aveva constructing the digital asset

Upload: ayhanatakan

Post on 01-Jun-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 AVEVA Constructing the Digital Asset

    1/37

  • 8/9/2019 AVEVA Constructing the Digital Asset

    2/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    This presentation may include predictions, estimates, intentions,

    beliefs and other statements that are or may be construed as

    being forward-looking. While these forward-looking statements

    represent our current judgment on what the future holds, they are

    subject to risks and uncertainties that could result in actual

    outcomes differing materially from those projected in these

    statements. No statement contained herein constitutes a

    commitment by AVEVA to perform any particular action or to

    deliver any particular product or product features. Readers are

    cautioned not to place undue reliance on these forward-looking

    statements, which reflect our opinions only as of the date of this

    presentation. The Company shall not be obliged to disclose any

    revision to these forward-looking statements to reflect events or

    circumstances occurring after the date on which they are made or

    to reflect the occurrence of future events.

  • 8/9/2019 AVEVA Constructing the Digital Asset

    3/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    Constructing

    the Digital

    Asset

  • 8/9/2019 AVEVA Constructing the Digital Asset

    4/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    AVEVAs Solution

    Project Planning at Highest Level

    Construction Work Packages (CWP)

    Work Scope and Budget

    Material, Documents, Drawings, etc.

    Schedule Responsible, Crew, Trade, Contractor, etc.

    Workface Planning at Lower Level

    Installation Work Packages (IWP)

    IWP Report

    Detailed and discrete work scope and budget Specific required material and related documents

    Schedule and sequence

    Responsible crew, etc.

    Key Concept #1 Work Packaging

  • 8/9/2019 AVEVA Constructing the Digital Asset

    5/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    AVEVAs Solution

    Integrating the schedulewith the 3D model

    Simulate constructionsequence to verifycorrect planning

    Visualize installationand completion statusby color-codingobjects in 3D model

    Key Concept #2 4D Planning

  • 8/9/2019 AVEVA Constructing the Digital Asset

    6/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    AVEVAs Solution

    Visualize materialand resourceavailability

    Proactively

    expedite materialor modify scheduleto accommodatematerial shortages

    Key Concept #3 Integrated with Materials Management

  • 8/9/2019 AVEVA Constructing the Digital Asset

    7/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    AVEVAs Solution

    Key Concept #4 Visualization

  • 8/9/2019 AVEVA Constructing the Digital Asset

    8/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    Solution Review

    and

    Demonstration

  • 8/9/2019 AVEVA Constructing the Digital Asset

    9/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Construction Management

    System Architecture

    ERM

    AVEVA-Construction Management

    AVEVA-Digital Information Hub

    DASHBOARD PLANNING CONSTRUCTION MATERIAL

    Gateway GatewayGateway Gateway

  • 8/9/2019 AVEVA Constructing the Digital Asset

    10/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    High level flow example

    ERM

    DASHBOARD PLANNING CONSTRUCTION MATERIAL

    E3D PrimaveraDocumentum SAP

    3DModel

    Level1-3

    Documents Procurement

  • 8/9/2019 AVEVA Constructing the Digital Asset

    11/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    High level flow example

    ERM

    DASHBOARD PLANNING CONSTRUCTION MATERIAL

    E3D PrimaveraDocumentum SAP

    Construction

    Work Package

  • 8/9/2019 AVEVA Constructing the Digital Asset

    12/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    High level flow example

    ERM

    DASHBOARD PLANNING CONSTRUCTION MATERIAL

    E3D PrimaveraDocumentum SAP

    Installation

    Work Package

  • 8/9/2019 AVEVA Constructing the Digital Asset

    13/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    Importing

    3D-Models

    and 3D-Items

  • 8/9/2019 AVEVA Constructing the Digital Asset

    14/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Initial Setup for pulling into Hub

    Digital Asset Import Setup

    Project Information Hub

  • 8/9/2019 AVEVA Constructing the Digital Asset

    15/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    3D Model Items Import

    Import 3D Models brings inthe geometry of all the

    models (no tag information isimported at this time)

    Import 3D Models Items bringsin the tag information

  • 8/9/2019 AVEVA Constructing the Digital Asset

    16/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    3D Material

    Assignment

  • 8/9/2019 AVEVA Constructing the Digital Asset

    17/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    3D Material Assignment

    Work PackageKitting allows theuser to use the

    model to associate

    material tohighlighted workpackage, andsubsequently

    further breakdownwith construction

    planning

  • 8/9/2019 AVEVA Constructing the Digital Asset

    18/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    3D Material Assignment

    Green & Red Buttonscan be used to

    promote or demote

    the selection ofitems to and fromthe work packages

    3D model

    Within the jobkitting the

    system identifiesall activityproperties

    On the Left a Multilevel Bill of Materials

    On the Right a flatBill of Materials

  • 8/9/2019 AVEVA Constructing the Digital Asset

    19/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    Importing

    DIH

    Documents

  • 8/9/2019 AVEVA Constructing the Digital Asset

    20/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Import DIH Documents

    A List of Pulled documents can beseen in s70010 Documents

    Documents can be pulled in whenand as the user desires

    Project Information Hub

  • 8/9/2019 AVEVA Constructing the Digital Asset

    21/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Documents

    When you select an associateddocument, it can be opened in

    your default browser andnavigate to that document.

    Then display it using the builtin viewer

    Lines of Data cancreated New,Delete

    And Save

    Documents can beassociated to work

    packages & jobs theyare need for

  • 8/9/2019 AVEVA Constructing the Digital Asset

    22/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Lines of Data cancreated New,

    DeleteAnd Save

    Attachments

    Save

    Create Revisions

    FilterEdit Open thedocument for

    Editing

    View Opensthedocument

    Attachments aremeans of pulling indocuments from a

    network and viewingamending them and

    saving

  • 8/9/2019 AVEVA Constructing the Digital Asset

    23/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    Construction

    Managment

    Material

    Module

  • 8/9/2019 AVEVA Constructing the Digital Asset

    24/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Drawings

    Lines of Data canbe created New,Delete

    And Save

    Drawings can beassociated to the jobs

    they are need for

    If those Drawings are used in Design Gant View, thenthe system will identify if the drawing is critical from theEnd of the Design Gant View finish date to the Planned

    Usage date

  • 8/9/2019 AVEVA Constructing the Digital Asset

    25/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Material Procurement

    Detailed informationon the material statusis available by using

    the purchaseinformation button

  • 8/9/2019 AVEVA Constructing the Digital Asset

    26/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Material Stock Holding

    Detailed information onthe material stock

    holding is available byusing the stock button

  • 8/9/2019 AVEVA Constructing the Digital Asset

    27/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Material Critical

    Within the GantChart there is aMaterial statuscolumn. This

    identifies the overallMaterial Status. On

    A Traffic light

    Drill down to theindividual material is

    possible, to get detailedinformation on why an

    activity is material critical

    Within the GantChart there is aMaterial statuscolumn. This

    identifies the overallMaterial Status. On

    A Traffic light

  • 8/9/2019 AVEVA Constructing the Digital Asset

    28/37

    Copyright 2014 AVEVA Solutions

    Limited and its subsidiaries.

    All rights reserved.

    Stages

    Types of

    Work

  • 8/9/2019 AVEVA Constructing the Digital Asset

    29/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Stages Types of Work

    Stage 1

    Assemble

    Tubing

    Stage 2

    Machine

    Flanges

    Stage 3

    Assemble

    Spool

    Stage 4

    Install

    Spool

    Stage 4

    Install

    Spool

    Stage 4

    Install

    Spool

    Stage 5

    Inspect

    System

    Stage 4

    Install

    Spool

    Stages and Work

    Types are means of

    following the

    material through its

    life cycle within

    planning

  • 8/9/2019 AVEVA Constructing the Digital Asset

    30/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Work Stages

    Within Work Stages Types userscan define different types of work,that can be later associated with

    material

    Lines of Datacan be Cut

    copied & PasteOr New, Delete

    And Save

    They can also attach a colourthat, so as to colourise the 3D

    model to demonstrate the state ofthe model at that time

  • 8/9/2019 AVEVA Constructing the Digital Asset

    31/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Stages of Work

    Within Stages of Work users can

    setup generic routes

    Once the userhas setup a Stageof Work, they can

    then setup thegeneric route by

    adding new a

    Work Type

    A sequence of Work Typescan then be defined

    Each Work Type can then bedefined as a % of the overall

    Product Code Norm value.So if the Product code is 170hours for Pipe spool then cutwill receive 5% of the Norm

    = 8.5 hours

    Note toPresenter this

    screen willneed to be

    updated withthe addition of

    resources

  • 8/9/2019 AVEVA Constructing the Digital Asset

    32/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Stages of Work

    Within Stages of Work, users

    can define the Class Ids, thiswill have the function that all

    the Class items within the3D Model and Items session,

    will automatically get thatwork Stages

  • 8/9/2019 AVEVA Constructing the Digital Asset

    33/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Timeline Simulation

    Timeline Simulation allows the user to

    simulate the construction of the 3Dmodel using the items attached to the

    Project as the time rolls on itemsappear with a reference point on the

    scheduleNote This Facility works within both

    levels of the Plan

  • 8/9/2019 AVEVA Constructing the Digital Asset

    34/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    3D Timeline Simulation

    Status Colours can be used todefine the Cad items in its

    material cycle

    With Auto zoom

    User can setthe speed atwhich thetimeline

    simulationruns

    Select specific Time on

    the Simulation relates tothe timeline of the

    schedule

  • 8/9/2019 AVEVA Constructing the Digital Asset

    35/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    3D Model

    3D Model allows the user tonavigate around the model

    from within the plan. Makinggeneral enquires i.e. location,

    size, etc.Note This Facility also works within

    the detailed plan

  • 8/9/2019 AVEVA Constructing the Digital Asset

    36/37

    Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    3D Model-Status

    v

    User can set the visibilitylevel of the surrounding

    structure. This Introducesthe rest of the model

    This Systemdisplay Status ofthe model colours

    No stage toComplete

  • 8/9/2019 AVEVA Constructing the Digital Asset

    37/37

    Thank you