August Progress I10 / BarrazaAviation Pkwy (SR 210) Meeting Notes Feasibility Reports & Environmental Overviews 101 North 1 st Avenue, Suite: 3100 Tel. (602) 2531200 Phoenix, Arizona 85003 Fax. (602) 2531202 ARIZONA DEPARTMENT OF TRANSPORTATION 205 S. 17 th Avenue, Mail Drop 605E Phoenix, AZ 85007 PROGRESS MEETING NOTES I-10, JCT I-19 TO EMPIRITA TI Project No. 010 PM 260 H7825 01L Federal Project No. 010-E(210)A August 30, 2010 TO: August Progress Meeting Attendees Billah Khan, ADOT Roadway Predesign Section, MD 605E Daniel Granillo, ADOT Tucson District Project Development, MD T168 Robin Raine, ADOT Tucson District Statewide Project Management, MD T100 Tom Martinez, ADOT Tucson District Transportation Engineering Specialist, MD T120 Delores Crumbacher, ADOT Regional Traffic, MD T120 Ayman Ghadban, ADOT Tucson District Utility Eng. Coordinator, MD T100 Rod Lane, ADOT Tucson District Development / Maintenance Engineer Tim Thurein, PAG Transportation Planning, 177 N. Church St., Ste. 405, Tucson, AZ 85701 Robert Young, Pima County Transportation System, 201 N. Stone Ave., Tucson, AZ 85701 Ben Goff, Pima County Transportation System Director, 201 N. Stone Ave., Tucson, AZ, 85701 Karen Lamberton, Cochise County Transportation Planner, 1415 Melody Lane, Bldg E, Bisbee, AZ 85603 José Ortiz, City of Tucson Traffic Engineering, 201 N. Stone Ave., Tucson, AZ 85701 Robert McGee, Sun Tran Director of Scheduling, 4220 S. Park Ave., Tucson, AZ 85714 Kathy Jirschele, Kaneen P.R., Community Outreach, 110 S. Church St., Ste. 3350, Tucson, AZ 85701 Liz Beamer, Kaneen P.R., Community Outreach, 110 S. Church St., Ste. 3350, Tucson, AZ 85701 Mike Dawson, EcoPlan Associates, 78 W. Cushing St., Tucson, AZ 85701 Steve Reuter, EcoPlan Associates, 78 W. Cushing St., Tucson, AZ 85701 Brad Olbert, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Patricia Gonella, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Shanthi Krishnan, Jacobs, 101 N. First Ave., Ste 3100, Phoenix, AZ 85003 Vanessa Quinto, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Phoenix (Video Conference): Tim Wilson, ADOT Roadway Predesign Section, MD 605E Paul Baumgardt, ADOT Environmental Planning Group, MD EM02 Don Mauller, ADOT MPD, MD 32C Mohamad Jawhar, ADOT Engineering Survey Section, MD 203P Kathy Boyle, ADOT Intergovernmental Affairs, MD 118A Shafiqul Islam, ADOT Tucson District, MD T100 William Lyons, ADOT Roadway Engineering Group, MD 615E Pete Mayne, ADOT R/W Project Management Section Coordinator, MD 612E Gricel Sato, ADOT Public Involvement Southern Arizona Mike Demlong, Arizona Game & Fish Department, 5000 W. Carefree Hwy, Phoenix, AZ 85028 Ray Schweinsburg, Arizona Game & Fish Department, 5000 W. Carefree Hwy, Phoenix, AZ 85028 Scott Sprague, Arizona Game & Fish Department, 5000 W. Carefree Hwy, Phoenix, AZ 85028 Gary Fromm, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Betsi Phoebus, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003

Upload: lamthuy

Post on 05-Aug-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

August Progress    I‐10 / Barraza‐Aviation Pkwy (SR 210) Meeting Notes     Feasibility Reports & Environmental Overviews 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202  

ARIZONA DEPARTMENT OF TRANSPORTATION 205 S. 17th Avenue, Mail Drop 605E

Phoenix, AZ 85007

PROGRESS MEETING NOTES

I-10, JCT I-19 TO EMPIRITA TI Project No. 010 PM 260 H7825 01L Federal Project No. 010-E(210)A

August 30, 2010

TO: August Progress Meeting Attendees

Billah Khan, ADOT Roadway Predesign Section, MD 605E Daniel Granillo, ADOT Tucson District Project Development, MD T168 Robin Raine, ADOT Tucson District Statewide Project Management, MD T100 Tom Martinez, ADOT Tucson District Transportation Engineering Specialist, MD T120 Delores Crumbacher, ADOT Regional Traffic, MD T120 Ayman Ghadban, ADOT Tucson District Utility Eng. Coordinator, MD T100 Rod Lane, ADOT Tucson District Development / Maintenance Engineer Tim Thurein, PAG Transportation Planning, 177 N. Church St., Ste. 405, Tucson, AZ 85701 Robert Young, Pima County Transportation System, 201 N. Stone Ave., Tucson, AZ 85701 Ben Goff, Pima County Transportation System Director, 201 N. Stone Ave., Tucson, AZ, 85701 Karen Lamberton, Cochise County Transportation Planner, 1415 Melody Lane, Bldg E, Bisbee, AZ

85603 José Ortiz, City of Tucson Traffic Engineering, 201 N. Stone Ave., Tucson, AZ 85701 Robert McGee, Sun Tran Director of Scheduling, 4220 S. Park Ave., Tucson, AZ 85714 Kathy Jirschele, Kaneen P.R., Community Outreach, 110 S. Church St., Ste. 3350, Tucson, AZ 85701 Liz Beamer, Kaneen P.R., Community Outreach, 110 S. Church St., Ste. 3350, Tucson, AZ 85701 Mike Dawson, EcoPlan Associates, 78 W. Cushing St., Tucson, AZ 85701 Steve Reuter, EcoPlan Associates, 78 W. Cushing St., Tucson, AZ 85701 Brad Olbert, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Patricia Gonella, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Shanthi Krishnan, Jacobs, 101 N. First Ave., Ste 3100, Phoenix, AZ 85003 Vanessa Quinto, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Phoenix (Video Conference): Tim Wilson, ADOT Roadway Predesign Section, MD 605E Paul Baumgardt, ADOT Environmental Planning Group, MD EM02 Don Mauller, ADOT MPD, MD 32C Mohamad Jawhar, ADOT Engineering Survey Section, MD 203P Kathy Boyle, ADOT Intergovernmental Affairs, MD 118A Shafiqul Islam, ADOT Tucson District, MD T100 William Lyons, ADOT Roadway Engineering Group, MD 615E Pete Mayne, ADOT R/W Project Management Section Coordinator, MD 612E Gricel Sato, ADOT Public Involvement Southern Arizona Mike Demlong, Arizona Game & Fish Department, 5000 W. Carefree Hwy, Phoenix, AZ 85028 Ray Schweinsburg, Arizona Game & Fish Department, 5000 W. Carefree Hwy, Phoenix, AZ 85028 Scott Sprague, Arizona Game & Fish Department, 5000 W. Carefree Hwy, Phoenix, AZ 85028 Gary Fromm, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003 Betsi Phoebus, Jacobs, 101 N. First Ave., Ste. 3100, Phoenix, AZ 85003

Page 2: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 2 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

Laurene Montero, Jacobs, 101 N. First Ave., Ste 3100, Phoenix, AZ 85003 Teleconference: Tom Engel, ADOT Safford District Maintenance Engineer, MD S400 Not in Attendance Todd Emery, ADOT Tucson District Engineer, MD T100 Jerry James, ADOT Tucson District Assistant District Engineer, MD T100 Reza Karimvand, ADOT Tucson District Traffic, MD T120 Linda Ritter, ADOT Tucson District Communication and Community Partnerships, MD T100 Bill Harmon, ADOT Safford District Engineer, MD S400 Robert Travis, ADOT Utilities and Railroad Engineering, MD 618E Karim Rashid, ADOT Traffic Design Team, MD 063R Chris Cooper, ADOT Roadway Design, MD 615E Reed Henry, ADOT Support Team Manager, MD 615E Teresa Welborn, ADOT Communications & Community Partnerships, MD T118A J.J. Liu, ADOT Geotechnical Operations, MD T068R Pe-Shen Yang, ADOT Bridge Design Service, MD 612E Paul Burch, ADOT Pavement Design Section, MD 068R Javed Bari, ADOT Pavement Design Section, MD 068R Chong-Tai Chyan, ADOT Photogrammetry and Mapping, MD 203P Virgil Coxon, ADOT Chief Surveyor, MD 203P Jim Wilson, ADOT Geotechnical Design Engineer, MD 068R Leroy Brady, ADOT Roadside Development, MD 617E Shajed Haque, ADOT Roadway Drainage Design, MD 634E Estomih Kombe, ADOT Transportation Research Project Manager, MD 075R Debbie Mayfield, ADOT Priority Programming Section, MD 310B Marta Raiford, ADOT Roadway Predesign Section, MD 605E Lev Derzhavets, ADOT Roadway Engineering Group, MD 615E Cherie Campbell, PAG Transportation Planning Director, 177 N. Church St., Ste. 405, Tucson, AZ

85701 Jim DeGrood, PAG Transportation Services, 177 N. Church St., Ste. 405, Tucson, AZ 85701 Don Freeman, PAG Technical Services Coordinator, 177 N. Church St., Ste. 405, Tucson, AZ 85701 Aichong Sun, PAG, 177 N. Church St., Ste. 405, Tucson, AZ 85701 Ken Davis, FHWA Senior Engineer Manager, 4000 N. Central Ave., Ste. 1500, Phoenix, AZ 85012 Aryan Lirange, FHWA Area Engineer, 4000 N. Central Ave., Ste. 1500, Phoenix, AZ 85012 Mary Frye, FHWA Environmental Coordinator, 4000 N. Central Ave., Ste. 1500, Phoenix, AZ 85012 Priscilla Cornelio, Pima County Department of Transportation Director, 201 N. Stone Ave., Tucson,

AZ, 85701 Damon Ballesteros, Pima County Project Manager, 201 N. Stone Ave., Tucson, AZ 85701 Albert Letzkus, Pima County Traffic Engineering Div. Manager, 1313 S. Mission Rd., Tucson, AZ,

85713 Jim Glock, City of Tucson Transportation Director, 201 N, Stone Ave., Tucson, AZ 85701 Mary Collins, City of Tucson Assistant to Transportation Director, 201 N, Stone Ave., Tucson, AZ

85701 Andy McGovern, City of Tucson Department of Transportation, 201 N, Stone Ave., Tucson, AZ 85701 Richard Salaz, City of South Tucson, Transportation and Flood Control, 1601 South 6th Ave.,

Tucson, AZ 85713 Joel Gastelum, City of South Tucson Planning, 1601 South 6th Ave., Tucson, AZ 85713

Page 3: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 3 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

Mary McLain, Sun Tran Asst. General Manager, 4220 South Park Ave., PO Box 26765, Tucson, AZ 85726

Nanette Pageau, Kaneen Advertising & Public Relations Inc., Public Relations Director, 110 S. Church Ave., Ste. 3350, Tucson, AZ 85701

Michael Toriello, Davis-Monthan AFB, 3791 S. 3rd St., Davis-Monthan AFB, AZ 85707 Darren Horstmeier, Davis-Monthan AFB, 3791 S. 3rd St., Davis-Monthan AFB, AZ 85707 Judy Alexander, Tucson Airport Authority, 7005 S. Plumer Ave., Tucson, AZ 85756 Aziz Aman, Union Pacific Railroad Zoe Richmond, Union Pacific Railroad Elizabeth Briones, Border Patrol, Assistant Chief Patrol Agent, Nogales, AZ Jeff Tanner, Border Patrol, Supervisory Border Patrol Agent, Nogales, AZ

FROM:

Brad Olbert, Jacobs, 101 North First Avenue, Ste. 3100, Phoenix, Arizona 85003 SUBJECT:

AUGUST PROGRESS MEETING NOTES I-10, JCT I-19 to Empirita TI Project No. 010 PM 260 H7825 01L I-10 / Barraza-Aviation Pkwy (SR 210) Feasibility Reports and Environmental Overviews INTRODUCTION The August Progress Meeting for the I-10, Jct I-19 to Empirita TI was held at 1:00 PM August 30, 2010 and concluded at 2:20 PM. The meeting was held at the ADOT Tucson District; ADOT Phoenix joined the meeting via video conference; ADOT Safford District attended the meeting via teleconference. This was the first Progress Meeting following the Kickoff Meeting held on July 21, 2010. This project has two Phases: Phase I consisting of two Feasibility Studies and two Environmental Overviews for I-10 from its junction with I-19 to SR 90 (eastern terminus extended from Empirita TI to SR 90 per Study Team consensus during the Kickoff Meeting; official project extension in process) and the Barraza-Aviation Parkway (SR 210). Phase II consists of a Design Concept Report and an Environmental Assessment for I-10, Junction I-19 to SR 90. Jacobs is currently contracted for Phase I of the study. Opportunity to express project concerns and expectations was given to agencies and individuals who were unable to attend the Kickoff Meeting. Following agencies’ input, Jacobs and EcoPlan provided the Team with an update on the traffic modeling, traffic counts/operation analysis, environmental and cultural resources. Brad Olbert, Jacobs PM, also provided an update on changes to the project schedule with the extension on the eastern terminus from the Empirita TI to SR 90. Agencies in attendance were: Pima Association of Governments (PAG), ADOT, ADOT Predesign, ADOT Tucson District, ADOT Safford District, Pima County, Cochise County, City of Tucson, Sun Tran and Arizona Game and Fish Department (AGFD). Agencies invited but unable to attend were: Federal Highway Administration (FHWA), City of South Tucson, Davis-Monthan AFB, Tucson Airport Authority, Border Patrol and Union Pacific Railroad (UPRR).

Page 4: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 4 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

SUMMARY Brad Olbert, Jacobs PM, opened the Progress Meeting with a safety moment and conducted self introductions of the attendees in Tucson and Phoenix. Brad gave a brief recap of the Kickoff Meeting and Site Review Meeting. Meeting notes were sent to the Study Team for review; minor comments were provided and are addressed. Final meeting notes are available at the Study Team website (www.jacobsaz.com). Brad Olbert also discussed changes involving the I-10 project’s eastern terminus. At the Kickoff Meeting, agencies expressed their concerns with the Empirita TI as the eastern terminus and suggested extending the eastern project limits to SR 90. A change order to extend the project’s eastern limit is in process. The tentative revised project name is I-10, Jct I-19 to SR 90 and the tentative eastern terminus milepost is 302.25. Mike Dawson, EcoPlan, commented that all environmental documents will round milepost to the nearest tenth of a mile (e.g., MP 302.3). Jacobs will announce to the Study Team when changes are official. With the east terminus extension, the project length would be approximate 42-miles along the I-10 corridor. Some agencies were unable to attend the Project Kickoff Meeting and opportunity to express their concerns and expectations were given to these agencies. Agencies unable to attend were: City of Tucson, Davis-Monthan AFB, Sun Tran and Union Pacific Railroad. Additional agencies were added to the project contact list following the Kickoff Meeting: Tucson Airport Authority, Border Patrol, and AGFD. Comments are summarized below: City of Tucson José Ortiz, City of Tucson Traffic Engineer, did not have comments at this time. Sun Tran Robert McGee, Sun Tran, meet with Geoff Slater, Nelson/Nygaard Consulting. Sun Tran suggested several park-and-ride transit stations along the I-10. Suggested park-and-ride locations are: Rita Road, Kolb Road and Wilmot Road. AGFD AGFD representatives, Mike Demlong, Ray Schweinsburg, and Scott Sprague, were present via video conference at ADOT Phoenix. AGFD is concerned that widening or otherwise modifying the section of interstate under study, could substantively impact wildlife attempting to cross I-10, especially along the section from SR 83 to SR 90. AGFD noted several major wildlife linkages or corridors that exist along this segment of I-10, linking the Rincon Mountains to the: Santa Rita, Whetstone, and Empire Mountains; Las Cienegas National Conservation Area; and Cienega Creek. For additional information on these linkages, they referred Jacobs/EcoPlan to review a study completed by Dr. Beier indentifying four (4) major wildlife corridors on the I-10 between SR 83 to SR 90; and the Arizona Wildlife Linkages Assessment (2006) prepared by ADOT and other members of the Arizona Wildlife Linkages Workgroup. As part of this feasibility study and in advance of any improvements to I-10 in the study area, AGFD suggested ADOT should support research to further refine the location of pertinent wildlife corridors and develop potential mitigation measures. AGFD noted vehicle-wildlife collisions often occur along this section of I-10 and suggested evaluating the need for mitigation measures (such as crossing structures) to minimize vehicle damage, reduce the risk of human injuries or death, and allow wildlife safe access across the interstate. For example, roadway hydrological structures crossing I-10 could also be modified/designed for wildlife use.

Page 5: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 5 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

AGFD noted they were an active participant in the Northwest Cochise County Long Range Transportation Plan Technical Advisory Committee (TAC). They referred the workgroup and consultants to review the final report (URS, September 2010) and the TAC’s recommendations. They look forward to being active participants in this feasibility study and partnership with ADOT. AGFD noted that due to the biological importance of this area, this project will likely also generate much attention and interest from the public and non-governmental organizations. Mike Dawson, EcoPlan, mentioned that at the Feasibility Study level, input from the public and non-governmental organizations will be very limited. The next phase will solicit input when alternative development occurs. Pima County Robert Young, Pima County, reiterated the importance of incorporating the Southeast Area in the modeling efforts. Davis-Monthan Davis-Monthan accepted invitation for this meeting but no representative was present at the progress meeting. Billah Khan, ADOT Predesign Project Manager, suggested that Jacobs to schedule a separate meeting with Davis-Monthan as their input and participation is critical for this project. UPRR No representative was present at this meeting Tucson Airport Authority No representative was present at this meeting Border Patrol No representative was present at this meeting ADOT Survey ADOT Survey provided DCR-level mapping for the I-10 corridor and will be available to provide more data as needed for this project. Following agencies input on the project, Jacobs presented a progress summary on the traffic modeling, traffic counts, environmental and cultural resources. Traffic Modeling Patrizia Gonella, Jacobs Modeling Team Lead, provided a summary of the modeling efforts. The project’s Traffic Focus Group met on August 11, 2010 to discuss the base assumptions to be used for the traffic model. Agencies included in the Traffic Focus Group were ADOT Tucson District, FHWA, PAG, City of Tucson, Pima County and Cochise County. (A copy of the meeting notes is available on the project’s website). Base assumptions for the traffic model were presented at the Progress Meeting and all parties agreed with the recommendations. Base assumptions for traffic model / traffic forecast are:

Population: PAG 2040 population growth assumptions will be used. PAG’s 2040 population estimate for the Southeast Area is 300,000, which is half of 2080 build-out population estimate of 600,000 people.

Page 6: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 6 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

Roadway Facilities: PAG 2040 adopted model will be used including the approved and reserved

projects. The PAG model was adopted in July 2010. Reserved projects are those projects identified in the PAG model as needed but not yet funded. Only the reserved projects in the influence area will be included, these are approximately 25% of all PAG’s RTP reserved projects.

Influence Area: The influence area is the area where traffic demand will affect improvements on I-10

and Barraza-Aviation Parkway. Limits of the influence area are delineated in gray dots in the 2040 Base Roadway (RTP) Exhibit provided at the Progress Meeting. The influence area includes I-10 from I-19 to SR 90, Southeast Area and area north of I-10 to Speedway Boulevard. A copy of the 2040 Base Roadway Exhibit is attached.

Cochise County Traffic Model: Recommendations and the Cochise County model will be used to

produce future traffic volumes. In addition to the traffic model, the Cochise County Northwest Area Plan should be finalized by August 31, 2010 and several highlights from this plan will be included in the I-10 study. Cochise County Northwest Area Plan highlights are included in the August 11, 2010 Traffic Focus Group meeting notes.

Barraza-Aviation Pkwy / I-10 Northwest Connection: Existing Barraza-Aviation Parkway (SR

210)/I-10 northwest connection is located within the influence area. Traffic Data Collection: Shanthi Krishnan, Jacobs Traffic Lead, provided a progress summary on the traffic operation efforts. The traffic pattern study consists of two phases of traffic data collection:

Phase I (May 2010): total of 186 mechanical traffic counts were obtained along I-10, I-10 TIs, Barraza-

Aviation Parkway (SR 210) and major traffic intersections. Phase II (September 2010): additional counts will be taken along I-10 and SR 210 in September when

schools resume to regular schedules. Additional traffic counts will be taken for the additional ten (10) miles along I-10 from Empirita TI to SR 90.

Jacobs received traffic counts for Phase I and is currently reviewing them. Traffic data will be presented in exhibit form and will be use for operation study to review alternatives to traffic interchange types. Environmental Mike Dawson, EcoPlan Environmental Lead, provided a progress summary on the environmental efforts. The environmental team is currently setting data collection boundaries. Boundaries for the I-10 are pretty straight forward as it follows both sides of the future I-10 right-of-way. Boundaries for the Barraza-Aviation Parkway (SR 210) are not as straight forward. FHWA suggested a connection to the west of Alvernon Way. However, a connection west of Alvernon Way would not allow SR 210 to function as a reliever for the I-10 traffic. Mike Dawson suggested setting the SR 210 western limits for the extended study area at Palo Verde Road. ADOT, Pima County, and the City of Tucson all agreed with this recommendation. The environmental team will present the Study Team decision to FHWA as part of the agency coordination process.

Page 7: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 7 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

Mike Dawson also presented two options for the Environmental Overview exhibits. Options are: include the GIS information only or include GIS information and aerial map. Exhibit options will be forwarded to Study Team for feedback. The Environmental Overview will incorporate wildlife/vehicular collision data to the extent records are readily available and relate the information to milesposts or segments within the I-10 corridor. Within indentified wildlife corridors recognized by AZFD, the EO will note existing bridge/culvert/drainage structures which may provide opportunity for enhanced wildlife crossings. Betsi Phoebus, Jacobs (Environmental Team), provided an update on the Air / Noise / 4(f) status. Sensitive noise receivers are located with the study area and the noise modeling will address these properties. Both projects are located with the Tucson Region Carbon Monoxide Maintenance Area. Future field surveys will identify potential Section 4(f) resources in the study area. Cultural Resource Laurene Montero, Jacobs Cultural Resource Team Lead, provided a progress summary on the cultural resources efforts. Data collection for the Barraza-Aviation Parkway study area is completed, except for the extended limits, which were still under discussion. Fifteen (15) cultural sites were originally estimated, but thirty (30) sites are found in this area. Nine (9) are historic sites including a railroad station and artifacts scatters. Ten (10) sites are prehistoric sites. Seventy nine (79) previous studies were found, but they do not appear to cover most of the Barraza-Aviation Parkway study area. Data collection will resume when the extended study limits referenced above have been finalized. The cultural resource team will start data collection along the I-10 corridor. The study limits includes I-10 from junction with I-19 to SR 90, and a one-half mile surrounding the right-of-way on all sides. Utility Coordination Brad Olbert and Vanessa Quinto, Jacobs, met with Ayman Ghadban, ADOT Tucson District Utility Eng. Coordinator, at the end of the Progress Meeting to discuss the possibility of arranging a Utility Coordination Meeting to inform all utility companies in the area about the I-10 and Barraza-Aviation Parkway studies and to obtain input from these agencies regarding potential utility conflicts and future plans that might be in conflict with future roadway improvements. Jacobs will proceed with arrangements for the Utility Coordination Meeting. The new Utility Coordinator for ADOT Safford District is John Rocha. Ayman Ghadban will be the utility point of contact for this project but Jacobs will include John Rocha on all emails and invitations regarding utility discussion. Project Schedule The project schedule is in process of being revised along with the change order to extend the project limits ten (10) miles further east from Empirita TI to SR 90.

Page 8: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

    I‐10 / Barraza‐Aviation Pkwy (SR 210)     Feasibility Reports & Environmental Overviews 

August Progress Meeting      PAGE 8 OF 8 

101 North 1st Avenue, Suite: 3100    Tel. (602) 253‐1200 Phoenix, Arizona  85003    Fax. (602) 253‐1202 

Milestones on the tentative revised project schedule were given to the Study Team. Tentative revised milestones are:

o Public Information Meetings: end of January 2011 o Initial Feasibility Studies: end of February 2011 o Draft Environmental Overviews: end of February 2011 o Final Feasibility Studies: mid-May 2011 o Final Environmental Overviews: mid-May 2011

Action Items

1. Jacobs to schedule meeting with Davis-Monthan. Border Patrol will also be invited to this meeting. 2. Jacobs Traffic Modeling Group to proceed with model using the base assumptions presented at the

Progress Meeting. 3. Jacobs Traffic Operation Team to proceed with Phase II traffic count data collection. 4. Jacobs and Ecoplan Environmental Team to follow up with FHWA with extended study area for

Barraza-Aviation Parkway (SR 210). The proposed western limit for extended study area is Palo Verde Road.

5. Jacobs Cultural Resource Team to proceed with data collection along the I-10 Corridor. 6. EcoPlan to obtain a copy of the NAU wildlife corridor study. 7. Jacobs to schedule Utility Coordination Meeting.

Subsequent to the August Progress Meeting, the project name has been changed to: I-10, Jct I-19 to SR 90

Signed: _________________________________ Brad Olbert, PE, Project Manager Enclosure: 2040 Base Roadway (RTP) Exhibit August Progress Meeting Roster (Tucson) August Progress Meeting Roster (Phoenix)

Page 9: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT

!!!!!

! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!!!!!

!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!

!!!!!

!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!

!!!!

!!!!

!!!!!!!

!!!!

!!!!!

!!!!

!!!!!

!!!!!

!!!!!!!!!!

!!!!

!!!!!

!!!!!!!!

!!!!!

!!!!!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!

!!!!!

!!!!!

!!!

! ! ! ! ! ! ! ! ! ! ! !!!

!!!!!

!!!!

!!!!!

!!!!

!!!!!

!!!!

!!!!

!!!!!

!"a$

!"d$

!"a$

!"a$

!"a$

EMPIR

ITA RD

MESC

AL RD

SKYL

INE R

D

ƾ1

ƾ2

ƾ3

ƾ4

ƾ6

ƾ6c

ƾ5

ƾ7

ƾ8

ƾ9

ƾ10

ƾ11

ƾ13

ƾ12a

ƾ12b

WENT

WORT

H RD

KOLB

RD

SAHUARITA RD

WILM

OT RD

ALVE

RNON

WAY

NOGA

LES H

WY

VALENCIA RD

MARSH STATION RD

22ND ST

BROADWAY BLVDHOUG

HTON

RD SPEEDWAY BLVD

1ST A

VE

TANQUE VERDE RD

CRAY

CROF

T RD

COUN

TRY C

LUB R

D

CAMP

BELL

AVE

AJO WAY

GOLFLINKS RD

HARR

ISON

RD

CAMI

NO SE

CO RD

PANT

ANO

RD

SWAN

RDIRVINGTON RD

DREXEL RD

PIMA

COU

NTY

COCH

ISE

COUN

TY

WILM

OT RD

Davis- Monthan Air Force Base

TucsonInternational

Airport

2040 BASE ROADWAY (RTP) EXHIBIT

J

Date: 8.30.2010

Pima Assoication of Governments2040 Regional Transportation Plan

597.03 Dawn Rd: Nogales Highway to I-10 Construct 4-lane roadway Arterial Lanes Before: 0 Lanes After: 4 Distance: 12.50 33.02 Los Reales Rd: I-19 to Old Nogales Highway Extend and widen to 4-lane roadway Collector Lanes Before: 0 Lanes After: 4 Distance: 1.60 555.08 Pima Mine Rd: Wilmot Rd. to I-10 Add connector to I-10 of Southern Parkway Loop Parkway Distance: 10.00 183.08 Rita Rd Corridor Project: Old Vail Rd to Sahuarita Rd Improve Corridor Arterial Distance: 11.33

598.03 Rita Rd #1: Sahuarita Rd to I-10 Construct 4-lane roadway Arterial Lanes Before: 0 Lanes After: 4 Distance: 8.70 180.00 Rita Rd #2: I-10 to Old Vail Rd Widen to 4-lane roadway, includes railroad overpass Collector Lanes Before: 2 Lane After: 4 Distance: 1.50

529.08 River / Alvernon / Swan Parkway: Thornydale Rd to Sahuarita Rd Upgrade to parkway level of service and extend to south Parkway Lanes Before: 4 Lanes After: 6 Distance: 33.74

RESERVE PROJECTS

ƾ1

ƾ3

ƾ4

ƾ5

ƾ7

ƾ6

ƾ8

ƾ9

ƾ10

ƾ11

ƾ13

ƾ12a

ƾ12b

Subsystem Lanes Before: Lanes After: Distance:Plan Id# Street/Project Name: TerminiDescription

ƾ2

331.98 36th St: Kino Pkwy to Country Club Rd Widen to 4-lanes with bike lanes, sidewalks, drainage & bus pullouts Arterial Lanes Before: 2 Lanes After: 4 Distance: 1.25 425.03 Benson Highway: Kino to Irvington Widen to 6-lane roadway Arterial Lanes Before: 4 Lanes After: 6 Distance: 0.61 596.03 Camino Aurelia: Nogales Highway to Wilmot Rd Widen to 4-lane roadway Arterial Lanes Before: 2 Lanes After: 4 Distance: 5.70 505.08 Camino Seco Rd: Irvington Rd to Golf Links Rd Construct 3-lane roadway Arterial Lanes Before: 0 Lanes After: 3 Distance: 3.00 175.08 Country Club Corridor Project (North): Prince Rd to south of Los Reales Rd Arterial Distance: 10.53

466.03 Country Club Rd #1: Los Reales to Valencia Widen to 4-lane roadway Arterial Lanes Before: 2 Lanes After: 4 Distance: 1.00 271.03 Country Club Rd #2: Aviation Hwy to 22nd St Widen to 5-lane roadway Arterial Lanes Before: 2 Lanes After: 5 Distance: 0.63

588.03 Country Club Rd (South): Camino Aurelia to Pima Mine Rd Extend and Improve to 6-lane roadway Arterial Lanes Before: 0 Lanes After: 4 Distance: 10.00 74.03 Craycroft Rd #2: Golf Links to 22nd St Widen to 6-lane roadway Arterial Lanes Before: 5 Lanes After: 6 Distance: 1.00

Level 1Level 2

Regional Transportation PlanRoadway Network

Reserve Projects !! ! !

!!!! Area of Influence

Page 10: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 11: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
quintomv
Text Box
Conference Call
Page 12: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 13: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 14: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 15: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 16: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 17: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 18: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 19: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT
Page 20: August Progress I 10 Barraza Aviation Pkwy (SR 210 ... · Rod Lane, ADOT Tucson District Development / Maintenance Engineer ... Tim Wilson, ADOT Roadway Predesign Section, ... ADOT