author: hock, source: …sp.bridges.transportation.org/documents/2010 scobs...microsoft powerpoint -...
TRANSCRIPT
![Page 1: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/1.jpg)
Author: Hock, Source: www.behance.net/hockstuff/frame/113621
![Page 2: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/2.jpg)
Accelerating solutions for highway safety,renewal, reliability, and capacity
![Page 3: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/3.jpg)
Procurement
Design
Planning
Operations & Maint
Construction
Get in,Get out,Stay out
![Page 4: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/4.jpg)
R09. Risk ManualR09. Risk Manual
R06. High-Speed NDT*R06. High-Speed NDT*
R04. Innovative BridgeDesigns
R04. Innovative BridgeDesigns
R01. Locating Utilities*R01. Locating Utilities*
R02. Geotech SolutionsR02. Geotech Solutions
R05. Modular PavementR05. Modular Pavement
R07. Performance SpecsR07. Performance Specs
R16. Railroad-DOTMitigation Strategies
R16. Railroad-DOTMitigation Strategies
R15. Integrating Utilityand TransportationAgency Priorities*
R15. Integrating Utilityand TransportationAgency Priorities*
R23. Using ExistingIn-place Pavement &Achieving long Life
R23. Using ExistingIn-place Pavement &Achieving long Life
R21. CompositeSystems
R21. CompositeSystems
R26. PreservationApproaches
R26. PreservationApproaches
R19. Bridges forService Life
of 100 Years*
R19. Bridges forService Life
of 100 Years*
Rapid Approaches Long-Lived FacilitiesMinimize Disruption
28 Research Projects $32million
R11. StrategicApproaches at
Corridor/Network Level
R11. StrategicApproaches at
Corridor/Network Level
R10. ProjectManagement for Large
Projects
R10. ProjectManagement for Large
Projects
R03. Worker FatigueR03. Worker Fatigue
Technology Related
Project Delivery Related
Indicates Multiple Projects*
![Page 5: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/5.jpg)
• Recommendations for LRFD Designand LOAD RATING Specs• Analysis methods, details• SLS approach, method for re-calibration, toolbox database,examples• Implementation plan
Focus on
- Improving existing and prove promising concepts for systems,subsystems, and components that historically limit the service lifeof bridges
- New design codes that incorporate a rational approach basedon Service Limit State
What SHRP 2 is doingWhat SHRP 2 is doing …… 100100--Year BridgesYear Bridges
Recommendations forLRFD CONSTRUCTION
Specs
Stand-alone guide devoted toDesign for Life.
PlanningPlanning DesignDesign Operations & MaintOperations & MaintConst.Proc.
![Page 6: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/6.jpg)
Innovative Bridges for Rapid RenewalInnovative Bridges for Rapid Renewal
Focus on
Developing standardized approaches
to designing, constructing, and reusing
complete bridge systems
WhatWhat SHRPSHRP 2 is doing2 is doing…… Accelerating constructionAccelerating construction
• Recommendations forLRFD Design Specs• Analysis methods• Details
Recommendations forLRFD CONSTRUCTION
Specs
PlanningPlanning DesignDesign ConstructionProc. Operations and Maint.
![Page 7: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/7.jpg)
Reducing Worker, Inspector and ManagerReducing Worker, Inspector and ManagerFatigue in Rapid Renewal EnvironmentsFatigue in Rapid Renewal Environments
Focus on
developing a best practices toolbox that can be used in reducing
workforce fatigue on rapid renewal projects.
WhatWhat SHRPSHRP 2 is doing2 is doing …… Improving safetyImproving safety
PlanningPlanning DesignDesign ConstructionProc. Operations and Maint.
Tool Box:• Recommendations for reducing fatigue and improvingsafety• Fatigue risk management plans• Implementation guidelines and training materials
Tool Box:• Recommendations for reducing fatigue andimproving safety• Fatigue risk management plans• Implementation guidelines & trainingmaterials
![Page 8: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/8.jpg)
Focus on
- Developing performance specifications and identifying strategies to
manage and minimize the risk to all parties involved in rapid highwayrenewal projects
- Addressing risk and risk transfer decisions associated with thediffering contracting approaches that may be used for rapid renewal
WhatWhat SHRPSHRP 2 is doing2 is doing …… EnablingEnabling
PerformancePerformance--Based RenewalBased Renewal
PlanningPlanning DesignDesign ConstructionProc. Operations and Maint.
• Performance specifications for rapid renewalscenarios
• Guide for implementing risk managementprocesses
• Training materials for implementing riskmanagement guide
![Page 9: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/9.jpg)
What SHRP 2 is doing … Inspection
PlanningPlanning DesignDesignOperations & Maint.Operations & Maint.Construction
Construction QA/QC
Evaluation of FieldSpectroscopy Devices
Condition AssessmentNDT to Identity Bridge Deck
Deterioration
NDT for Tunnel Linings
![Page 10: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/10.jpg)
Potential Users and Beneficiaries
• Taxpayers
• Motorists
• Commercial drivers
• Bus riders
• Shipping and logisticsprofessionals
• Environmental agencies
• Communities, businessesand event owners
• Railroads
• Utilities
• Auto manufacturers andsuppliers
• MPOs
• Law enforcementproviders
• Firefighters
• EMS providers
• State and localtransportation agencies
• Highway designers,contractors andsuppliers
![Page 11: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/11.jpg)
TRB S.R. 296 Recommendations: Summary
1. A SHRP 2 implementation program should beestablished
2. FHWA should serve as the principalimplementation agent in partnership withAASHTO, NHTSA and TRB
3. Funding: $400 million for 1st 6 years
4. Establish a formal stakeholder advisorystructure
5. Develop detailed implementation plans
![Page 12: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/12.jpg)
Implementation Activities
• TRB, FHWA and AASHTO implementation staff
• Form SHRP 2 Implementation SteeringCommittee
• Form Communication and Marketing work group
• Prepare product lists based on a strategicapproach
• “Early products”— Railroads, Utilities, Land Use,TCAPP, Performance Measures
• Extensive national and international outreachprogram: meetings and presentations
![Page 13: Author: Hock, Source: …sp.bridges.transportation.org/Documents/2010 SCOBS...Microsoft PowerPoint - GeneralSessionItemT-Starnes.ppt Author Kelley Created Date 6/10/2010 4:30:29 PM](https://reader033.vdocuments.site/reader033/viewer/2022042319/5f0954297e708231d4264f5a/html5/thumbnails/13.jpg)