0 Surface Water Drainage Proposals
7.0 Foul Drainage Proposals
8.0 Maintenance
9.0 Conclusions
Appendix A – Location Plan
Appendix B – Topographical Survey
Appendix C – Thames Water Sewer Records
Appendix D – Environment Agency Flood Maps
Appendix E – Development Proposals
Appendix F – Drainage Calculations
Appendix G – Indicative Drainage Layout
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 4 of 8
Sustainable Drainage Report Revision B
1.0 Introduction
Tully De’Ath have been commissioned by Pocket Living to provide a Sustainable Drainage Report for the redevelopment of the Gainsford Road Site in Waltham Forest.
The purpose of the report is to demonstrate to the Planners and the Lead Local Flood Authority that the site can be drained in a safe and sustainable manner for the lifetime of the development. The report has been prepared in accordance with guidance set out within the SuDS Manual, and makes reference to the Waltham Forest Surface Water Management Plan document.
2.0 Site Location
The site is located on the northern side of Gainsford Road, between Hoe Street to the east and Blackhorse Lane to the west. It is bounded on the east by the Ahmadiyya Muslim Association. Immediately to the west of the site are a series of terraced houses, which have taken the place of the former William Morris Technical School. The north of the site is bordered by the rear gardens of the associated terraced homes.
The site has a Planning boundary of 1726 m² and a postcode address of E17 6QB.
Refer to Appendix A for Location Plan.
3.0 Existing Conditions
The existing site is a disused two storey office building and car park, all of which is 100% hard paved.
Topography
A topographical survey (Appendix B) indicates approximately a 1.0m fall in levels from east to west, with the south-eastern corner having a level of 23.50m AOD and the south-western corner 22.51m AOD. There is also up to a 0.5m fall from north to south. The north-eastern corner has a level of 23.70m AOD with a level of 22.90m AOD in the north-western corner.
Sewerage System
A survey has indicated a separate uncontrolled foul and surface water drainage system on the site. The surface water drains to a manhole in the south-western corner of the site, which in turn appears to discharge off-site through the adjacent front gardens. The foul drainage is collected along the frontage of Gainsford Road, however the final outfall has not been established, but is believed to connect into an adopted 225 dia. foul sewer in Gainsford Road. With reference to the Thames Water sewer records, (Appendix C) there are no adopted surface water sewers adjacent to the site. The nearest adopted surface water sewer is located in the front gardens on the opposite side of the road and to the western end of Gainsford Road.
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 5 of 8
Geology
An intrusive ground investigation has not been completed at the time of writing this report. However, based upon the geological maps, it is anticipated that beneath a layer of fill material, the natural geology will be sands and gravels over London Clay. This suggests infiltration as a form of surface water disposal may be appropriate; though this will be dependent on the depth of fill material on the site, whether there is any contamination and the depth of the ground water table.
Water Features
The nearest water course is the Dagenham Brook which is located 1.1km to the west of the site.
Flood Risk
With reference to the Environment Agencies flood maps (Appendix D) the site is located in a Flood Zone 1 which is assessed as having less than a 1 in 1000 chance of river flooding.
The Surface Water Flood map does not highlight any surface water flooding on the site, although there are some areas of flooding highlighted as having a Low risk of flooding within Gainsford Road.
The nearest flood risk associated with reservoir flooding is approximately 0.5km to the north of site.
With reference to the Waltham Forest Surface Water Management Plan, the site is not located within a Critical Drainage Area.
The new development will reduce the impermeable area on the site and, with reference to Chapter 6, the surface water discharge rate will be restricted. Consequently the risk of sewer and surface water flooding will reduce as a result of the new development.
4.0 Development Proposals
The new development comprises a single residential block, part 2, part 3 and part 4 stories in height, containing a total of 45 No. 1-bed units. Private garden areas and a communal shared spaced incorporating an allotment area will be provided.
No parking spaces will be provided on the scheme.
The new proposals will result in a reduced impermeable area of 1500m², which is a reduction of 200m². Refer to Appendix E for Development Proposals.
5.0 Sustainable Drainage Options
Many existing drainage systems can cause problems of flooding, pollution or damage to the environment, and are not proving to be sustainable. Sustainable drainage systems (SuDS) are an alternative approach to conventional drainage design and implementation; they replicate natural drainage and deal with run-off where it occurs.
Appropriately designed, constructed and maintained, SuDS are more sustainable than conventional drainage systems and can help to:
Reduce run-off rates
Reduce the risk of flooding
Encourage natural groundwater re-charge
Reduce pollutant concentrations in storm water
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 6 of 8
Reduce volume of surface water run-off
Provide habitat for wildlife
However, there are many site-specific factors which will influence the choice of any single or combination of SuDS devices used within a development. The primary factors are:
How the land is used – whether the development is domestic, commercial or industrial
Whether the soil is contaminated
The existing soil conditions, i.e. whether the ground is permeable, or has a high water table
The topography of the site – whether it is steeply sloping
Availability of space – urban or non-urban
Most advice on the use of sustainable drainage techniques recommends the use of ground infiltration as a preferred option, which may take the form of permeable paving, swales, infiltration basins or ground soakaways. However, these systems are dependent on the suitability of the subsoil permeability, the availability of an adequate depth of unsaturated soil zone, and the absence of leachable contaminants in the subsoil.
Within this development, infiltration devices are assumed not to be suitable although this is to be confirmed by insitu testing. However, the following SuDS features are to be included within the development.
Water Butts
Although not a primary SuDS device, when incorporated into other surface water management systems, water butts can provide some benefits. On this site water butts will be provided to assist in the irrigation of the allotment space.
Permeable Paving
Permeable paving provides a pavement suitable for pedestrians and vehicles whilst allowing rainwater to
infiltrate through the surface and into the underlying layers. The water is temporarily stored before either
infiltrating into the sub-soils (if appropriate) or discharging to the drainage system, where the sub-base
material is wrapped in an impermeable membrane. As well as providing surface water attenuation, they are
also efficient at removing urban run-off pollutants, making them ideal for use in car park areas.
All hard paved areas will be constructed using permeable paving with a tanked base unless it has been established by insitu testing that base infiltration is appropriate.
Geocellular/Modular Systems
These are plastic modular systems with a high void ratio that can be used to create a below-ground infiltration
or storage structure. They have the advantage of being flexible, lightweight, and can be installed within
trafficked areas. If the sub-soils are appropriate these systems can be used as a soakaway, or alternatively
they can also form an underground storage tank with the units wrapped in an impermeable membrane.
A storage tank is proposed for this site unless the insitu testing confirms infiltration is appropriate.
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 7 of 8
6.0 Surface Water Drainage Proposals
The new development will result in a reduced impermeable area of approximately 200m², which will as a consequence result in a reduction in surface water volume leaving the site.
Regarding surface water discharge rates Policy 2 of the Surface Water Management Plan states:
Proposed ‘brownfield’ redevelopments greater than 0.1 hectare are required to reduce post development runoff rates for events up to and including the 1 in 100 year return period event with an allowance for climate change (in line with PPS25 and UKCIP guidance) to 50% of the existing site conditions. If this results in a discharge rate lower than the Greenfield conditions it is recommended that the Greenfield rate (calculated in accordance with IoH1241 ) are used.
With reference to the drainage calculations in Appendix F, the existing 1 in 1 year run-off rate has been calculated to be 23 l/s. A 50% reduction in flows equates to a maximum discharge rate of 11 l/s for all events up to the 100 year event with an additional 30% allowance for climate change. With a reduced impermeable area for the site of 1550m² the volume of attenuation required to accommodate a 1 in 100 year event, including a 30% allowance for climate change, has been calculated to be 39m³.
With reference to Appendix G, an indicative drainage layout has been developed which locates an attenuation tank beneath the communal garden area. A hydro-brake chamber will be located within the front gardens fronting Gainsford Road which will in turn discharge to the existing outfall chamber in the south-western corner of the site.
External ground levels are designed to fall away from the building to provide additional protection during an exceedance storm event.
An intrusive ground investigation report has yet to be completed. It is possible that infiltration may be appropriate for this site, however this will depend upon the depth of fill material, whether there is any contamination present, and the depth of the ground water. The drainage details developed within this report are based on the assumption that infiltration is not appropriate. If the intrusive investigation establishes that infiltration is suitable the permeable paving will not require a tanked base and the attenuation tank could be designed as a soakaway. The size of the soakaway would be designed to accommodate a 1 in 100 return event with a 30% allowance for climate change, with an infiltration rate based upon measured results.
7.0 Foul Drainage Proposals
The foul discharge rates for the existing office building is not known; however the survey suggests that a number of gullies and rainwater pipes are connected to the foul system The new development will provide a new separate foul and surface water drainage system which will remove any surface water flows from the foul network.
The 45 new units will generate a peak foul flow of 2.1 l/s. Any surface water flows removed from the foul system are likely to offset the flows generated by the new development, particularly when the foul flows generated by the existing buildings are also removed.
An indicative foul drainage layout is included within the drainage strategy drawing in Appendix F. This will be subject to confirmation from a CCTV survey that the existing foul drainage outfall is suitable for re-use and a Section 106 approval from Thames Water
Sustainable Drainage Report - Revision B 17th May 2016 11757 Page 8 of 8
8.0 Maintenance
Maintenance of any drainage scheme is essential to ensure that it continues to perform as designed. Within the site’s ‘Health & Safety/Maintenance File’ details of routine maintenance inspections should be included together with guidance as to how they should be undertaken, at what intervals and/or events and by who.
Generally the surface water drainage system requires regular inspection/clearing to prevent blockages due to accumulation of silt. Trapped gullies and catch-pits should be inspected and cleared of silt and permeable paving surfaces should be jetted in order to remove silt from the open joints between the blocks.
The below ground storage crates should incorporate inspection/jetting units within the base layer.
It is recommended that all elements within the private sections of the proposed drainage network are initially inspected and cleared by a suitably trained person every six months for at least the first two years of operation to establish a long-term inspection/clearing interval appropriate for this site. Inspection/clearing should also be carried out after every major storm event.
The site will be managed by Pocket Living for the lifetime of the development and, as a consequence, the drainage system will form part of their maintenance obligations.
9.0 Conclusions
The site is located in a low flood risk area.
The existing development is 100% hard paved and has an uncontrolled discharge into the adjacent sewerage system.
The new development will provide a reduced impermeable area which will as a consequence reduce the amount of surface water volume discharging from the site.
A number of SuDS features will be incorporated into the development which include new soft landscaping areas, permeable paving, a below-ground surface water attenuation tank and water butts for irrigating the allotments.
The surface water discharge rate will be restricted 11 l/s for all events up to the 1 in 100 +CC rerun period. This is a 50% reduction of the existing 1 in 1 year flow, which satisfies the requirements of the Waltham Forest Surface Water Management Plan.
Surface water attenuation will be provided to accommodate the 100+CC event.
Should the intrusive ground investigation works establish that infiltration is appropriate, the permeable paving will allow for base infiltration and the attenuation tank will be designed as a soakaway using measured infiltration rates.
Ground levels will be designed to fall away from the building which will provide additional flood protection in an exceedance event.
The drainage system will be maintained for the lifetime of the development in accordance with a site specific maintenance strategy.
The above demonstrates that the new development will reduce the flood risk both within and beyond the development, as well as providing a new drainage system which reduces, controls and treats the surface water run-off from the site.
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix A – Location Plan
Site Location Plan
Gainsford Road,
London,
E17 6QB
SITE LOCATION
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix B – Topographical Survey
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix C – Thames Water Sewer Records
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix D – Environment Agency Flood Maps
Map legend
Click on the map to see what Flood Zone (National Planning Policy Guidance definitions) the proposed development is in.
Flood Map for Planning (Rivers and Sea)
Flood Zone 3
Flood Zone 2
Flood defences(Not all may be shown*)
Areas benefiting from flood defences(Not all may be shown*)
Main River Line
Main River Line
Other national environmental organisations
Natural Resources Wales Area of responsibility
Scottish Environment Protection Agency Area of responsibility
Other maps Data search Text only version
Author: Environment Agency | [email protected]
Last updated: 18th March 2016
Enter a postcode or place name: Other topics for this area...
Flood Map for Planning (Rivers and Sea)
Flood Map for Planning (Rivers and Sea)
X: 536,694;Y: 189,417 at scale 1:10,000
Customers in Wales - From 1 April 2013 Natural Resources Wales (NRW) has taken over the responsibilities of the Environment Agency in Wales.© Environment Agency copyright and database rights 2016. © Ordnance Survey Crown copyright. All rights reserved. Environment Agency, 100026380.
Contains Royal Mail data © Royal Mail copyright and database right 2016.This service is designed to inform members of the public, in line with our terms and conditions. For business or commercial use, please contact us.
Follow us: YouTube Twitter Flickr Facebook
Privacy policy | Terms and conditions | Contact us© Environment Agency 2016
More about flooding:
Understanding the Flood Map for Planning (Rivers and Sea)
A more detailed explanation to help you understand the flood map shown above.
Current flood warnings
We provide flood warnings online 24 hours a day. Find out the current flood warning status in your local area.
* Legend Information: Flood defences and the areas benefiting from them are gradually being added through updates. Please contact your local environment agency office for further details.
Page 1 of 1Environment Agency - What's in your backyard?
04/04/2016http://maps.environment-agency.gov.uk/wiyby/wiybyController?lang=_e&topic=floo...
Map legend
Risk of Flooding from Surface Water
High
Medium
Low
Very Low
Other national environmental organisations
Natural Resources Wales Area of responsibility
Scottish Environment Protection Agency Area of responsibility
Data search
Author: The Environment Agency | [email protected]
Last updated: 04 April 2016
Enter a postcode or place name: Other topics for this area...
Risk of Flooding from Surface Water View other Interactive Maps
Risk of Flooding from Surface Water
Surface water flooding happens when rainwater does not drain away through the normal drainage systems or soak into the ground, but lies on or flows over the ground instead.
The shading on the map shows the risk of flooding from surface water in this particular area.
Click on the map for a more detailed explanation.
Map of X: 536,694; Y: 189,417 at scale 1:10,000
Customers in Wales - From 1 April 2013 Natural Resources Wales (NRW) will take over the responsibilities of the Environment Agency in Wales. © Environment Agency copyright and database rights 2016. © Ordnance Survey Crown copyright. All rights reserved. Environment Agency, 100026380.
Contains Royal Mail data © Royal Mail copyright and database right 2016. This service is designed to inform members of the public, in line with our terms and conditions. For business or commercial use, please contact us.
Follow us: YouTube Twitter Flickr Facebook
Privacy policy | Terms and conditions | Contact us | Cymraeg
© Environment Agency 2016
200 m
1000 ft
535848, 190285
Page 1 of 1Environment Agency - Risk of Flooding from Surface Water
04/04/2016http://watermaps.environment-agency.gov.uk/wiyby/wiyby.aspx?layerGroups=default...
Map legend
Risk of Flooding from Reservoirs
Maximum extent of flooding
Other national environmental organisations
Natural Resources Wales Area of responsibility
Scottish Environment Protection Agency Area of responsibility
Data search
Author: The Environment Agency | [email protected]
Last updated: 04 April 2016
Enter a postcode or place name: Other topics for this area...
Risk of Flooding from Reservoirs View other Interactive Maps
Risk of Flooding from Reservoirs
Reservoir flooding is extremely unlikely to happen.
The shading on the map shows the area that could be flooded if a large reservoir were to fail and release the water it holds. A large reservoir is one that holds over 25,000 cubic metres of water, equivalent to approximately 10 Olympic sized swimming pools. Since this is a worst case scenario, it’s unlikely that any actual flood would be this large.
Click on the shading to see details of reservoirs that could cause flooding in this area.
Map of X: 536,694; Y: 189,417 at scale 1:10,000
Customers in Wales - From 1 April 2013 Natural Resources Wales (NRW) will take over the responsibilities of the Environment Agency in Wales. © Environment Agency copyright and database rights 2016. © Ordnance Survey Crown copyright. All rights reserved. Environment Agency, 100026380.
Contains Royal Mail data © Royal Mail copyright and database right 2016. This service is designed to inform members of the public, in line with our terms and conditions. For business or commercial use, please contact us.
Follow us: YouTube Twitter Flickr Facebook
Privacy policy | Terms and conditions | Contact us | Cymraeg
© Environment Agency 2016
200 m
1000 ft
535442, 189440
Page 1 of 1Environment Agency - Risk of Flooding from Reservoirs
04/04/2016http://watermaps.environment-agency.gov.uk/wiyby/wiyby.aspx?topic=reservoir&sca...
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix E – Development Proposals
1280 BK
1280
GR
1280 BK
1280
GR
1280
GR
1280
BK
1280
BK
1280BR
1280
GR
1280
BK
1280
GR
1280
GR
1280
BR
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
future accessiblekitchen space
1500mm clearturning circle
1500mm clearturning circle
SVP
boilerW/D
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
recy
cle b
ins
bene
ath
600x
600
pre-
plum
bing
for
dish
wash
er
stor
age
450x
600
corn
er s
tora
ge40
0x60
0
level landing area (1400x1800mm)
1500mm clearturning circle
Hinged or removablefixed shower screen
SVP
SVP
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
6500
B
6500
C
6500
D
6500
E
6500
F
6500
GA
KEY SETTING OUT POINT
6500
02
6500
03
6500
04
6500
05
6500
06
6500
07
6500
01
G01G02G03G04
G05
G12
G11
G10
G09G08
G07
G06
Bins
Bikes
Bikes
1
2
3
5
4
KEY
Site boundaryThermal lineIndicative smoke vent location
1 Mechanical Riser2 Electrical Riser3 Electrical Plant rm and Meters4 Gas Meter rm5 Mechanical Plant rm
Dry riserRWPs 89mm DIA
B B
A
A
8020
to k
erb
Furthest routes to bin storeDistance from bin store to pavement
1:200 @ A3
The Print House, 18 Ashwin Street, London E8 3DLE:[email protected] T: +44(20) 7254 6294
Do not scale off this drawing. Any discrepancies or queries should be brought to the attention of the authors. Gort Scott Ltd retains copyright of these drawings and the work depicted on them. No unauthorised reproduction of work.
This drawing is for the purposes declared in the Status Box only. Whilst all reasonable efforts are used to ensure drawings are accurate, Gort Scott Ltd accept no responsibility or liability for any reliance on these drawings for purposes other than those stated.
STATUS:
PROJECT:
TITLE:
DRAWING:
DATE:
Gainsford Road
Mar 2016SCALE:
REV:
PLANNING
D
Proposed Ground Floor
10-10
gort scott
Rev Date
Notes
1:200 @ A3
The Print House, 18 Ashwin Street, London E8 3DLE:[email protected] T: +44(20) 7254 6294
Do not scale off this drawing. Any discrepancies or queries should be brought to the attention of the authors. Gort Scott Ltd retains copyright of these drawings and the work depicted on them. No unauthorised reproduction of work.
This drawing is for the purposes declared in the Status Box only. Whilst all reasonable efforts are used to ensure drawings are accurate, Gort Scott Ltd accept no responsibility or liability for any reliance on these drawings for purposes other than those stated.
STATUS:
PROJECT:
TITLE:
DRAWING:
DATE:
Gainsford Road
Mar 2016SCALE:
REV:
PLANNING
D
Proposed First Floor
10-11
gort scott
Rev Date
Notes
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
6500
B
6500
C
6500
D
6500
E
6500
F
6500
GA
KEY SETTING OUT POINT
6500
02
6500
03
6500
04
6500
05
6500
06
6500
07
6500
01
101104105106
107
115
114
113
112111
110
109
102103
108
1
2 3ST
KEY
Site boundaryThermal lineIndicative smoke vent location
1 Mechanical Riser2 Electrical Riser3 Electrical Plant rm and Meters4 Gas Meter rm5 Mechanical Plant rm
Dry riserRWPs 89mm DIA
B B
A
A
1:200 @ A3
The Print House, 18 Ashwin Street, London E8 3DLE:[email protected] T: +44(20) 7254 6294
Do not scale off this drawing. Any discrepancies or queries should be brought to the attention of the authors. Gort Scott Ltd retains copyright of these drawings and the work depicted on them. No unauthorised reproduction of work.
This drawing is for the purposes declared in the Status Box only. Whilst all reasonable efforts are used to ensure drawings are accurate, Gort Scott Ltd accept no responsibility or liability for any reliance on these drawings for purposes other than those stated.
STATUS:
PROJECT:
TITLE:
DRAWING:
DATE:
Gainsford Road
Mar 2016SCALE:
REV:
PLANNING
D
Proposed Second Floor
10-12
gort scott
Rev Date
Notes
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0re
cycl
e bin
sbe
neat
h60
0x60
0
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
6500
B
6500
C
6500
D
6500
E
6500
F
6500
GA
KEY SETTING OUT POINT
6500
02
6500
03
6500
04
6500
05
6500
06
6500
07
6500
01
201204205206
207
213
212
211210
209
202203
208
1
23 ST
KEY
Site boundaryThermal lineIndicative smoke vent location
1 Mechanical Riser2 Electrical Riser3 Electrical Plant rm and Meters4 Gas Meter rm5 Mechanical Plant rm
Dry riserRWPs 89mm DIA
B B
A
A
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boilerW/D
pre-
plum
bing
for
dish
wash
er
stora
ge60
0x60
0
recy
cle b
ins
bene
ath
600x
600
draw
er u
nit
600x
600
cera
mic
hob &
ove
n60
0x60
0
hood
abo
ve
fridg
e/fre
ezer
600x
600
SVP
clear manoeuvering zoneØ1500mm
boile
rW
/D
pre-plumbingfor
dishwasher
storage600x600
recycle binsbeneath600x600
drawer unit600x600
ceramic hob & oven600x600
hood above
fridge/freezer600x600
SV
P
clea
r man
oeuv
erin
g zo
neØ
1500
mm
6500
B
6500
C
6500
D
6500
E
6500
F
6500
GA
KEY SETTING OUT POINT
6500
02
6500
03
6500
04
6500
05
6500
06
6500
07
6500
01
305
304303
301302
1
KEY
Site boundaryThermal lineIndicative smoke vent location
1 Mechanical Riser2 Electrical Riser3 Electrical Plant rm and Meters4 Gas Meter rm5 Mechanical Plant rm
Dry riserRWPs 89mm DIA
2 3
B B
A
A
ST
1:200 @ A3
The Print House, 18 Ashwin Street, London E8 3DLE:[email protected] T: +44(20) 7254 6294
Do not scale off this drawing. Any discrepancies or queries should be brought to the attention of the authors. Gort Scott Ltd retains copyright of these drawings and the work depicted on them. No unauthorised reproduction of work.
This drawing is for the purposes declared in the Status Box only. Whilst all reasonable efforts are used to ensure drawings are accurate, Gort Scott Ltd accept no responsibility or liability for any reliance on these drawings for purposes other than those stated.
STATUS:
PROJECT:
TITLE:
DRAWING:
DATE:
Gainsford Road
Mar 2016SCALE:
REV:
PLANNING
D
Proposed Third Floor
10-13
gort scott
Rev Date
Notes
6500 6500 6500 6500 6500 6500
KEY SETTING OUT POINT
6500
02
6500
03
6500
04
6500
05
6500
06
6500
07
6500
01
RWP
RWP
RWP
RWP
RWP
RWPRWP
RWPRWP
RWP
RWP
RWP
KEY
Site boundaryThermal lineIndicative smoke vent location
1 Mechanical Riser2 Electrical Riser3 Electrical Plant rm and Meters4 Gas Meter rm5 Mechanical Plant rm
Dry riserRWPs 89mm DIA
KEY
Site boundaryThermal lineIndicative smoke vent location
1 Mechanical Riser2 Electrical Riser3 Electrical Plant rm and Meters4 Gas Meter rm5 Mechanical Plant rm
Dry riserRWPs 89mm DIA
B B
A
A
1:200 @ A3
The Print House, 18 Ashwin Street, London E8 3DLE:[email protected] T: +44(20) 7254 6294
Do not scale off this drawing. Any discrepancies or queries should be brought to the attention of the authors. Gort Scott Ltd retains copyright of these drawings and the work depicted on them. No unauthorised reproduction of work.
This drawing is for the purposes declared in the Status Box only. Whilst all reasonable efforts are used to ensure drawings are accurate, Gort Scott Ltd accept no responsibility or liability for any reliance on these drawings for purposes other than those stated.
STATUS:
PROJECT:
TITLE:
DRAWING:
DATE:
Gainsford Road
Mar 2016SCALE:
REV:
PLANNING
D
Proposed Roof Plan
10-14
gort scott
Rev Date
Notes
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix F – Drainage Calculations
Tully De'Ath Page 1
Sheridan House
Hartfield Road
Forest Row
Date 05/04/2016 16:47 Designed by mt
File Existing runoff rate ca... Checked by
XP Solutions Network 2014.1.1
Summary of Critical Results by Maximum Level (Rank 1) for Storm
©1982-2014 XP Solutions
Simulation CriteriaAreal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000
Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000Hot Start Level (mm) 0 Inlet Coeffiecient 0.800
Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000Foul Sewage per hectare (l/s) 0.000
Number of Input Hydrographs 0 Number of Storage Structures 0Number of Online Controls 0 Number of Time/Area Diagrams 0Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall DetailsRainfall Model FSR Ratio R 0.449
Region England and Wales Cv (Summer) 0.750M5-60 (mm) 20.400 Cv (Winter) 0.840
Margin for Flood Risk Warning (mm) 300.0 DVD Status OFFAnalysis Timestep Fine Inertia Status OFF
DTS Status ON
Profile(s) Summer and WinterDuration(s) (mins) 15, 30, 60, 120, 240, 360, 480, 960, 1440
Return Period(s) (years) 1Climate Change (%) 0
PN Storm
Return
Period
Climate
Change
First X
Surcharge
First Y
Flood
First Z
Overflow
O/F
Act.
Lvl
Exc.
1.000 15 Winter 1 0%1.001 15 Winter 1 0%
PN
US/MH
Name
Water
Level
(m)
Surch'ed
Depth (m)
Flooded
Volume
(m³)
Flow /
Cap.
O'flow
(l/s)
Pipe
Flow
(l/s) Status
1.000 1 10.131 -0.094 0.000 0.63 0.0 23.3 OK1.001 2 10.004 -0.096 0.000 0.62 0.0 23.1 OK
Tully De'Ath Page 1
Sheridan House
Hartfield Road
Forest Row
Date 05/04/2016 17:20 Designed by mt
File INITIAL TANK SIZING CAL... Checked by
XP Solutions Source Control 2014.1.1
Summary of Results for 100 year Return Period (+30%)
©1982-2014 XP Solutions
Half Drain Time : 31 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Control
(l/s)
Max
Σ Outflow
(l/s)
Max
Volume
(m³)
Status
15 min Summer 22.145 0.475 0.0 10.9 10.9 29.5 Flood Risk30 min Summer 22.194 0.524 0.0 10.9 10.9 32.5 Flood Risk60 min Summer 22.176 0.506 0.0 10.9 10.9 31.4 Flood Risk120 min Summer 22.099 0.429 0.0 10.9 10.9 26.6 Flood Risk180 min Summer 22.003 0.333 0.0 10.9 10.9 20.6 Flood Risk240 min Summer 21.914 0.244 0.0 10.9 10.9 15.1 O K360 min Summer 21.780 0.110 0.0 10.9 10.9 6.8 O K480 min Summer 21.704 0.034 0.0 10.9 10.9 2.1 O K600 min Summer 21.672 0.002 0.0 10.8 10.8 0.1 O K720 min Summer 21.670 0.000 0.0 9.5 9.5 0.0 O K960 min Summer 21.670 0.000 0.0 7.5 7.5 0.0 O K1440 min Summer 21.670 0.000 0.0 5.3 5.3 0.0 O K2160 min Summer 21.670 0.000 0.0 3.8 3.8 0.0 O K2880 min Summer 21.670 0.000 0.0 3.0 3.0 0.0 O K4320 min Summer 21.670 0.000 0.0 2.1 2.1 0.0 O K5760 min Summer 21.670 0.000 0.0 1.7 1.7 0.0 O K7200 min Summer 21.670 0.000 0.0 1.4 1.4 0.0 O K8640 min Summer 21.670 0.000 0.0 1.2 1.2 0.0 O K10080 min Summer 21.670 0.000 0.0 1.1 1.1 0.0 O K
15 min Winter 22.222 0.552 0.0 10.9 10.9 34.2 Flood Risk
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Discharge
Volume
(m³)
Time-Peak
(mins)
15 min Summer 136.492 0.0 39.7 1730 min Summer 87.821 0.0 51.1 3060 min Summer 53.743 0.0 63.1 46120 min Summer 31.792 0.0 73.2 80180 min Summer 23.100 0.0 80.8 112240 min Summer 18.323 0.0 85.5 144360 min Summer 13.164 0.0 92.0 200480 min Summer 10.416 0.0 96.9 254600 min Summer 8.681 0.0 100.9 306720 min Summer 7.477 0.0 104.3 0960 min Summer 5.903 0.0 109.8 01440 min Summer 4.226 0.0 117.9 02160 min Summer 3.022 0.0 126.5 02880 min Summer 2.380 0.0 132.8 04320 min Summer 1.698 0.0 142.1 05760 min Summer 1.335 0.0 149.0 07200 min Summer 1.108 0.0 154.5 08640 min Summer 0.950 0.0 159.1 010080 min Summer 0.835 0.0 163.1 0
15 min Winter 136.492 0.0 44.1 17
Tully De'Ath Page 2
Sheridan House
Hartfield Road
Forest Row
Date 05/04/2016 17:20 Designed by mt
File INITIAL TANK SIZING CAL... Checked by
XP Solutions Source Control 2014.1.1
Summary of Results for 100 year Return Period (+30%)
©1982-2014 XP Solutions
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Control
(l/s)
Max
Σ Outflow
(l/s)
Max
Volume
(m³)
Status
30 min Winter 22.291 0.621 0.0 10.9 10.9 38.5 Flood Risk60 min Winter 22.263 0.593 0.0 10.9 10.9 36.8 Flood Risk120 min Winter 22.149 0.479 0.0 10.9 10.9 29.7 Flood Risk180 min Winter 22.000 0.330 0.0 10.9 10.9 20.5 O K240 min Winter 21.865 0.195 0.0 10.9 10.9 12.1 O K360 min Winter 21.697 0.027 0.0 10.9 10.9 1.7 O K480 min Winter 21.670 0.000 0.0 9.5 9.5 0.0 O K600 min Winter 21.670 0.000 0.0 7.9 7.9 0.0 O K720 min Winter 21.670 0.000 0.0 6.8 6.8 0.0 O K960 min Winter 21.670 0.000 0.0 5.4 5.4 0.0 O K1440 min Winter 21.670 0.000 0.0 3.9 3.9 0.0 O K2160 min Winter 21.670 0.000 0.0 2.8 2.8 0.0 O K2880 min Winter 21.670 0.000 0.0 2.2 2.2 0.0 O K4320 min Winter 21.670 0.000 0.0 1.6 1.6 0.0 O K5760 min Winter 21.670 0.000 0.0 1.2 1.2 0.0 O K7200 min Winter 21.670 0.000 0.0 1.0 1.0 0.0 O K8640 min Winter 21.670 0.000 0.0 0.9 0.9 0.0 O K10080 min Winter 21.670 0.000 0.0 0.8 0.8 0.0 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Discharge
Volume
(m³)
Time-Peak
(mins)
30 min Winter 87.821 0.0 57.1 3060 min Winter 53.743 0.0 69.6 48120 min Winter 31.792 0.0 82.2 86180 min Winter 23.100 0.0 90.2 122240 min Winter 18.323 0.0 95.1 152360 min Winter 13.164 0.0 103.0 200480 min Winter 10.416 0.0 108.5 0600 min Winter 8.681 0.0 113.0 0720 min Winter 7.477 0.0 116.8 0960 min Winter 5.903 0.0 123.0 01440 min Winter 4.226 0.0 132.1 02160 min Winter 3.022 0.0 141.6 02880 min Winter 2.380 0.0 148.7 04320 min Winter 1.698 0.0 159.2 05760 min Winter 1.335 0.0 166.9 07200 min Winter 1.108 0.0 173.0 08640 min Winter 0.950 0.0 178.2 010080 min Winter 0.835 0.0 182.6 0
Tully De'Ath Page 3
Sheridan House
Hartfield Road
Forest Row
Date 05/04/2016 17:20 Designed by mt
File INITIAL TANK SIZING CAL... Checked by
XP Solutions Source Control 2014.1.1
Rainfall Details
©1982-2014 XP Solutions
Rainfall Model FSR Winter Storms YesReturn Period (years) 100 Cv (Summer) 0.750
Region England and Wales Cv (Winter) 0.840M5-60 (mm) 20.400 Shortest Storm (mins) 15
Ratio R 0.449 Longest Storm (mins) 10080Summer Storms Yes Climate Change % +30
Time Area Diagram
Total Area (ha) 0.155
Time
From:
(mins)
To:
Area
(ha)
0 4 0.155
Tully De'Ath Page 4
Sheridan House
Hartfield Road
Forest Row
Date 05/04/2016 17:20 Designed by mt
File INITIAL TANK SIZING CAL... Checked by
XP Solutions Source Control 2014.1.1
Model Details
©1982-2014 XP Solutions
Storage is Online Cover Level (m) 22.300
Cellular Storage Structure
Invert Level (m) 21.670 Safety Factor 2.0Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.94Infiltration Coefficient Side (m/hr) 0.00000
Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)
0.000 66.0 66.0 0.630 66.0 86.5
Hydro-Brake Optimum® Outflow Control
Unit Reference MD-SHE-0154-1100-0830-1100Design Head (m) 0.830
Design Flow (l/s) 11.0Flush-Flo™ CalculatedObjective Minimise upstream storage
Diameter (mm) 154Invert Level (m) 21.470
Minimum Outlet Pipe Diameter (mm) 225Suggested Manhole Diameter (mm) 1200
Control Points Head (m) Flow (l/s)
Design Point (Calculated) 0.830 10.9Flush-Flo™ 0.271 10.9Kick-Flo® 0.590 9.3
Mean Flow over Head Range - 9.2
The hydrological calculations have been based on the Head/Discharge relationship for theHydro-Brake Optimum® as specified. Should another type of control device other than aHydro-Brake Optimum® be utilised then these storage routing calculations will beinvalidated
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
0.100 5.5 1.200 13.0 3.000 20.1 7.000 30.20.200 10.8 1.400 14.0 3.500 21.7 7.500 31.30.300 10.9 1.600 14.9 4.000 23.1 8.000 32.20.400 10.7 1.800 15.8 4.500 24.4 8.500 33.10.500 10.3 2.000 16.6 5.000 25.7 9.000 34.00.600 9.4 2.200 17.3 5.500 26.9 9.500 35.00.800 10.7 2.400 18.1 6.000 28.11.000 11.9 2.600 18.8 6.500 29.2
Sustainable Drainage Report - Revision B 17th May 2016 11757
Appendix G – Indicative Drainage Layout
FOR PLANNING
PURPOSE ONLY
Feasibility Research
EIA, Flood Risk & Transportation Assessment
Urban Planning and Design
Integrated Transport Solutions
Infrastructure Development
Structural Design
Eco and MMC Focused
Tully De’Ath offers a range of
excellent design services to a
wide client base. If you want to
find out more about the
services we offer, please
contact your nearest office on
the details below.
Sheridan House, Forest Row, East Sussex, RH18 5EA
01342 828000 ph
01342 828001 fax
Unit 4, St Saviours Wharf, Mill Street, London, SE1 2BE
0845 850 8280 ph
0845 850 8281 fax
www.tullydeath.com