atsuto suzuki. 1. toward ilc construction : japanese activities 1. toward ilc construction :...

27
Atsuto Suzuki ILC Status from Japan

Upload: wesley-basil-wiggins

Post on 03-Jan-2016

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

Atsuto Suzuki

ILC Statusfrom Japan

Page 2: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

1. Toward ILC Construction : Japanese Activities

Page 3: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

HEPResearchers

Set-up JLCB and JLCC

2012 2013 2014 2015~6

Site Decision Design ILC Lab.

Japan Policy Council

Positive Referencefrom New Prime

Minister

Detailed Design of International Country

Project Proposal to Science Council

of Japan

Formal Messageon Hosting ILC in Japan

Establish ILC Pre-

J-Lab.

Proposal of hosting ILC in

Japan to Government

Cite/HostEstablish

at European Strategy MeetingDec. 11, 2012

Action Plan in 2012

Page 4: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

Site Decision Design ILC Lab.

Technical Evaluation Committee Socio-Environmental Evaluation Committee International Evaluation Committee

January, 2013

Site Evaluation Committee

August, 2013

Page 5: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

Project Proposal to Science Council

of Japan

Review by Japan Science Council

September 26, 2013

It is essential to start investigating the reliability on hosting the ILC in Japan, taking 2~3 years.

our understanding: “go-sign” of ILC pre-Lab.

Page 6: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

TDRSeptember 28, 2013

HEPResearchers

Set-up JLCB and JLCC

Site Decision Design ILC Lab.

Project Proposal to Science Council

of Japan

Formal Messageon Hosting ILC in Japan

Proposal of hosting ILC in

Japan to Government

Formal message on starting diplomatic negotiations of the ILC project by Japanese government

Page 7: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

October, 2013

On 2 October, Minister of MEXT said that the government will create a working group of advisors with specialists from various fields which will review the possible issues on the realization of the ILC in Japan.

In December, 0.5 M$ requested by MEXT was approved in the fiscal year 2014 budget. Even though the amount is small, it is symbolic that the Japanese government for the first time allocates a “preparatory budget” for the ILC as an official project

Page 8: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

Establish ILC Pre-

J-Lab.

February

February 6, 2014

LCC & LCB

Page 9: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities
Page 10: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2013 2014 2015 2016

Review by Science Council of Japan

Task Force

Particle ・ Nuclear Physics WG

Academic Experts

Committee

TDR Validation WG

February 6, 2014

May 8, 2014

MEXT

TDR Validation

Value Estimation for Quake-Proof

Value Estimation for

Environmental Improvement

Total Value

Estimation

Clarification of ILC Physics

Review Issues

Page 11: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

construction

Further Action Plan before Construction

2012

2014

2. Action Plan toward before

Constructionin 2014

Page 12: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

by A. Yamamoto

Expense Account for Preparatory Phase

②③

④⑤

① Accelerator ② Detector ③ CFS ④ Safety ⑤ Environment ⑥ Management

23.3 28.8 52.0 68.3 76.6 249.5 M$

2013

Page 13: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Further Action Plan before Construction

sorry, sorry ・・・

Page 14: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Staging Scenario(LCB, LCC)

Further Action Plan before Construction

Page 15: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Staging Scenario(LCB, LCC)

Lab Design: Organization, Structure (LCB, LCC)

LCB WG (Feb. 2014 ~ )PIP & PDG

Further Action Plan before Construction

CERNEU

XFEL

Procu

rement

Legal Base

Pers

onne

lITAR

ILC

ITER

Page 16: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Staging Scenario(LCB, LCC)

Lab Design: Organization, Structure (LCB, LCC)

MEXT Validation(LCC-PreLab)

Further Action Plan before Construction

Page 17: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Staging Scenario(LCB, LCC)

Lab Design: Management, Structure (LCB, LCC)

MEXT Validation(LCC-PreLab)

Full Proposal (LCB-LCC-PreLab)

ConstructionStart

Further Action Plan before Construction

Page 18: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Staging Scenario(LCB, LCC)

Lab Design: Management, Structure (LCB, LCC)

MEXT Validation(LCC-PreLab)

GovernmentalNegotiation

Preparatory Phase Decision-Making

Full Proposal (LCB-LCC-PreLab)

Further Action Plan before Construction

ConstructionStart

Page 19: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Engineering R&DSchedule

(LCC-PreLab)

Pre-constructionSchedule

(LCC-PreLab)

Staging Scenario(LCB, LCC)

Lab Design: Management, Structure (LCB, LCC)

MEXT Validation(LCC-PreLab)

GovernmentalNegotiation

Preparatory Phase Decision-Making

Full Proposal (LCB-LCC-PreLab)

Further Action Plan before Construction

ConstructionStart

3-Legged Race:

HEP community / Governments

Page 20: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Cite-Dependent Value(LCC-LCB-PreLab)

GovernmentalNegotiation

Preparatory Phase Decision-Making

Further Action Plan before Construction

@ 100 JYen/USD @ 115 JYen/Euro

TDR Value Estimation

Page 21: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Cite-Dependent Value(LCC-LCB-PreLab)

GovernmentalNegotiation

Preparatory Phase Decision-Making

Further Action Plan before Construction

Value-Sharing Model Host Others

CFS - LAND ??? % ??? %

Instrument - Electricity ??? % ??? %

Maintenance/Labor ??? % ??? %

Detector ??? % ??? %

Page 22: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

2014 2015 2016 2017 2018

Cite-Dependent Value(LCC-LCB-PreLab)

GovernmentalNegotiation

Preparatory Phase Decision-Making

Further Action Plan before Construction

Value-Sharing Model

Diplomacy of Diet Members’ Caucus

Page 23: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

Next Meeting in July

Page 24: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

The ILC is a global project, to be designed and realized by a worldwide cooperation of scientists and engineers. In Japan, for the first time ever, the government has allocated a budget for the coming Japanese fiscal year to investigate and examine the ILC project itself, which is in addition to the existing funding for the research and development. This has great significance in that the Japanese government has shown a vital interest in the ILC project.

We have reached the stage where we must now work together with other governments for the realization of the ILC. The Japanese government intends to perform concentrated investigations and address the major issues and arrive at a conclusion about hosting the ILC by the end of JFY2015.

January 8, 2014

Page 25: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

Dr. E. Moniz Mr. H. Shimomura

Dr. Ernest Moniz

It was a great pleasure to talk with you when I visited the United States recently. In our conversation, I explained the current situation regarding the International Linear Collider (ILC) project in Japan, and I would like to reiterate what I said through this letter.

February 7, 2014

Page 26: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

May 2014

Letter from to

CERN DG

EU Government

June 2014 Meeting : France-Japan Friendship Diet Members’ Caucus

October 2012 March 2013 March 2013 April 2014

LynBrian

Harry

Page 27: Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities

3. Summary

Further Action Plan before Construction