    Crown Systems (Singapore) Pte. Ltd.

    ASTA POWER PROJECT

  • 8/10/2019 Asta Powerproject Presentation Slides

    2/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Agenda

    2

    Company Profile

    Asta PowerProject Overview

    CostOS Cost Estimating Overview

    Summary

  • 8/10/2019 Asta Powerproject Presentation Slides

    3/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    COMPANY PROFILE

    3

  • 8/10/2019 Asta Powerproject Presentation Slides

    4/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    About Crown Systems

    Headquarter in Singapore since 1997 with offices in Brunei, Indonesia,Malaysia, Philippines and Vietnam

    Autodesk Gold Partner, Authorized Training Center and AuthorizedCertification Center

    Oracle Certified Advantage Partner and HP Gold Partner

    Expertise in Project Management Consulting, BIM Implementation, 3DModeling, Simulation and Visualization using Autodesk Applications

    Large pool of highly experienced BIM Process Consultants and ApplicationEngineers specializing in Architectural, Structural and M&E domains

    Working with Developers, Architects, Engineering Firms, A1 Contractors onlarge scale construction projects for BIM/ IPD implementation

  • 8/10/2019 Asta Powerproject Presentation Slides

    5/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Regional Presence

    Singapore (HQ)

    Brunei

    Indonesia

    Malaysia

    Philippines

    Viet Nam

    5

  • 8/10/2019 Asta Powerproject Presentation Slides

    6/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    6

    FINANCIAL HEALTH

    VALUED SERVICES

    PRODUCT LEADERSHIP

    Marine Engineering Engineer ing & Construct ion

    Shell Chemicals

    Power, Energy & Proc ess

    High Technolo gy OthersResearch & Developm ent

    Our Client List (Project Management)

  • 8/10/2019 Asta Powerproject Presentation Slides

    7/28

  • 8/10/2019 Asta Powerproject Presentation Slides

    8/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    BIM 3D & Beyond - Solutions

    BIM 3D - ModelingBIM 4D Clash

    Detection & Time LinerBIM 5D Cost

    EstimatesBIM 6D Facility

    Management

  • 8/10/2019 Asta Powerproject Presentation Slides

    9/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    ASTA OVERVIEW

    9

  • 8/10/2019 Asta Powerproject Presentation Slides

    10/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    About ASTA Development

    Project, Portfolio and Resource management specialists

    since 1988

    Owned by a London listed parent company

    Over 60,000 users worldwide

    Sales, Support, Training and Consultancy

    Dedicated to continuous improvement via feedback from

    customers

  • 8/10/2019 Asta Powerproject Presentation Slides

    11/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    ASTA PowerProject

    Effective Project Management and Planning Efficiency

    Used by 90% of Top Main Contractors in UK

    Sold Worldwide to 20 countries since 1988

    Rated the No. 1 software in the UK building industry in a recent survey by the

    Planning Engineers Organisation

    Easy to use with excellent presentation capabilities

    Companies Using ASTA: Bovis Lend Lease, Fosters and Partners

    (architectural firm)

  • 8/10/2019 Asta Powerproject Presentation Slides

    12/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Client List

  • 8/10/2019 Asta Powerproject Presentation Slides

    13/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Projects that used Asta

    The London Eye, UK

    The Eden Project, UK

    Jumeriah Park, Dubai

    Reichstag in Berlin

    Hong Kong Airport

    Petrolnas Towers, Malaysia

    The Space Shuttle, USA

    Warsaw Metro LineThe Great Court @ British Museum

    The London 2012 Olympic Game

    Renewable Energy Projects, France

    Commonwealth Games Village in India

    Schipol Airport, Netherlands

    Building the Education Revolution, Sydney

  • 8/10/2019 Asta Powerproject Presentation Slides

    14/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Multi-Users, Multi-Projects

  • 8/10/2019 Asta Powerproject Presentation Slides

    15/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Solution for all Issues

  • 8/10/2019 Asta Powerproject Presentation Slides

    16/28

  • 8/10/2019 Asta Powerproject Presentation Slides

    17/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Project, Resource & Cost Management

  • 8/10/2019 Asta Powerproject Presentation Slides

    18/28

  • 8/10/2019 Asta Powerproject Presentation Slides

    19/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Risk Analysis

  • 8/10/2019 Asta Powerproject Presentation Slides

    20/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Integration with Outlook

    Integration with MS Outlook

  • 8/10/2019 Asta Powerproject Presentation Slides

    21/28

  • 8/10/2019 Asta Powerproject Presentation Slides

    22/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Earned Value Analysis

  • 8/10/2019 Asta Powerproject Presentation Slides

    23/28

  • 8/10/2019 Asta Powerproject Presentation Slides

    24/28

  • 8/10/2019 Asta Powerproject Presentation Slides

    25/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Demo Areas

    Overview

    ProjectCreation

    RepetitiveScheduling

    Resource &Cost

    S-Curve

    Line ofBalance

    ProgressUpdates

  • 8/10/2019 Asta Powerproject Presentation Slides

    26/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    SUMMARY

    26

  • 8/10/2019 Asta Powerproject Presentation Slides

    27/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    Summary and Conclusion

    Advantages of our Consulting Approach (Why Us?)

    Proven Track Record for Project Management & BIM Implementation/Methodology Work closely with BCA and familiar with BCA BIM submission

    requirements

    Long Term support and partnership commitment

    Knowledge transferthrough customized/ tailored trainings and hand holdingsessions.

    Direct access to our team of technical support staff through various

    communication channels.

    Empower your employees

    Provide advisory services in planning for future growth

  • 8/10/2019 Asta Powerproject Presentation Slides

    28/28

    CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED

    28

    Question and Answer