A&T PREEMINENCE 2020

1 — A&T PREEMINENCE 2020

NORTH CAROLINA A&T STATE UNIVERSITY FACILITIES MASTER PLAN

EMBRACING OUR PAST, CREATING OUR FUTURE

THEMES- 1999 Renovate and I th

13Replace Student

HousingImprove the Infrastructure

3

Renovate / Replace 2

2 — A&T PREEMINENCE 2020

pAcademic and Support Facilities

Master Plan

3 — A&T PREEMINENCE 2020

2020 Master Plan Themes1. Enhance Intellectual Environment Through

Creative Use Of Physical And Virtual Space

2. Create An Inclusive Global/ InternationalCorridor On Campus

3. Enhance Institutional Facilities In Support OfGraduate Education (With Specific Focus on STEM), Research And Outreach

4. Create Partnership With Local And NationalOrganizations To Improve Growth Opportunities

5 Infrastructure Improvements

)

5. Infrastructure Improvements

6. Pedestrian Campus

4 — A&T PREEMINENCE 2020

5 — A&T PREEMINENCE 2020

Campus Orientation

Partnership Sites

University Owned Sites

Acquisition SitesAcquisition Sites

6 — A&T PREEMINENCE 2020

Campus Development:Project Sites

3

1

Appropriated Projects

2 5

TBDTBD1

1 New College of Engineering2 School of Nursing/ Life Sciences Building3 Enrollment Management/ One-Stop Center4 Data Center at Gateway Park (NOT SHOWN)

TBD

2

Non-Appropriated Projects

5 Performing Arts Center6 Convocation Center (NOT SHOWN)

131 New Sebastian Health Center2 New Student Center3 New Sky Box

TBD = To Be DeterminedTBD

7 — A&T PREEMINENCE 2020

Campus Development:New Construction

bb

1

1

22

3

3

8 — A&T PREEMINENCE 2020

Appropriated Projects

16 10

9

1312

7 Marteena Hall Modernization8 Price Hall Modernization

TBD TBD

15STEM

17

9 McNair Hall Modernization10 Fort IRC Research Modernization

11 Carver Hall Modernization12 Webb Hall Modernization13 Benbow Hall Modernization

8147

TBDAGRICULTURAL / RESEARCH

13 Benbow Hall Modernization14 Sockwell Hall Modernization

15 Moore Gym Modernization

16 Hodgin Hall Modernization

ATHLETICS

OTHER

11

17 Frazier Hall ModernizationLand AcquisitionSteam Line ReplacementTechnology Infrastructure Upgrade – PH 2Electrical Infrastructure Upgrade – PH 2Water Line Modernization

9 — A&T PREEMINENCE 2020

Campus Development:Modernizations

TBD = To Be DeterminedTBD

12 Private/Non-University Property

12

12

10

16

6

1

1

2 5

1

98

12

1411

6

16

1

3

Proposed Projects

1 Global Village Mixed-Use Retail & Housing

2 School of Nursing/ Life Science Building

6 Buildings A-D7 Building E8 Building F9 Building G

126

Science Building3 Intramural Fields4 Parking Structure5 Performing Arts Center

9 Building G10 Building H11 Building I

10 — A&T PREEMINENCE 2020

Campus Development:Global Village

1 Promote A Vigoro s STEM Oriented1. Promote A Vigorous STEM- OrientedAcademic Environment

2. Premier Research, Science And Technology-Focused Institution

3. Expand The Breadth Of Faculty AndStudent Involvement In Funded Research

11 — A&T PREEMINENCE 2020

JOINT SCHOOL NANOSCIENCE AND NANOENGINEERING

1

Built Projects

2

1 Research Facility One (USDA Building)2 Joint School of Nanoscience & Nanoengineering

12 — A&T PREEMINENCE 2020

Campus Development:South Campus

9 Buildings100+ Acres7 Miles Away From Main Campus

13 — A&T PREEMINENCE 2020

Campus Development:North Campus

Appropriated Projects

Global Village Projects

Non-Appropriated Projects

14 — A&T PREEMINENCE 2020

Campus Development:Campus Vision

15 — A&T PREEMINENCE 2020

A&T PREEMINENCE 2020

A&T PREEMINENCE 2020

16 — A&T PREEMINENCE 2020

NORTH CAROLINA A&T STATE UNIVERSITY FACILITIES MASTER PLAN

EMBRACING OUR PAST, CREATING OUR FUTURE