M/s Aadhya Didactics Pvt.Ltd., `VISWAKARMA’, #491, East End Road, 9th Block, Jayanagar, Bangalore 560 069. India

T / F: +91-80-26639780 II E-MAIL - [email protected] II WEBSITE: http://www.nemmadi.in

Automated Inspection Management System

Technology Lead Insights to Improve Projects

Nemmadi.in Page: 2 of 23

www.nemmadi.in

Pre-delivery Quality Inspection Report

Client:

Project:

Project Address:

Tower:

Floor:

Flat No:

PROJECT BRIEF

Nemmadi.in Page: 3 of 23

www.nemmadi.in

Contents

1. NIMS APP ............................................................................................................................................................................... 4

Ensuring inspection accurate and meticulously carried out without skipping any checkpoints ............ 4

2. EXECUTIVE SUMMARY ........................................................................................................................................................ 5

Snags: rooms and aspect wise ................................................................................................................................... 5

Room wise inspection points ....................................................................................................................................... 6

Room wise Percentage of Snags ............................................................................................................................... 7

Top Ten Snags .................................................................................................................................................................. 8

3. SPECIFICATIONS .................................................................................................................................................................. 9

Conformance to promised specification of Doors, Windows, Tiles, Painting, Finish etc. ........................... 9

Are all fittings provided same as the specified brands assured by Builder.................................................... 9

4. VISUAL REPORT: ..................................................................................................................................................................10

Architectural and Civil Engineering ........................................................................................................................10

Plumbing: ........................................................................................................................................................................13

Electrical: ........................................................................................................................................................................16

5. AREA STATEMENT: ..............................................................................................................................................................19

Checking dimensions of the property (Carpet Area) and compare to the specifications as provided

by the builder in the drawings ..........................................................................................................................................19

6. THERMOGRAPHIC ANALYSIS ..........................................................................................................................................21

Checking for apparent water leakage and dampness with Thermo graphic camera ..........................21

7. GENERAL OBSERVATION ..................................................................................................................................................23

Nemmadi.in Page: 4 of 23

www.nemmadi.in

1. NIMS APP

Ensuring inspection accurate and meticulously carried out without skipping

any checkpoints

Nemmadi.in Page: 5 of 23

www.nemmadi.in

2. EXECUTIVE SUMMARY

Snags: rooms and aspect wise

Nemmadi.in Page: 6 of 23

www.nemmadi.in

Room wise inspection points

Nemmadi.in Page: 7 of 23

www.nemmadi.in

Room wise Percentage of Snags

Nemmadi.in Page: 8 of 23

www.nemmadi.in

Top Ten Snags

Nemmadi.in Page: 9 of 23

www.nemmadi.in

3. SPECIFICATIONS

Conformance to promised specification of Doors, Windows, Tiles, Painting,

Finish etc.

Are all fittings provided same as the specified brands assured by Builder

Nemmadi.in Page: 10 of 23

www.nemmadi.in

4. VISUAL REPORT:

Architectural and Civil Engineering

o Checking of Internal painting and polishing

o Checking of Flooring, skirting and dado

o Checking of Floor slopes in toilets and balconies

o Checking of Doors and Windows for proper functioning including Hardware

o Checking of Granite copings, wash basin and Kitchen counters

o Checking of Decks and Railings

Nemmadi.in Page: 11 of 23

www.nemmadi.in

Nemmadi.in Page: 12 of 23

www.nemmadi.in

Nemmadi.in Page: 13 of 23

www.nemmadi.in

Plumbing:

o The necessary quality check been conducted on the concealed or embedded

plumbing pipes (Verification of Documentary proof to be provided by Builder).

o Checking for functioning of fittings and fixtures

o Checking for damages if any of the fittings and fixtures

o Check for any apparent leakages of pipes and also at the false ceiling in Toilets

Nemmadi.in Page: 14 of 23

www.nemmadi.in

Nemmadi.in Page: 15 of 23

www.nemmadi.in

Nemmadi.in Page: 16 of 23

www.nemmadi.in

Electrical:

o Checking for specified provisioning and functioning of the Electrical system, starting

with main Circuit Breaker, Earth Leakage Circuit Breaker (ELCB), and other Circuit

Breakers

o Checking of functioning and polarity of plug points and switches

o Check the quality of work with respect to fixing of face plates and switches

Nemmadi.in Page: 17 of 23

www.nemmadi.in

Nemmadi.in Page: 18 of 23

www.nemmadi.in

Nemmadi.in Page: 19 of 23

www.nemmadi.in

5. AREA STATEMENT:

Checking dimensions of the property (Carpet Area) and compare to the

specifications as provided by the builder in the drawings

Nemmadi.in Page: 20 of 23

www.nemmadi.in

Nemmadi.in Page: 21 of 23

www.nemmadi.in

6. THERMOGRAPHIC ANALYSIS

Checking for apparent water leakage and dampness with Thermo graphic

camera

Nemmadi.in Page: 22 of 23

www.nemmadi.in

Nemmadi.in Page: 23 of 23

www.nemmadi.in

7. GENERAL OBSERVATION

End of the Document End of the document