atlas: setting the scene fred. atlashardware ray production assembly joe qa data base jo reception...
TRANSCRIPT
ATLAS: Setting the SceneFred
ATLAS Hardware
RayProductionAssembly
JoeQA
Data base
JoReception
Testing
Trigger
ThorstenL1/HLT
Physics
Sarah(Fred)WW
PaulInstallation
Testing
SteveField mapAlignment
Sarah’s 2005 : WW ScatteringWW scattering at high mass (MWW ~ 1-2TeV):
Considered several possible signals against W+jets and ttbar backgrounds.Analysis: pT cuts (>320GeV) on each of the W’s
E (>300GeV) and η (>2.5) cuts on tag jets + further environment cuts.Studied optimum way to define hadronic W (2 overlapping jets), compared kT and cone algorithms.
Also joined in with ATLAS full simulation effort:
• in initial selection of events with lepton and ET
miss, found 65 % fewer events than ATLFAST,
• effect of subsequent cuts was ~ as predicted.More issues to be investigated yet:
•how to implement our hadronic W finding in full simulation,
• how well are backgrounds (W+jets) modelled,
• how to convince someone to make millions of background events for us?
TO BE CONTINUED…TO BE CONTINUED… Simon Head Simon Head (Manchester),(Manchester),
Stathis Stefanadis (UCL)Stathis Stefanadis (UCL)
Fast simulation of ATLAS detector (ATLFAST):
TO APPEAR IN A THESIS NEAR YOU SOON.TO APPEAR IN A THESIS NEAR YOU SOON.
For 30fb-1 s/b s/√b
Double Resonance 4.1 12.5
No Resonance 1.5 4.7
W+jetsttbar
ATLAS Hardware
RayProductionAssembly
JoeQA
Data base
JoReception
Testing
Trigger
ThorstenL1/HLT
Physics
Sarah(Fred)WW
ChrisTop
JamesJet gaps
SimonWW
WorkingGroups
HiggsSarah
Brian/Fred
DiffractiveIrina/Pilko/Will
Brian/Fred
TopChris
Mike/ThorstenJo
SMSteve
IrinaDiffractive
PilkoDiffractive
WillDiffractive
PaulInstallation
Testing
SteveField mapAlignment
ATLASsLHCsSCT
SoIManchester on
No fte’s
ProposalSpring 2006Manchester ?
R&D2006-09
• 2015: End of life of inner detector Increase in luminosity (x10) sLHC
• 2006: Start of 3-year R&D for SCT Radiation hard detector
Thermal/Mech engineeringIntegrated coolingOpto-electronicsReadout (x10 channels)
22 SY/year £650k/year
• 2090: sLHC decision Trigger upgrade proposal
• 2010: Start of 5-year build & install SCT 65 SY/year (Manchester 2-3/year) £27M overallProd/Install
2010-2015
ATLASsLHCsSCT
SoIManchester on
No fte’s
ProposalSpring 2006Manchester ?
R&D2006-09
FP420
Brian
Prod/Install2010-2015
(Irina)PilkoWill