a&t preeminence 2020...9 — a&t preeminence 2020 campus development: modernizations tbd =...
TRANSCRIPT
A&T PREEMINENCE 2020
1 — A&T PREEMINENCE 2020
NORTH CAROLINA A&T STATE UNIVERSITY FACILITIES MASTER PLAN
EMBRACING OUR PAST, CREATING OUR FUTURE
THEMES- 1999 Renovate and I th
13Replace Student
HousingImprove the Infrastructure
3
Renovate / Replace 2
2 — A&T PREEMINENCE 2020
pAcademic and Support Facilities
2020 Master Plan Themes1. Enhance Intellectual Environment Through
Creative Use Of Physical And Virtual Space
2. Create An Inclusive Global/ InternationalCorridor On Campus
3. Enhance Institutional Facilities In Support OfGraduate Education (With Specific Focus on STEM), Research And Outreach
4. Create Partnership With Local And NationalOrganizations To Improve Growth Opportunities
5 Infrastructure Improvements
)
5. Infrastructure Improvements
6. Pedestrian Campus
4 — A&T PREEMINENCE 2020
Partnership Sites
University Owned Sites
Acquisition SitesAcquisition Sites
6 — A&T PREEMINENCE 2020
Campus Development:Project Sites
3
1
Appropriated Projects
2 5
TBDTBD1
1 New College of Engineering2 School of Nursing/ Life Sciences Building3 Enrollment Management/ One-Stop Center4 Data Center at Gateway Park (NOT SHOWN)
TBD
2
Non-Appropriated Projects
5 Performing Arts Center6 Convocation Center (NOT SHOWN)
131 New Sebastian Health Center2 New Student Center3 New Sky Box
TBD = To Be DeterminedTBD
7 — A&T PREEMINENCE 2020
Campus Development:New Construction
Appropriated Projects
16 10
9
1312
7 Marteena Hall Modernization8 Price Hall Modernization
TBD TBD
15STEM
17
9 McNair Hall Modernization10 Fort IRC Research Modernization
11 Carver Hall Modernization12 Webb Hall Modernization13 Benbow Hall Modernization
8147
TBDAGRICULTURAL / RESEARCH
13 Benbow Hall Modernization14 Sockwell Hall Modernization
15 Moore Gym Modernization
16 Hodgin Hall Modernization
ATHLETICS
OTHER
11
17 Frazier Hall ModernizationLand AcquisitionSteam Line ReplacementTechnology Infrastructure Upgrade – PH 2Electrical Infrastructure Upgrade – PH 2Water Line Modernization
9 — A&T PREEMINENCE 2020
Campus Development:Modernizations
TBD = To Be DeterminedTBD
12 Private/Non-University Property
12
12
10
16
6
1
1
2 5
1
98
12
1411
6
16
1
3
Proposed Projects
1 Global Village Mixed-Use Retail & Housing
2 School of Nursing/ Life Science Building
6 Buildings A-D7 Building E8 Building F9 Building G
126
Science Building3 Intramural Fields4 Parking Structure5 Performing Arts Center
9 Building G10 Building H11 Building I
10 — A&T PREEMINENCE 2020
Campus Development:Global Village
1 Promote A Vigoro s STEM Oriented1. Promote A Vigorous STEM- OrientedAcademic Environment
2. Premier Research, Science And Technology-Focused Institution
3. Expand The Breadth Of Faculty AndStudent Involvement In Funded Research
11 — A&T PREEMINENCE 2020
JOINT SCHOOL NANOSCIENCE AND NANOENGINEERING
1
Built Projects
2
1 Research Facility One (USDA Building)2 Joint School of Nanoscience & Nanoengineering
12 — A&T PREEMINENCE 2020
Campus Development:South Campus
9 Buildings100+ Acres7 Miles Away From Main Campus
13 — A&T PREEMINENCE 2020
Campus Development:North Campus
Appropriated Projects
Global Village Projects
Non-Appropriated Projects
14 — A&T PREEMINENCE 2020
Campus Development:Campus Vision