SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION FINAL 2019-2022 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM SORTED BY FUNDING CATEGORY Prepared by: SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION DIVISION OF PLANNING\ENGINEERING OFFICE OF PROJECT DEVELOPMENT 700 BROADWAY AVENUE PIERRE, SOUTH DAKOTA 57501 Attachment STIP #6B

Upload: others

Post on 14-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION

FINAL 2019-2022

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

SORTED BY FUNDING CATEGORY

Prepared by: SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION

DIVISION OF PLANNING\ENGINEERING OFFICE OF PROJECT DEVELOPMENT

700 BROADWAY AVENUE PIERRE, SOUTH DAKOTA 57501

Attachment STIP #6B

Page 2: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding
Page 3: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

South Dakota Transportation Improvement Program

Tentative 2019 - 2022

Report Date 08/23/2018By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM-NH 0909(46)406 4433

NH 0011(118)80 062V

I90 - Exit 406 SD11

(Corson/Brandon) Interchange;

SD11 - Fm Ash St. to the I90

Interchange in Brandon and 260th St

Intersection in Corson

Preliminary EngineeringMinnehaha* 0.5 I90E

I90W

SD11

0.000 2019 1.00 0.052

Also Funded In:

Item Category

State Highway System Urban Projects 0.026 1.00

Total Project Cost

0.078

IM 0907(84)297 0647 I90 - EBL Fm White Lake to

Plankinton

Pavement GrindingAurora 10.6 I90E 1.755 2019 2.00 1.930

IM 0906(71)278 04DG I90 - Strs, SD45S Interchange; SD25

Interchange, 5.5 E of SD50

Interchange Over 356 Ave; 6.0 E of

the Mt Vernon Interchange over I90;

SD25 Interchange

Polymer Chip Seal, Joint

Modification, Abutment, Column &

Bent Cap Repair

Brule

Davison

Hanson

0.0 I90E

I90W

0.479 2019 3.00 0.526

IM 0903(111)172 05D5 I90 - Strs 2.3 E of the SD63 N

Interchange; US83 S Interchange

Deck Overlay, Joints, Reset

Bearings, Trim Girder Ends

Jackson

Jones

0.0 I90E

I90W

0.691 2019 4.00 0.759

IM-FP-PH

2292(06)4

4778 I229 - Exit 5 (26th St. Intch/Yeager

Rd) in Sioux Falls; I229 - NB & SB

curve at Cliff Ave Interchange

Interchange Improvement; High

Friction Surface Treatment

Minnehaha* 0.4 I229N

I229S

10.567 2019 5.00 12.452

Also Funded In:

Item Category

Roadway Safety Improvement 0.416 35.00

Total Project Cost

12.868

IM 0907(81)308 04DM I90 - Str, SD258 over I90, Plankinton

Intch

Deck Replacement, Approach Slab

Replacement, Rehab Abutments &

Zone Painting

Aurora 0.0 I90E 1.413 2019 6.00 1.553

IM 0907(82)319 04DN I90 - Str, Exit 319 (Mt Vernon) Deck Replacement, Approach Slab

Replacement, Rehab Abutments &

Zone Painting

Davison 0.0 I90E 1.363 2019 7.00 1.498

¥ Costs reflect anticipated inflationPage 1 HC65Coding.rpt

Page 4: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 0909(86)379 04DU

IM 0294(70)103 04DT

I90 - Strs, Over I90 1.2 E of Exit 379

(SD19); 4.8 W of Exit 390 (SD38);

2.1 W of Exit 396 (I29); I29 - Strs,

3.2 N of Minnehaha County Line, 5.0

S of Exit 109 (SD34); Exit 109

(SD34); Exit 114 (SD32)

Zone Painting, Girder RepairMinnehaha

Moody

0.0 I29N

I90E

0.659 2019 8.00 0.724

IM-NH 0299(75)185 04VY I29 - Strs, 8 N of US212; 4.8 S of the

SD20 Intch; 2 N of Codington Co

Line; 6.2 S of the US12 intch; 0.6 S

of the US12 Intch; US12 Intch; and 2

S of the Roberts Co Line

Polymer Chip SealCodington

Grant

Roberts

0.0 I29N

I29S

US12

0.809 2019 9.00 0.890

IM 0295(41)127 04W0 I29 Strs - 3.0 S of the US14

Interchange, SD324 Interchange & 2

N of US 14B Interchange

Abutment Repair, Polymer Chip

Seal

Brookings 0.0 I29N

I29S

0.692 2019 10.00 0.761

IM-NH

0903(110)132

04W1 I90 - Strs, Over Big Buffalo Crk 1.0 E

of the SD240S Interchange; Over

Fairview Rd and Over Co Rd 7.0 W

and 4.0 W of the SD73N

Interchange; SD73N Exit; Over a

county road 3 E of the SD73 N Intch;

Over White Willow Ck 1.3 W of the

Kadoka Intch; SD73 S Intch

Polymer Chip SealJackson 0.0 I90E

I90W

SD73

1.014 2019 11.00 1.115

IM-FP 0299(71)239 04D6 I29 - SBL, From S of Exit 242 to S of

the ND State Line

PCC Surfacing, Polymer Chip

Seal, Approach Slabs, Joint

Modifications, Approach

Modifications

Roberts* 13.0 I29S 12.339 2019 12.00 13.885

IM 0295(42)140 04W2 I29 - Strs, SD30 Interchange, SD28

Interchange

Deck Overlay, Joint Modification,

Approaches

Brookings

Deuel

0.0 I29N 0.915 2019 13.00 1.005

IM-PH 0294(71)121 05FF I29 N/S - Strs. 7 N SD32

Interchange; 1 S Brookings Co. Line;

2.2 N Moody Co. Line; 0.9 S US14

Interchange

High Friction Surface, Polymer

Chip Seal

Brookings

Moody

0.0 I29N

I29S

0.468 2019 14.00 0.515

Also Funded In:

Item Category

Roadway Safety Improvement 0.044 27.00

Total Project Cost

0.559

IM 0902(171)78 05YW Rapid City Area Interstate FencePennington 20.1 I90E 0.236 2019 15.00 0.260

¥ Costs reflect anticipated inflationPage 2 HC65Coding.rpt

Page 5: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 0908(93)368 04DQ I90 - Str, Exit 368 (Canistota) Deck Replacement, Approach Slab

Replacement, Rehab Abutments &

Zone Painting

McCook 0.0 I90E 1.343 2019 16.00 1.476

IM 0901(197)23 05F2

P 0034(179)9 05EW

SD34 - Fm US85 to I90; I90 - Exit 23

Ramps

Mill & AC Resurfacing, Pipe WorkButte

Lawrence

* 18.1 I90E

I90W

SD34

0.189 2019 17.00 0.213

Also Funded In:

Item Category

Minor Arterial Projects 5.361 10.00

Total Project Cost

5.574

IM 0904(62)210 067N I90 EBL & WBL - Fm W of Exit 212

to E of Exit 226; 190 - Strs, Over

293 Ave 1.3 E of the US83 N Intch;

Over Sundance Road 3.6 E of the

US83 N Intch; US183 Interchange;

Over 300 Ave 7.5 E of the US83 N

Intch; Over 303 Ave 3 W of the

US183 S Intch; Over 305 Ave (W

Presho Intch); US183 Intch;

AC Resurfacing; Approach Slab

Replacement, Polymer Chip Seal,

Joints, Deck Overlaly

Lyman 16.9 I90E

I90W

16.376 2019 18.00 18.428

IM 0908(96)334 06J4 I90 - Fm E of the Davision/Hanson

County Line to W of the Humboldt

Exit at Various Locations

Mill & AC Resurfacing of Existing

Crossover & Construct Crossovers,

Ramp Crossovers, Ramp Detours

Davison

Hanson

McCook

1.4 I90E 1.228 2019 19.00 1.381

IM-P Z410(17) 06X8 Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2019

Statewide 0.0 0.250 2019 20.00 0.275

Also Funded In:

Item Category

Special Projects 0.350 2.00

Total Project Cost

0.625

IM 0901(194)36 05W7 I-90 - Fm Exit 37 to 2 miles south of

Tilford, I-29 - Fm Exit 121 north to

Brookings

Dynamic Advisory Speed SignsBrookings

Meade

Moody

17.0 I29N

I29S

I90E

I90W

1.183 2019 21.00 1.301

Miles2019 60.999 98.0

¥ Costs reflect anticipated inflationPage 3 HC65Coding.rpt

Page 6: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 0901(179)9 03R9 I90 - Strs, WB On Ramp over

Spearfish Crk, 0.3 W of US85N

Intch; Over False Bottom Crk, 1.0 E

of US14A Intch, 0.8 W of SD34 N

Interchange Over RR

Scour Protection, Berm RepairLawrence 0.0 I90E

I90W

0.361 2020 22.00 0.397

IM 2292(93)0 032L Solberg/Tallgrass Overpass Approach Slabs to Structure and

AC Surfacing

Lincoln 0.0 I229N

I229S

0.289 2020 23.00 0.317

IM 0903(105)131 04NJ I-90 - Pierre Region Crossroad ImprovementsJackson

Jones

Lyman

119.8 I90E

I90W

0.862 2020 24.00 0.993

IM 0902(112)59 6568 I90 - Exit 59, (LaCrosse Street) in

Rapid City

Interchange Reconstruction, PCC

Surfacing, Aux. Lane Addition (WB

& EB), Str Widening, Deck

Overlay, Approach Slabs

Pennington* 0.0 I90E

I90W

11.163 2020 25.00 12.960

Construction planned for 2020 & 2021.

IM 0901(181)0 04NH I-90 - Rapid City Region Crossroad ImprovementsJackson

Lawrence

Meade

Pennington

131.5 I90E

I90W

0.898 2020 26.00 1.009

IM 0908(92)357 04DP I90 - Str, Exit 357 (Bridgewater) Deck Replacement, Approach Slab

Replacement, Rehab Abutments &

Zone Painting

McCook 0.0 I90E 1.390 2020 27.00 1.528

IM-FP

0903(106)163

04D9 I90 - WBL, Fm E of the Belvidere

Exit to W of the Jackson/Jones Co.

Line; Str. Over I90, 2.5 SW of the

SD63 N Exit, Perault Road

Grading, PCC Surfacing, Pipe

Work; Approach Slabs & Remove

Asphalt Membrane Overlay

Jackson* 10.6 I90W 17.330 2020 28.00 19.051

IM-FP 0299(65)239 03W5 I29 - NBL, Fm South of Exit 242 to S

of the North Dakota State Line

PCC Surfacing; Polymer Chip

Seal, Approach Slabs, Joint

Modification, Approaches

Roberts* 13.0 I29N 12.331 2020 29.00 13.876

IM 0291(129)0 05HF I29 - Strs Over the Big Sioux River at

the Iowa/South Dakota State Line

Bridge Zone PaintingUnion 0.0 I29N

I29S

0.582 2020 30.00 0.639

¥ Costs reflect anticipated inflationPage 4 HC65Coding.rpt

Page 7: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 0903(112)152 05TD I90 - Strs, Over SD248 P 2.2 E of

the SD73 S Intch; SD63 S Intch;

Over Brave Bull Rd 1.4 E of the

SD63 S Intch; SD63 N Intch; Over

Stamford Rd 2.3 E of the SD63 N

Intch;

Polymer Chip SealJackson 0.0 I90E

I90W

0.755 2020 31.00 0.830

IM-FP 0908(95)362 05HP I90 EBL - Fm 2 W of the Salem

Interchange to 2 Mi W of Humboldt;

I90 Strs - 0.6 W of the US81

Interchange Over W Fork of the

Vermillion River; I90 Strs - 2 E of

the US81 Interchange Over 448 Ave;

I90 Str - 2.1 W of the Minnehaha Co

Line Over theE Fork of the Vermillion

River; I90 Str - 1 W of the

Minnehaha Co Line Over 453 Ave

Remove and Replace PCCP,

Pipework, Replace Str; Deck

Overlay, Approach Slabs; Replace

Str; Polymer Chip Seal

McCook* 14.9 I90E 27.930 2020 32.00 31.428

Construction planned to begin in 2021.

IM 0907(85)334 06DJ I90 E&W - Fm E of Mitchell to E of

the James River

Remove & Replace PCCP, Pipe

Work

Davison

Hanson

0.6 I90E

I90W

1.282 2020 33.00 1.442

IM-P Z410(18) 06X9 Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2020

Statewide 0.0 0.255 2020 34.00 0.280

Also Funded In:

Item Category

Special Projects 0.357 3.00

Total Project Cost

0.637

IM-FP 0299(69)213 02PV I29 NBL - Fm N of Exit 224 (Peever)

N to S of Exit 242; Service Rd Near

Exit 232 & Exit 232 NB Ramps; Rest

Area at Exit 213 on Interstate 29;

Strs: 1.4 N of the Peever Exit Over

Hines Creek; 1.8 N of the Peever

Exit Over Agency Creek; 0.8 N of the

SD10 Exit Over the Little Minn.

River; 5.5 NE of the SD10 Exit Over

a drainage ditch

PCC Surfacing of Mainline, Spot

Grading; AC Resurfacing of

Service Roads & Ramps; Lighting;

Polymer Chip Seal

Roberts* 15.3 I29N 16.074 2020 35.00 18.078

Construction planned to begin in 2021.

Miles2020 102.828 305.7

IM 0901(192)0 05MQ I90 EBL/WBL - Fm the Wyoming

Border to West of Exit 10

Pipe WorkLawrence 9.7 I90E

I90W

0.441 2021 36.00 0.495

¥ Costs reflect anticipated inflationPage 5 HC65Coding.rpt

Page 8: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 0905(104)251 04NK I-90 - Mitchell Area Crossroad ImprovementsAurora

Brule

Davison

Hanson

Lyman

McCook

124.9 I90E

I90W

0.886 2021 37.00 0.974

IM 0903(109)174 04TJ I90 - Fm W of the Jackson/Jones

County Line E to 3 Mi W of Exit 201

(Draper)

Pipe WorkJackson

Jones

23.9 I90E

I90W

1.434 2021 38.00 1.612

IM-P 0901(193)7 04W4 I90 - Strs, Over Co Rd & Over

Spearfish Creek, 3.0 W & 0.3 W of

the US85N Interchange; Co Rd over

I90, 2.2 W of the SD34N

Interchange; Over RR, 0.8 W of

SD34N Interchange; SD34

Interchange; Over Whitewood Crk,

1.0 E of SD34N Interchange; Over

RR, 0.2 SE of US14A Interchange;

Co Rd Over I90, 3.2 NW of the

Tilford Interchange; The Tilford

Interchange; Co Rd over I90, 3.1

NW of the SD231 Interchange

Zone Painting, Diaphram Weld

Repair

Lawrence

Meade

0.0 I90E

I90W

SD34

1.559 2021 39.00 1.713

P 0013(38)108 04VD

IM-PH 0293(107)99 05F9

SD13 - 0.3 N of Flandreau Over the

Big Sioux River; I29 N/S - 1 N

SD115 Interchange; 1.2 N

Minnehaha Co. Line; 3.8 S SD34

Interchange; 3 S SD34 Interchange

High Friction Surface Treatment,

Polymer Chip Seal, Deck Repair,

Curb Repair, Approach Slabs, Joint

Replacement

Minnehaha

Moody

0.0 I29N

I29S

SD13

1.663 2021 40.00 1.828

Also Funded In:

Item Category

Bridge Projects 0.202 47.00

Roadway Safety Improvement 0.015 102.00

Total Project Cost

2.045

IM-FP

0903(108)163

04D7

P 0063(48)75 04Q2

I90 - EBL, Fm E of the Belvidere Exit

to W of the Jackson/Jones Co. Line;

Str. Over I90, 2.5 SW of the SD63 N

Exit, Perault Road; SD63 - Fm

Belvidere to North of I90 & Fm

SD248, N 0.3 Mi (near 1880 Town)

Grading, PCC Surfacing, Pipe

Work; Approach Slabs & Remove

Asphalt Membrane Overlay; Mill &

AC Resurfacing

Jackson* 11.6 I90E

SD63

17.060 2021 41.00 18.754

Also Funded In:

Item Category

Minor Arterial Projects 0.065 41.00

State Secondary Projects 0.316 17.00

Total Project Cost

19.135

¥ Costs reflect anticipated inflationPage 6 HC65Coding.rpt

Page 9: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 2292(95)0 03RD I229 Corridor Median Lighting, Automatic Traffic

Recorders

Lincoln

Minnehaha

* 11.4 I229N

I229S

2.077 2021 42.00 2.391

IM 0908(97)362 05HQ I90 WBL - Fm 2 W of the Salem

Interchange to 2 Mi W of Humboldt;

190 Str - 0.6 W of the US81

Interchange Over the W Fork of the

Vermillion River; 190 Str - 2 E of the

US81 Interchange Over 448 Ave

Remove & Replace PCCP, Pipe

Work; Replace Str; Polymer Chip

Seal, Deck Overlay, Approach

Slabs

McCook* 14.9 I90W 28.476 2021 43.00 32.043

Construction planned to begin in 2022.

IM 0299(78)215 0652 I29 - Str.s 1.9 NE of SD15 over 460

Ave

Polymer Chip SealRoberts 0.0 I29N

I29S

0.090 2021 44.00 0.098

IM 0909(89)379 06G5 I90 - Fm W of Humboldt to Near

Hartford

Construct Crossovers, Ramp

Crossovers, Ramp Detours

Minnehaha 7.0 I90E 1.289 2021 45.00 1.450

IM-P Z410(19) 06XA Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2021

Statewide 0.0 0.260 2021 46.00 0.286

Also Funded In:

Item Category

Special Projects 0.364 4.00

Total Project Cost

0.650

IM 2292(102)3 067Q I-229 Exit 3 to Exit 10 Crossover ImprovementsMinnehaha 8.2 I229N

I229S

2.773 2021 47.00 3.048

IM 0294(72)109 06X1 I29 - Exit 109 (Coleman Interchange) Interchange LightingMoody 0.6 I29N

I29S

0.246 2021 48.00 0.271

IM 0909(93)379 06XW

IM 0291(127)0 04NL

I-90 - Sioux Falls Area; I-29 -

Mitchell Region

Crossroad ImprovementsLincoln

Minnehaha

Moody

Union

183.6 I29N

I29S

I90E

I90W

0.689 2021 49.00 0.757

IM 0293(111)78 06X2 I29 - Exits 78, 81 & 83 Approach Slab Replacement,

Epoxy Chip Seal

Minnehaha 0.0 I29N 0.799 2021 50.00 0.974

IM 0902(175) 06Y4 Rapid City Area Wildlife FenceAreawide 0.0 0.246 2021 51.00 0.271

¥ Costs reflect anticipated inflationPage 7 HC65Coding.rpt

Page 10: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

Miles2021 66.965 395.8

IM 0904(60)201 04DK I90 - Strs, Over 279th Ave At the

Draper Intch; Over 282 Ave 3 E of

the Draper Intch; Over a creek 5.5 W

of the US83 N Intch; Over 286 Ave

4.7 W of the US83 N Intch;

Polymer Chip Seal, JointsJones 0.0 I90E

I90W

0.707 2022 52.00 0.777

IM 2291(01)10 01QA I229 - 60th St N Over I229 South of

I90

Replace Structure, Approach

Grading

Minnehaha 0.0 I229N

I229S

2.856 2022 53.00 3.291

IM 0299(73)232 03R6 I29 - Strs, SD10/I29 Intch: County

Road over I29, 2.0 N of SD10 Intch:

County Road over I29, 6.5 NE of

SD10 Intch: SD127/I29 Intch &

County Road over I29, 2.0 N of

SD127 Intch: Over BNSF RR 0.6 S

of US12 Intch

Zone PaintingRoberts 0.0 I29N

I29S

0.777 2022 54.00 0.854

IM 0297(40)193 04W5 SD20/I29 Interchange Deck ReplacementCodington 0.0 I29N 1.929 2022 55.00 2.120

IM-NH-P 0040(234) 04W7 I90 - Strs, 1.5 W of Exit 67 Over S

Gate Road & a Crk; 1.4 W of Exit 67

over RR Track; 4.0 E of the Box

Elder Interchange over 154th Ave;

0.5 W of SD240 Over RR; 0.3 E of

Wasta Over the Cheyenne River; 1.9

NW of the W Wall Interchange

Under Cedar Butte Road; 6.3 NW of

the SD240 S Interchange Over

Whitewater Crk; On the US014 WB

Off ramp at the I90 Interchange;

US14 – Str, US14 & I 90

Interchange; SD240 – Str, At the W

Wall Interchange Over I90

Zone PaintingJackson

Pennington

0.0 I90E

I90W

SD240

US14E

2.095 2022 56.00 2.303

IM 0905(109)227 05EF I90 EBL & WBL - Fm Presho to

Reliance; I90 - Strs, 2 E of US183

Over 308 Ave, 6 E of US183 Over

312 Ave, At the Kennebec Intch

Over SD273, 4.3 E of the Kennebec

Intch Over 319 Ave, At the Lyman

Intch Over 321st Ave, 4 W of the

Reliance Intch Over 324th Ave, At

the Reliance Intch Over SD248

Mill & AC Resurfacing, Pipe Work;

Polymer Chip Seal; Approach

Slabs

Lyman* 34.0 I90E

I90W

9.410 2022 57.00 10.594

¥ Costs reflect anticipated inflationPage 8 HC65Coding.rpt

Page 11: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM-FP 0901(195)32 021G I90 - EBL from Exit 32 (Sturgis) to

north of Exit 40 (Tilford)

Mainline Improvements &

Structures

Meade* 5.9 I90E 24.430 2022 58.00 29.153

IM-FP 0909(90)377 05T3 I90 WBL - Fm 2 Mi W of Humboldt

to 2 Mi E of Hartford; I90 WBL - Exit

379 (Humbolt); I90 Str - 0.4 W of

Exit 390 (SD38) Over a Creek

Remove and Replace PCCP

Surfacing; Replace Str, Approach

Grading, Surfacing, Correct

Clearance Deficiency; Work to be

Determined

McCook

Minnehaha

* 13.1 I90W 23.280 2022 59.00 26.992

Construction planned to begin in 2023.

IM 0909(91)394 065D I90 - Str. 2.1 W of I29 over 470 Ave Low Slump Dense Concrete

Overlay, Approach Guardrail

Minnehaha 0.0 I90E

I90W

0.326 2022 60.00 0.358

IM 0291(131)18 065L I29 Strs. at the Elk Point Interch; 0.2

N of the Elk Point Interch over RR

Polymer Chip Seal, Replace

Joints, Approach Slabs

Union 0.0 I29N

I29S

0.765 2022 61.00 0.841

IM 0299(79)222 065N

P 0010(149)359 06G4

I29 - Strs. 2 S. of the Peever Interch

(129 St); SD10 Interchange; SD10 -

Str 0.7 W of SD127 Over a Creek

Polymer Chip Seal, Replace

Approach Slabs, Joints, Approach

Guardrail; Polymer Chip Seal,

Replace Approach Slabs &

Approach Guardrail

Roberts 0.0 I29N

SD10

0.532 2022 62.00 0.585

Also Funded In:

Item Category

Bridge Projects 0.294 72.00

Total Project Cost

0.879

IM-P Z410(20) 06XC Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2022

Statewide 0.0 0.265 2022 63.00 0.291

Also Funded In:

Item Category

Special Projects 0.371 5.00

Total Project Cost

0.662

IM 0293(106)77 03RA I29 - Exit 77 (41st Street

Interchange) in Sioux Falls

Interchange ModificationMinnehaha* 0.5 I29N

I29S

23.209 2022 64.00 26.275

IM 2292(98)6 04XK I229 Exit 9 (Benson Road)

Interchange; I229 - Strs. E 6th S &

Benson Road

Preliminary EngineeringMinnehaha* 0.0 I229N

I229S

0.000 2022 65.00 0.055

IM 2292(84)3 000S I229 - Exit 3 (Minnesota Ave) in

Sioux Falls

Preliminary EngineeringMinnehaha* 0.0 I229S 0.000 2022 66.00 0.055

¥ Costs reflect anticipated inflationPage 9 HC65Coding.rpt

Page 12: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Interstate Maintenance Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM 2292(101)4 05HN I-229 Exit 4 (Cliff Ave) Interchange Preliminary EngineeringMinnehaha* 0.0 I229S 0.000 2022 67.00 0.055

IM 0909(92)387 06G8 I90 - County Road over I 90 at Exit

387 (Hartford Interchange)

Preliminary EngineeringMinnehaha* 0.0 I90E

I90W

0.000 2022 68.00 0.055

IM 0293(112)76 06VQ I29 - SBL Fm 57th St. to 49th St. in

Sioux Falls

Remove Riprap, Drainage

Improvements, Pipe Work

Minnehaha 0.6 I29S 0.703 2022 69.00 0.773

Miles2022 105.427 54.1

¥ Costs reflect anticipated inflationPage 10 HC65Coding.rpt

Page 13: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-PH

0018(198)173

04XH US18 - Fm E of Vetal to the

Bennett/Todd County Line

Grading, Interim SurfacingBennett* 2.5 US18 0.455 2019 1.00 0.555

Also Funded In:

Item Category

Roadway Safety Improvement 2.115 2.00

Total Project Cost

2.670

NH 0083(79)45 04E7 US83 - Fm North of White River to N

of the Mellette/Jones Co Line

Grading, Interim Surfacing,

Structure Replacement over the

White & Little White River

Jones

Mellette

* 11.0 US83 17.345 2019 2.00 23.114

Construction planned to begin in 2020.

P 0010(91)358 028U

NH-P 0010(118)361 05EJ

SD10 - Fm the west city limits in

Sisseton to 458th Ave (8th Ave) East

in Sisseton & Fm 8th Ave E to

SD127; SD10 - Fm E of SD127 to E

of I29

SD10 - Grading, Roundabouts,

Replace Structure (RCBC) & AC

Surfacing; SD10 - AC Resurfacing

Roberts* 3.8 SD10 0.257 2019 3.00 0.314

Also Funded In:

Item Category

Minor Arterial Projects 0.314 6.00

State Highway System Municipal Projects 8.499 3.00

Total Project Cost

9.127

NH 0018(185)402 036W US18 - Fm US81 to SD19 AC SurfacingHutchinson

Turner

* 17.0 US18 5.264 2019 4.00 6.423

NH 0083(82)25 03RR

NH 0018(208)175 05TM

US83 - Fm the W Junction of US18

to the N Junction of SD44; US18 -

Fm the Bennett/Todd County Line to

White Horse

US83 - Mill & AC Resurfacing,

Drainage Improvement, Bridge

Berm Repair; US18 - Spot AC

Surfacing of Shoulders

Bennett

Mellette

Todd

55.1 US18

US83

7.417 2019 5.00 9.267

NH 0014(209)190 04WK

P 0063(00)142 05DY

NH 0034(186)154 05TN

US14 - Fm SD34 to E of Hayes;

SD34 - 16 Mi W of US14/SD63N;

SD34 - At the US14/SD63N Jct;

SD63 - Str 2.1 Miles S of the

Ziebach County Line

Mill & AC Resurfacing; Pipe Work;

Mill & AC Resurfacing; Pipe Work;

Replace RCBC Inlet Apron

Haakon

Stanley

12.9 SD34

SD63

US14

3.828 2019 6.00 4.778

Also Funded In:

Item Category

Minor Arterial Projects 0.065 11.00

Total Project Cost

4.843

Construction planned to begin in 2020.

NH 0018(201)62 04WL US18 - Fm the S Junction with

US385 to Oglala

Mill & AC Resurfacing, Pipe WorkFall River

Oglala Lakota

25.5 US18 5.883 2019 7.00 7.353

¥ Costs reflect anticipated inflationPage 11 HC65Coding.rpt

Page 14: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0018(200)148 04WT US18 - Fm the W Junction with

SD73, Through Martin, to the E Jct

of SD73, & Fm W of Antelope

Road/242 Ave to the Bennett/Todd

Co Line

Mill & AC Resurfacing, ADA Curb

Ramp Upgrades, Pipe Work,Traffic

Signal Upgrades

Bennett 15.1 US18 3.629 2019 8.00 4.454

Construction planned to begin in 2020.

NH 0212(173)397 04E9 US212 - Fm W of the S Junction of

SD15 to the Minn State Line; US212

- Str 1.1 W of the N SD15 Junction

Over Caine Ck

Mill & PCCP Overlay, Pipe Work;

Replace Structure (RCBC) &

Approach Grading

Deuel* 14.7 US212 13.527 2019 9.00 16.507

Also Funded In:

Item Category

Bridge Projects 0.865 15.00

Total Project Cost

17.372

NH 0012(207)247 05E2

P 0247(09)169 05TP

US12 - Fm SD247 to the West City

Limits of Ipswich; SD247 - Fm US12

N through Roscoe

AC Resurfacing, Pipe Work; Mill &

AC Resurfacing

Edmunds 15.1 SD247

US12

3.683 2019 10.00 4.712

Also Funded In:

Item Category

State Secondary Projects 0.162 7.00

Total Project Cost

4.874

NH 0281(116)173 05U2 US281 S - Fm SD20 N to the

Warner Road; US281 N&S - Fm

Warner Road to Aberdeen; US281

N&S - Fm Old US281 S of Wylie

Park to End of Div Hwy; US281 Str -

1.1 mi S of US12 over Foot Crk

Mill & AC Resurfacing, Pipe Work,

Upgrade End Blocks

Brown

Spink

* 30.4 US281

US281N

US281S

7.654 2019 11.00 9.340

NH 0046(72)277 067X SD46 - Fm US18 in Pickstown to

Wagner

Mill & AC ResurfacingCharles Mix 11.2 SD46 2.633 2019 12.00 3.292

NH 0083(86)000 068G US83 - Fm the Nebraska State Line

to Mission

Mill & AC ResurfacingTodd 21.2 US83 5.452 2019 13.00 6.813

NH 0016(90)37 068L US16 - Fm SD244 to S of theUS16B

S Jct in Hill City; US16 - Between

Hill City and Three Forks

Mill & AC ResurfacingPennington 3.4 US16 0.661 2019 14.00 0.806

Also Funded In:

Item Category

State Highway System Municipal Projects 0.070 5.00

Total Project Cost

0.876

¥ Costs reflect anticipated inflationPage 12 HC65Coding.rpt

Page 15: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0018(209)373 04E5

NH 0037(155)36 06J5

US18 - Fm SD37 to SD25; SD37 -

Fm Bon Homme/Hutchinson County

Line to 2 mi N of US18

Mill & AC ResurfacingBon Homme

Hutchinson

21.0 SD37

US18

5.018 2019 15.00 6.272

NH 0018(218)339 06CQ US18 - Fm Lake Andes to the SD50

E Jct

Mill & AC ResurfacingCharles Mix 9.9 US18 2.132 2019 16.00 2.601

NH 0085(101)0 06VP US85 - Fm the Wyoming State Line

to Cheyenne Crossing

Fence Repair & ReplacementLawrence 16.2 US85 0.256 2019 17.00 0.312

Miles2019 106.913 286.0

NH 0034(192)124 05XJ SD34 - Near the Cheyenne River

Bridge

ROW AcquisitionHaakon 0.4 SD34 0.037 2020 18.00 0.046

NH 0014(220)239 05HX US14 - Fm Appx 7 Mi E of Pierre to

W of US83 N Junction

Crack & Seat, AC ResurfacingHughes* 5.8 US14 2.606 2020 19.00 3.258

NH 014A(20)29 04WC

NH 0085(96)16 05FG

US14A - Fm Cheyenne Crossing to

Deadwood via Lead and Central

City; US85 - At Cheyenne Crossing

Mill & AC Resurfacing, Pipe WorkLawrence 11.0 US14A

US85

1.629 2020 20.00 2.033

Also Funded In:

Item Category

State Highway System Municipal Projects 0.981 10.00

Total Project Cost

3.014

NH-PH

0050(114)324

04HN

PH 0018(190)348 04JX

PH 0281(108)35 04JE

NH 0046(75)282 06JY

US281 - Fm US18 to the Charles

Mix/Douglas County Line; US18 -

Fm the E Junction of SD50 to

US281; SD50 - Fm E Jct of US18 to

W of Wagner; SD46 - Intersection

with 388th Ave/BIA29 (Marty Road)

US281 - Shoulder Widening, Pipe

Work, Spot Grading; US18 -

Shoulder Widening, Pipe Work;

SD50 - Grading & AC Surfacing,

Lighting; SD46 - Intersection

Modification

Charles Mix

Douglas

* 12.9 SD46

SD50

US18

US281

2.451 2020 21.00 3.004

Also Funded In:

Item Category

Roadway Safety Improvement 13.898 63.00

Total Project Cost

16.902

NH 0050(100)411 023V SD50 WBL - Fm Vermillion to the

end of the divided lanes west of I29

Grading and PCCP SurfacingClay

Union

* 4.9 SD50W 7.605 2020 22.00 9.733

¥ Costs reflect anticipated inflationPage 13 HC65Coding.rpt

Page 16: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0014(222)254 05E4 US14 - Fm E of Blunt to the

Hughes/Hyde County Line

Cold In Place Recycle; Pipe WorkHughes 13.0 US14 4.254 2020 23.00 5.317

NH 0012(213)159 05U6 US12 - Fm McLaughlin E 12 Miles Mill & AC Resurfacing, Pipe WorkCorson 14.2 US12 3.366 2020 24.00 4.108

Also Funded In:

Item Category

State Highway System Municipal Projects 0.235 8.00

Total Project Cost

4.343

NH 0085(98)56 05F1 US85 - Fm N of Belle Fourche to S

of SD168

Mill & AC Resurfacing, Pipe WorkButte 22.2 US85 8.293 2020 25.00 10.342

NH 0085(97)99 05EL US85 - Fm S of the Butte/Harding

Co Line to S of Buffalo

Mill & AC Resurfacing, Pipe WorkButte

Harding

12.6 US85 2.301 2020 26.00 2.807

NH 0012(214)330 05TW US12E - Fm Bristol to Webster;

US12, US12E&W - AC Segments

over Rush Lake

AC Resurfacing, Pipe Work; Mill &

AC Resurfacing

Day 13.8 US12

US12E

US12W

3.978 2020 27.00 4.972

NH 0079(75)27 05EM

NH 0018(219)40 06CN

SD79N - Fm N of the Custer/Fall

River County Line to the end of the

Divided Hwy S of Hermosa & SD79S

- Fm N of US18 to N of the Fall

River/Custer County Line; US18 -

Fm Hot Springs to W of SD79

Mill & AC Resurfacing, Pipe Work;

Mill & AC Resurfacing & Pipe Work

Custer

Fall River

27.5 SD79N

SD79S

US18

5.885 2020 28.00 7.334

NH 0281(118)217 05E8 US281 - Fm the N Junction of SD10

to the North Dakota State Line

Mill, Cold in Place Recycle, AC

Resurfacing

Brown 12.0 US281 5.660 2020 29.00 7.074

NH 0212(188)15 068U US212 - Fm E of Belle Fourche to

Nisland

AC Resurfacing, Install Turn LanesButte 13.4 US212 4.097 2020 30.00 5.121

NH 0018(216)420 06Q6 US18 - Fm SD19 to I29 Mill & AC Resurfacing, AC

Surfacing of Shoulders

Lincoln

Turner

14.5 US18 4.655 2020 31.00 5.681

Miles2020 70.830 178.2

NH 0012(218)387 05EK US12 - Fm Milbank to the MN State

Line

Mill & AC Resurfacing, Pipe Work,

Intersection Improvements

Grant 10.3 US12 3.890 2021 32.00 4.861

¥ Costs reflect anticipated inflationPage 14 HC65Coding.rpt

Page 17: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0212(182)187 05EN

P 1804(49)292 05X8

US 212 - Fm LaPlant to the W

Junction of US83; SD1804 - Fm the

Agar Road N to the W US212 Jct

and Fm the E US212 Jct to West

Whitlock

US212 - Mill & AC Resurfacing,

Pipe work; SD1804 - Pipe Work

Dewey

Potter

Sully

46.3 SD1804

US212

6.761 2021 33.00 8.449

Also Funded In:

Item Category

State Secondary Projects 0.083 12.00

Total Project Cost

8.532

NH 0014(208)230 04XQ US14 - Fm W of SD1804 to W of the

US83 N Jct (Blunt Jct.)

AC Surfacing, Pipe WorkHughes 15.0 US14

US14E

US14W

1.592 2021 34.00 1.943

Also Funded In:

Item Category

State Highway System Urban Projects 0.683 11.00

Total Project Cost

2.626

NH 0083(80)44 04E8 US83 - From White River to S of

Murdo

AC Surfacing, ADA UpgradesJones

Mellette

* 23.3 US83 12.489 2021 35.00 15.608

NH 0050(117)407 04YU SD50 - From the divided lanes west

of Vermillion to the divided lanes

east of Vermillion

Mill, Grading & AC Surfacing,

Lighting & Str Repair

Clay 4.8 SD50

SD50E

SD50W

5.921 2021 36.00 7.590

NH 0018(205)52 04XT US18E - Fm Smithwick Road to the

S Jct of US385 on the Original

Lanes of the Heartland Expressway

Mill & AC Resurfacing;

Reconstruction of Select Vertical

Curves, AC Surfacing

Fall River* 9.7 US18E 6.920 2021 37.00 8.885

NH 0079(79)111 05TR

NH 0034(189)35 05TQ

SD34 - Fm Regency St. in Sturgis E

to E of SD79; SD79 - Fm SD34 to S

of the US212 S Jct

SD34 - Mill & AC Resurfacing,

Pipe Work; SD79 - Mill & AC

Resurfacing, Pipe Work, Replace

Str. (RCBC), Upgrade Bridge Rail,

Intersection Improvements

Butte

Meade

21.9 SD34

SD34E

SD34W

SD79

SD79N

SD79S

8.119 2021 38.00 10.110

Also Funded In:

Item Category

State Highway System Urban Projects 0.283 14.00

Total Project Cost

10.393

NH 0212(187)327 05TX US212 - Fm Doland to 6 W of Clark Mill, AC Resurfacing, Pipe WorkClark

Spink

10.8 US212 2.472 2021 39.00 3.089

¥ Costs reflect anticipated inflationPage 15 HC65Coding.rpt

Page 18: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0212(186)114 05E7 US212 - Fm Faith to Dupree Mill & AC Resurfacing, Pipe WorkMeade

Ziebach

20.9 US212 5.133 2021 40.00 6.414

NH 0014(226)113 05U1 US14 - Fm E of Wall to Cottonwood;

US14 - 3.8 W of the Jackson Co

Line Over a Branch of Cottonwood

Creek

Mill & AC Resurfacing Pipe Work;

Replace Structure (RCBC) &

Approach Grading

Jackson

Pennington

14.1 US14 3.303 2021 41.00 4.031

Also Funded In:

Item Category

Bridge Projects 0.658 54.00

Total Project Cost

4.689

NH 0073(75)213 05RY SD73 - Fm the N SD20 Junction, N

15 Mi

Mill & AC Resurfacing, Pipe WorkPerkins 15.7 SD73 3.256 2021 42.00 4.068

NH 0081(103)6 04G5 US81 - Fm the End of the Divided

Lanes to 303rd Street North of

Yankton

Grading, Structure, & AC SurfacingYankton 3.4 US81 6.158 2021 43.00 7.514

Also Funded In:

Item Category

Bridge Projects 0.765 45.00

Total Project Cost

8.279

NH 0014(234)167 05E9 US14 - Fm Midland to SD34 Mill & AC Resurfacing, Pipe Work,

Bridge Rail

Haakon

Stanley

22.3 US14 5.742 2021 44.00 7.175

NH 0012(227)99 068A

P 0073(76)252 068C

US12 - Fm the Perkins/Corson Cnty

Line to Morristown; SD73 - Fm US12

to the ND State Line

Mill & AC Resurfacing, Pipe WorkCorson 13.7 SD73

US12

3.503 2021 45.00 4.377

Also Funded In:

Item Category

Minor Arterial Projects 0.340 45.00

Total Project Cost

4.717

NH 0012(226)190 068D US12 - Fm the Mobridge E City

Limits to W of the divided lanes at

US83; US12, & US12 E&W - Fm W

of the divided lanes West of Selby to

N of the divided lanes South of Selby

Cold In Place, AC Resurfacing, Mill

& AC Resurfacing, Pipe Work

Walworth* 21.7 US12

US12E

US12W

12.100 2021 46.00 14.765

Also Funded In:

Item Category

State Highway System Municipal Projects 0.434 16.00

Total Project Cost

15.199

¥ Costs reflect anticipated inflationPage 16 HC65Coding.rpt

Page 19: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 014A(25)42 068K US14A - Fm E of the US85 N Jct to

the PCCP segment in Sturgis

Mill & AC Resurfacing, Pipe WorkLawrence

Meade

9.4 US14A 2.341 2021 47.00 2.856

Also Funded In:

Item Category

State Highway System Urban Projects 0.249 16.00

Total Project Cost

3.105

NH 0034(198)77 068T SD34 - Fm W of Union Center to W

of the SD73 W Jct

Mill & AC Resurfacing, Pipe WorkMeade 19.2 SD34 4.864 2021 48.00 6.079

NH 0018(203)333 04V9 US18 - Str. 0.8 N of Pickstown Over

Saint Francis Bay; US18 - Fm

Pickstown to Lake Andes

Replace Structure (Bridge) &

Approach Grading; Spot Grading,

Pipe Work & Interim Surfacing;

Intersection Improvements

Charles Mix 6.4 US18 1.736 2021 49.00 2.118

Also Funded In:

Item Category

Bridge Projects 3.053 50.00

Total Project Cost

5.171

Miles2021 119.932 288.9

NH 0012(219)294 05HT US12 EBL & WBL - Fm E of the

Aberdeen Airport to E of Bath

Remove & Replace PCCP

Surfacing, Grading, PCCP, Pipe

Work, Roadway Lighting

Brown* 3.8 US12E

US12W

11.140 2022 50.00 14.317

NH 0281(115)194 05DV US 281 - Str. 0.2 N of Junction US12

Over BNSF Railroad

Repair Embankment Settlement,

Approach Pavement and Approach

Slabs, Zone Painting

Brown 0.0 US281 0.172 2022 51.00 0.210

Also Funded In:

Item Category

Bridge Projects 0.718 59.00

Total Project Cost

0.928

NH 0012(197)183 04XF

P 1806(18)363 05M9

US12 - Str. 2.4 W of the Walworth

Co Line Over Claymore Ck & at the

S Junction of SD1806; SD1806 - Fm

1200' S of US12 to US12

US12 - Replace Structure (Bridge)

& Approach Grading, Intersection

Relocation/Improvements; SD1806

- Grading & AC Surfacing

Corson* 0.2 SD1806

US12

0.315 2022 52.00 0.384

Also Funded In:

Item Category

State Secondary Projects 0.368 20.00

Bridge Projects 2.186 67.00

Total Project Cost

2.938

¥ Costs reflect anticipated inflationPage 17 HC65Coding.rpt

Page 20: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Major Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0018(211)332 05TT US18 - Fm Pickstown to Lake Andes Mill & AC ResurfacingCharles Mix 6.4 US18 1.911 2022 53.00 2.332

Also Funded In:

Item Category

State Highway System Municipal Projects 0.466 17.00

Total Project Cost

2.798

NH 0018(214)286 0687

P 0043(26)0 06D8

US18 - Fm Burke to E of SD43;

SD43 - Fm the Nebraska State Line

to the JCT with US18

Mill & AC Resurfacing, Pipe Work,

Intersection Improvements

Gregory 26.4 SD43

US18

6.019 2022 54.00 7.523

Also Funded In:

Item Category

State Secondary Projects 0.767 23.00

Total Project Cost

8.290

NH 0212(189)155 06CM US212 - Fm Eagle Butte to LaPlant Mill & AC Resurfacing, Intersection

Improvements, Pipe Work

Dewey 32.2 US212 7.312 2022 55.00 8.923

NH 0212(190)39 068V US212 - Fm SD79 in Newell to the

Maurine/Bixby Rd

Mill & AC Resurfacing, Pipe WorkButte

Meade

47.9 US212 12.571 2022 56.00 15.710

NH 0081(110)61 06J6 US81 - Fm SD38 to the McCook/

Miner County Line

Mill & AC Resurfacing, Pipe WorkMcCook 9.1 US81 2.113 2022 57.00 2.578

Also Funded In:

Item Category

State Highway System Municipal Projects 0.351 19.00

Total Project Cost

2.929

NH-P 0046(74)290 06J7

NH 0050(131)337 05E1

SD46 - Fm Wagner to SD37; SD50 -

Fm the E Jct with SD46 S towards

Avon

Mill & AC Resurfacing, Pipe Work,

Intersection Improvements

Bon Homme

Charles Mix

20.7 SD46

SD50

6.242 2022 58.00 7.617

Also Funded In:

Item Category

Minor Arterial Projects 2.603 64.00

Total Project Cost

10.220

NH 0012(273)301 06XE US12 - Various locations on US12

E&W in Brown County

Inslope RestorationBrown 1.9 US12E

US12W

0.351 2022 59.00 0.428

Miles2022 60.022 148.6

¥ Costs reflect anticipated inflationPage 18 HC65Coding.rpt

Page 21: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0034(164)270 040A SD34 - Fm the S Junction of SD47 E

to SD50

Pipe WorkBuffalo 4.0 SD34 2.277 2019 1.00 3.428

Construction planned to begin in 2020.

P 0249(02)73 04EE

P 0047(107)88 04ED

P 0034(169)269 04EC

SD249 - Fort Thompson to SD34;

SD47 - Big Bend Dam to Fort

Thompson; SD34 - Fm Ft Thompson

to SD 50

SD249 - Mill & AC Surfacing, Pipe

Work, Intersection Modifications;

SD47 - Mill & AC Surfacing, Pipe

Work; SD34 - Mill & AC

Resurfacing, Pipe Work

Buffalo

Lyman

8.9 SD249

SD34

SD47

2.022 2019 2.00 2.311

Also Funded In:

Item Category

State Highway System Municipal Projects 0.399 2.00

Total Project Cost

2.710

Construction planned to begin in 2020.

P-PH 0046(47)356 025D SD46 - Fm W of SD19/SD19A to W

of the Junction with I29

Spot Grading, Shoulder Widening,

Str.s, & Culvert Replacement Over

Ash & Blind Creek, Left Turn

Lanes; Replace Structure (Bridge)

and Approach Grading at the

Vermillion River, Full Depth

Reclaimation, Interim Surfacing

Clay

Lincoln

* 8.1 SD46 1.032 2019 3.00 1.259

Also Funded In:

Item Category

Bridge Projects 4.237 9.00

Roadway Safety Improvement 4.780 9.00

Total Project Cost

10.276

Construction planned to begin in 2020.

P 0034(171)312 04VU SD34 - Wessington Springs Landslide RepairJerauld 0.3 SD34 0.114 2019 4.00 0.146

P 0044(192)254 03RX SD44 - Fm Winner to SD47 Full Depth Reclaimation, AC

Resurfacing, Pipe Work

Gregory

Tripp

19.9 SD44 10.330 2019 5.00 12.909

P 0010(91)358 028U

NH-P 0010(118)361 05EJ

SD10 - Fm the west city limits in

Sisseton to 458th Ave (8th Ave) East

in Sisseton & Fm 8th Ave E to

SD127; SD10 - Fm E of SD127 to E

of I29

SD10 - Grading, Roundabouts,

Replace Structure (RCBC) & AC

Surfacing; SD10 - AC Resurfacing

Roberts* 3.8 SD10 0.257 2019 6.00 0.314

Also Funded In:

Item Category

Major Arterial Projects 0.314 3.00

State Highway System Municipal Projects 8.499 3.00

Total Project Cost

9.127

¥ Costs reflect anticipated inflationPage 19 HC65Coding.rpt

Page 22: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0020(145)240 03T1 SD20 - Fm US83 to Hoven Mill & AC Resurfacing; Pipe WorkWalworth 13.7 SD20 1.991 2019 7.00 2.492

P 0065(17)193 04ER SD65 - Fm SD20 E Jct (Isabel) to

the Grand River

Mill & AC ResurfacingCorson

Dewey

* 20.5 SD65 5.099 2019 8.00 5.099

P 0028(38)341 05EV SD28 - Fm the N Junction of US81

to the E City Limits of Estelline

Mill & AC Resurfacing, Pipe WorkHamlin 13.1 SD28 3.493 2019 9.00 4.261

Also Funded In:

Item Category

State Highway System Municipal Projects 0.178 4.00

Total Project Cost

4.439

IM 0901(197)23 05F2

P 0034(179)9 05EW

SD34 - Fm US85 to I90; I90 - Exit 23

Ramps

Mill & AC Resurfacing, Pipe WorkButte

Lawrence

* 18.1 I90E

I90W

SD34

4.290 2019 10.00 5.361

Also Funded In:

Item Category

Interstate Maintenance Projects 0.213 17.00

Total Project Cost

5.574

NH 0014(209)190 04WK

P 0063(00)142 05DY

NH 0034(186)154 05TN

US14 - Fm SD34 to E of Hayes;

SD34 - 16 Mi W of US14/SD63N;

SD34 - At the US14/SD63N Jct;

SD63 - Str 2.1 Miles S of the

Ziebach County Line

Mill & AC Resurfacing; Pipe Work;

Mill & AC Resurfacing; Pipe Work;

Replace RCBC Inlet Apron

Haakon

Stanley

12.9 SD34

SD63

US14

0.052 2019 11.00 0.065

Also Funded In:

Item Category

Major Arterial Projects 4.778 6.00

Total Project Cost

4.843

Construction planned to begin in 2020.

P 0034(00)240 05NJ SD34 - 1.5 miles E of 319th Ave in

Hughes County.

Pipe WorkHughes 0.8 SD34 0.106 2019 12.00 0.131

P 0013(42)115 04EV

P 0324(05)357 04F7

SD13 - Fm 7 mi N of Flandreau, N 6

mi; SD324 - Fm I29 to SD13

Mill and AC ResurfacingBrookings

Moody

14.4 SD13

SD324

1.282 2019 13.00 1.602

Also Funded In:

Item Category

State Secondary Projects 2.233 3.00

Total Project Cost

3.835

¥ Costs reflect anticipated inflationPage 20 HC65Coding.rpt

Page 23: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0020(166)41 05EU

P 0079(78)219 05UU

SD79 - Fm 15 N of the SD20 E

Junction to the ND State Line; SD20

- Fm 10 W of the W SD79 Jct to E of

Prairie City

Mill & AC Resurfacing, PipeworkHarding

Perkins

37.6 SD20

SD79

5.367 2019 14.00 6.866

Also Funded In:

Item Category

State Secondary Projects 2.969 5.00

Total Project Cost

9.835

P 0011(106)09 04EU

P 0050(124)423 05UF

SD11 - Fm Elk Point to SD50; SD50

- Fm SD11 E to the Iowa State Line

Mill & AC ResurfacingUnion 7.9 SD11

SD50

1.566 2019 15.00 1.956

P 1804(47)250 04X3

P 0204(06)178 05EA

SD1804 - Fm N of US14 to N of the

Hughes/Sully County Line; US14 -

Fm W of SD1804 to the US83 N Jct

(Blunt Jct.); SD204 - Across the

Oahe Dam

Mill, AC ResurfacingHughes

Stanley

Sully

16.7 SD1804

SD204

1.431 2019 16.00 1.802

Also Funded In:

Item Category

State Secondary Projects 2.237 8.00

Total Project Cost

4.039

Miles2019 50.002 200.7

P 0244(11)27 04FT SD244 - 3.2 mi S of US385 & 16

Over Palmer Gulch

Replace Structure (Bridge) and

Approach Grading, Turn Lanes &

Spot Grading

Pennington 0.4 SD244 0.388 2020 17.00 0.474

Also Funded In:

Item Category

Bridge Projects 1.915 26.00

Total Project Cost

2.389

P-PH 0046(60)346 04J5 SD46 - Fm Irene to W of

SD19/SD19A

Shoulder Widening, Replace Str.

(RCBC), Pipe Work, Spot Grading,

Interim Surfacing

Clay

Yankton

* 9.9 SD46 3.266 2020 18.00 3.986

Also Funded In:

Item Category

Roadway Safety Improvement 10.739 40.00

Total Project Cost

14.725

¥ Costs reflect anticipated inflationPage 21 HC65Coding.rpt

Page 24: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0022(63)370 05U9

P 0101(09)85 05UA

SD22 - Fm SD15 to the Minnesota

State Line; SD 101 - Fm SD 22 N to

Gary

Mill & AC Resurfacing, Spot

Grading, Pipe Work; Mill & AC

Resurfacing, Pipe Work

Deuel 16.3 SD101

SD22

3.120 2020 19.00 3.898

Also Funded In:

Item Category

State Secondary Projects 0.773 9.00

Total Project Cost

4.671

P 0048(12)371 05EQ

P 0011(107)23 05UJ

SD48 - Fm I29 to Just E of the Iowa

State Line; SD11 - Fm SD48 to 1 Mi

S of Alcester; SD48 - Str 1.5 E of SD

11 Over E Union Ck;

Mill, AC Resurfacing, Intersection

Improvements, Pipe Work; Berm

Repair & Riprap

Union 23.0 SD11

SD48

5.669 2020 20.00 6.997

Also Funded In:

Item Category

Bridge Projects 0.181 35.00

Total Project Cost

7.178

NH-P 0042(65)344 05F0 SD42 - Fm W of SD19 to the

Tea/Ellis Road

Mill, Full Depth Reclamation, AC

Surfacing; Shoulder Resurfacing,

Joint Seal, Intersection

Improvements

McCook

Minnehaha

* 16.1 SD42 6.675 2020 21.00 8.312

P 0034(181)313 03RY SD34 - Fm Wessington Springs to

the beginning of the concrete

segments in Woonsocket

Mill & AC Resurfacing, Pipe Work,

Intersection Improvements, Bridge

Rail

Jerauld

Sanborn

15.4 SD34 4.095 2020 22.00 5.117

P 0025(80)88 05J1 SD25 - Fm the E Junction of SD34

W of Howard, N to the

Miner/Kingsbury County Line

Mill and AC Resurfacing, Pipe

Work

Kingsbury

Miner

* 13.1 SD25 3.062 2020 23.00 3.826

P 0044(200)65 05J8 SD44 - Fm 1.2 mi W of Base Line

Road to Rapid Creek

Cold in Place Processing, AC

Resurfacing, Pipe Work

Pennington 9.4 SD44 3.262 2020 24.00 4.077

P-PH 0015(77)155 04K8

P- PH

0020(152)439

04UL

PP 0020(176)443 0628

SD15 - Fm the N Junction of US212

N to S Junction of SD20; SD20 - Fm

the S Junction of SD15 to the N

Junction. of SD15; SD20 - Near

Labolt SD, DOT 097530J BNSF

Railroad

Grading, Interim Surfacing,

Replace Strs; Signal Upgrades

Deuel

Grant

* 12.0 SD15

SD20

4.730 2020 25.00 5.771

Also Funded In:

Item Category

Railroad Crossing Improvement Projects 0.350 46.00

Roadway Safety Improvement 11.214 62.00

Total Project Cost

17.335

¥ Costs reflect anticipated inflationPage 22 HC65Coding.rpt

Page 25: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0183(26)39 05ED US183 - Fm US18 to I90 Full Depth Reclaimation, AC

Resurfacing, Pipe Work

Lyman

Tripp

35.8 US183 19.088 2020 26.00 23.855

P 0011(88)81 04EX SD11 - Fm the N City Limits of

Brandon to the Minnesota State Line

AC Resurfacing, & Mill, AC

Resurfacing, Intersection

Improvements, Approach Slabs,

Drop Inlets, Column Repair

Minnehaha 20.9 SD11 6.601 2020 27.00 8.055

Also Funded In:

Item Category

State Highway System Municipal Projects 0.115 9.00

Bridge Projects 0.105 43.00

Total Project Cost

8.275

P 0019(45)54 069J SD19 - Fm the W SD44 Jct to the W

SD42 Jct

Mill & AC Resurfacing, Intersection

Improvements, Approach Slabs

Minnehaha

Turner

10.3 SD19 2.382 2020 28.00 2.977

Miles2020 77.345 182.6

P 0037(141)11 04EY

P 0052(06)315 04F0

P 037P(05)11 05XF

SD37 - Fm N of Springfield to SD50;

SD52 - Fm SD37 to SD50; SD37P -

Fm SD37 to the W Springfield City

Limits

SD37P - Mill & AC Resurfacing;

SD52 - AC Surfacing; SD37 - Mill

& AC Resurfacing

Bon Homme* 22.2 SD37

SD37P

SD52

2.503 2021 29.00 3.216

Also Funded In:

Item Category

State Secondary Projects 4.769 15.00

State Highway System Municipal Projects 0.396 15.00

Total Project Cost

8.381

NH-P 0115(58)67 04ET SD115 - Fm US18 to Harrisburg Mill & AC Resurfacing, Pipe WorkLincoln 8.8 SD115 2.225 2021 30.00 2.782

P 0044(201)276 05GP SD44 - Fm E of SD47 to 6.5 Mi W of

the Platte/Winner (Missouri River)

Bridge

Slide RepairGregory 7.7 SD44 0.661 2021 31.00 0.826

P 0020(168)439 05J2

P 0015(84)155 05J3

SD15 - Fm the N Junction of US212

N to S Junction of SD20; SD20 - Fm

the S Junction of SD15 to the N

Junction. of SD15

AC SurfacingDeuel

Grant

12.0 SD15

SD20

4.477 2021 32.00 5.594

P 0020(167)363 05N2 SD20 - Fm E of Crocker to SD25 Erosion Repair and Pipe WorkClark 9.0 SD20 0.499 2021 33.00 0.622

¥ Costs reflect anticipated inflationPage 23 HC65Coding.rpt

Page 26: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0015(83)199 04XA SD15 - 1.2 W of SD123 over the

North Fork of the Whetstone River &

4.8 mi E of I29

Replace Structure (Bridge) &

Approach Grading; Replace

Sturcture (RCBC) & Approach

Grading

Roberts 0.0 SD15 2.079 2021 34.00 2.537

Also Funded In:

Item Category

Bridge Projects 1.463 46.00

Total Project Cost

4.000

P 0045(58)66 05U8 SD45 - Fm 6 Mi N of Kimball to 7 N

of SD34

Cold In Place Recycling & AC

Resurfacing, Pipe Work; Modify

Endblocks

Brule

Buffalo

21.9 SD45 7.580 2021 35.00 9.472

P 0028(41)365 05UC SD28 - Fm SD15 to the Minnesota

State Line

Mill & AC Resurfacing, Pipe WorkDeuel 11.4 SD28 2.428 2021 36.00 3.034

P 0028(39)278 04EP SD28 - Fm W of SD37 to the Clark

County Line

Mill, AC Resurfacing, Pipe WorkClark

Spink

18.0 SD28 3.896 2021 37.00 4.869

P 0047(113)42 05UN SD47 - Fm 2.5 Mi N of the

Gregory/Brule County Line to SD49

Mill & AC Resurfacing, Pipe WorkLyman 16.0 SD47 3.515 2021 38.00 4.392

P 0037(152)169 05UG SD37 - Fm Doland to Turton Mill & AC Resurfacing, Pipe WorkSpink 11.0 SD37 2.524 2021 39.00 3.154

P 0010(129)282 05UM SD10 - Fm US281 E 14 mi Mill & AC Resurfacing, Pipe WorkBrown 14.0 SD10 3.044 2021 40.00 3.807

IM-FP

0903(108)163

04D7

P 0063(48)75 04Q2

I90 - EBL, Fm E of the Belvidere Exit

to W of the Jackson/Jones Co. Line;

Str. Over I90, 2.5 SW of the SD63 N

Exit, Perault Road; SD63 - Fm

Belvidere to North of I90 & Fm

SD248, N 0.3 Mi (near 1880 Town)

Grading, PCC Surfacing, Pipe

Work; Approach Slabs & Remove

Asphalt Membrane Overlay; Mill &

AC Resurfacing

Jackson* 11.6 I90E

SD63

0.053 2021 41.00 0.065

Also Funded In:

Item Category

Interstate Maintenance Projects 18.754 41.00

State Secondary Projects 0.316 17.00

Total Project Cost

19.135

P 0020(172)66 05RX SD20 - Fm E of Prairie City to SD73 AC Resurfacing, Pipe WorkPerkins 30.9 SD20 6.147 2021 42.00 7.682

¥ Costs reflect anticipated inflationPage 24 HC65Coding.rpt

Page 27: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0034(190)55 05RC SD34 - 16.7 Mi NE Jct of SD79N Bank StabilizationMeade 0.0 SD34 0.799 2021 43.00 0.974

P 0022(72)348 05UD SD22 - Fm US81 to I29 Mill & AC Resurfacing & Pipe WorkDeuel

Hamlin

12.1 SD22 3.085 2021 44.00 3.856

NH 0012(227)99 068A

P 0073(76)252 068C

US12 - Fm the Perkins/Corson Cnty

Line to Morristown; SD73 - Fm US12

to the ND State Line

Mill & AC Resurfacing, Pipe WorkCorson 13.7 SD73

US12

0.273 2021 45.00 0.340

Also Funded In:

Item Category

Major Arterial Projects 4.377 45.00

Total Project Cost

4.717

P 0036(12)36 069U SD36 - Fm US16A to SD79 AC ResurfacingCuster 9.1 SD36 1.985 2021 46.00 2.481

P 0042(76)355 067T SD42 - Intersection of 463rd Ave

(Wall Lake); SD42 - Intersection of

Co. HWY 145

Construct Roundabout; ROWMinnehaha 0.0 SD42 1.595 2021 47.00 2.184

P 0065(19)164 06L0 SD65 - Fm US212 to the Grand

River

Pipe Work, Erosion ControlCorson

Dewey

Ziebach

45.7 SD65 0.403 2021 48.00 0.503

Miles2021 62.390 275.1

P 0036(11)41 05KK SD36 - Approximately 4 miles West

of the Junction with SD79

Slide RepairCuster 0.2 SD36 0.310 2022 49.00 0.344

P 0015(81)182 05J7

PS 0015(86)198 062A

SD15 - Fm the Grant/Roberts

County Line, N & W to W of I29.;

SD15 - N Side of Wilmont DOT

394493C SMRR Railroad

Mill & AC Overlay, Pipework;

Crossing Surface

Roberts 25.2 SD15 5.561 2022 50.00 6.950

Also Funded In:

Item Category

Railroad Crossing Improvement Projects 0.060 56.00

Total Project Cost

7.010

NH-P 0042(59)373 03TE SD42 - Fm the Big Sioux River

Bridge to the Iowa State Line

Grading, PCC Surfacing, Curb &

Gutter, Sidewalk, ADA, Storm

Sewer, Lighting, Signals, Approach

Slabs

Minnehaha* 4.9 SD42 20.985 2022 51.00 26.814

¥ Costs reflect anticipated inflationPage 25 HC65Coding.rpt

Page 28: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P-PH 0046(61)366 04JF

PP-PS 0046(71)381 062C

SD46 - Fm Beresford E 15 miles.;

SD 46 - 0.3 S of 298th St., DOT

381576D D&I Railroad

Grading, Interim Surfacing,

Replace Structure (RCBC) &

Replace Structure (Bridge),

Erosion Repair; Signal Upgrades &

Crossing Surface

Union* 15.8 SD46 2.452 2022 52.00 2.992

Also Funded In:

Item Category

Railroad Crossing Improvement Projects 0.250 57.00

Roadway Safety Improvement 21.753 124.00

Total Project Cost

24.995

P-PH 0046(66)334 04X4 SD46 - Fm US81 to Irene Grading & Interim Surfacing,

Replace Structure (RCBC),

Replace Structure (Bridge),

Intersection Lighting at US81/SD46

Yankton* 12.0 SD46 8.324 2022 53.00 10.158

Also Funded In:

Item Category

Roadway Safety Improvement 7.709 125.00

Total Project Cost

17.867

P 0020(169)326 05DW SD20 - Str. 5.2 E of Junction US

281

Repair Embankment Settlement,

Approach Pavement and Approach

Slabs

Spink 0.0 SD20 0.146 2022 54.00 0.187

P-PH 0015(82)167 05D9 SD15 - Fm the N Jct of SD20, N to

Milbank

Grading, Interim Surfacing &

Replace Strs.

Grant* 6.0 SD15 4.870 2022 55.00 5.943

Also Funded In:

Item Category

Roadway Safety Improvement 4.235 114.00

Total Project Cost

10.178

P 0044(211)200 04EM SD44 - Fm US83 to through Wood Mill & AC Resurfacing, Pipe WorkMellette 14.1 SD44 3.171 2022 56.00 3.961

P 0044(212)172 04X0 SD44 - Fm SD63 to the N Jct of

US83

Full Depth Reclamation, AC

Surfacing, Intersection

Improvements, Pipe Work

Mellette 22.9 SD44 10.996 2022 57.00 13.741

P 0025(86)55 06CV SD25 - Fm SD262 to SD38 Mill & AC Resurfacing, Pipe WorkHanson 6.0 SD25 1.617 2022 58.00 2.021

P 0020(189)181 06CY SD20 - Fm Trail City to US12 Mill & AC Resurfacing, Pipe WorkCorson

Dewey

11.0 SD20 2.587 2022 59.00 3.233

¥ Costs reflect anticipated inflationPage 26 HC65Coding.rpt

Page 29: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Minor Arterial Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0047(117)67 069Q

P 0248(13)261 06YC

SD47 - From I90 to W of Ft

Thompson; SD248 - Fm Reliance to

I90

Mill & AC Resurfacing, Pipe WorkLyman 20.0 SD248

SD47

4.585 2022 60.00 5.731

Also Funded In:

Item Category

State Secondary Projects 0.319 27.00

Total Project Cost

6.050

P 0022(70)360 069C SD22 - Fm I29 to SD15 in Clear

Lake

Cold in Place Recycle & AC

Surfacing, Pipe Work, Intersection

Improvement

Deuel 9.6 SD22 3.648 2022 61.00 4.564

P 0026(04)230 04X5

P 0047(119)157 069F

SD26 - Fm SD47 to SD45; SD47 -

Fm N of SD26 to the US212 E Jct.

Mill & AC Resurfacing, Pipe WorkFaulk

Hand

Hyde

38.8 SD26

SD47

3.361 2022 62.00 4.199

Also Funded In:

Item Category

State Secondary Projects 5.364 21.00

Total Project Cost

9.563

P 0063(56)173 069R SD63 - Fm the US212 E Jct to N of

the Moreau River

Mill & AC Resurfacing, Pipe WorkDewey 16.7 SD63 3.641 2022 63.00 4.444

NH-P 0046(74)290 06J7

NH 0050(131)337 05E1

SD46 - Fm Wagner to SD37; SD50 -

Fm the E Jct with SD46 S towards

Avon

Mill & AC Resurfacing, Pipe Work,

Intersection Improvements

Bon Homme

Charles Mix

20.7 SD46

SD50

2.133 2022 64.00 2.603

Also Funded In:

Item Category

Major Arterial Projects 7.617 58.00

Total Project Cost

10.220

Miles2022 97.885 223.9

¥ Costs reflect anticipated inflationPage 27 HC65Coding.rpt

Page 30: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Secondary Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 1806(12)149 038Z SD1806 - Fm the Lyman/Stanley

county line N 14.7 miles; Str. 11.2

SE of US83 over Antelope Ck

Mill & AC Resurfacing, Pipe Work;

Deck Overlay, Approach Guardrail,

& Erosion Repair

Stanley 14.6 SD1806 4.888 2019 1.00 5.965

Also Funded In:

Item Category

Bridge Projects 0.369 24.00

Total Project Cost

6.334

Construction planned to begin in 2020.

P 0071(03)06 04FV

P 0071(10)0 3570

SD71 - Fm the Nebr State Line to S

of Hat Ck; SD71 - Str 0.5 mi S of

SD471 over a Creek

AC Surfacing & Pipe Work;

Replace Structure (RCBC) &

Approach Grading

Fall River* 17.5 SD71 2.193 2019 2.00 2.740

Also Funded In:

Item Category

Bridge Projects 1.152 13.00

Total Project Cost

3.892

P 0013(42)115 04EV

P 0324(05)357 04F7

SD13 - Fm 7 mi N of Flandreau, N 6

mi; SD324 - Fm I29 to SD13

Mill and AC ResurfacingBrookings

Moody

14.4 SD13

SD324

1.787 2019 3.00 2.233

Also Funded In:

Item Category

Minor Arterial Projects 1.602 13.00

Total Project Cost

3.835

P 0271(04)166 04X7 SD271 - Fm Java to the Campbell

County Line

AC ResurfacingWalworth 7.0 SD271 1.032 2019 4.00 1.290

P 0020(166)41 05EU

P 0079(78)219 05UU

SD79 - Fm 15 N of the SD20 E

Junction to the ND State Line; SD20

- Fm 10 W of the W SD79 Jct to E of

Prairie City

Mill & AC Resurfacing, PipeworkHarding

Perkins

37.6 SD20

SD79

2.376 2019 5.00 2.969

Also Funded In:

Item Category

Minor Arterial Projects 6.866 14.00

Total Project Cost

9.835

P 1804(48)292 05UV SD1804 - Fm the Agar Road N to

the W US212 Jct and Fm the E

US212 Jct to West Whitlock

Mill & AC Resurfacing, Pipe WorkPotter

Sully

15.4 SD1804 2.476 2019 6.00 3.094

¥ Costs reflect anticipated inflationPage 28 HC65Coding.rpt

Page 31: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Secondary Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0012(207)247 05E2

P 0247(09)169 05TP

US12 - Fm SD247 to the West City

Limits of Ipswich; SD247 - Fm US12

N through Roscoe

AC Resurfacing, Pipe Work; Mill &

AC Resurfacing

Edmunds 15.1 SD247

US12

0.130 2019 7.00 0.162

Also Funded In:

Item Category

Major Arterial Projects 4.712 10.00

Total Project Cost

4.874

P 1804(47)250 04X3

P 0204(06)178 05EA

SD1804 - Fm N of US14 to N of the

Hughes/Sully County Line; US14 -

Fm W of SD1804 to the US83 N Jct

(Blunt Jct.); SD204 - Across the

Oahe Dam

Mill, AC ResurfacingHughes

Stanley

Sully

16.7 SD1804

SD204

1.833 2019 8.00 2.237

Also Funded In:

Item Category

Minor Arterial Projects 1.802 16.00

Total Project Cost

4.039

Miles2019 20.690 138.3

P 0022(63)370 05U9

P 0101(09)85 05UA

SD22 - Fm SD15 to the Minnesota

State Line; SD 101 - Fm SD 22 N to

Gary

Mill & AC Resurfacing, Spot

Grading, Pipe Work; Mill & AC

Resurfacing, Pipe Work

Deuel 16.3 SD101

SD22

0.619 2020 9.00 0.773

Also Funded In:

Item Category

Minor Arterial Projects 3.898 19.00

Total Project Cost

4.671

P 0042(70)280 02R0 SD42 - Fm US281 to the

Aurora/Davison County Line

Mill & AC Resurfacing, Pipe WorkAurora 5.9 SD42 1.088 2020 10.00 1.359

P-PH 0052(05)315 04HK

P 037P(04)12 06K0

SD52 - Fm SD37 to SD50; SD37P -

Str. 0.19 Mi S of the SD37/SD37P

Intersection, Pine Street in

Springfield

SD52 - Grading, Interim Surfacing,

Replace Strs (RCBC), Extend

RCBC; SD37P - Structure and

Approach Grading, Replace

Structure (RCBC), Approach

Grading & Pipe Work

Bon Homme* 12.1 SD37P

SD52

6.175 2020 11.00 7.572

Also Funded In:

Item Category

Roadway Safety Improvement 10.180 49.00

Total Project Cost

17.752

Miles2020 9.704 34.3

¥ Costs reflect anticipated inflationPage 29 HC65Coding.rpt

Page 32: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Secondary Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0212(182)187 05EN

P 1804(49)292 05X8

US 212 - Fm LaPlant to the W

Junction of US83; SD1804 - Fm the

Agar Road N to the W US212 Jct

and Fm the E US212 Jct to West

Whitlock

US212 - Mill & AC Resurfacing,

Pipe work; SD1804 - Pipe Work

Dewey

Potter

Sully

46.3 SD1804

US212

0.067 2021 12.00 0.083

Also Funded In:

Item Category

Major Arterial Projects 8.449 33.00

Total Project Cost

8.532

P 0049(05)27 04F4 SD49 - Fm SD44 to SD47 Mill & AC Resurfacing, Pipe WorkLyman

Tripp

25.7 SD49 4.860 2021 13.00 6.217

P 1806(16)138 04XW SD1806 - Fm SD273 N 11.3 Mi. to

the Lyman/Stanley Co Line;

SD1806 - 6.4 NW of SD271 Over

Cedar Ck,6.7 NW of SD271 Over

Straight Ck.

Spot Grading, Mill & AC

Resurfacing, Pipe Work; Approach

Guardrail & Erosion Repair

Lyman

Stanley

11.0 SD1806 4.519 2021 14.00 5.648

P 0037(141)11 04EY

P 0052(06)315 04F0

P 037P(05)11 05XF

SD37 - Fm N of Springfield to SD50;

SD52 - Fm SD37 to SD50; SD37P -

Fm SD37 to the W Springfield City

Limits

SD37P - Mill & AC Resurfacing;

SD52 - AC Surfacing; SD37 - Mill

& AC Resurfacing

Bon Homme* 22.2 SD37

SD37P

SD52

3.819 2021 15.00 4.769

Also Funded In:

Item Category

Minor Arterial Projects 3.216 29.00

State Highway System Municipal Projects 0.396 15.00

Total Project Cost

8.381

P 1806(15)177 045K SD1806 - 3 Miles S of the US83

Junction South of Ft. Pierre

Drainage Improvement and

Erosion Repair

Stanley 0.0 SD1806 1.539 2021 16.00 1.953

IM-FP

0903(108)163

04D7

P 0063(48)75 04Q2

I90 - EBL, Fm E of the Belvidere Exit

to W of the Jackson/Jones Co. Line;

Str. Over I90, 2.5 SW of the SD63 N

Exit, Perault Road; SD63 - Fm

Belvidere to North of I90 & Fm

SD248, N 0.3 Mi (near 1880 Town)

Grading, PCC Surfacing, Pipe

Work; Approach Slabs & Remove

Asphalt Membrane Overlay; Mill &

AC Resurfacing

Jackson* 11.6 I90E

SD63

0.259 2021 17.00 0.316

Also Funded In:

Item Category

Interstate Maintenance Projects 18.754 41.00

Minor Arterial Projects 0.065 41.00

Total Project Cost

19.135

P 0047(112)248 05UT SD47 - Fm Eureka to the ND State

Line

AC Resurfacing, PipeworkMcPherson 12.1 SD47 2.580 2021 18.00 3.224

¥ Costs reflect anticipated inflationPage 30 HC65Coding.rpt

Page 33: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Secondary Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0053(09)10 069V SD53 - Fm US18, S 16 Mi Mill & AC Resurfacing & Pipe WorkTripp 16.0 SD53 2.985 2021 19.00 3.732

Miles2021 25.942 144.9

NH 0012(197)183 04XF

P 1806(18)363 05M9

US12 - Str. 2.4 W of the Walworth

Co Line Over Claymore Ck & at the

S Junction of SD1806; SD1806 - Fm

1200' S of US12 to US12

US12 - Replace Structure (Bridge)

& Approach Grading, Intersection

Relocation/Improvements; SD1806

- Grading & AC Surfacing

Corson* 0.2 SD1806

US12

0.288 2022 20.00 0.368

Also Funded In:

Item Category

Major Arterial Projects 0.384 52.00

Bridge Projects 2.186 67.00

Total Project Cost

2.938

P 0026(04)230 04X5

P 0047(119)157 069F

SD26 - Fm SD47 to SD45; SD47 -

Fm N of SD26 to the US212 E Jct.

Mill & AC Resurfacing, Pipe WorkFaulk

Hand

Hyde

38.8 SD26

SD47

4.292 2022 21.00 5.364

Also Funded In:

Item Category

Minor Arterial Projects 4.199 62.00

Total Project Cost

9.563

P 0022(74)333 05UP SD 22 - Fm Hazel E to US81N Mill & AC Resurfacing, Pipe WorkHamlin 13.5 SD22 2.592 2022 22.00 3.239

NH 0018(214)286 0687

P 0043(26)0 06D8

US18 - Fm Burke to E of SD43;

SD43 - Fm the Nebraska State Line

to the JCT with US18

Mill & AC Resurfacing, Pipe Work,

Intersection Improvements

Gregory 26.4 SD43

US18

0.629 2022 23.00 0.767

Also Funded In:

Item Category

Major Arterial Projects 7.523 54.00

Total Project Cost

8.290

P 0010(148)182 06D6 SD10 - Fm Pollock to the US83 N

Jct

Mill & AC Resurfacing, Pipe WorkCampbell 10.9 SD10

SD10E

SD10W

2.788 2022 24.00 3.483

P 0040(329)47 06D7 SD40 - Fm the SD79 N Jct to the

Cheyenne River

Mill & AC Resurfacing, Pipe WorkCuster 21.5 SD40 4.567 2022 25.00 5.701

¥ Costs reflect anticipated inflationPage 31 HC65Coding.rpt

Page 34: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Secondary Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0042(77)301 04F6 SD42 - Fm SD37 to Bridgewater Mill & AC Resurfacing, Pipe WorkDavison

Hanson

McCook

25.8 SD42 6.206 2022 26.00 7.747

P 0047(117)67 069Q

P 0248(13)261 06YC

SD47 - From I90 to W of Ft

Thompson; SD248 - Fm Reliance to

I90

Mill & AC Resurfacing, Pipe WorkLyman 20.0 SD248

SD47

0.262 2022 27.00 0.319

Also Funded In:

Item Category

Minor Arterial Projects 5.731 60.00

Total Project Cost

6.050

Miles2022 26.988 157.1

¥ Costs reflect anticipated inflationPage 32 HC65Coding.rpt

Page 35: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Urban Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

IM-NH 0909(46)406 4433

NH 0011(118)80 062V

I90 - Exit 406 SD11

(Corson/Brandon) Interchange;

SD11 - Fm Ash St. to the I90

Interchange in Brandon and 260th St

Intersection in Corson

Preliminary EngineeringMinnehaha* 0.5 I90E

I90W

SD11

0.000 2019 1.00 0.026

Also Funded In:

Item Category

Interstate Maintenance Projects 0.052 1.00

Total Project Cost

0.078

P 1358(02) 05C2

NH 2042(29) 06YQ

NH 0042(80)371 06YP

Six Mile Road - Fm 500' N of

Arrowhead Parkway, Arrowhead

Parkway - Fm 0.5 m W of Six Mile

Rd to Six Mile Rd; SD42 - Fm 0.5 m

W of Six Mile Rd to Willow Run Ent.

Grading, Storm Sewer, Curb &

Gutter & PCCP Surfacing, ROW,

Signals, Lighting

Minnehaha 0.4 SD42 5.963 2019 2.00 7.277

Also Funded In:

Item Category

Local Urban System Projects 7.882 3.00

Total Project Cost

15.159

Construction planned for 2020.

NH-P 0037(128)125 0271

NH 0014(200)345 04PK

SD37 - Fm 3rd St. N to 15th St.

North in Huron; Intersection of 21st

St & SD37 in Huron; US14 - At the

Intersection of SD37 in Huron

Urban Grading & PCC Surfacing,

Lighting, Intersection Improvement;

AC Surfacing & Turn Lane

Modification

Beadle* 1.4 SD37

SD37N

SD37S

US14E

US14W

6.826 2019 3.00 8.730

NH 0212(168)376 027Q US212 - Fm SD20 to US81 in

Watertown

Grading, PCCP Surfacing,

Replace Structure (Bridge), Curb &

Gutter, Sidewalk, ADA, Roadway

Lighting

Codington* 0.9 US212 7.772 2019 4.00 9.922

NH 0034(163)387 03TC SD34 - From the Washington

Ave/2nd St NE Intersection South to

the start of the Divided Highway in

Madison

Urban Grading, Storm Sewer, Curb

& Gutter, Sidewalk, Roadway

Lighting, ADA, PCC Surfacing

Lake 2.4 SD34

SD34E

SD34W

6.472 2019 5.00 8.272

NH 0044(167)44 027K

P 0231(13)79 03CP

SD231 (W Chicago/W Omaha) - Fm

Sheffer St to Mt View Rd (SD44) in

Rapid City; SD44 (W Omaha St) -

Fm Mt. View Rd to the start of the

divided lanes Near 12th St

Urban Grading, Storm Sewer, Curb

& Gutter, Sidewalk, Traffic Signals,

PCC Surfacing, Str Repair &

Widening Over Rapid Creek,

Lighting

Pennington* 1.2 SD231

SD231N

SD231S

SD44

SD44E

SD44W

10.317 2019 6.00 13.168

Construction Planned for 2019 and 2020.

¥ Costs reflect anticipated inflationPage 33 HC65Coding.rpt

Page 36: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Urban Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0445(00)74 06WX SD445 - Deadwood Ave and Krebs

Drive

Install Left Turn Lane at Deadwood

Ave & Krebs Dr

Pennington 0.2 SD445 0.000 2019 7.00 0.320

Miles2019 47.715 7.0

P-PH 0014(179)419 027B US14 - Fm Main Ave. to Medary

Ave. in Brookings & the Intersections

of US14 & 12th Ave,

Urban Grading, Curb & Gutter,

Storm Sewer, Traffic Signals, ADA,

Sidewalk, Roadway Lighting &

PCC Surfacing

Brookings 0.7 US14 2.344 2020 8.00 2.861

Also Funded In:

Item Category

Roadway Safety Improvement 0.750 50.00

Total Project Cost

3.611

NH 0014(194)227 03WN US14 - Missouri River Bridge at

Pierre

Replace Structure (Bridge),

Intersection Improvements

Hughes

Stanley

* 0.8 US14

US14E

US14W

35.383 2020 9.00 45.359

Construction planned to begin in 2021 through 2022.

Miles2020 48.220 1.5

NH 2042(28) 05UW Arrowhead Parkway - Fm Highline

Avenue to 0.5 m W of Six Mile Road

Grading, Storm Sewer, Curb &

Gutter, PCCP Surfacing, ROW,

Signals, and Lighting

Minnehaha 1.4 8.320 2021 10.00 10.153

Also Funded In:

Item Category

Local Urban System Projects 0.717 5.00

Total Project Cost

10.870

NH 0014(208)230 04XQ US14 - Fm W of SD1804 to W of the

US83 N Jct (Blunt Jct.)

AC Surfacing, Pipe WorkHughes 15.0 US14

US14E

US14W

0.560 2021 11.00 0.683

Also Funded In:

Item Category

Major Arterial Projects 1.943 34.00

Total Project Cost

2.626

NH 1157(02) 05C3

NH 0011(101)72 05C4

Veterans Parkway - Fm Arrowhead

Parkway N 1000' in Sioux Falls;

SD11 - Fm Arrowhead Parkway S

500' in Sioux Falls

Grading, Storm Sewer, Curb &

Gutter & PCCP Surfacing, ROW,

Signals, Lighting

Minnehaha 0.0 SD11N

SD11S

2.126 2021 12.00 2.595

Also Funded In:

Item Category

Local Urban System Projects 0.561 6.00

Total Project Cost

3.156

¥ Costs reflect anticipated inflationPage 34 HC65Coding.rpt

Page 37: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Urban Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0212(174)377 027D US212 - Fm US81 to 19th St. SE in

Watertown

Urban Grading, PCCP Surfacing,

Curb & Gutter, ADA, Lighting

Codington* 1.0 US212 6.306 2021 13.00 8.051

NH 0079(79)111 05TR

NH 0034(189)35 05TQ

SD34 - Fm Regency St. in Sturgis E

to E of SD79; SD79 - Fm SD34 to S

of the US212 S Jct

SD34 - Mill & AC Resurfacing,

Pipe Work; SD79 - Mill & AC

Resurfacing, Pipe Work, Replace

Str. (RCBC), Upgrade Bridge Rail,

Intersection Improvements

Butte

Meade

21.9 SD34

SD34E

SD34W

SD79

SD79N

SD79S

0.232 2021 14.00 0.283

Also Funded In:

Item Category

Major Arterial Projects 10.110 38.00

Total Project Cost

10.393

NH 0085(00)54 04P9

NH 0212(00)13 04PA

P 0034(191)9 05V0

US85 - Through Belle Fourche;

US212 - Through Belle Fourche;

SD34/US85 Intersection

ADA Curb Ramp Upgrades;

Intersection Improvements, Traffic

Signals

Butte 2.6 SD34

US212

US85

0.577 2021 15.00 0.739

NH 014A(25)42 068K US14A - Fm E of the US85 N Jct to

the PCCP segment in Sturgis

Mill & AC Resurfacing, Pipe WorkLawrence

Meade

9.4 US14A 0.203 2021 16.00 0.249

Also Funded In:

Item Category

Major Arterial Projects 2.856 47.00

Total Project Cost

3.105

Miles2021 22.753 51.3

NH 0014(185)229 026Z US14 - Fm Sioux Ave to the Divided

Hwy W of SD1804 in Pierre

Urban Grading, Roundabouts,

Curb & Gutter, ADA Upgrades,

Traffic Signals, Storm Sewer,

Roadway Lighting, Surfacing

Hughes* 1.3 US14 6.860 2022 17.00 8.761

Miles2022 8.761 1.3

¥ Costs reflect anticipated inflationPage 35 HC65Coding.rpt

Page 38: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Municipal Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 014A(15)41 04FA US14A - Fm Railroad Ave to E of the

Junction. of US85 in Deadwood

Mill & AC Resurfacing, ADA,

Traffic Signals, Joint Repair, Spall

Repair

Lawrence* 1.4 US14A 1.917 2019 1.00 2.457

P 0249(02)73 04EE

P 0047(107)88 04ED

P 0034(169)269 04EC

SD249 - Fort Thompson to SD34;

SD47 - Big Bend Dam to Fort

Thompson; SD34 - Fm Ft Thompson

to SD 50

SD249 - Mill & AC Surfacing, Pipe

Work, Intersection Modifications;

SD47 - Mill & AC Surfacing, Pipe

Work; SD34 - Mill & AC

Resurfacing, Pipe Work

Buffalo

Lyman

8.9 SD249

SD34

SD47

0.325 2019 2.00 0.399

Also Funded In:

Item Category

Minor Arterial Projects 2.311 2.00

Total Project Cost

2.710

Construction planned to begin in 2020.

P 0010(91)358 028U

NH-P 0010(118)361 05EJ

SD10 - Fm the west city limits in

Sisseton to 458th Ave (8th Ave) East

in Sisseton & Fm 8th Ave E to

SD127; SD10 - Fm E of SD127 to E

of I29

SD10 - Grading, Roundabouts,

Replace Structure (RCBC) & AC

Surfacing; SD10 - AC Resurfacing

Roberts* 3.8 SD10 6.421 2019 3.00 8.499

Also Funded In:

Item Category

Major Arterial Projects 0.314 3.00

Minor Arterial Projects 0.314 6.00

Total Project Cost

9.127

P 0028(38)341 05EV SD28 - Fm the N Junction of US81

to the E City Limits of Estelline

Mill & AC Resurfacing, Pipe WorkHamlin 13.1 SD28 0.146 2019 4.00 0.178

Also Funded In:

Item Category

Minor Arterial Projects 4.261 9.00

Total Project Cost

4.439

NH 0016(90)37 068L US16 - Fm SD244 to S of theUS16B

S Jct in Hill City; US16 - Between

Hill City and Three Forks

Mill & AC ResurfacingPennington 3.4 US16 0.057 2019 5.00 0.070

Also Funded In:

Item Category

Major Arterial Projects 0.806 14.00

Total Project Cost

0.876

Miles2019 11.603 30.6

P 016A(14)55 04PG US16A - Through Keystone US16A - Mill & AC Resurfacing &

ADA Curb Ramp Upgrades

Pennington 1.3 US16A 0.914 2020 6.00 1.141

¥ Costs reflect anticipated inflationPage 36 HC65Coding.rpt

Page 39: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Municipal Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0050(111)231 6953 SD50 - Fm K St to I-90 at

Chamberlain

Regrading to 3 Lanes (I90 to

Sorensen Drive), Mill, AC

Resurfacing, Slide Area Repair,

Pipe Work, Lighting

Brule 3.6 SD50 6.772 2020 7.00 8.460

NH 0012(213)159 05U6 US12 - Fm McLaughlin E 12 Miles Mill & AC Resurfacing, Pipe WorkCorson 14.2 US12 0.192 2020 8.00 0.235

Also Funded In:

Item Category

Major Arterial Projects 4.108 24.00

Total Project Cost

4.343

P 0011(88)81 04EX SD11 - Fm the N City Limits of

Brandon to the Minnesota State Line

AC Resurfacing, & Mill, AC

Resurfacing, Intersection

Improvements, Approach Slabs,

Drop Inlets, Column Repair

Minnehaha 20.9 SD11 0.094 2020 9.00 0.115

Also Funded In:

Item Category

Minor Arterial Projects 8.055 27.00

Bridge Projects 0.105 43.00

Total Project Cost

8.275

NH 014A(20)29 04WC

NH 0085(96)16 05FG

US14A - Fm Cheyenne Crossing to

Deadwood via Lead and Central

City; US85 - At Cheyenne Crossing

Mill & AC Resurfacing, Pipe WorkLawrence 11.0 US14A

US85

0.803 2020 10.00 0.981

Also Funded In:

Item Category

Major Arterial Projects 2.033 20.00

Total Project Cost

3.014

Miles2020 10.932 51.0

NH 0385(48)35 028Z

NH 0018(184)39 03TH

NH 018B(02)40 06DE

US18 - Fm US385 to the Hot

Springs City Limits; US385 - Fm

US18 to Summerville St. in Hot

Springs; US18B - Str 300' west of

US18.

Urban Reconstruction, PCC

Surfacing, Curb & Gutter,

Sidewalk, Roadway Lighting,

Traffic Signals; Grading, PCC

Surfacing, Lighting, Curb & Gutter,

Str, Approach Slab; Approach Slab

Fall River* 2.2 US18

US18B

US385

14.363 2021 11.00 18.866

NH 0212(165)224 039L US212 - Through Gettysburg Urban Grading, PCC Surfacing,

ADA Upgrades, Storm Sewer,

Roadway Lighting

Potter* 1.7 US212 8.321 2021 12.00 10.644

¥ Costs reflect anticipated inflationPage 37 HC65Coding.rpt

Page 40: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Municipal Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0018(193)252 04FD

P 0044(185)253 04FE

US18 - Fm W of Monroe St to

Lincoln St in Winner, US18E&W -

From Lincoln St to 3rd St in Winner,

& US18 - From 3rd St to 7th St in

Winner; SD44 - From the Junction

with US18 to Plum St

Urban Reconstruction; Reconstruct

to PCCP, Intersection

Improvement

Tripp* 1.4 SD44

US18

US18E

US18W

4.659 2021 13.00 6.081

NH 0018(191)250 03TK

P 0044(188)253 04F9

SD44 - Fm Plum St to W of Sale

Barn Rd/317th Ave in Winner; US18

- Fm W of the Str Over Dog Ear Ck

To W of Monroe St in Winner

SD44 - Grading, Shoulder

Widening, Sidewalk, Lighting, PCC

Surfacing, & Mill & PCC Overlay

US18 - Reconstruct to PCCP

Tripp* 2.5 SD44

US18

5.303 2021 14.00 6.925

Construction planned to begin in 2022.

P 0037(141)11 04EY

P 0052(06)315 04F0

P 037P(05)11 05XF

SD37 - Fm N of Springfield to SD50;

SD52 - Fm SD37 to SD50; SD37P -

Fm SD37 to the W Springfield City

Limits

SD37P - Mill & AC Resurfacing;

SD52 - AC Surfacing; SD37 - Mill

& AC Resurfacing

Bon Homme* 22.2 SD37

SD37P

SD52

0.317 2021 15.00 0.396

Also Funded In:

Item Category

Minor Arterial Projects 3.216 29.00

State Secondary Projects 4.769 15.00

Total Project Cost

8.381

NH 0012(226)190 068D US12 - Fm the Mobridge E City

Limits to W of the divided lanes at

US83; US12, & US12 E&W - Fm W

of the divided lanes West of Selby to

N of the divided lanes South of Selby

Cold In Place, AC Resurfacing, Mill

& AC Resurfacing, Pipe Work

Walworth* 21.7 US12

US12E

US12W

0.356 2021 16.00 0.434

Also Funded In:

Item Category

Major Arterial Projects 14.765 46.00

Total Project Cost

15.199

Miles2021 43.346 51.7

NH 0018(211)332 05TT US18 - Fm Pickstown to Lake Andes Mill & AC ResurfacingCharles Mix 6.4 US18 0.382 2022 17.00 0.466

Also Funded In:

Item Category

Major Arterial Projects 2.332 53.00

Total Project Cost

2.798

NH 0016(89)41 060L US16 - 0.1 Mile East of

US16/US16B Intersection on Spring

Creek

Bank StabilizationPennington 0.0 US16 0.226 2022 18.00 0.276

¥ Costs reflect anticipated inflationPage 38 HC65Coding.rpt

Page 41: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

State Highway System Municipal Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0081(110)61 06J6 US81 - Fm SD38 to the McCook/

Miner County Line

Mill & AC Resurfacing, Pipe WorkMcCook 9.1 US81 0.288 2022 19.00 0.351

Also Funded In:

Item Category

Major Arterial Projects 2.578 57.00

Total Project Cost

2.929

NH 0018(217)209 06X5 US18 - Fm E of the US83 Jct East Replace Roadway LightingTodd 1.1 US18 0.296 2022 20.00 0.361

Miles2022 1.454 16.6

¥ Costs reflect anticipated inflationPage 39 HC65Coding.rpt

Page 42: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0047(99)89 039V SD47 - Str 0.3 NE of the Big Bend

Dam Over Soldier Creek

Scour ProtectionBuffalo 0.0 SD47 0.452 2019 1.00 0.452

NH 014A(14)38 04FX US14A - 2 mi N of US85 over

Deadwood Ck

Replace Structure (RCBC) &

Approach Grading

Lawrence 0.1 US14A 1.027 2019 2.00 1.313

P 0040(00)18 04UY Regionwide Rapid City Region Bridge

Rehabilitation

Regionwide 0.0 0.000 2019 3.00 1.248

NH 0018(00)101 06JC US18 - Str Over Cheyenne Creek Partial RCBC ReplacementOglala Lakota 0.0 US18 0.000 2019 4.00 0.624

NH 0012(176)399 03U2

P 0022(41)352 03U3

US12 - Str 0.6 E of SD109 Over the

Whetstone River Diversion Channel;

SD22 - Str 3.2 E of US81 Over the

Big Sioux River

Fatigue Retrofit, Replace Torn

Diaphragm Lower Chords, & Cover

Plate Repair; Fatigue Retrofit

Grant

Hamlin

0.0 SD22

US12

0.174 2019 5.00 0.212

P 0010(00)17 04UQ Regionwide Aberdeen Region Bridge

Rehabilitation

Regionwide 0.0 0.000 2019 6.00 0.312

P 0020(00)17 04UR Regionwide Mitchell Region Bridge

Rehabilitation

Regionwide 0.0 0.000 2019 7.00 0.312

P 0030(00)17 04UT Regionwide Pierre Region Bridge RehabilitationRegionwide 0.0 0.000 2019 8.00 0.312

P-PH 0046(47)356 025D SD46 - Fm W of SD19/SD19A to W

of the Junction with I29

Spot Grading, Shoulder Widening,

Str.s, & Culvert Replacement Over

Ash & Blind Creek, Left Turn

Lanes; Replace Structure (Bridge)

and Approach Grading at the

Vermillion River, Full Depth

Reclaimation, Interim Surfacing

Clay

Lincoln

* 8.1 SD46 3.472 2019 9.00 4.237

Also Funded In:

Item Category

Minor Arterial Projects 1.259 3.00

Roadway Safety Improvement 4.780 9.00

Total Project Cost

10.276

Construction planned to begin in 2020.

P 0042(58)311 03AN SD42 - 7.5 E of the Davison Co Line

over the James River

Replace Structure (Bridge) &

Approach Grading

Hanson 0.8 SD42 4.962 2019 10.00 6.363

¥ Costs reflect anticipated inflationPage 40 HC65Coding.rpt

Page 43: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0037(132)157 03TX

P 0037(140)140 04FH

SD37 - 4.9 mi S of the Spink Co Line

over the James River; SD37 - Str. 6

S of US212 Over a Creek

Replace Structure (Bridge) and

Approach Grading; Scour

Protection

Beadle

Spink

0.8 SD37 2.956 2019 11.00 3.786

P 0020(130)295 03TW

P 0026(03)250 04FK

SD26 - 2.8 mi W of SD45 Over

Shaefer Ck; SD20 - Str. 0.8 S of

SD45N Over a Creek & Str. 3.3 E of

the Faulk Co Line Over Snake Creek

Replace Structure (Bridge) and

Approach Grading; Scour

Protection, Column Repair

(58-033-060)

Faulk

Hand

Spink

0.4 SD20

SD26

1.220 2019 12.00 1.556

P 0071(03)06 04FV

P 0071(10)0 3570

SD71 - Fm the Nebr State Line to S

of Hat Ck; SD71 - Str 0.5 mi S of

SD471 over a Creek

AC Surfacing & Pipe Work;

Replace Structure (RCBC) &

Approach Grading

Fall River* 17.5 SD71 0.898 2019 13.00 1.152

Also Funded In:

Item Category

State Secondary Projects 2.740 2.00

Total Project Cost

3.892

P 00SW(54) 04V6 Statewide 2019 Bridge Inspection CostsStatewide 0.0 0.952 2019 14.00 1.161

NH 0212(173)397 04E9 US212 - Fm W of the S Junction of

SD15 to the Minn State Line; US212

- Str 1.1 W of the N SD15 Junction

Over Caine Ck

Mill & PCCP Overlay, Pipe Work;

Replace Structure (RCBC) &

Approach Grading

Deuel* 14.7 US212 0.709 2019 15.00 0.865

Also Funded In:

Item Category

Major Arterial Projects 16.507 9.00

Total Project Cost

17.372

NH 0014(213)415 05DA

NH 014B(172)419 05DC

P 0022(59)379 05DD

US14E - Str 1.9 E of Volga Over the

Big Sioux River; US14 B - Strs 2.0

W of I29 Interchange Over Six Mile

Ck, 1.6 W of I29 Interchange over

East Branch of Six Mile Ck & 1.4 E

of I 29 Interchange Over Deer Ck;

SD22 - Str 8.7, 9.3 & 11.4 E of SD15

Over Cobb Ck

Epoxy Chip Seal, Weld Repair

(20-193-160), Repair Appr. Slab &

Replace Joints (06-119-150)

Brookings

Deuel

0.0 SD22

US14B

US14E

US14W

0.798 2019 16.00 0.972

NH 0014(214)346 05DE US14, US14 E&W - Str. 0.5 E of

SD37 Over Ravine Lake (2), 1.3 E of

SD37 Over James River, 1.4 E of

SD37 (Commercial Route), 2.8 E of

Cavour Over Pearl Crk, & 2.7 W of

Iroquois

Polymer Chip Seal & Joint

Replacement

Beadle 0.0 US14

US14E

US14W

0.489 2019 17.00 0.597

¥ Costs reflect anticipated inflationPage 41 HC65Coding.rpt

Page 44: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0258(00)277 05DF SD258 - Str. 0.3 N of Plankinton

Interchange Over Snow Ck

RCBC RehabilitationAurora 0.0 SD258 0.000 2019 18.00 0.087

P 0044(197)196 05FU SD44 - Str 0.7 W of US83 Over the

Little White River

Polymer Chip Seal, Joint

Replacement

Mellette 0.0 SD44 0.158 2019 19.00 0.194

P 0010(119)183 05DH

P 0063(00)186 05DN

P 0065(18)199 05DP

SD10 - Str 1.0 E of Pollock Over

Lake Pocasse; SD63 - Str 13 N of

Junction US212 over the Moreau

River; SD65 - Str. 0.4 N of Dewey

County Line Over Firesteel Ck

Polymer Chip Seal; Polymer Chip

Seal; Pourable Joint Seal

Campbell

Corson

Dewey

0.0 SD10

SD63

SD65

0.235 2019 20.00 0.287

NH 0079(73)35 05DQ

P 0040(235)43 05DR

SD79N&S - Str 2.7 N of Fall River

County Line Over Beaver Ck; SD40 -

Str 4.4 W of Junction SD79 Over

Battle Ck

Polymer Chip Seal and Column

Repair; Replace Compression

Seals and Polymer Chip Seal

Custer 0.0 SD40

SD79N

SD79S

0.218 2019 21.00 0.267

P 0037(150)0 05FT SD37 - Missouri River Bridge at

Niobrara/Running Water

Epoxy Chip Seal (South Dakota

Share)

Bon Homme 0.0 SD37 0.392 2019 22.00 0.479

NH 0085(99)92 05V2 US85 - Strs, 5.8 S of the

Butte/Harding Co Line; 8.4 S of the

Butte/Harding Co Line

Zone Painting, Joint RepairButte 0.0 US85 0.220 2019 23.00 0.267

P 1806(12)149 038Z SD1806 - Fm the Lyman/Stanley

county line N 14.7 miles; Str. 11.2

SE of US83 over Antelope Ck

Mill & AC Resurfacing, Pipe Work;

Deck Overlay, Approach Guardrail,

& Erosion Repair

Stanley 14.6 SD1806 0.303 2019 24.00 0.369

Also Funded In:

Item Category

State Secondary Projects 5.965 1.00

Total Project Cost

6.334

Construction planned to begin in 2020.

Miles2019 27.424 57.0

P 0030(00)18 04UX Regionwide Pierre Region Bridge RehabilitationRegionwide 0.0 0.000 2020 25.00 0.216

¥ Costs reflect anticipated inflationPage 42 HC65Coding.rpt

Page 45: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0244(11)27 04FT SD244 - 3.2 mi S of US385 & 16

Over Palmer Gulch

Replace Structure (Bridge) and

Approach Grading, Turn Lanes &

Spot Grading

Pennington 0.4 SD244 1.570 2020 26.00 1.915

Also Funded In:

Item Category

Minor Arterial Projects 0.474 17.00

Total Project Cost

2.389

NH 0012(175)106 03UA

NH 0212(161)135 03UC

P 0063(46)146 03UD

P 0063(45)144 03WC

US12 - Str.s 6.7 E of the Perkins Co

Line Over Hay Ck; US212 - Str.s 0.5

W of Dupree Over Bear Ck; SD63 -

Str 1.7 N of the Haakon Co Line

Over Dupree Ck; SD63 - Str 0.5 S of

the Ziebach/Haakon Co Line Over

Hermaphrodite Ck

Scour ProtectionCorson

Haakon

Ziebach

0.0 SD63

US12

US212

0.711 2020 27.00 0.743

NH 0083(75)39 03UE

NH 0018(183)247 03UF

P 0183(22)2 03UG

P 0044(181)257 03UH

P 0049(04)35 03UK

US83 - Str.s 2.3 S of SD44E Over a

creek & 3.1 N of the Mellette Co Line

Over Horse Ck; US18 - Str.s 3.9 E of

US183 Over Big Hollow Ck & 2 SE

of Winner Over W Branch of

Thunder Ck; US183 - Str 2.2 N Of

the Neb State Line Over the Keya

Paha River; SD44 - Str 4 E of US18

Over Thunder Ck; SD49 - Str 7 S oh

Hamill Over a creek

Scour Protection and/or Column

Repair

Mellette

Tripp

0.0 SD44

SD49

US18

US183

US83

0.828 2020 28.00 1.009

NH 0085(84)36 03U6

NH 0079(70)127 03U8

US85 - Str.s 2 N of Belle Fourche

Over Crow Creek, 0.6 NE of US212

over Indian Ck, & 0.3 S of I90 Over

Miller Ckk; SD79 - Str 2 N of the

Meade Co Line Over the Belle

Fourche River

Scour Protection and/or Column

Repair

Butte

Lawrence

0.0 SD79

US85

US85S

0.610 2020 29.00 0.744

P 016A(08)59 04FU US16A WB & EB - Over US16E at

the Keystone Interchange

Bridge RehabilitationPennington 0.0 US16AE

US16AW

2.157 2020 30.00 3.163

NH 0212(183)33 05FN US212 - Str 2.3 W of SD79 Over

Owl Ck.

Replace Structure (Bridge) and

Approach Grading

Butte* 0.0 US212 3.300 2020 31.00 4.223

NH 0012(187)107 04FL US12 - Strs 7.9 mi E of the Perkins

Co Line & 0.2 mi W of SD65S over

the Burlington Northern RR

Replace Structure (Bridge) and

Approach Grading

Corson 2.3 US12 6.570 2020 32.00 8.016

P 00SW(58) 05FP Statewide 2020 Bridge Inspection CostsStatewide 0.0 0.971 2020 33.00 1.184

¥ Costs reflect anticipated inflationPage 43 HC65Coding.rpt

Page 46: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0010(123)273 03AM SD10 - 5.8 W of US281 over Dry

Run Creek & 2.9 W of US281 over

the Elm River

Replace Structure (Bridge) &

Approach Grading

Brown 0.0 SD10 2.989 2020 34.00 3.826

P 0048(12)371 05EQ

P 0011(107)23 05UJ

SD48 - Fm I29 to Just E of the Iowa

State Line; SD11 - Fm SD48 to 1 Mi

S of Alcester; SD48 - Str 1.5 E of SD

11 Over E Union Ck;

Mill, AC Resurfacing, Intersection

Improvements, Pipe Work; Berm

Repair & Riprap

Union 23.0 SD11

SD48

0.149 2020 35.00 0.181

Also Funded In:

Item Category

Minor Arterial Projects 6.997 20.00

Total Project Cost

7.178

NH 0019(42)0 05GX SD19 - Str 4.1 S of Vermillion Over

the Missouri River

Anchor Bolts, Joints, Epoxy Chip

Seal on South Dakota Side

Clay 0.0 SD19 0.688 2020 36.00 0.839

LR 2020( ) 05GT Structure Preservation Projects

Throughout South Dakota

2020 Structure PreservationStatewide 0.0 5.218 2020 37.00 6.367

NH 0044(203)39 05Q8 SD44 - Str 4.1 SW of Jct SD231

Over Rapid Creek

Zone Painting, Replace Open

Joints, Repair Spalling at Barrier

Joints and Edge of Slab, Deck

Overlay

Pennington 0.0 SD44 0.291 2020 38.00 0.354

P 0030(33)361 05V3 SD30 - Str 3.4 E of I29 over Six Mile

Creek; 0.8 W of I29 over N Branch

of Deer Ck;

LSDC Overlay, Upgrade Bridge

Rail, Approach Guardrail

Brookings 0.0 SD30 0.499 2020 39.00 0.608

P 0248(11)145 05V5 SD248 - Str, 1.0 E of Cactus Flats

Over Big Buffalo Creek & 1.4 W of

Kadoka Over White Willow Creek

Replace Strs (Bridge), Approach

Grading

Jackson 0.0 SD248 3.541 2020 40.00 4.321

NH 0281(120)185 0673

NH 0012(225)248 067A

US281 - Strs 3.5 N Jct SD10 E over

Maple River; 0.2 N Jct US12 over

BNSF Railroad; 6.7 and 8.8 S of Jct

US12 over Moccasin Ck; US12 - Str

0.5 E of Roscoe over BNSF Railroad

Polymer Chip SealBrown

Edmunds

0.0 US12

US281

US281N

US281S

0.432 2020 41.00 0.527

NH 0018(213)45 06DQ US18 WBL - Str 1.0 S of SD79 N Jct

Over the Cheyenne River

Abutment, Berm, Joint Repair,

Approach Slabs, Bridge Ends and

Approach Pavement

Fall River 0.0 US18E

US18W

0.641 2020 42.00 0.782

¥ Costs reflect anticipated inflationPage 44 HC65Coding.rpt

Page 47: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0011(88)81 04EX SD11 - Fm the N City Limits of

Brandon to the Minnesota State Line

AC Resurfacing, & Mill, AC

Resurfacing, Intersection

Improvements, Approach Slabs,

Drop Inlets, Column Repair

Minnehaha 20.9 SD11 0.086 2020 43.00 0.105

Also Funded In:

Item Category

Minor Arterial Projects 8.055 27.00

State Highway System Municipal Projects 0.115 9.00

Total Project Cost

8.275

Miles2020 39.123 46.6

P 0020(160)04 04FR SD20 - 4.2 & 5.0 mi E of the

Montana State Line Over the Little

Missouri River & Over Valley Creek

& 14.8 E of the E US85 Junction

Over Sioux Creek

Replace Structure (Bridge) and

Approach Grading

Harding* 0.0 SD20 5.693 2021 44.00 7.282

NH 0081(103)6 04G5 US81 - Fm the End of the Divided

Lanes to 303rd Street North of

Yankton

Grading, Structure, & AC SurfacingYankton 3.4 US81 0.627 2021 45.00 0.765

Also Funded In:

Item Category

Major Arterial Projects 7.514 43.00

Total Project Cost

8.279

P 0015(83)199 04XA SD15 - 1.2 W of SD123 over the

North Fork of the Whetstone River &

4.8 mi E of I29

Replace Structure (Bridge) &

Approach Grading; Replace

Sturcture (RCBC) & Approach

Grading

Roberts 0.0 SD15 1.199 2021 46.00 1.463

Also Funded In:

Item Category

Minor Arterial Projects 2.537 34.00

Total Project Cost

4.000

P 0013(38)108 04VD

IM-PH 0293(107)99 05F9

SD13 - 0.3 N of Flandreau Over the

Big Sioux River; I29 N/S - 1 N

SD115 Interchange; 1.2 N

Minnehaha Co. Line; 3.8 S SD34

Interchange; 3 S SD34 Interchange

High Friction Surface Treatment,

Polymer Chip Seal, Deck Repair,

Curb Repair, Approach Slabs, Joint

Replacement

Minnehaha

Moody

0.0 I29N

I29S

SD13

0.166 2021 47.00 0.202

Also Funded In:

Item Category

Interstate Maintenance Projects 1.828 40.00

Roadway Safety Improvement 0.015 102.00

Total Project Cost

2.045

P 00SW(60) 05FQ Statewide 2021 Bridge Inspection CostsStatewide 0.0 0.990 2021 48.00 1.208

¥ Costs reflect anticipated inflationPage 45 HC65Coding.rpt

Page 48: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

LR 2021( ) 05GU Structure Preservation Projects

Throughout South Dakota

2021 Structure PreservationStatewide 0.0 5.411 2021 49.00 6.603

NH 0018(203)333 04V9 US18 - Str. 0.8 N of Pickstown Over

Saint Francis Bay; US18 - Fm

Pickstown to Lake Andes

Replace Structure (Bridge) &

Approach Grading; Spot Grading,

Pipe Work & Interim Surfacing;

Intersection Improvements

Charles Mix 6.4 US18 2.503 2021 50.00 3.053

Also Funded In:

Item Category

Major Arterial Projects 2.118 49.00

Total Project Cost

5.171

P 0044(204)363 05Q9

NH 0018(210)390 05QA

SD44 - Strs, 15 Mi E of SD37 Over

the James Ri; 9 W of US81 over

Wolf Ck; 3.3 W of SD19 Over SD

Owned RR; US18 - Str, 0.6 E of

Olivet Over James River.

Joint Repair, Bent Cap, Column

Repair, Zone Painting, Replace

Approach Curb, Abutment, Anchor

Bolt, Grout Pad Repair, Replace

Curb on Approaches, Abutment

Anchor Bolts, Zone Painting,

Column, Abutment and/or Curb

Repair

Hutchinson

Turner

0.0 SD44

US18

0.731 2021 51.00 0.891

P 0324(06)358 05QC SD324 - Str, 0.8 E I29 Interchange

Over Medary Ck

LSDC Overlay, Replace Approach

Slabs, Joints and Upgrade Bridge

Rail and End Blocks

Brookings 0.0 SD324 0.577 2021 52.00 0.705

NH 0014(227)327 05QD US14 - Str, 2 NW of Wolsey Over

Cain Ck

Replace Approach Slabs, Joints

and Guardrail

Beadle 0.0 US14 0.192 2021 53.00 0.234

NH 0014(226)113 05U1 US14 - Fm E of Wall to Cottonwood;

US14 - 3.8 W of the Jackson Co

Line Over a Branch of Cottonwood

Creek

Mill & AC Resurfacing Pipe Work;

Replace Structure (RCBC) &

Approach Grading

Jackson

Pennington

14.1 US14 0.539 2021 54.00 0.658

Also Funded In:

Item Category

Major Arterial Projects 4.031 41.00

Total Project Cost

4.689

NH 014A(21)41 04VE US14A - At the Junction of US85

South Over Whitewood Creek

Polymer Chip Seal, Joint

Replacement, Repair/Rehab

Abutment, Erosion Repair

Lawrence 0.0 US14A 1.409 2021 55.00 1.720

NH 0281(121)154 067C US281 - Strs 0.5 N of US212 over

Turtle Ck; 5.8 N of US212 over

Snake Ck

LSDC Overlay, Replace Approach

Rail and Slabs

Spink 0.0 US281 0.586 2021 56.00 0.714

¥ Costs reflect anticipated inflationPage 46 HC65Coding.rpt

Page 49: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0044(210)291 06E1 SD44 - Missouri River Bridge Preliminary EngineeringCharles Mix 0.0 SD44 0.066 2021 57.00 0.081

NH 0034(183)123 05FV

P 0063(53)144 05QE

SD34 - Str Over the Cheyenne

River; SD63 - Str, Ziebach-Haakon

County Line Over the Cheyenne

River

LSDC Overlay,Bolted Splices &

Zone Painting; Zone Painting and

Collect Drainage Under Open

Joints

Haakon

Ziebach

0.0 SD34

SD63

1.556 2021 58.00 1.898

Miles2021 27.477 23.9

NH 0281(115)194 05DV US 281 - Str. 0.2 N of Junction US12

Over BNSF Railroad

Repair Embankment Settlement,

Approach Pavement and Approach

Slabs, Zone Painting

Brown 0.0 US281 0.588 2022 59.00 0.718

Also Funded In:

Item Category

Major Arterial Projects 0.210 51.00

Total Project Cost

0.928

P 0050(90)295 6497 SD50 - 5.3 S of SD44E & 4.1 & 4.3

S of Geddes over Pease Creek

Deck Overlay, Approach Guardrail

& Approach Pavement

Charles Mix 0.0 SD50 0.558 2022 60.00 0.680

NH 0018(204)446 04VA US18 - 2.0 West of Canton Over a

Creek

Scour Protection at RCBC Outlet &

Clean Inlet

Lincoln 0.0 US18 0.108 2022 61.00 0.131

P 0050(118)226 04V8 SD50 - 5.4 N of the I90 Loop Over

Bad Hand Creek

Scour Protection at RCBC OutletBrule 0.0 SD50 0.091 2022 62.00 0.110

P 0011(94)86 04VC SD11 - 5.2 N of the I90 Interchange

Over West Pipestone Creek

Epoxy Chip Seal and Column

Repair

Minnehaha 0.0 SD11 0.098 2022 63.00 0.120

NH 0034(177)56 04VF SD34 - 17.6 NE of SD79 Over the

Belle Fourche River

PS Girder RepairMeade 0.0 SD34 0.070 2022 64.00 0.085

P 0079(72)145 04X8 SD79 - 4.9 S of SD168 over North

Willow Ck

Epoxy Chip Seal, Joints, Abutment

Repair, Berm Repair, Joints, Reset

Bearings, Upgrade Bridge Rail

Butte 0.0 SD79 0.405 2022 65.00 0.495

P 0040(230)38 04X9 SD40 - 0.3 E of Hayward Over Battle

Ck

Epoxy Chip SealPennington 0.0 SD40 0.097 2022 66.00 0.118

¥ Costs reflect anticipated inflationPage 47 HC65Coding.rpt

Page 50: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0012(197)183 04XF

P 1806(18)363 05M9

US12 - Str. 2.4 W of the Walworth

Co Line Over Claymore Ck & at the

S Junction of SD1806; SD1806 - Fm

1200' S of US12 to US12

US12 - Replace Structure (Bridge)

& Approach Grading, Intersection

Relocation/Improvements; SD1806

- Grading & AC Surfacing

Corson* 0.2 SD1806

US12

1.792 2022 67.00 2.186

Also Funded In:

Item Category

Major Arterial Projects 0.384 52.00

State Secondary Projects 0.368 20.00

Total Project Cost

2.938

P 00SW(61) 05FR Statewide 2022 Bridge Inspection CostsStatewide 0.0 1.031 2022 68.00 1.259

P 016A(10)37 04G1 US16A - 1 mi W of SD36 Over

Grace Coolidge Creek

Replace Structure (RCBC) &

Approach Grading

Custer 0.0 US16A 0.910 2022 69.00 1.163

NH 0212(184)143 04XG US212 - 1.8 E of the Ziebach Co

Line Over Little Bear Creek

Replace Structure (Bridge) &

Approach Grading

Dewey 0.0 US212 2.665 2022 70.00 3.408

LR 2022( ) 05GV Structure Preservation Projects

Throughout South Dakota

2022 Structure PreservationStatewide 0.0 5.428 2022 71.00 6.624

IM 0299(79)222 065N

P 0010(149)359 06G4

I29 - Strs. 2 S. of the Peever Interch

(129 St); SD10 Interchange; SD10 -

Str 0.7 W of SD127 Over a Creek

Polymer Chip Seal, Replace

Approach Slabs, Joints, Approach

Guardrail; Polymer Chip Seal,

Replace Approach Slabs &

Approach Guardrail

Roberts 0.0 I29N

SD10

0.241 2022 72.00 0.294

Also Funded In:

Item Category

Interstate Maintenance Projects 0.585 62.00

Total Project Cost

0.879

BR NBIS(48) 06A5

BR NBIS(00) 06A6

Missouri River Bridges at: I90 & I90L

at Chamberlain; SD44, SD19 near

Vermillion; SD1806 and US12 near

Mobridge; US14 at Pierre; US212

west of Gettysburg; Pedestrian

Walkway at Yankton

Underwater Bridge InspectionsBrule

Charles Mix

Clay

Corson

Hughes

Potter

Walworth

Yankton

0.0 I90E

I90EL

SD1806

SD19

SD44

US12

US14E

US212

0.194 2022 73.00 0.238

PCN 06A6 The City of Yankton will be reimbursing the SD Dept. of Transportation for the cost of this

inspection.

¥ Costs reflect anticipated inflationPage 48 HC65Coding.rpt

Page 51: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Bridge Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0085(102)26 06XM US85 - Strs. 0.1 NE, 0.6 NE & 0.8

NE of Jct US 385 over Whitewood

Ck

Bridge Rail PaintingLawrence 0.0 US85 0.210 2022 74.00 0.256

Miles2022 17.885 0.2

¥ Costs reflect anticipated inflationPage 49 HC65Coding.rpt

Page 52: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Railroad Crossing Improvement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PP-PS 1286(13) 05RW Holly Blvd. in Brandon SD, DOT

186712R, E&E Railroad

Signal Upgrades, Approach Work,

Crossing Surface Rehabilitation,

CE

Minnehaha 0.0 0.288 2019 1.00 0.320

PP-PS 7670(09) 0617 Ball Park Road, in Sturgis,

DOT199693B RCP&E Railroad

Signals, Crossing Surface,

Sidewalk, Approach, CE

Meade 0.0 0.180 2019 2.00 0.200

PP 0022(62) 05RK Ellis & Eastern Railroad - Fm

Brandon To Ellis

Replace Crossbuck SignsMinnehaha 0.0 0.036 2019 3.00 0.040

PP-PS

0212(170)376

04CA US212 in Watertown, crossing

075504H, BNSF

Upgrade Signal System and

Crossing Surface Rehabilitation,

CE

Codington 0.0 US212 0.333 2019 4.00 0.370

PP-PS

0010(127)358

05RJ SD10 - In Sisseton SD,

DOT#394515A, SMRR

Upgrade Signal System and

Crossing Surface Rehabilitation,

CE

Roberts 0.0 SD10 0.225 2019 5.00 0.250

PS 0012(210) 05RP Sisseton Milbank Railroad - Crossing

Upgrades, Roberts & Marshall

County

Crossing Surface Rehabilitation,

CE

Marshall

Roberts

0.0 0.360 2019 6.00 0.400

PP-PS

0034(185)387

05RF SD34 - In Madison SD, DOT#

381200J, BNSF

Upgrade Signal System and

Crossing Surface Rehabilitation

Lake 0.0 SD34 0.315 2019 7.00 0.350

PS 000S(371) 05VD Statewide 2019 Railroad Inventory

Compilation & Analysis

Statewide 0.0 0.037 2019 8.00 0.041

PS 000S(372) 05VH Statewide 2019 Preliminary Engineering for

Railroad Safety Projects

Statewide 0.0 0.043 2019 9.00 0.048

PP-PS

0037(153)128

0626 SD37 in Huron, DOT 075419T

RCP&E Railroad

Signal Upgrades and Crossing

Surface

Beadle 0.0 SD37 0.234 2019 10.00 0.260

PP-PS 4718(04) 0624 15th Street in Yankton, DOT

382257N BNSF Railroad

Upgrade Signals, Upgrade

Crossing, Approach, CE

Yankton 0.0 0.176 2019 11.00 0.195

PP-PS 2284(05) 064A 8th Ave NE in Aberdeen, DOT

067590L, BNSF

Replace Signals, Crossing

Surface, Approach, CE

Brown 0.0 0.333 2019 12.00 0.370

¥ Costs reflect anticipated inflationPage 50 HC65Coding.rpt

Page 53: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Railroad Crossing Improvement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PP-PS 2255(10) 064C N Roosevelt St in Aberdeen, DOT

067589S, BNSF

Replace Signals, Crossing, City

Approach and CE

Brown 0.0 0.333 2019 13.00 0.370

PP 0034(194)396 064E SD34 in Wentworth SD, DOT

075187F, BNSF

Signal Upgrades, CELake 0.0 SD34 0.113 2019 14.00 0.125

PP 1186(09) 064F W 60th St. N in Sioux Falls, DOT

097244D, BNSF

Signal Upgrades, CEMinnehaha 0.0 0.113 2019 15.00 0.125

PP 0028(42)313 064G SD28 in Willow Lake, DOT

097346W, BNSF

Signal Upgrades, CEClark 0.0 SD28 0.113 2019 16.00 0.125

PP 0011(112)55 064K SD11 in Canton, DOT 385875Y,

BNSF

Signal Upgrades, CELincoln 0.0 SD11 0.113 2019 17.00 0.125

PP 0044(206)393 064L SD44 in Parker, DOT 385927N,

BNSF

Signal Upgrades, CETurner 0.0 SD44 0.113 2019 18.00 0.125

PP 8063(17) 064Q Main St. in Parker, DOT 385929C,

BNSF

Signal Upgrades, CETurner 0.0 0.113 2019 19.00 0.125

PP 0081(109)45 064T US81 Near Dolton, DOT 385957F,

BNSF

Signal Upgrades, CEHutchinson 0.0 US81 0.113 2019 20.00 0.125

PP 0015(87)175 065T SD15 in Milbank, DOT 393640J,

BNSF

Signal Upgrades, CEGrant 0.0 SD15 0.113 2019 21.00 0.125

PP 0040(318)48 065V SD40 in Hermosa, DOT190235G,

RCP&E

Install Signals, CECuster 0.0 SD40 0.162 2019 22.00 0.180

PP 0020(178)318 066A SD20 in Northville, DOT189455F,

RCP&E

Install Signals, CESpink 0.0 SD20 0.162 2019 23.00 0.180

PP 0240(14)127 066C SD240 E&W (W S Blvd) in Wall,

DOT 190051G, RCP&E

Signal Upgrades, CEPennington 0.0 SD240E

SD240W

0.198 2019 24.00 0.220

PP 6596(01) 066D W 4th Ave in Wall, DOT 190050A,

RCP&E

Upgrade Bungalow and Signal

Equipment

Pennington 0.0 0.090 2019 25.00 0.100

¥ Costs reflect anticipated inflationPage 51 HC65Coding.rpt

Page 54: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Railroad Crossing Improvement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PP 0015(88)198 066J SD15 in Wilmot, DOT 394493C,

SMRR

Install Signals, CERoberts 0.0 SD15 0.131 2019 26.00 0.145

PP 0273(08)62 066K SD273 in Kennebec, DOT 386141B,

DSRC

Install Signals, CELyman 0.0 SD273 0.126 2019 27.00 0.140

PP 0047(115)70 066L SD47 in Reliance, DOT 386126Y,

DSRC

Install Signals, CELyman 0.0 SD47 0.126 2019 28.00 0.140

PP 0045(59)58 066Q SD45 W of Kimball, DOT 386092G,

DSRC

Install Signals, CEBrule 0.0 SD45 0.126 2019 29.00 0.140

PP 0203(03)53 066R SD203 E of Plankinton, DOT

386061H, DSCR

Install Signals, CEAurora 0.0 SD203 0.126 2019 30.00 0.140

PS 6364(07) 066T 258th St. in Minnehaha County, DOT

381686N, D&I

Upgrade Crossing, Approach

Work, CE

Minnehaha 0.0 0.045 2019 31.00 0.050

PS 6148(04) 066U 254th St. in Minnehaha County, DOT

381691K, D&I

Upgrade Crossing, Approach

Work, CE

Minnehaha 0.0 0.045 2019 32.00 0.050

PS 8050(75) 066V 248th St. in Minnehaha County, DOT

381703C, D&I

Upgrade Crossing, Approach

Work, CE

Minnehaha 0.0 0.045 2019 33.00 0.050

PH-PS 3230(05) 01DJ Box Elder - Pennington Co Rd 14-16

- Radar Hill Rd Intersection and

Commercial Gate Road Intersection;

Radar Hill Road, S of Hwy1416

Intersection, DOT#190122B, RCP&E

Railroad

Intersection Reconstruction, Add

Turn Lanes; Crossing Surface

Rehabilitation, Approach Work &

Relocate Existing Signals

Pennington 0.0 0.045 2019 34.00 0.050

Also Funded In:

Item Category

Roadway Safety Improvement 3.383 10.00

Total Project Cost

3.433

Coordinate with PCN 05RH

PP 0010(136)321 066G

PP-PS 0027(11)230 06K1

PS 8046(05) 070K

SD27 in Britton DOT 394614X,

DMV&WRR; SD10 in Britton,

DOT394616L, DMV&W; 8th St in

Britton DOT 394615E; DMV&W RR

Install Railroad Signals, Upgrade

Crossing Surface, Sidewalk,

Approach Work, CE

Marshall 0.0 SD10

SD27

0.779 2019 35.00 0.865

¥ Costs reflect anticipated inflationPage 52 HC65Coding.rpt

Page 55: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Railroad Crossing Improvement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PP-PS 3720(05) 06NL Spruce Street in Mitchell, DOT

382394V BNSF

Signal Upgrades, Crossing Surface

Upgrades, City Approach and CE

Davison 0.0 0.360 2019 36.00 0.400

PP 0050(130)381 06NU SD50 in Yankton, DOT 382261D

BNSF

Signal Upgrades & CEYankton 0.0 SD50 0.117 2019 37.00 0.130

PS 8050(79) 06NM Ladelle St in Dell Rapids, DOT

381713H D&I

Crossing Surface Upgrade, City

Approach and CE

Minnehaha 0.0 0.072 2019 38.00 0.080

PS 8050(80) 06NN Orleans Street in Dell Rapids DOT

381714P D&I

Crossing Surface Upgrade, City

Approach and CE

Minnehaha 0.0 0.045 2019 39.00 0.050

PP 6265(01) 06NP 423 Avenue N. of Britton, DOT

394618A DMV&W

Install Lighting at CrossingMarshall 0.0 0.027 2019 40.00 0.030

PP 6393(01) 06XV 469 Ave (White Street) in Burbank

DOT 382147D, BNSF

Signal UpgradesClay 0.0 0.072 2019 41.00 0.080

Miles2019 7.434 0.0

PP-PS 1310(11) 061U 6th Street in Sioux Falls, DOT

097881H BNSF Railroad

Signal Upgrades, Sidewalk,

Approach, CE

Minnehaha 0.0 0.147 2020 42.00 0.150

PP-PS 0022(58) 05K1 West Ave, 186646F and 10th Street

186645Y, E&E Railroad

Rehabilitation of Crossing

Surfaces, Signal Upgrades,

Approach, CE

Minnehaha 0.0 0.450 2020 43.00 0.500

PS 000S(374) 05VE Statewide 2020 Railroad Inventory

Compilation & Analysis

Statewide 0.0 0.037 2020 44.00 0.041

PS 000S(375) 05VJ Statewide 2020 Preliminary Engineering for

Railroad Safety Projects

Statewide 0.0 0.043 2020 45.00 0.048

¥ Costs reflect anticipated inflationPage 53 HC65Coding.rpt

Page 56: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Railroad Crossing Improvement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P-PH 0015(77)155 04K8

P- PH

0020(152)439

04UL

PP 0020(176)443 0628

SD15 - Fm the N Junction of US212

N to S Junction of SD20; SD20 - Fm

the S Junction of SD15 to the N

Junction. of SD15; SD20 - Near

Labolt SD, DOT 097530J BNSF

Railroad

Grading, Interim Surfacing,

Replace Strs; Signal Upgrades

Deuel

Grant

* 12.0 SD15

SD20

0.315 2020 46.00 0.350

Also Funded In:

Item Category

Minor Arterial Projects 5.771 25.00

Roadway Safety Improvement 11.214 62.00

Total Project Cost

17.335

Miles2020 1.089 12.0

PS 8050(71) 05RE Marion Rd, 1.5 mi NW of Sioux

Falls, DOT# 097254J, BNSF

Upgrade Crossing Surface,

Approach Work, CE

Minnehaha 0.0 0.035 2021 47.00 0.040

PP-PS 1261(11) 02HW Cliff Ave. by 20th St. in Sioux Falls;

BNSF, DOT #075474T

Upgrade Signals, Crossing Surface

Rehabilitation, Approach, PE, CE

Minnehaha 0.0 0.900 2021 48.00 1.000

PP-PS 1261(10) 011B Cliff Ave. by 14th St. in Sioux Falls,

DOT#381-656W, BNSF

Upgrade Signals, Crossing Surface

Rehabilitation, Approach

Improvement, PE, CE

Minnehaha 0.0 0.450 2021 49.00 0.500

PS 000S(384) 06A7 Statewide 2021 Preliminary Engineering for

Railroad Safety Projects

Statewide 0.0 0.043 2021 50.00 0.048

PS 000S(383) 06A8 Statewide 2021 Railroad Inventory

Compilation & Analysis

Statewide 0.0 0.038 2021 51.00 0.042

LR 2021(00)0 06E2 Various Locations Throughout South

Dakota

2021 Statewide Railroad Crossing

Projects

Statewide 0.0 0.905 2021 52.00 1.006

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

PP 0081(111)119 06NQ US81 Crossing in Arlington, DOT

197451Y RCP&E

Install GatesKingsbury 0.0 US81 0.072 2021 53.00 0.080

Miles2021 2.716 0.0

¥ Costs reflect anticipated inflationPage 54 HC65Coding.rpt

Page 57: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Railroad Crossing Improvement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PS 1186(08) 04A7 60th St. N. in Sioux Falls,

DOT#381679D, D&I Railroad

Railroad Crossing Rehabilitation,

Approach, CE

Minnehaha 0.0 0.090 2022 54.00 0.100

LR 2022(00)0 06E3 Various Locations Throughout South

Dakota

2022 Statewide Railroad Crossing

Projects

Statewide 0.0 1.995 2022 55.00 2.217

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

P 0015(81)182 05J7

PS 0015(86)198 062A

SD15 - Fm the Grant/Roberts

County Line, N & W to W of I29.;

SD15 - N Side of Wilmont DOT

394493C SMRR Railroad

Mill & AC Overlay, Pipework;

Crossing Surface

Roberts 25.2 SD15 0.054 2022 56.00 0.060

Also Funded In:

Item Category

Minor Arterial Projects 6.950 50.00

Total Project Cost

7.010

P-PH 0046(61)366 04JF

PP-PS 0046(71)381 062C

SD46 - Fm Beresford E 15 miles.;

SD 46 - 0.3 S of 298th St., DOT

381576D D&I Railroad

Grading, Interim Surfacing,

Replace Structure (RCBC) &

Replace Structure (Bridge),

Erosion Repair; Signal Upgrades &

Crossing Surface

Union* 15.8 SD46 0.225 2022 57.00 0.250

Also Funded In:

Item Category

Minor Arterial Projects 2.992 52.00

Roadway Safety Improvement 21.753 124.00

Total Project Cost

24.995

PS 000S(393) 06NR Statewide 2022 Railroad Inventory

Compilation & Analysis

Statewide 0.0 0.037 2022 58.00 0.041

PS 000S(394) 06NT Statewide 2022 Preliminary Engineering for

Railroad Safety Projects

Statewide 0.0 0.043 2022 59.00 0.048

Miles2022 2.716 41.0

¥ Costs reflect anticipated inflationPage 55 HC65Coding.rpt

Page 58: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Urban System Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 1358(05) 05JE

P 1225(06) 05JF

26th Street from Cleveland Avenue

to 1,050 feet West of Southeastern

Avenue in Sioux Falls; Southeastern

Avenue from Klondike Trail to South

Lighthouse Place in Sioux Falls

Grading, Intersection

Improvements, Storm Sewer, Curb

& Gutter, PCCP and AC Surfacing,

Signals, Lighting, Permanent

Signing, Sidewalk, Structure

Minnehaha* 0.0 14.345 2019 1.00 19.500

P 8050(76) 06KC From the intersection of S Highline

Ave. and E Arrowhead Parkway,

extending S and then W to E 18th

St. in Sioux Falls

Shared Use Path for Arrowhead

Parkwy

Minnehaha 0.0 0.365 2019 2.00 0.445

P 1358(02) 05C2

NH 2042(29) 06YQ

NH 0042(80)371 06YP

Six Mile Road - Fm 500' N of

Arrowhead Parkway, Arrowhead

Parkway - Fm 0.5 m W of Six Mile

Rd to Six Mile Rd; SD42 - Fm 0.5 m

W of Six Mile Rd to Willow Run Ent.

Grading, Storm Sewer, Curb &

Gutter & PCCP Surfacing, ROW,

Signals, Lighting

Minnehaha 0.4 SD42 6.459 2019 3.00 7.882

Also Funded In:

Item Category

State Highway System Urban Projects 7.277 2.00

Total Project Cost

15.159

Construction planned for 2020.

Miles2019 27.827 0.4

P 1360(02) 06JQ 85th Street (270th Street) - Fm

Sundowner Avenue E 1 mile to

Tallgrass Avenue in Sioux Falls

Preliminary EngineeringLincoln* 1.0 0.000 2020 4.00 0.250

Miles2020 0.250 1.0

NH 2042(28) 05UW Arrowhead Parkway - Fm Highline

Avenue to 0.5 m W of Six Mile Road

Grading, Storm Sewer, Curb &

Gutter, PCCP Surfacing, ROW,

Signals, and Lighting

Minnehaha 1.4 0.588 2021 5.00 0.717

Also Funded In:

Item Category

State Highway System Urban Projects 10.153 10.00

Total Project Cost

10.870

NH 1157(02) 05C3

NH 0011(101)72 05C4

Veterans Parkway - Fm Arrowhead

Parkway N 1000' in Sioux Falls;

SD11 - Fm Arrowhead Parkway S

500' in Sioux Falls

Grading, Storm Sewer, Curb &

Gutter & PCCP Surfacing, ROW,

Signals, Lighting

Minnehaha 0.0 SD11N

SD11S

0.460 2021 6.00 0.561

Also Funded In:

Item Category

State Highway System Urban Projects 2.595 12.00

Total Project Cost

3.156

¥ Costs reflect anticipated inflationPage 56 HC65Coding.rpt

Page 59: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Urban System Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

Miles2021 1.278 1.4

P 1400(16) 05NF

P 1423(07) 06Y0

P 8050(81) 06XY

41st Street In Sioux Falls - Fm W of

Marion Rd to Shirley Ave; Marion

Road - Fm 39th St to 43rd St in

Sioux Falls; Shirley Ave - Fm 41st St

to W Shirley Place in Sioux Falls

Grading, Traffic Signals, Curb &

Gutter, Sidewalk, PCCP Paving,

Storm Sewer, ADA Upgrade,

Lighting, Pavement Markings,

ROW; Urban Construction; Urban

Reconstruction

Minnehaha 1.3 12.129 2022 7.00 14.800

P 1186(00) 00KD 60th St. N from I-29 to N. 4th Ave.

in Sioux Falls

PEMinnehaha* 2.0 0.000 2022 8.00 0.200

Miles2022 15.000 3.3

¥ Costs reflect anticipated inflationPage 57 HC65Coding.rpt

Page 60: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Safe Routes To School Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P SRTS(46) 06AA Statewide 2019 Safe Routes To School Non

Infrastructure

Statewide 0.0 0.020 2019 1.00 0.020

P SRTS(44) 04P3 Wood P.E., Non Infrastructure and

Construct New Sidewalk

Mellette 0.0 0.062 2019 2.00 0.062

Miles2019 0.082 0.0

P SRTS(47) 06AC Statewide 2020 Safe Routes To School Non

Infrastructure

Statewide 0.0 0.020 2020 3.00 0.020

Miles2020 0.020 0.0

P SRTS(48) 06AD Statewide 2021 Safe Routes To School Non

Infrastructure

Statewide 0.0 0.020 2021 4.00 0.020

Miles2021 0.020 0.0

P SRTS(49) 06TF Statewide 2022 Safe Routes to School Non

Infrastructure

Statewide 0.0 0.020 2022 5.00 0.020

Miles2022 0.020 0.0

¥ Costs reflect anticipated inflationPage 58 HC65Coding.rpt

Page 61: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 8039(16) 02UM Various County Roads in Kingsbury

County

Signing & DelineationKingsbury 0.0 1.310 2019 1.00 1.746

NH-PH

0018(198)173

04XH US18 - Fm E of Vetal to the

Bennett/Todd County Line

Grading, Interim SurfacingBennett* 2.5 US18 1.904 2019 2.00 2.115

Also Funded In:

Item Category

Major Arterial Projects 0.555 1.00

Total Project Cost

2.670

P-PH 6147(12) 02SN Day County #01 from 142 St. on the

S side of at Waubay, S 2 miles on

446 Ave., East 1 mile on 144 St.,

and S 3 miles on 447 Ave. to 147 St.

RSI Category Day Co. Rd. #1 (447th

Ave.) Between 145th St. and 147th

St.

Grading, Base Course, AC

Surfacing, RSI Category - Grading

to Correct Horizontal & Vertical

Alignment, Reduce Shoulder Drop

Off, & Lengthen Pipe.

Day 6.0 0.450 2019 3.00 0.500

Also Funded In:

Item Category

County Secondary and Off System Projects 3.200 2.00

Total Project Cost

3.700

Total = $2.58; STPw/Match = $1.445; Local or SIB = $0.635; RSI = $0.5

PH 8055(30) 02UW Various County, City & Township

Roads in Roberts County & Tribal

Roads in Marshall & Day Counties

Signing & DelineationDay

Marshall

Roberts

0.0 2.318 2019 4.00 3.090

PH 8046(03) 03BC Various County, City, & Township

Roads in Marshall County

Signing & DelineationMarshall 0.0 1.009 2019 5.00 1.345

PH 8010(26) 02UJ Various County, City, & Township

Roads in Butte County

Signing & DelineationButte 0.0 0.793 2019 6.00 1.057

PH 8031(05) 03BB Various County, City, & Township

Roads in Hanson County

Signing & DelineationHanson 0.0 0.652 2019 7.00 0.870

PH 0037(147)067 05K4 Junction of SD37 with 256th Street,

258th Street, 259th Street, and

260th Street.

Intersection ImprovementsDavison 0.0 SD37 1.181 2019 8.00 1.312

¥ Costs reflect anticipated inflationPage 59 HC65Coding.rpt

Page 62: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P-PH 0046(47)356 025D SD46 - Fm W of SD19/SD19A to W

of the Junction with I29

Spot Grading, Shoulder Widening,

Str.s, & Culvert Replacement Over

Ash & Blind Creek, Left Turn

Lanes; Replace Structure (Bridge)

and Approach Grading at the

Vermillion River, Full Depth

Reclaimation, Interim Surfacing

Clay

Lincoln

* 8.1 SD46 4.780 2019 9.00 4.780

Also Funded In:

Item Category

Minor Arterial Projects 1.259 3.00

Bridge Projects 4.237 9.00

Total Project Cost

10.276

Construction planned to begin in 2020.

PH-PS 3230(05) 01DJ Box Elder - Pennington Co Rd 14-16

- Radar Hill Rd Intersection and

Commercial Gate Road Intersection;

Radar Hill Road, S of Hwy1416

Intersection, DOT#190122B, RCP&E

Railroad

Intersection Reconstruction, Add

Turn Lanes; Crossing Surface

Rehabilitation, Approach Work &

Relocate Existing Signals

Pennington 0.0 3.045 2019 10.00 3.383

Also Funded In:

Item Category

Railroad Crossing Improvement Projects 0.050 34.00

Total Project Cost

3.433

Coordinate with PCN 05RH

PH 0037(139)11 04HJ SD37 - Fm N of Springfield to SD50 SD37 - Shoulder Widening, Culvert

Extensions, Pipe Work, Replace

Str (RCBC)

Bon Homme* 8.6 SD37 7.470 2019 11.00 8.300

PH 0010(106) 04HT Various locations on the State

System in the Aberdeen Region

Durable Pavement MarkingRegionwide 0.0 0.312 2019 12.00 0.312

PH 0020(147) 04HU Various locations on the State

System in the Mitchell Region

Durable Pavement MarkingRegionwide 0.0 0.572 2019 13.00 0.572

PH 0030(23) 04HV Various locations on the State

System in the Pierre Region

Durable Pavement MarkingRegionwide 0.0 0.229 2019 14.00 0.229

PH 0040(220) 04HW Various locations on the State

System in the Rapid City Region

Cold Plastics Durable Pavement

Marking

Regionwide 0.0 0.208 2019 15.00 0.208

PH 0040(221) 04HX Various locations on the State

System in the Rapid City Region

Sprayable Durable Pavement

Marking

Regionwide 0.0 0.338 2019 16.00 0.338

¥ Costs reflect anticipated inflationPage 60 HC65Coding.rpt

Page 63: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 000S(338) 04HY Public Traveled Roads Statewide 2019 Preliminary Engineering for

Conducting Road Safety Audit

Reviews (RSAR)

Statewide 0.0 0.028 2019 17.00 0.031

PH 00SW(84) 04J0 Statewide 2019 Local Government Traffic

Engineering Services Performed

by the SDDOT Traffic & Safety

Engineer and Provide Traffic

Ccontrol Devices

Statewide 0.0 0.120 2019 18.00 0.120

NH 0016(92)61 070G US16 E&W - Jct of Neck Yoke Rd

by Reptile Gardens

Roadway LightingPennington 0.4 US16E

US16W

0.099 2019 19.00 0.121

PH 000S(342) 04J1 Public Traveled Roads Statewide 2019 Preliminary Engineering for

Roadway Safety Improvement

Statewide 0.0 0.122 2019 20.00 0.135

PH 00SW(25) 04Y3 Statewide Preliminary Engineering to be

Started in 2019 for Roadway

Safety Projects.

Statewide 0.0 1.311 2019 21.00 1.457

PH 00SW(30) 057F Various Locations Statewide 2019 Corridor Signal TimingStatewide 0.0 0.208 2019 22.00 0.208

PH 1400(10) 00YE City of Sioux Falls - Western & 41st

St.

Install Right Turn Lane EB to SB,

Widen S Leg For Additional Lt Turn

Lane, PE, ROW

Minnehaha 0.0 0.791 2019 23.00 0.878

PH 014A(19)31 04XJ US14A - 2 E of US85 (Cheyenne

Crossing)

Grading and AC SurfacingLawrence 0.8 US14A 1.821 2019 24.00 2.023

PH 0040(334) 05W5 Various Locations on the state and

local systems in the Rapid City

Region

High Friction Surface TreatmentLawrence

Meade

Pennington

* 1.8 I190S

I90E

I90W

US14A

US16E

0.871 2019 25.00 0.968

¥ Costs reflect anticipated inflationPage 61 HC65Coding.rpt

Page 64: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 000S(392) 06NE Various Locations on the state and

local systems in the Aberdeen,

Pierre, and Mitchell Regions

High Friction Surface TreatmentDay

Lyman

Minnehaha

1.0 I29N

I29S

I90W

SD47

US12E

US12W

1.002 2019 26.00 1.113

IM-PH 0294(71)121 05FF I29 N/S - Strs. 7 N SD32

Interchange; 1 S Brookings Co. Line;

2.2 N Moody Co. Line; 0.9 S US14

Interchange

High Friction Surface, Polymer

Chip Seal

Brookings

Moody

0.0 I29N

I29S

0.040 2019 27.00 0.044

Also Funded In:

Item Category

Interstate Maintenance Projects 0.515 14.00

Total Project Cost

0.559

PH 0020(179) 06AK Mitchell Region Centerline Rumble StripesLake

McCook

Minnehaha

Moody

Yankton

32.0 SD115

SD34

US81

0.832 2019 28.00 0.832

PH 0010(137) 06AL Aberdeen Region Centerline Rumble StripesBrookings

Codington

Deuel

Hamlin

Kingsbury

41.0 US14

US212

US81

1.144 2019 29.00 1.144

PH 0040(320) 06AM Rapid City Region Centerline Rumble StripesButte

Custer

Lawrence

Pennington

39.6 US16

US212

US385

US85

1.144 2019 30.00 1.144

PH 00SW(66) 06AX Various Locations Statewide 2019 Snow FenceStatewide 0.0 0.094 2019 31.00 0.104

PH 0034(188)368 05W8

PH 0019(44)95 060F

SD34 - Intersections with 437th Ave,

461st Ave, 462nd Ave (Wentworth

Corner), 463rd Ave, 464th Ave

(Chester Corner) & Dakota Ethanol

Plant; SD19 - Intersection with 236th

(Hillside Corner)

Intersection ImprovementsLake

Miner

0.0 SD19

SD34

1.704 2019 32.00 1.892

¥ Costs reflect anticipated inflationPage 62 HC65Coding.rpt

Page 65: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 0010(154) 06U0 Various locations in the Aberdeen

Region

Transverse Rumble Strips at Stop

Controlled Intersections

Beadle

Brookings

Brown

Buffalo

Day

Deuel

Edmunds

Grant

Hamlin

Hand

Marshall

McPherson

Miner

Roberts

0.0 SD10

SD101

SD109

SD127

SD158

SD21

SD22

SD239

SD25

SD253

SD26

SD27

SD28

SD324

SD37

SD45

SD50

US14B

US281

US81

0.140 2019 33.00 0.156

PH 0012(271)288 06W7 US12 through Aberdeen Install Adaptive Signal Control

System

Brown 0.0 US12 1.144 2019 34.00 1.144

IM-FP-PH

2292(06)4

4778 I229 - Exit 5 (26th St. Intch/Yeager

Rd) in Sioux Falls; I229 - NB & SB

curve at Cliff Ave Interchange

Interchange Improvement; High

Friction Surface Treatment

Minnehaha* 0.4 I229N

I229S

0.375 2019 35.00 0.416

Also Funded In:

Item Category

Interstate Maintenance Projects 12.452 5.00

Total Project Cost

12.868

PH 0010(128) 05W9 Aberdeen Region Intersection Sight Distance

Improvements

Regionwide 0.0 0.094 2019 36.00 0.104

PH 0031(46) 06YE Various Intersections in the Pierre

Area

Pedestrian Crossing ImprovementsHughes 0.0 US14

US14B

0.047 2019 37.00 0.052

Miles2019 44.243 142.2

¥ Costs reflect anticipated inflationPage 63 HC65Coding.rpt

Page 66: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 0010(147) 05HC Various Paved County and City

Roads in the Aberdeen Region

Signing & DelineationEdmunds

Hamlin

McPherson

0.0 0.387 2020 38.00 0.669

PH 00SW(52) 05M6 Various Paved County and City

Roads in the Pierre and Rapid City

Regions

Signing & DelineationCorson

Dewey

Haakon

Harding

Jackson

Jones

Lawrence

Mellette

Oglala Lakota

Perkins

Sully

Todd

Tripp

Walworth

Ziebach

0.0 0.553 2020 39.00 0.921

P-PH 0046(60)346 04J5 SD46 - Fm Irene to W of

SD19/SD19A

Shoulder Widening, Replace Str.

(RCBC), Pipe Work, Spot Grading,

Interim Surfacing

Clay

Yankton

* 9.9 SD46 9.665 2020 40.00 10.739

Also Funded In:

Item Category

Minor Arterial Projects 3.986 18.00

Total Project Cost

14.725

PH 0020(177) 04HG Various Locations in the Mitchell

Region

Interstate Median Protection for

Mitchell Region

Regionwide* 0.0 1.061 2020 41.00 1.061

PH 0040(317) 062J Various Locations in the Rapid City

Region

Interstate Median Protection for

Rapid City Region

Regionwide 0.0 1.061 2020 42.00 1.061

PH 0010(138) 06DU Various Locations in the Aberdeen

Region

Interstate Median Protection for

Aberdeen Region

Regionwide 0.0 1.061 2020 43.00 1.061

PH 0020(187) 06JK Various Paved County and City

Roads in the Mitchell Region

Signing & DelineationBon Homme

Buffalo

Hutchinson

Jerauld

Moody

0.0 0.579 2020 44.00 0.966

¥ Costs reflect anticipated inflationPage 64 HC65Coding.rpt

Page 67: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 0030(39) 06JL Pierre Region Centerline Rumble StripesHughes

Sully

Todd

31.5 US14

US18

US83

0.849 2020 45.00 0.849

PH 8004(02) 04HQ Various County, City, & Township

Roads in Bennett County

Signing & DelineationBennett 0.0 0.541 2020 46.00 0.722

PH 8052(71) 04L4 Various County, City, & Township

Roads in Pennington County

Signing & DelineationPennington 0.0 1.540 2020 47.00 2.200

PH 8017(08) 04KC Various County, City, & Township

Roads in Custer County

Signing & DelineationCuster 0.0 0.857 2020 48.00 1.173

P-PH 0052(05)315 04HK

P 037P(04)12 06K0

SD52 - Fm SD37 to SD50; SD37P -

Str. 0.19 Mi S of the SD37/SD37P

Intersection, Pine Street in

Springfield

SD52 - Grading, Interim Surfacing,

Replace Strs (RCBC), Extend

RCBC; SD37P - Structure and

Approach Grading, Replace

Structure (RCBC), Approach

Grading & Pipe Work

Bon Homme* 12.1 SD37P

SD52

9.162 2020 49.00 10.180

Also Funded In:

Item Category

State Secondary Projects 7.572 11.00

Total Project Cost

17.752

P-PH 0014(179)419 027B US14 - Fm Main Ave. to Medary

Ave. in Brookings & the Intersections

of US14 & 12th Ave,

Urban Grading, Curb & Gutter,

Storm Sewer, Traffic Signals, ADA,

Sidewalk, Roadway Lighting &

PCC Surfacing

Brookings 0.7 US14 0.750 2020 50.00 0.750

Also Funded In:

Item Category

State Highway System Urban Projects 2.861 8.00

Total Project Cost

3.611

PH 0010(107) 04JL Various locations on the State

System in the Aberdeen Region

Durable Pavement MarkingRegionwide 0.0 0.318 2020 51.00 0.318

PH 0020(151) 04JM Various locations on the State

System in the Mitchell Region

Durable Pavement MarkingRegionwide 0.0 0.584 2020 52.00 0.584

PH 0030(24) 04JN Various locations on the State

System in the Pierre Region

Durable Pavement MarkingRegionwide 0.0 0.233 2020 53.00 0.233

¥ Costs reflect anticipated inflationPage 65 HC65Coding.rpt

Page 68: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 0040(222) 04JP Various locations on the State

System in the Rapid City Region

Cold Plastics Pavement MarkingRegionwide 0.0 0.212 2020 54.00 0.212

PH 0040(223) 04JQ Various locations on the State

System in the Rapid City Region

Sprayable Pavement MarkingRegionwide 0.0 0.345 2020 55.00 0.345

PH 00SW(20) 04JR Public Traveled Roads Statewide 2020 Preliminary Engineering for

Conducting Road Safety Audit

Reviews (RSAR)

Statewide 0.0 0.029 2020 56.00 0.032

PH 00SW(18) 04JT Public Traveled Roads Statewide 2020 Preliminary Engineering for

Roadway Safety Improvement

Statewide 0.0 0.124 2020 57.00 0.138

PH 00SW(23) 04RM Statewide 2020 Local Government Traffic

Engineering Services Performed

by the SDDOT Traffic & Safety

Engineer and Provide Traffic

Ccontrol Devices

Statewide 0.0 0.122 2020 58.00 0.122

PH 0028(37)329 04JY SD28 - Fm US81 W 11 mi Through

Lake Norden

Shoulder Widening, Culvert

Extensions, Pipe Work, Spot

Grading

Hamlin* 11.2 SD28 8.687 2020 59.00 8.687

Construction planned to begin in 2021.

PH 00SW(24) 04Y4 Statewide Preliminary Engineering to be

Started in 2020 for Roadway

Safety Projects.

Statewide 0.0 1.337 2020 60.00 1.486

PH 00SW(31) 057G Various Locations Statewide 2020 Corridor Signal TimingStatewide 0.0 0.212 2020 61.00 0.212

P-PH 0015(77)155 04K8

P- PH

0020(152)439

04UL

PP 0020(176)443 0628

SD15 - Fm the N Junction of US212

N to S Junction of SD20; SD20 - Fm

the S Junction of SD15 to the N

Junction. of SD15; SD20 - Near

Labolt SD, DOT 097530J BNSF

Railroad

Grading, Interim Surfacing,

Replace Strs; Signal Upgrades

Deuel

Grant

* 12.0 SD15

SD20

10.092 2020 62.00 11.214

Also Funded In:

Item Category

Minor Arterial Projects 5.771 25.00

Railroad Crossing Improvement Projects 0.350 46.00

Total Project Cost

17.335

¥ Costs reflect anticipated inflationPage 66 HC65Coding.rpt

Page 69: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-PH

0050(114)324

04HN

PH 0018(190)348 04JX

PH 0281(108)35 04JE

NH 0046(75)282 06JY

US281 - Fm US18 to the Charles

Mix/Douglas County Line; US18 -

Fm the E Junction of SD50 to

US281; SD50 - Fm E Jct of US18 to

W of Wagner; SD46 - Intersection

with 388th Ave/BIA29 (Marty Road)

US281 - Shoulder Widening, Pipe

Work, Spot Grading; US18 -

Shoulder Widening, Pipe Work;

SD50 - Grading & AC Surfacing,

Lighting; SD46 - Intersection

Modification

Charles Mix

Douglas

* 12.9 SD46

SD50

US18

US281

12.752 2020 63.00 13.898

Also Funded In:

Item Category

Major Arterial Projects 3.004 21.00

Total Project Cost

16.902

PH 00SW(59) 05GL Various Locations Statewide 2020 Snow FenceStatewide 0.0 0.096 2020 64.00 0.106

PH 8059(05) 04JK Various County, City, & Township

Roads in Stanley County

Signing & DelineationStanley 0.0 0.505 2020 65.00 0.674

PH 0020(181) 06C4 Mitchell Region Intersection ImprovementsRegionwide 0.0 0.191 2020 66.00 0.212

PH 0010(140) 06C5 Aberdeen Region Intersection ImprovementRegionwide 0.0 0.191 2020 67.00 0.212

PH 0040(322) 06C6 Rapid City Region Intersection ImprovementsRegionwide 0.0 0.191 2020 68.00 0.212

PH 0020(190) 06JE Various Locations in the Mitchell

Region

Intersection ImprovementsCharles Mix

Davison

Lake

Lincoln

Minnehaha

0.0 SD11

SD37

SD38

SD44

US81

1.433 2020 69.00 1.592

PH 0040(332) 06K3 Various Locations in the Rapid City

Region

Turn Lane ConstructionFall River

Pennington

0.0 SD79S

US18

0.573 2020 70.00 0.637

PH 000S(395) 06TT Various locations on the local

system in the Rapid City and Pierre

Region

Rumble Stripes and High Grade

Polymer Pavement Markings

Regionwide 40.0 0.424 2020 71.00 0.424

PH 0020(192) 06TU Various locations on the local

system in the Mitchell Region

Rumble Stripes and High Grade

Polymer Pavement Markings

Regionwide 40.0 0.424 2020 72.00 0.424

¥ Costs reflect anticipated inflationPage 67 HC65Coding.rpt

Page 70: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 0010(155) 06TV Various locations on the local

system in the Aberdeen Region

Rumble Stripes and High Grade

Polymer Pavement Markings

Regionwide 40.0 0.424 2020 73.00 0.424

PH 0044(213)312 06TW Jct SD44/SD50 E of Platte Intersection ImprovementsCharles Mix 0.0 SD44 0.287 2020 74.00 0.318

PH 0010(156) 06TX Various locations in the Aberdeen

Region

Radar Speed Feedback SignsRegionwide 0.0 0.096 2020 75.00 0.106

PH 0020(193) 06TY Various locations in the Mitchell

Region

Radar Speed Feedback SignsRegionwide 0.0 0.096 2020 76.00 0.106

PH 0020(194) 06U1 Various locations in the Mitchell

Region

Transverse Rumble Strips at Stop

Controlled Intersections

Regionwide 0.0 0.143 2020 77.00 0.159

Miles2020 75.439 210.3

PH 0030(34) 062G Various Locations in the Pierre

Region

Interstate Median Protection for

Pierre Region

Regionwide 0.0 1.082 2021 78.00 1.082

PH 8030(14) 04LA Various County, City, & Township

Roads in Hand County

Signing & DelineationHand 0.0 1.534 2021 79.00 2.045

PH 0020(180) 06AE Various Locations in the Mitchell

Region

Guardrail EliminationRegionwide 0.0 0.487 2021 80.00 0.541

PH 0030(35) 06AF Various Locations in the Pierre

Region

Guardrail EliminationRegionwide 0.0 0.487 2021 81.00 0.541

PH 0010(139) 06AG Various Locations in the Aberdeen

Region

Guardrail EliminationRegionwide 0.0 0.487 2021 82.00 0.541

PH 0040(321) 06AH Various Locations in the Rapid City

Region

Guardrail EliminationRegionwide 0.0 0.487 2021 83.00 0.541

PH 0010(151) 06K2 Various Locations in the Watertown

Area.

Intersection ImprovementsBrookings

Codington

0.0 SD20

US14

US81

1.776 2021 84.00 1.973

¥ Costs reflect anticipated inflationPage 68 HC65Coding.rpt

Page 71: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 8041(19) 04L7 Various County, City, & Township

Roads in Lawrence County

Signing & Delineation - Gravel

Roads ONLY

Lawrence 0.0 0.842 2021 85.00 1.122

PH 8029(24) 04LC Various County, City, & Township

Roads in Hamlin County

Signing & Delineation - Gravel

Roads ONLY

Hamlin 0.0 0.875 2021 86.00 1.166

PH 8034(31) 04K9 Various County, City, & Township

Roads in Hutchinson County

Signing & Delineation - Gravel

Roads ONLY

Hutchinson 0.0 1.167 2021 87.00 1.555

PH 0010(115) 04KE Various locations on the State

System in the Aberdeen Region

Durable Pavement MarkingRegionwide 0.0 0.325 2021 88.00 0.325

PH 0020(162) 04KF Various locations on the State

System in the Mitchell Region

Durable Pavement MarkingRegionwide 0.0 0.595 2021 89.00 0.595

PH 0030(29) 04KG Various locations on the State

System in the Pierre Region

Durable Pavement MarkingRegionwide 0.0 0.238 2021 90.00 0.238

PH 0040(231) 04KH Various locations on the State

System in the Rapid City Region

Cold Plastics Durable Pavement

Marking

Regionwide 0.0 0.216 2021 91.00 0.216

PH 0040(232) 04KJ Various locations on the State

System in the Rapid City Region

Sprayable Durable Pavement

Marking

Regionwide 0.0 0.352 2021 92.00 0.352

PH 000S(355) 04KK Public Traveled Roads Statewide 2021 Preliminary Engineering for

Conducting Road Safety Audit

Reviews (RSAR)

Statewide 0.0 0.029 2021 93.00 0.032

PH 00SW(85) 04KL Statewide 2021 Local Government Traffic

Engineering Services Performed

by the SDDOT Traffic & Safety

Engineer and Provide Traffic

Control Devices

Statewide 0.0 0.124 2021 94.00 0.124

PH 000S(357) 04KM Public Traveled Roads Statewide 2021 Preliminary Engineering for

Roadway Safety Improvement

Statewide 0.0 0.127 2021 95.00 0.141

PH 000S(358) 04KN Various Locations Statewide Guardrail ReplacementStatewide* 0.0 1.082 2021 96.00 1.082

¥ Costs reflect anticipated inflationPage 69 HC65Coding.rpt

Page 72: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P-PH 0034(170)350 04KR SD34 - Fm Sanborn/Miner County

Line E to 425th Ave Near Roswell

Shoulder Widening, Structure

Replacements, Pipe Work

Miner 7.0 SD34 9.249 2021 97.00 9.249

PH 0018(192)390 04KT US18 - Fm E of the James River to

US81

Shoulder Widening, Spot Grading,

Pipe Work

Hutchinson* 11.7 US18 10.929 2021 98.00 10.929

PH 00SW(17) 04Y5 Statewide Preliminary Engineering to be

Started in 2021 for Roadway

Safety Projects.

Statewide 0.0 1.364 2021 99.00 1.515

PH 00SW(32) 057J Various Locations Statewide 2021 Corridor Signal TimingStatewide 0.0 0.216 2021 100.00 0.216

PH 0044(184)330 04K0 SD44 - Fm the E Junction with

US281 to SD37 at Parkston

Shoulder Widening, AC Surfacing

of Shoulders, Pipe Work, Extend

Culvert (RCBC), Upgrade Bridge

Approach Guard Rail

Douglas

Hutchinson

* 17.8 SD44 15.067 2021 101.00 15.067

P 0013(38)108 04VD

IM-PH 0293(107)99 05F9

SD13 - 0.3 N of Flandreau Over the

Big Sioux River; I29 N/S - 1 N

SD115 Interchange; 1.2 N

Minnehaha Co. Line; 3.8 S SD34

Interchange; 3 S SD34 Interchange

High Friction Surface Treatment,

Polymer Chip Seal, Deck Repair,

Curb Repair, Approach Slabs, Joint

Replacement

Minnehaha

Moody

0.0 I29N

I29S

SD13

0.014 2021 102.00 0.015

Also Funded In:

Item Category

Interstate Maintenance Projects 1.828 40.00

Bridge Projects 0.202 47.00

Total Project Cost

2.045

PH 8009(03) 04L8 Various County, City, & Township

Roads in Buffalo County

Signing & Delineation - Gravel

Roads ONLY

Buffalo 0.0 0.197 2021 103.00 0.262

PH 8065(19) 04KA Various County, City, & Township

Roads in Walworth County

Signing & Delineation - Gravel

Roads ONLY

Walworth 0.0 0.724 2021 104.00 0.966

PH 00SW(67) 06AY Various Locations Statewide 2021 Snow FenceStatewide 0.0 0.097 2021 105.00 0.108

PH 8041(20) 05F8 Nemo Rd - Horizontal curve at

Pennington/Meade Co line

PE, CE, ROW, GradingMeade

Pennington

1.0 3.068 2021 106.00 3.408

¥ Costs reflect anticipated inflationPage 70 HC65Coding.rpt

Page 73: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 000S(396) 06TQ Various Locations on the state and

local systems in the Aberdeen,

Pierre, and Mitchell

High Friction Surface TreatmentRegionwide 1.5 0.974 2021 107.00 1.082

PH 0040(335) 06TR Various Locations on the state and

local systems in the Rapid City

Region

High Fiction Surface TreatmentRegionwide 1.5 0.974 2021 108.00 1.082

Miles2021 58.111 40.5

PH 8062(07) 04KD Various County, City, & Township

Roads in Tripp County

Signing & Delineation - Gravel

Roads ONLY

Tripp 0.0 1.733 2022 109.00 2.311

PH 8005(13) 04HR Various County, City, & Township

Roads in Bon Homme County

Signing & Delineation - Gravel

Roads ONLY

Bon Homme 0.0 0.747 2022 110.00 0.997

PH 8053(23) 04L9 Various County, City, & Township

Roads in Perkins County

Signing & Delineation, - Gravel

Roads ONLY

Perkins 0.0 0.739 2022 111.00 1.826

PH 8023(07) 05WN Various County, City, & Township

Roads in Edmunds County

Signing & Delineation - Gravel

Roads ONLY

Edmunds 0.0 1.251 2022 112.00 1.667

NH-PH 0385(51)87 03VD US385 - Fm 1.5 mi N of US16 E to

Pactola Dam; US385 - Str 3.6 N of

US16 E over Horse Creek

Shoulder Widening, Pipe Work &

Spot Grading; Replace Str (RCBC)

& Approach Grading

Pennington* 8.2 US385 14.681 2022 113.00 16.313

P-PH 0015(82)167 05D9 SD15 - Fm the N Jct of SD20, N to

Milbank

Grading, Interim Surfacing &

Replace Strs.

Grant* 6.0 SD15 3.811 2022 114.00 4.235

Also Funded In:

Item Category

Minor Arterial Projects 5.943 55.00

Total Project Cost

10.178

PH 0010(116) 04RN Various locations on the State

System in the Aberdeen Region

Durable Pavement MarkingRegionwide 0.0 0.331 2022 115.00 0.331

PH 0020(150) 04RP Various locations on the State

System in the Mitchell Region

Durable Pavement MarkingRegionwide 0.0 0.607 2022 116.00 0.607

PH 0030(30) 04RQ Various locations on the State

System in the Pierre Region

Durable Pavement MarkingRegionwide 0.0 0.243 2022 117.00 0.243

¥ Costs reflect anticipated inflationPage 71 HC65Coding.rpt

Page 74: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 0040(233) 04RT Various locations on the State

System in the Rapid City Region

Sprayable Durable Pavement

Marking

Regionwide 0.0 0.359 2022 118.00 0.359

PH 00SW(86) 04RV Statewide 2022 Local Government Traffic

Engineering Services Performed

by the SDDOT Traffic & Safety

Engineer and Provide Traffic

Ccontrol Devices

Statewide 0.0 0.127 2022 119.00 0.127

PH 000S(351) 04RW Public Traveled Roads Statewide 2022 Public Traveled Roads

Statewide

Statewide 0.0 0.129 2022 120.00 0.144

PH 000S(352) 04RX Various Locations Statewide Guardrail ReplacementStatewide* 0.0 1.104 2022 121.00 1.104

PH 00SW(87) 04Y6 Statewide Preliminary Engineering to be

Started in 2022 for Roadway

Safety Projects.

Statewide 0.0 1.391 2022 122.00 1.546

PH 00SW(33) 057K Various Locations Statewide 2022 Corridor Signal TimingStatewide 0.0 0.221 2022 123.00 0.221

P-PH 0046(61)366 04JF

PP-PS 0046(71)381 062C

SD46 - Fm Beresford E 15 miles.;

SD 46 - 0.3 S of 298th St., DOT

381576D D&I Railroad

Grading, Interim Surfacing,

Replace Structure (RCBC) &

Replace Structure (Bridge),

Erosion Repair; Signal Upgrades &

Crossing Surface

Union* 15.8 SD46 19.578 2022 124.00 21.753

Also Funded In:

Item Category

Minor Arterial Projects 2.992 52.00

Railroad Crossing Improvement Projects 0.250 57.00

Total Project Cost

24.995

P-PH 0046(66)334 04X4 SD46 - Fm US81 to Irene Grading & Interim Surfacing,

Replace Structure (RCBC),

Replace Structure (Bridge),

Intersection Lighting at US81/SD46

Yankton* 12.0 SD46 6.939 2022 125.00 7.709

Also Funded In:

Item Category

Minor Arterial Projects 10.158 53.00

Total Project Cost

17.867

PH 8016(10) 04HP Various County, City, & Township

Roads in Corson County

Signing & Delineation - Gravel

Roads ONLY

Corson 0.0 1.176 2022 126.00 1.568

¥ Costs reflect anticipated inflationPage 72 HC65Coding.rpt

Page 75: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Roadway Safety Improvement

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

PH 00SW(68) 06C0 Various Locations Statewide 2022 Snow FenceStatewide 0.0 0.099 2022 127.00 0.110

NH PH

0012(229)263

06C7 US12 – Fm Ipswich to the Divided

Highway W of Aberdeen

Intersection Improvements,

Passing Lanes, Lighting

Brown

Edmunds

* 20.2 US12 11.651 2022 128.00 12.944

PH 000S(397) 06U6 Various locations on the local

system in the Rapid City and Pierre

Region

Rumble Stripes and High Grade

Polymer Pavement Markings

Regionwide 40.0 0.442 2022 129.00 0.442

PH 0020(196) 06U7 Various locations on the local

system in the Mitchell Region

Rumble Stripes and High Grade

Polymer Pavement Markings

Regionwide 40.0 0.442 2022 130.00 0.442

PH 0010(157) 06U8 Various locations on the local

system in the Aberdeen Region

Rumble Stripes and High Grade

Polymer Pavement Markings

Regionwide 40.0 0.442 2022 131.00 0.442

PH 00SW(88) 06W8 Public Traveled Roads Statewide 2022 Preliminary Engineering for

Conducting Road Safety Audit

Reviews (RSAR)

Statewide 0.0 0.030 2022 132.00 0.033

Miles2022 77.474 182.2

¥ Costs reflect anticipated inflationPage 73 HC65Coding.rpt

Page 76: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0031(29) 042G Various Locations in the Pierre Area Pipe WorkHaakon

Stanley

19.5 SD1806

SD63

US83

1.190 2019 1.00 1.452

IM-NH-P 0022(60) 05L6 Various Routes in the Sioux Falls

Area

Chip SealLincoln

Miner

Minnehaha

Moody

21.9 I29N

I29S

I90E

I90W

SD11

SD17

SD34

0.416 2019 2.00 0.508

IM-NH-P 0021(151) 041F Various Locations in the Mitchell

Area

Pipe WorkDavison

McCook

0.2 I90E

SD37

SD42

1.818 2019 3.00 2.218

NH-P 0023(37) 041Q Various Locations in the Yankton

Area

Pipe WorkBon Homme

Charles Mix

Hutchinson

Yankton

0.0 SD44

SD46

SD50

0.190 2019 4.00 0.232

IM-NH-P 0022(44) 041K Various Locations in the Sioux Falls

Area

Pipe WorkLake

Minnehaha

Moody

0.0 I29S

SD11

SD13

SD32

US81

0.434 2019 5.00 0.701

NH-P 0011(80) 040T Various Locations in the Aberdeen

Area

Culvert RepairBrown

Day

Marshall

48.2 SD25

SD27

US281

1.157 2019 6.00 1.707

P 0033(16) 042A Various Locations in the Winner

Area

Culvert LiningAreawide 0.0 0.309 2019 7.00 0.500

P 0042(53) 042F Various Locations in the Belle

Fourche Area

Culvert RepairAreawide 0.460 2019 8.00 0.743

¥ Costs reflect anticipated inflationPage 74 HC65Coding.rpt

Page 77: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0011(110) 05XU Various Routes in the Aberdeen

Area

Rout and SealBrown

Day

Edmunds

McPherson

46.3 SD253

SD37

SD45

US12E

US281

US281N

US281S

0.318 2019 9.00 0.388

IM-NH-P 0040(316) 05XV Various Routes in the Rapid City

Region

Rout and SealButte

Harding

Lawrence

Meade

Pennington

66.3 I190N

I190S

I90E

I90W

SD34

SD44

SD44E

SD44W

SD79

0.548 2019 10.00 0.669

P 0013(48) 05XW Various Routes in the Huron Area Rout and SealBuffalo

Hand

13.1 SD45 0.089 2019 11.00 0.109

IM-P 0021(166) 05XX Various Routes in the Mitchell Area Rout and SealBuffalo

Douglas

Hutchinson

McCook

Minnehaha

Moody

82.4 I29N

I29S

I90E

I90W

SD34

SD42

SD44

SD50

0.792 2019 12.00 0.967

NH-P 0031(39) 05XY Various Routes in the Pierre Area Rout and SealHaakon

Hughes

Jackson

Lyman

Potter

Stanley

* 37.8 SD20

SD63

US14

US14B

US14EB

US14WB

US83

US83N

US83S

0.401 2019 13.00 0.489

¥ Costs reflect anticipated inflationPage 75 HC65Coding.rpt

Page 78: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0023(50) 05Y0 Various Routes in the Yankton Area Rout and SealClay

Lincoln

Union

12.6 SD11

SD46

SD50

SD50E

SD50EL

SD50W

SD50WL

0.089 2019 14.00 0.109

NH-P 0011(108) 05Y1 Various Routes in the Aberdeen

Area

Asphalt Surface TreatmentBrown

Day

Faulk

Marshall

Spink

112.5 SD20

SD25

SD27

SD37

US12E

US212

US281N

2.973 2019 15.00 3.628

NH-P 0043(22) 05Y3 Various Routes in the Custer Area Asphalt Surface TreatmentCuster

Oglala Lakota

Pennington

46.5 SD391

SD40

SD407

US18

1.235 2019 16.00 1.506

NH-P 0013(47) 05Y4 Various Routes in the Huron Area Asphalt Surface TreatmentClark

Spink

44.0 SD20

SD25

SD26

SD28

US212

US281

1.164 2019 17.00 1.420

NH-P 0021(165) 05Y5 Various Routes in the Mitchell Area Asphalt Surface TreatmentAurora

Charles Mix

Douglas

Gregory

Hanson

Hutchinson

Jerauld

Sanborn

99.1 SD1804

SD224

SD38

SD44

SD50

US18

US281

2.620 2019 18.00 3.197

¥ Costs reflect anticipated inflationPage 76 HC65Coding.rpt

Page 79: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0032(31) 05Y6 Various Routes in the Mobridge Area Asphalt Surface TreatmentCampbell

Edmunds

Walworth

Ziebach

62.6 SD65

US12

US12E

US12W

US83

US83N

US83S

1.755 2019 19.00 2.141

NH-P 0031(38) 05Y7 Various Routes in the Pierre Area Asphalt Surface TreatmentHaakon

Hughes

Jackson

Potter

Stanley

Sully

111.9 SD1804

SD1806

SD20

SD34

US14

US212

2.958 2019 20.00 3.609

NH-P 0041(160) 05Y8 Various Routes in the Rapid City

Area

Asphalt Surface TreatmentLawrence

Pennington

40.3 SD240

SD44

US85

1.065 2019 21.00 1.301

IM-P 0012(217) 05Y9 Various Routes in the Watertown

Area

Asphalt Surface TreatmentBrookings

Clark

Codington

Grant

Hamlin

Roberts

68.7 I29N

I29S

SD109

SD20

SD21

SD28

SD30

2.204 2019 22.00 2.689

P 0033(28) 05YA Various Routes in the Winner Area Asphalt Surface TreatmentJackson

Lyman

Mellette

20.3 SD44

SD53

SD63

0.537 2019 23.00 0.655

NH-P 0023(51) 05YC Various Routes in the Yankton Area Asphalt Surface TreatmentHutchinson

Turner

Union

Yankton

49.8 I29L

SD11

SD44

US18

US81

1.315 2019 24.00 1.605

¥ Costs reflect anticipated inflationPage 77 HC65Coding.rpt

Page 80: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0011(109) 05YD Various Routes in the Aberdeen

Area

Pavement RestorationBrown

Day

Faulk

32.8 SD25

SD45

US12

US12E

US12W

US212

1.931 2019 25.00 2.357

NH-P 0040(315) 05YE Various Routes in the Rapid City

Region

Pavement RestorationCuster

Fall River

Lawrence

Pennington

40.5 SD244

SD36

SD79

SD79N

SD79S

US16

US16A

US16AE

US16AW

US18

US385

US85

3.101 2019 26.00 3.785

NH 0013(46) 05YF Various Routes in the Huron Area Pavement RestorationBeadle

Kingsbury

7.8 US14 0.455 2019 27.00 0.555

IM-NH-P 0021(163) 05YG Various Routes in the Mitchell Area Pavement Restoration, Shoulder

Work

Davison

Hanson

Sanborn

34.2 I90E

I90W

SD34

SD34E

SD34W

SD37

SD37N

SD37S

3.905 2019 28.00 4.765

NH-P 0012(216) 05YH Various Routes in the Watertown

Area

Pavement RestorationGrant

Hamlin

Kingsbury

19.0 SD15

US81

1.115 2019 29.00 1.361

NH 0033(27) 05YJ Various Routes in the Winner Area Pavement RestorationJones

Tripp

8.0 US18

US83

0.497 2019 30.00 0.607

¥ Costs reflect anticipated inflationPage 78 HC65Coding.rpt

Page 81: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0021(164) 05YK Various Routes in the Mitchell Area Pavement Grinding; Install

Centerline Rumble Strips

Clay

Davison

Hanson

Hutchinson

Yankton

33.1 SD37

SD38

SD50W

0.735 2019 31.00 0.896

NH-P 0011(114) 06E9 Various Locations Throughout the

Aberdeen Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 32.00 0.520

NH-P 0012(223) 06EF Various Locations Throughout the

Watertown Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 33.00 0.520

NH-P 0013(53) 06EJ Various Locations Throughout the

Huron Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 34.00 0.520

NH-P 0022(68) 06EN Various Locations Throughout the

Sioux Falls Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 35.00 0.260

NH-P 0023(54) 06ET Various Locations Throughout the

Yankton Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 36.00 0.260

NH-P 0021(168) 06EX Various Locations Throughout the

Mitchell Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 37.00 0.260

NH-P 0032(33) 06F2 Various Locations Throughout the

Mobridge Area

2019 Areawide Pipe Work

Projects

Areawide 0.0 0.213 2019 38.00 0.260

NH-P 0031(43) 06F6 Various Locations Throughout the

Pierre Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 39.00 0.260

NH-P 0033(30) 06FA Various Locations Throughout the

Winner Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 40.00 0.260

NH-P 0042(74) 06FF Various Locations Throughout the

Belle Fourche Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 41.00 0.520

NH-P 0041(162) 06FJ Various Locations Throughout the

Rapid City Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 42.00 0.520

¥ Costs reflect anticipated inflationPage 79 HC65Coding.rpt

Page 82: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0043(24) 06FN Various Locations Throughout the

Custer Area

2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 43.00 0.520

P 0032(36) 06YD Various Routes in the Mobridge Area Rout and SealCampbell

Walworth

35.2 SD1804 0.240 2019 44.00 0.293

P 0030(43) 070F Various Routes in the Pierre Region Micro-SurfacingDewey

Haakon

Stanley

Ziebach

47.8 SD63 1.711 2019 45.00 2.088

Miles2019 53.930 1,262.4

NH-P 0033(15) 041V Various Locations in the Winner

Area

Pipe WorkLyman

Mellette

Todd

Tripp

40.5 SD47

SD49

US83

0.461 2020 46.00 0.699

P 0022(45) 041L Various Locations in the Sioux Falls

Area

Pipe WorkAreawide 0.0 0.311 2020 47.00 0.503

NH-P 0022(77) 06Y8 Various Routes in the Sioux Falls

Area

Asphalt Surface TreatmentLincoln 3.8 SD11 0.102 2020 48.00 0.124

IM-NH-P 0022(76) 06Y9 Various Routes in the Sioux Falls

Region

Pavement RestorationLincoln

Minnehaha

42.7 I29N

I29S

I90E

I90W

SD115

SD115N

SD115S

SD38

SD38E

SD38W

SD42

US18

2.562 2020 49.00 3.126

NH-P 0011(115) 06EA Various Locations Throughout the

Aberdeen Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 50.00 0.531

¥ Costs reflect anticipated inflationPage 80 HC65Coding.rpt

Page 83: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0012(224) 06EG Various Locations Throughout the

Watertown Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 51.00 0.531

NH-P 0013(54) 06EK Various Locations Throughout the

Huron Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 52.00 0.531

NH-P 0022(69) 06EP Various Locations Throughout the

Sioux Falls Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 53.00 0.265

NH-P 0023(55) 06EU Various Locations Throughout the

Yankton Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 54.00 0.265

NH-P 0021(169) 06EY Various Locations Throughout the

Mitchell Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 55.00 0.265

NH-P 0032(34) 06F3 Various Locations Throughout the

Mobridge Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 56.00 0.265

NH-P 0031(44) 06F7 Various Locations Throughout the

Pierre Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 57.00 0.265

NH-P 0033(31) 06FC Various Locations Throughout the

Winner Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 58.00 0.265

NH-P 0042(75) 06FG Various Locations Throughout the

Belle Fourche Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 59.00 0.531

NH-P 0041(163) 06FK Various Locations Throughout the

Rapid City Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 60.00 0.531

IM 0041(171) 06YA Various Routes in the Rapid City

Area

Pavement RestorationMeade

Pennington

22.1 I190N

I190S

I90E

I90W

1.328 2020 61.00 1.619

NH-P 0043(25) 06FP Various Locations Throughout the

Custer Area

2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 62.00 0.531

¥ Costs reflect anticipated inflationPage 81 HC65Coding.rpt

Page 84: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0011(141) 06FR

P 0013(146) 06WW

Various Locations Throughout the

Aberdeen & Huron Areas

2020 Regionwide Approach Slab

Repair

Areawide

Regionwide

0.0 0.870 2020 63.00 1.061

P 0020(182) 06FU Various Locations Throughout the

Mitchell Region

2020 Regionwide Approach Slab

Repair

Regionwide 0.0 0.870 2020 64.00 1.061

P 0040(323) 06FY Various Locations Throughout the

Rapid City Region

2020 Regionwide Approach Slab

Repair

Regionwide 0.0 0.870 2020 65.00 1.061

NH 0012(00)289 04PF

NH 0011(119) 06VM

US12 - Through Aberdeen; Various

Locations in the Aberdeen Area

ADA Curb Ramp Upgrades; Joint

and Spall Repair

Brown 11.3 US12

US281

US281N

US281S

0.835 2020 66.00 1.019

Also Funded In:

Item Category

Americans with Disabilities Act (ADA) 1.906 2.00

Total Project Cost

2.925

P 0011(143) 06YF Various routes in the Aberdeen Area Rout and SealBrown 23.0 SD37 0.160 2020 67.00 0.195

NH 0042(81) 06YG Various Routes in the Belle Fourche

Area

Rout and SealButte

Harding

Perkins

54.1 SD73

US12

US85

0.377 2020 68.00 0.459

NH 0013(155) 06YH Various Routes in the Huron Area Rout and SealBeadle

Kingsbury

12.3 US14

US14E

US14W

0.086 2020 69.00 0.105

NH-P 0021(171) 06YJ Various Routes in the Mitchell Area Rout and SealBrule

Charles Mix

Douglas

Gregory

Hanson

Jerauld

McCook

69.0 SD38

SD44

SD45

SD46

US18

US281

0.480 2020 70.00 0.586

NH 0031(47) 06YK Various Locations in the Pierre Area Rout and SealJackson

Stanley

23.9 SD73

US14

0.167 2020 71.00 0.203

¥ Costs reflect anticipated inflationPage 82 HC65Coding.rpt

Page 85: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0041(170) 06YL Various Routes in the Rapid City

Area

Rout and SealLawrence 6.5 US385 0.046 2020 72.00 0.055

NH-P 0012(277) 06YN Various Routes in the Watertown

Area

Rout and SealCodington 11.5 SD20

US212

US81

0.080 2020 73.00 0.098

P 0033(33) 06YR Various Locations in the Winner

Area

Rout and SealJackson

Lyman

Tripp

15.6 SD44

US183

0.108 2020 74.00 0.133

IM-NH-P 0023(57) 06YT Various Locations in the Yankton

Area

Rout and SealClay

Lincoln

34.4 I29N

I29S

SD19

0.339 2020 75.00 0.413

NH-P 0011(142) 06YU Various Locations in the Aberdeen

Area

Asphalt Surface TreatmentBrown

Edmunds

Faulk

Marshall

McPherson

Roberts

83.1 SD10

SD25

SD253

SD37

SD45

US212

2.241 2020 76.00 2.735

P 0042(82) 06YV Various Locations in the Belle

Fourche Area

Asphalt Surface TreatmentButte

Harding

44.4 SD34

SD79

1.197 2020 77.00 1.461

NH-P 0043(29) 06YW Various Locations in the Custer Area Asphalt Surface TreatmentCuster

Fall River

18.5 US16A

US18E

0.499 2020 78.00 0.609

NH-P 0013(154) 06YX Various Locations in the Huron Area Asphalt Surface TreatmentBeadle

Buffalo

Faulk

Hand

Spink

34.8 SD28

SD45

US14

US212

0.937 2020 79.00 1.144

P 0021(172) 06YY Various Locations in the Mitchell

Area

Asphalt Surface TreatmentBuffalo

McCook

30.8 SD34

SD42

SD50

0.831 2020 80.00 1.015

¥ Costs reflect anticipated inflationPage 83 HC65Coding.rpt

Page 86: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0032(37) 0700 Various Routes in the Mobridge Area Asphalt Surface TreatmentCampbell

Dewey

Walworth

45.3 SD1804

SD20

1.221 2020 81.00 1.490

NH-P 0031(48) 0701 Various Routes in the Pierre Area Asphalt Surface TreatmentHaakon

Jackson

13.8 SD63

US14

0.371 2020 82.00 0.453

NH 0041(172) 0702 Various Routes in the Rapid City

Area

Asphalt Surface TreatmentMeade 17.4 SD34 0.468 2020 83.00 0.571

IM-NH-P 0012(278) 0703 Various Routes in the Watertown

Area

Asphalt Surface TreatmentBrookings

Codington

Deuel

Hamlin

Moody

Roberts

63.6 I29N

I29S

SD127

SD28

US81

1.714 2020 84.00 2.092

NH-P 0033(34) 0704 Various Routes in the Winner Area Asphalt Surface TreatmentBennett

Jackson

Mellette

Pennington

Tripp

53.1 SD240

SD377

SD44

SD73

1.430 2020 85.00 1.746

NH-P 0023(58) 0705 Various Routes in the Yankton Area Asphalt Surface TreatmentClay

Lincoln

Union

Yankton

30.1 SD11

SD153

SD19

SD46

SD50

SD50E

SD50EL

SD50W

SD50WL

SD52

0.811 2020 86.00 0.989

NH 0011(144) 0706 Various Routes in the Aberdeen

Area

Crack LevelingEdmunds 14.7 US12 0.112 2020 87.00 0.137

NH 0042(83) 0707 Various Routes in the Belle Fourche

Area

Crack LevelingHarding 20.5 US85 0.157 2020 88.00 0.191

¥ Costs reflect anticipated inflationPage 84 HC65Coding.rpt

Page 87: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH 0013(156) 0708 Various Routes in the Huron Area Pavement RestorationBeadle

Hand

20.3 US14 1.218 2020 89.00 1.487

NH 0021(173) 070A Various Routes in the Mitchell Area Pavement RestorationAurora

Gregory

McCook

19.5 US18

US281

US81

1.537 2020 90.00 1.875

NH 0031(49) 070C Various Routes in the Pierre Area Pavement RestorationHughes 7.2 US14 0.433 2020 91.00 0.528

NH-P 0023(59) 070D Various Routes in the Yankton Area Pavement RestorationHutchinson

McCook

Union

Yankton

19.2 I29L

SD46

SD50

US81

US81N

US81S

1.729 2020 92.00 2.110

Miles2020 37.929 907.0

LR 2021(00)0 06KJ 2021 Pavement Preservation

Projects Throughout South Dakota

Pavement PreservationStatewide 0.0 20.681 2021 93.00 25.236

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

NH-P 0011(117) 06EC Various Locations Throughout the

Aberdeen Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 94.00 0.541

NH-P 0012(228) 06EH Various Locations Throughout the

Watertown Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 95.00 0.541

NH-P 0013(56) 06EL Various Locations Throughout the

Huron Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 96.00 0.541

NH-P 0022(71) 06EQ Various Locations Throughout the

Sioux Falls Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 97.00 0.271

NH-P 0023(56) 06EV Various Locations Throughout the

Yankton Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 98.00 0.271

¥ Costs reflect anticipated inflationPage 85 HC65Coding.rpt

Page 88: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0021(170) 06F0 Various Locations Throughout the

Mitchell Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 99.00 0.271

NH-P 0032(35) 06F4 Various Locations Throughout the

Mobridge Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 100.00 0.271

NH-P 0031(45) 06F8 Various Locations Throughout the

Pierre Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 101.00 0.271

NH-P 0033(32) 06FD Various Locations Throughout the

Winner Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 102.00 0.271

NH-P 0042(78) 06JP Various Locations Throughout the

Belle Fourche Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 103.00 0.541

NH-P 0041(168) 06FL Various Locations Throughout the

Rapid City Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 104.00 0.541

NH-P 0043(27) 06FQ Various Locations Throughout the

Custer Area

2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 105.00 0.541

IM-NH-P 0012(276) 06FT Various Locations Throughout the

Watertown Area

2021 Regionwide Approach Slab

Repair

Regionwide 0.0 0.888 2021 106.00 1.082

P 0020(186) 06FV Various Locations Throughout the

Mitchell Region

2021 Regionwide Approach Slab

Repair

Regionwide 0.0 0.888 2021 107.00 1.082

P 0300(31) 06FX Various Locations Throughout the

Pierre Region

2021 Regionwide Approach Slab

Repair

Regionwide 0.0 0.888 2021 108.00 1.082

P 0040(331) 06G0 Various Locations Throughout the

Rapid City Region

2021 Regionwide Approach Slab

Repair

Regionwide 0.0 0.888 2021 109.00 1.082

Miles2021 34.436 0.0

NH-P 0043(28) 06UX Various Locations Throughout the

Custer Area

2022 Areawide Pipe Work ProjectsAreawide 0.0 0.497 2022 110.00 0.552

¥ Costs reflect anticipated inflationPage 86 HC65Coding.rpt

Page 89: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Pavement Preservation Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

LR 2022(00)0 06LA 2022 Pavement Preservation

Projects Throughout South Dakota

Pavement PreservationStatewide 0.0 22.793 2022 111.00 27.814

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

P 0020(195) 06UQ Various Locations Throughout the

Mitchell Region

2022 Regionwide Approach Slab

Repair

Regionwide 0.0 0.905 2022 112.00 1.104

NH-P 0041(169) 06UR Various Locations Throughout the

Rapid City Area

2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 113.00 0.552

NH-P 0042(79) 06UT Various Locations Throughout the

Belle Fourche Area

2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 114.00 0.552

NH-P 0011(120) 06WA Various Locations Throughout the

Aberdeen Area

2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 115.00 0.552

NH-P 0012(272) 06WC Various Locations Throughout the

Watertown Area

2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 116.00 0.552

NH-P 0013(115) 06WD Various Locations Throughout the

Huron Area

2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 117.00 0.552

P 0030(42) 06WE Various Locations Throughout the

Pierre Region

2022 Regionwide Approach Slab

Repair

Regionwide 0.0 0.905 2022 118.00 1.104

P 0040(336) 06WF Various Locations Throughout the

Rapid City Region

2022 Regionwide Approach Slab

Repair

Regionwide 0.0 0.905 2022 119.00 1.104

Miles2022 34.438 0.0

¥ Costs reflect anticipated inflationPage 87 HC65Coding.rpt

Page 90: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Miscellaneous

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

SS FY19(02) 05HH DBE Supportive Services for CY19 DBE Supportive Services for CY19Statewide 0.0 0.121 2019 1.00 0.134

P DBEC(24)19 05HJ DBEC Certification Services

Statewide for CY2019

DBEC Certification Services

Statewide for CY2019

Statewide 0.0 0.061 2019 2.00 0.068

SS FY19(03) 05HK On The Job Training and Support

Services (OJT/SS) Work Program

Anticipated funding for FY2019 On

The Job Training and Support

Services (OJT/SS) Work Program

Statewide 0.0 0.038 2019 3.00 0.043

P 000S(00)27 05HL Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2019 4.00 1.040

P 000S(380) 065Q Statewide NSTI Program Grant for FY2019Statewide 0.0 0.019 2019 5.00 0.021

P 00SW(55)214 04C4 Brown County near Aberdeen Wetland Bank Site ConstructionBrown 0.0 0.929 2019 6.00 1.032

P 00SW(63) 065G Turner County Near Davis, SE 1/4 &

NE 1/4, SEC 36, T98N, R52W

Wetland Bank Site ConstructionTurner 0.0 1.099 2019 7.00 1.220

Miles2019 3.558 0.0

SS FY20(02) 05WU DBE Supportive Services for CY20 DBE Supportive Services for CY20Statewide 0.0 0.123 2020 8.00 0.137

P DBEC(25)20 05WV DBEC Certification Services

Statewide for CY2020

DBEC Certification Services

Statewide for CY2020

Statewide 0.0 0.063 2020 9.00 0.069

SS FY20(03) 05WW On The Job Training and Support

Services (OJT/SS) Work Program

Anticipated funding for FY2020 On

The Job Training and Support

Services (OJT/SS) Work Program

Statewide 0.0 0.039 2020 10.00 0.044

P 000S(00)28 05WX Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2020 11.00 1.061

P 000S(381) 06DG Statewide NSTI Program Grant for FY2020Statewide 0.0 0.019 2020 12.00 0.021

¥ Costs reflect anticipated inflationPage 88 HC65Coding.rpt

Page 91: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Miscellaneous

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

Miles2020 1.332 0.0

P 000S(00)29 06CC Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2021 13.00 1.082

P DBEC(26)21 06C8 DBEC Certification Services

Statewide for CY2021

DBEC Certification Services

Statewide for CY2021

Statewide 0.0 0.065 2021 14.00 0.073

SS FY21(02) 06C9 DBE Supportive Services for CY21 DBE Supportive Services for CY21Statewide 0.0 0.130 2021 15.00 0.144

SS FY21(03) 06CA On The Job Training and Support

Services (OJT/SS) Work Program

Anticipated funding for FY2021 On

The Job Training and Support

Services (OJT/SS) Work Program

Statewide 0.0 0.044 2021 16.00 0.049

P 000S(382) 06DK Statewide NSTI Program Grant for FY2021Statewide 0.0 0.019 2021 17.00 0.022

Miles2021 1.370 0.0

P 000S(00)30 06KK Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2022 18.00 1.104

P DBEC(27)22 06KP DBEC Certification Services

Statewide for CY2022

DBEC Certification Services

Statewide for CY2022

Statewide 0.0 0.066 2022 19.00 0.074

SS FY22(02) 06KT On The Job Training and Support

Services (OJT/SS) Work Program

Anticipated funding for FY2022 On

The Job Training and Support

Services (OJT/SS) Work Program

Statewide 0.0 0.045 2022 20.00 0.050

P 000S(398) 06WG Statewide NSTI Program Grant for FY2022Statewide 0.0 0.020 2022 21.00 0.022

Miles2022 1.250 0.0

¥ Costs reflect anticipated inflationPage 89 HC65Coding.rpt

Page 92: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Recreational Trails Program Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NRT FY19(01) 0500 Statewide 2019 Various Recreation Trails

Projects

Statewide 0.0 0.983 2019 1.00 1.200

Miles2019 1.200 0.0

NRT FY20(01) 0501 Statewide 2020 Various Recreation Trails

Projects

Statewide 0.0 0.983 2020 2.00 1.200

Miles2020 1.200 0.0

NRT FY21(01) 0502 Statewide 2021 Various Recreation Trails

Projects

Statewide 0.0 0.205 2021 3.00 0.250

NH 0083(87)42 06L6 US83 - Fm Pony Street in Horse

Creek N to White River

Shared Use Path Construction and

Lighting

Mellette 2.2 US83 0.777 2021 4.00 0.948

Miles2021 1.198 2.2

NRT FY22(01) 0503 Statewide 2022 Various Recreation Trails

Projects

Statewide 0.0 1.040 2022 5.00 1.269

Miles2022 1.269 0.0

¥ Costs reflect anticipated inflationPage 90 HC65Coding.rpt

Page 93: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

County Secondary and Off System Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 6209(11) 042U From US212 at Faulkton, N 10.4 mi.

on 353 Ave. to SD20 (Co. Hwy 11,

Wecota Road)

Milling, Base Course, Gravel, Pipe,

AC Overlay (0.4 mi. in Faulkton)

Faulk 10.4 1.504 2019 1.00 2.754

Total = $2.7: $1.8 = STP/Match, Local = $0.9

P-PH 6147(12) 02SN Day County #01 from 142 St. on the

S side of at Waubay, S 2 miles on

446 Ave., East 1 mile on 144 St.,

and S 3 miles on 447 Ave. to 147 St.

RSI Category Day Co. Rd. #1 (447th

Ave.) Between 145th St. and 147th

St.

Grading, Base Course, AC

Surfacing, RSI Category - Grading

to Correct Horizontal & Vertical

Alignment, Reduce Shoulder Drop

Off, & Lengthen Pipe.

Day 6.0 2.623 2019 2.00 3.200

Also Funded In:

Item Category

Roadway Safety Improvement 0.500 3.00

Total Project Cost

3.700

Total = $2.58; STPw/Match = $1.445; Local or SIB = $0.635; RSI = $0.5

P 000S(00)219 04LU Various Locations in the Rapid City

Region

County Pavement MarkingRegionwide 0.0 0.000 2019 3.00 0.156

$0.156 - State funds at 60/40 (State - $0.094, County - $0.062)

P 000S(00)220 04LV Various Locations in the Aberdeen

Region

County Pavement MarkingRegionwide 0.0 0.000 2019 4.00 0.264

$0.264 - State funds at 60/40 (State - $0.158, County - $0.106)

P 000S(00)225 04LW Various Locations in the Mitchell

Region

County Pavement MarkingRegionwide 0.0 0.000 2019 5.00 0.372

$0.372 - State funds at 60/40 (State - $0.223, County - $0.149)

P 000S(00)226 04LX Various Locations in the Pierre

Region

County Pavement MarkingRegionwide 0.0 0.000 2019 6.00 0.042

$0.042 - State funds at 60/40 (State - $0.025, County - $0.017)

P 6480(04) 5777 Sheridan Lake Road from Jct. of

US385 to Alberta Road

Grading, Base Course, C&G, AC

Surfacing

Pennington 9.7 4.453 2019 7.00 9.500

Total = $9.5; STP/Match = $5.434; Local Funds = $4.066

Miles2019 16.288 26.1

¥ Costs reflect anticipated inflationPage 91 HC65Coding.rpt

Page 94: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

County Secondary and Off System Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 0043(00) 049U Fm SD471 to Provo W and NW to

Igloo apppx. 2 mi

Grading, Gravel Surfacing, ROW,

Obliteration of Existing Roadway

and Strs.

Fall River 2.0 0.000 2020 8.00 3.003

P 000S(00)221 04LY Various Locations in the Rapid City

Region

County Pavement MarkingRegionwide 0.0 0.000 2020 9.00 0.156

$0.156 - State funds at 60/40 (State - $0.094, County - $0.062)

P 000S(00)222 04M0 Various Locations in the Aberdeen

Region

County Pavement MarkingRegionwide 0.0 0.000 2020 10.00 0.264

$0.264 - State funds at 60/40 (State - $0.158, County - $0.106)

P 000S(00)223 04M1 Various Locations in the Mitchell

Region

County Pavement MarkingRegionwide 0.0 0.000 2020 11.00 0.372

$0.372 - State funds at 60/40 (State - $0.223, County - $0.149)

P 000S(00)224 04M2 Various Locations in the Pierre

Region

County Pavement MarkingRegionwide 0.0 0.000 2020 12.00 0.042

$0.042 - State funds at 60/40 (State - $0.025, County - $0.017)

Miles2020 3.837 2.0

P 000S(00)225 04M3 Various Locations in the Rapid City

Region

County Pavement MarkingRegionwide 0.0 0.000 2021 13.00 0.156

$0.156 - State funds at 60/40 (State - $0.094, County - $0.062)

P 000S(00)226 04M4 Various Locations in the Aberdeen

Region

County Pavement MarkingRegionwide 0.0 0.000 2021 14.00 0.264

$0.264 - State funds at 60/40 (State - $0.158, County - $0.106)

P 000S(00)227 04M5 Various Locations in the Mitchell

Region

County Pavement MarkingRegionwide 0.0 0.000 2021 15.00 0.372

$0.372 - State funds at 60/40 (State - $0.223, County - $0.149)

P 000S(00)228 04M6 Various Locations in the Pierre

Region

County Pavement MarkingRegionwide 0.0 0.000 2021 16.00 0.042

$0.042 - State funds at 60/40 (State - $0.025, County - $0.017)

Miles2021 0.834 0.0

¥ Costs reflect anticipated inflationPage 92 HC65Coding.rpt

Page 95: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

BRO 8027(29) 00QR Structure 2 W & 0.1 S of SD44/SD47

Over a Creek SN 27-030-081

Structure & Approach GradingGregory 0.2 0.227 2019 1.00 0.284

BRF 6403(09) 02JT Structure 0.6W & 0.1S of Rochford

over Rapid Creek SN 52-162-272

Structure & Approach GradingPennington 0.2 0.320 2019 2.00 0.400

BRO 8042(09) 6093 Structure 8 S & 1.6 E of Lennox

Over Snake Creek SN 42-036-190

Structure & Approach GradingLincoln 0.2 0.227 2019 3.00 0.284

BRO 8052(49) 6890 0.4 E & 0.3 N of Hill City Over Major

Lake Spillway (City Owned) SN

52-245-404

Structure & Approach GradingPennington 0.2 0.227 2019 4.00 0.284

BRO 8017(05) 00Z3 Structure 0.2N of Hermosa over a

creek (Structure owned by City of

Hermosa) SN 17-434-018

Structure & Approach GradingCuster 0.2 0.227 2019 5.00 0.284

BRO 8027(31) 02E9 Structure 1S & 0.1W of Herrick over

a creek SN 27-169-280

Structure & Approach GradingGregory 0.2 0.256 2019 6.00 0.320

BRO 8068(13) 04N4 Structure 7.6N & 2.3E of Lesterville

over a creek SN 68-043-014

Structure & Approach GradingYankton 0.0 0.747 2019 7.00 0.934

BRF 6332(02) 05LX Structure 6.1E of Center over the

East Fork of the Vermillion River

(245 St.) SN 44-191-010

Structure & Approach GradingMcCook 0.2 0.339 2019 8.00 0.423

P NBIS(38) 04MA Statewide 2019 Bridge Inspections, Scour

Analysis

Statewide 0.0 0.960 2019 9.00 1.200

BRO 8052(00)16-2 05R2 Structure Cherry & E St. James

(Cherry Ave.) in Rapid City over

Rapid Creek SN 52-427-308

Structure Preservation - Bridge

Improvement Grant (BIG) Projects

Pennington 0.0 0.000 2019 10.00 0.150

BIG Cap = $120,000

BRO 8052(00)16-1 05R1 Structure 0.1N of 12th & Omaha on

Twelfth St. in Rapid City over Rapid

Creek SN 52-408-298

Structure Preservation - Bridge

Improvement Grant (BIG) Projects

Pennington 0.0 0.000 2019 11.00 0.230

BIG Cap = $184,000

¥ Costs reflect anticipated inflationPage 93 HC65Coding.rpt

Page 96: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

BRO 8049(00) 02EC Structure 5S & 6.6W of Howard over

Rock Creek SN 49-094-180

Structure & Approach GradingMiner 0.2 0.000 2019 12.00 0.634

BRO 8041(00) 01KP Structure 2E & 5.5N of Spearfish

over the Redwater River SN

41-110-008

Structure & Approach GradingLawrence 0.2 0.000 2019 13.00 0.469

BRO 8041(00) 01KN Structure 4.5N & 2W of Spearfish

over the Redwater River SN

41-070-012

Structure & Approach GradingLawrence 0.2 0.000 2019 14.00 0.469

BRO 8040(00) 02EF Structure at 111 Garfield Ave. in

Madison over Park Creek (City

owned) SN 40-132-132

Structure & Approach GradingLake 0.2 0.000 2019 15.00 0.580

BRO 8030(00) 04M7 Structure 5E & 18.7S of Miller, on

365 Ave., over a creek SN

30-210-447

Structure & Approach GradingHand 0.2 0.000 2019 16.00 0.284

BRO 8014(00) 5756 Structure 7.5E & 5.1S of Irene over

Frog Creek on Norwegian Ave. just

S. of 302 St. SN 14-075-051

Structure & Approach GradingClay 0.2 0.000 2019 17.00 0.530

BRO 8003(09) H086 7.6 S & 2 W of Cavour Over Pearl

Creek SN 03-310-256

Structure & Approach GradingBeadle 0.2 0.320 2019 18.00 0.400

BRO 8002(11) 03F4 Structure 5E & 4.1N of Plankinton,

on 391 Ave., over a creek SN

02-210-109

Structure & Approach GradingAurora 0.2 0.280 2019 19.00 0.350

BRO 8002(00) 043K Structure 5E & 2.6N of Plankinton

over a creek (391 Ave.) SN

02-210-124

Structure & Approach GradingAurora 0.2 0.000 2019 20.00 0.400

BRF 6591(07) 05LV Structure 1.5N of Worthing over

Beaver Creek SN 42-080-107

Structure & Approach GradingLincoln 0.2 0.500 2019 21.00 0.625

BRF 6463(00)16-1 05QV Structure 0.2W & 0.3N of Burdock

on Co. Rd 21 over a creek SN

24-029-014

Structure Preservation - Bridge

Improvement Grant (BIG) Projects

Fall River 0.0 0.000 2019 22.00 0.237

BIG Cap = $189,684.80

¥ Costs reflect anticipated inflationPage 94 HC65Coding.rpt

Page 97: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

BRF 6418(00) 02ER Structure 7S & 2.6E of Carthage

over Rock Creek SN 49-096-090

Structure & Approach GradingMiner 0.2 0.000 2019 23.00 0.350

BRF 6377(00) 03H9 Structure 4W & 2.8S of Fairview, on

482 Ave., over a creek SN

42-180-223

Structure & Approach GradingLincoln 0.2 0.000 2019 24.00 0.630

BRF 6358(04) 01WJ Structure 3S & 1.7W of Chancellor

over the Vermillion River SN

63-194-120

Structure & Approach GradingTurner 0.2 0.976 2019 25.00 1.220

BRF 6319(00)17-4 06HT Structure 7.9S of Brookings on 471st

Ave. over a creek SN 06-169-239

Structure Replacement - Bridge

Improvement Grant (BIG) Project

Brookings 0.2 0.000 2019 26.00 1.348

BIG Cap = $1,078,600

BRF 6304(00) 02EG Structure at 509 Center St. E in

Madison over Madison Creek (City

owned) SN 40-131-132

Structure & Approach GradingLake 0.2 0.000 2019 27.00 0.400

BRF 6259(06) 03GU Structure 0.5E of White Horse, over

a creek SN 21-313-140

Structure & Approach Grading,

ROW, Utilities

Dewey 0.2 0.472 2019 28.00 0.590

BRF 6140(08) 01DX Structure 2.9N of Witten over

Cottonwood Creek SN 62-080-201

Structure & Approach GradingTripp 0.2 0.416 2019 29.00 0.520

BRO 8058(00) 05LY Structure 2.2N & 0.1E of Athol over

Snake Creek (162 St.) SN

58-061-140

Structure & Approach GradingSpink 0.2 0.000 2019 30.00 0.520

BRF 1618(00)16-3 05R3 Structure 1.8N of Jct of US16B on

Cambell St. in Rapid City over a

creek SN 52-430-312

Structure Preservation - Bridge

Improvement Grant (BIG) Projects

Pennington 0.0 0.000 2019 31.00 0.358

BIG Cap = $286,000

BRO 8044(08) 02E2 Structure 8.5 S & 1.1 E of Montrose

over the East Fork of the Vermillion

River SN 44-221-090

Structure & Approach GradingMcCook 0.2 0.680 2019 32.00 0.850

BRO 8018(07) 03GR Structure 2W & 13.4S of Mitchell, on

407 Ave., over South Fork of Twelve

Mile Creek SN 18-130-234

Structure & Approach GradingDavison 0.2 0.280 2019 33.00 0.350

¥ Costs reflect anticipated inflationPage 95 HC65Coding.rpt

Page 98: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

BRF 6197(02) 04VJ Structure 8E & 2.6S of Parkston

over North Branch of Dry Creek SN

34-140-096 (27760 418 Ave.)

Structure & Approach GradingHutchinson 0.2 0.624 2019 34.00 0.780

BRF 3103(00)18-2 06V7 Structure on State Line East of

Hudson on 294th Street over the Big

Sioux River SN 42-244-255

Structure Preservation - Bridge

Improvement Grant

Lincoln 0.2 0.000 2019 35.00 0.319

BIG Cap = $255,400

BRF 3710(00)18-1 06V8 Structure 0.4N of Junction I-90 Loop

in Mitchell on Sanborn St. over SD

owned RR SN 18-149-095 (City

Owned)

Structure Preservation - Bridge

Improvement Grant

Davison 0.2 0.000 2019 36.00 0.966

BIG Cap = $773,000

BRF 6152(00)18-2 06VA 12E of Hermosa on Spring Creek

Cutoff over Spring Creek SN

17-547-020

Structure Preservation - Bridge

Improvement Grant

Custer 0.2 0.000 2019 37.00 0.114

BIG Cap = $91,300

BRF 6167(00)17-1 06HK Structure 5W & 26.6S of Bison on

Bixby Road over Moreau River SN

53-195-556

Structure Preservation - Bridge

Improvement Grant (BIG) Projects

Perkins 0.2 0.000 2019 38.00 0.267

BIG Cap = $195,600

BRF 6230(00)18-1 06V3 Structure 0.5S & 6.5W of Big Stone

on 145 St. over the North Fork

Whetstone River SN 26-309-029

Structure Preservation - Bridge

Improvement Grant

Grant 0.2 0.000 2019 39.00 0.411

BIG Cap = $328,500

BRF 6230(00)18-2 06V4 Structure 0.6S & 2.4W of Big Stone

on 165 St. over the Whetstone River

SN 26-352-030

Structure Preservation - Bridge

Improvement Grant

Grant 0.2 0.000 2019 40.00 0.369

BIG Cap = $295,600

BRF 6230(00)18-3 06V5 Structure 1S & 1.5W of Big Stone on

485 Ave. over the Burlington

Northern RR SN 26-360-032

Structure Preservation - Bridge

Improvement Grant

Grant 0.2 0.000 2019 41.00 0.477

BIG Cap = $382,000

BRF 6251(00)18-1 06VK Structure 4N of Columbia on 396th

Ave. over the James River SN

07-200-184

Structure Replacement - Bridge

Improvement Grant

Brown 0.2 0.000 2019 42.00 1.879

BIG Cap = $939,700

¥ Costs reflect anticipated inflationPage 96 HC65Coding.rpt

Page 99: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

BRF 6312(00)18-1 06VH Structure 4S & 2.3W of Brookings on

216th Street over the Big Sioux River

SN 06-147-200

Structure Replacement - Bridge

Improvement Grant

Brookings 0.2 0.000 2019 43.00 1.623

BIG Cap = $811,800

BRF 6319(00)18-2 06VJ Structure 7.8S of Brookings on 471st

Street over the Big Sioux River SN

06-169-238

Structure Replacement - Bridge

Improvement Grant

Brookings 0.2 0.000 2019 44.00 2.086

BIG Cap = $1,042,900

BRF 6472(00)17-1 06HU Structure 3S & 1E of Westport on

123rd St. over the Elm River SN

07-120-230

Structure Replacement - Bridge

Improvement Grant (BIG) Project

Brown 0.2 0.000 2019 45.00 1.812

BIG Cap = $818,900

BRF 6546(00)18-1 06V6 Structure 1.6S & 0.6E of Canton on

283rd St. over the Big Sioux River

SN 42-175-153

Structure Preservation - Bridge

Improvement Grant

Lincoln 0.2 0.000 2019 46.00 0.314

BIG Cap = $251,400

BRO 8003(00)17-2 06HR Structure 1E & 5.8S of Cavour on

410 Ave. over Middle Pearl Creek

SN 03-340-238

Structure Replacement - Bridge

Improvement Grant (BIG) Projects

Beadle 0.2 0.000 2019 47.00 0.545

BIG Cap = $358,600

BRO 8014(00) 6868 Structure 0.6 S & 15 E of Irene Over

Ash Creek SN 14-150-006

Structure & Approach GradingClay 0.2 0.000 2019 48.00 0.400

BRO 8015(38) 04YH Structure 11.4W and 2S of South

Shore, on 159 St., over ther Big

Sioux River SN 15-166-050

Structure & Approach GradingCodington 0.2 0.560 2019 49.00 0.700

BRO 8017(00)18-1 06V9 Structure 11E & 2S of Fairburn on

Bison Lane over French Creek SN

17-540-147

Structure Preservation - Bridge

Improvement Grant

Custer 0.2 0.000 2019 50.00 0.155

BIG Cap = $124,300

BRO 8017(00)18-3 06VL Structure 2S & 10.5E of Fairburn on

E. French Creek Rd. over French

Creek SN 17-535-143

Structure Replacement - Bridge

Improvement Grant

Custer 0.2 0.000 2019 51.00 0.582

BIG Cap = $465,500

¥ Costs reflect anticipated inflationPage 97 HC65Coding.rpt

Page 100: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

BRO 8018(00)17-1 06HW Structure 15W & 5.9N of Mitchell on

394th Ave. over Firesteel Creek SN

18-000-041

Structure Replacement - Bridge

Improvement Grant (BIG) Project

Davison 0.2 0.000 2019 52.00 0.971

BIG Cap = $776,400

BRO 8018(00)17-2 06HV Structure 1.5S & 1W of Loomis on

404th Ave. over Firesteel Creek SN

18-100-052

Structure Replacement - Bridge

Improvement Grant (BIG) Project

Davison 0.2 0.000 2019 53.00 1.150

BIG Cap = $846,400

BRO 8024(00)18-1 06VF Structure at Jennings and River in

Hot Springs on Jennings Ave. over

the Fall River SN 24-292-033 (City

Owned)

Structure Replacement - Bridge

Improvement Grant

Fall River 0.2 0.000 2019 54.00 1.512

BIG Cap = $1,209,800

BRO 8053(00)18-1 06VC Structure 15.9E & 12.4S of Bison on

Foster Road over Thunder Butte

Creek SN 53-399-414

Structure Preservation - Bridge

Improvement Grant

Perkins 0.2 0.000 2019 55.00 0.191

BIG Cap = $152,700

BRO 8056(00) 02E3 Structure 0.5E & 3.4N of Artesian

over a creek SN 56-210-096

Structure & Approach GradingSanborn 0.2 0.000 2019 56.00 0.480

BRO 8064(00)17-2 06HY Structure 5.4E & 1.5S of Alcester on

484th Ave. on a creek SN

64-144-055

Structure Replacement - Bridge

Improvement Grant (BIG) Project

Union 0.2 0.000 2019 57.00 0.846

BIG Cap = $439,900

BRO 8069(00)17-1 06HQ Structure 5.5N & 8.5W of Red Elm

on IRR Co. Rd over Flint Rock Creek

SN 69-030-234

Structure Preservation - Bridge

Improvement Grant (BIG) Projects

Ziebach 0.2 0.000 2019 58.00 0.301

BIG Cap = $215,700

Miles2019 36.157 10.4

BRO 8024(14) 02E8 Structure 4E & 1.8N of Edgemont

over abandoned RR line SN

24-162-102

Structure & Approach GradingFall River 0.2 0.966 2020 59.00 1.208

P NBIS(39) 04MC Statewide 2020 Bridge Inspections, Scour

Analysis

Statewide 0.0 1.680 2020 60.00 2.100

¥ Costs reflect anticipated inflationPage 98 HC65Coding.rpt

Page 101: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Local Bridge Replacement Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

Miles2020 3.308 0.2

P NBIS(40) 04MD Statewide 2021 Bridge Inspections, Scour

Analysis

Statewide 0.0 0.960 2021 61.00 1.200

Miles2021 1.200 0.0

P NBIS(42) 04MG Statewide 2022 Bridge Inspections, Scour

Analysis

Statewide 0.0 1.680 2022 62.00 2.100

Miles2022 2.100 0.0

¥ Costs reflect anticipated inflationPage 99 HC65Coding.rpt

Page 102: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Special Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

EM 6403(06) 00CL South Rochford Rd fm Rochford SW

to Deerfield Rd

Grading, Drainage, Base Course,

Asphalt Concrete, & PE For

Structure #52-162-272

Pennington 9.5 8.355 2019 1.00 10.196

Total Project Estimated at $10.4 mill. ($7.65 in Earmark Funds, & $2.35 in Local Funds & $0.4 in Bridge

Funds.)

IM-P Z410(17) 06X8 Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2019

Statewide 0.0 0.286 2019 2.00 0.350

Also Funded In:

Item Category

Interstate Maintenance Projects 0.275 20.00

Total Project Cost

0.625

Miles2019 10.546 9.5

IM-P Z410(18) 06X9 Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2020

Statewide 0.0 0.292 2020 3.00 0.357

Also Funded In:

Item Category

Interstate Maintenance Projects 0.280 34.00

Total Project Cost

0.637

Miles2020 0.357 0.0

IM-P Z410(19) 06XA Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2021

Statewide 0.0 0.298 2021 4.00 0.364

Also Funded In:

Item Category

Interstate Maintenance Projects 0.286 46.00

Total Project Cost

0.650

Miles2021 0.364 0.0

IM-P Z410(20) 06XC Statewide Environmental Sensor Station

Deployment, Maintenance, and

Operation CY2022

Statewide 0.0 0.304 2022 5.00 0.371

Also Funded In:

Item Category

Interstate Maintenance Projects 0.291 63.00

Total Project Cost

0.662

Miles2022 0.371 0.0

¥ Costs reflect anticipated inflationPage 100 HC65Coding.rpt

Page 103: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Highway Systems Management

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P 00SW(00)2019 050K Statewide Right of Way AcquisitionStatewide 0.0 0.000 2019 1.00 2.000

Miles2019 2.000 0.0

P 00SW(00)2020 050L Statewide Right of Way AcquisitionStatewide 0.0 0.000 2020 2.00 2.000

Miles2020 2.000 0.0

P 00SW(00)2021 050G Statewide Right of Way AcquisitionStatewide 0.0 0.000 2021 3.00 2.000

Miles2021 2.000 0.0

P 00SW(00)2022 050J Statewide Right of Way AcquisitionStatewide 0.0 0.000 2022 4.00 2.000

Miles2022 2.000 0.0

¥ Costs reflect anticipated inflationPage 101 HC65Coding.rpt

Page 104: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Transportation Alternative Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

LR 2019(00)0 05KD Various Locations Throughout South

Dakota

2019 Statewide Transportation

Alternative Program Projects

Statewide 0.0 1.721 2019 1.00 2.100

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

P TAPU(19) 062K In Aberdeen 15th Ave. Trail from

Dakota St. N to Second St. N.

PE, CE and Construction of

Shared Use Path

Brown 0.0 0.432 2019 2.00 0.527

P TAPR(23) 062Q In Custer Extending from the

Intersection of Eleventh St. and the

Custer State Park Spur Trail of the

Mickelson Trail and Ending at the

Custer School Complex on Bluebell

Lane.

PE, CE and Construction of

Shared Use Path

Custer 0.0 0.432 2019 3.00 0.634

P TAPU(20) 062L In Piedmont N 2nd St from City Hall

to Piedmont Valley Elementary

School and 3rd St from Chestnut St

to Main St.

PE, CE and Construction of

Sidewalk

Meade 0.0 0.216 2019 4.00 0.264

P TAPU(23) 06Y5 In Harrisburg, on the North Side of

Willow St./CR110, from East of

SD115 to East of Columbia St.

Shared Use Path ConstructionLincoln 1.4 0.443 2019 5.00 0.750

PE completed under P TAPU(01) PCN 04Q8.

Miles2019 4.275 1.4

P TAPR(12) 05CD Whitewood - Along Laurel St. from

Meade St. to Custer St.

PE, CE and Construction of

Shared Use Path

Lawrence 0.1 0.150 2020 6.00 0.183

P TAPU(15) 05CC Rapid City - Along I-190 and SD44 /

Omaha St., from approximately 850

feet North of the Rapid Creek Bridge

along I190, to N. Mount Rushmore

Rd.

PE, CE and Construction of

Shared Use Path

Pennington 0.5 0.138 2020 7.00 0.169

LR 2020(00)0 05X2 Various Locations Throughout South

Dakota

2020 Statewide Transportation

Alternative Program Projects

Statewide 0.0 0.561 2020 8.00 0.684

This project is a "fund placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

¥ Costs reflect anticipated inflationPage 102 HC65Coding.rpt

Page 105: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Transportation Alternative Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

P TAPU(21) 06N6 North Sioux City along Streeter Drive

between River Drive and Bruneau

Drive

CE and Construction of Shared

Use Path

Union 0.4 0.219 2020 9.00 0.292

P TAPU(22) 06N7 Crooks along West Avenue from

Main St. to Executive Ave.

CE and Construction of Shared

Use Path & Install RR Crossing

Minnehaha 0.0 0.297 2020 10.00 0.362

P TAPR(27) 06NA Salem along Dakota Street from

Essex Ave. to Center Ave., Center

Ave. from Dakota St. to Main St. and

Main St from Center Ave to Lightner

Ave.

CE and Construction of Shared

Use Path

McCook 0.0 0.379 2020 11.00 0.510

P TAPR(28) 06NC Faulkton Various Sites Along US212

from 12th Ave to 9th Ave. and 9th

Ave. from US 212 to Faulkton Ave.

and 10th Ave from US212 to Court

St. and Court St. from 11th ave. to

10th Ave.

CE and Construction of a 5'

sidewalk

Faulk 0.0 0.095 2020 12.00 0.119

P TAPR(29) 06ND Valley Springs along Valley Drive

from Lynx St. to Broadway Ave.

CE and Construction of Shared

Use Path

Minnehaha 0.0 0.109 2020 13.00 0.133

Miles2020 2.452 1.0

P TAPU(09) 04UA Rapid City - On the east side of

Cambell St. from the end of the side

path south of Rocker Dr., N to E.

Omaha St./Hwy. 44.

PE, CE and Construction of

Shared Use Path

Pennington 0.9 0.470 2021 14.00 0.573

LR 2021(00)0 06L1 Various Locations Throughout South

Dakota

2021 Statewide Transportation

Alternative Program Projects

Statewide 0.0 1.788 2021 15.00 2.182

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

Miles2021 2.755 0.9

LR 2022(00)0 06L2 Various Locations Throughout South

Dakota

2022 Statewide Transportation

Alternative Program Projects

Statewide 0.0 2.258 2022 16.00 2.755

This project is a "funding placeholder" to show any difference between the total amount programmed and the

estimated annual programmed amount.

¥ Costs reflect anticipated inflationPage 103 HC65Coding.rpt

Page 106: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Transportation Alternative Projects

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

Miles2022 2.755 0.0

¥ Costs reflect anticipated inflationPage 104 HC65Coding.rpt

Page 107: Attachment STIP #6B SOUTH DAKOTA DEPARTMENT OF ... STIP 6… · south dakota department of transportation final 2019-2022 statewide transportation improvement program sorted by funding

By Category

¥¥

Americans with Disabilities Act (ADA)

Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal

Funds

Fiscal

YearTotal

Cost(Mil $)

NH-P 0011(00)77 04PE SD11 - Fm Aspen Blvd in Brandon,

N to Hemlock Ave in Corson

Sidewalk, ADA Curb Ramp

Upgrades & Signal Upgrade

Minnehaha 2.1 SD11 0.000 2019 1.00 0.780

Miles2019 0.780 2.1

NH 0012(00)289 04PF

NH 0011(119) 06VM

US12 - Through Aberdeen; Various

Locations in the Aberdeen Area

ADA Curb Ramp Upgrades; Joint

and Spall Repair

Brown 11.3 US12

US281

US281N

US281S

0.000 2020 2.00 1.906

Also Funded In:

Item Category

Pavement Preservation Projects 1.019 66.00

Total Project Cost

2.925

NH 0018(00)447 04PC US18 - Through Canton ADA Curb Ramp UpgradesLincoln 1.3 US18 0.000 2020 3.00 0.327

Miles2020 2.233 12.6

P 0040(00)32 04PH SD40 - Through Keystone ADA Curb Ramp Upgrades,

Sidewalks

Pennington 1.2 SD40 0.000 2021 4.00 0.207

NH 0044(00)46 04PD SD44 - Fm LaCrosse St to

Covington St in Rapid City

ADA Curb Ramp Upgrades,

Intersection Improvement,

Sidewalk

Pennington 3.4 SD44 0.000 2021 5.00 5.114

Miles2021 5.321 4.6