Asta Powerproject

An Overview of Asta Powerproject BIM

Page 2: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

Bringing 4D Planning within Affordable Reach

New module/bolt-on to Asta Powerproject,

adding 3D model view alongside Gantt Chart

Link project activities and model together in one

application

Quickly create schedules directly from IFC

model:

Drag’n’drop objects between the 3D view and tasks

Using structured templates with predefined searches to

automatically link to the IFC model objects

Compare ‘planned’ and ‘actual’ schedule plans

via 3D window for visual impact

Simulate the model using dates from timeline

Asta Powerproject BIM

Page 3: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

Initially release in Oct ‘14 & further distributed as part of

Asta Powerproject v13.0.01

Next release part of v13.0.02, to be released Q2 2015

V13.0.02 will be the first international release

v13.0.03 with additional BIM features scheduled for Q4

2015

Asta Powerproject BIM - Roadmap

Page 4: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

Key Aspects of using Asta Powerproject BIM:

Requires exported IFC file from design applications such as Revit, ArchiCAD, Vector Works, SketchUp, Tekla, Arcon etc.

Supports import of IFC 2x3 or IFC4

Relevant IFC Property informationpulled into Asta Powerproject

Filter view based on properties such as location or type

Colour model along similar criteria

In Version 13.0.01:

IFC file uploaded via web-interface to ELECO BIMCloud, which is hosted on Microsoft Azure platform

Asta Powerproject BIM draws the IFC data directly from the cloud, including any model revisions

Version 13.0.02 will also allow direct import of IFC

Asta Powerproject BIM

Page 5: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

From Asta’s parent company, ELECO plc

Shares information and supports improved collaboration amongst ELECO applications

Also boasts collaboration between users –sharing access to common files

Stores all data in IFC4 format

Eliminates the difficulty of emailing or FTP transfers of large BIM project files

Access the core project management, scheduling and resource management capabilities and draw on the functionality of other products from the ELECO group

Allows the sharing of data from visualisation, design and cost estimation tools such as Arcon® and Bidcon®

What is the ELECO BIMCloud?

Page 6: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

Asta Powerproject BIM module can be added to any

existing Asta Powerproject Licence

Licence needs an active support contract (adopting BIM

requires an upgrade to v13 of Powerproject)

UK Prices (contact local reseller for other region pricing):

£550 - named, £850 – concurrent

20% support fee applies

Asta Powerproject BIM - Licensing

Page 7: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

64-bit version for larger IFC modelsRemove the current 4GB memory limit

Overlaying of multiple IFC filesAllow separate IFC models to be imported e.g. Steelwork, Electrical etc & allow import of site objects such as cranes

Multiple 3D viewsRun two different 3D views alongside each other e.g. compare the effect of the current plan versus the original baseline

TimeLiner enhancements e.g. define in which direction an object is shown being constructed

Some objects may be built from left to right, others from back to front etc

3D Video generationProvide 3D video export functionality into industry-standard formats such as AVI & MP4

Task creation from Bidcon or such-likeAllow cost, resource and effort data to be imported and for tasks, resource and cost allocations to be created within a schedule

Asta Powerproject BIM v13.0.03 Features

Page 8: Asta Powerproject BIM Overview

© Copyright Asta Development 2015

New 1 day standard Asta training course focused on new BIM tool:

Overview of Asta Powerproject BIM

Introduction to the ELECO BIMCloud

Linking to the model tasks

BIM product selections and searches

Creating a bar chart from the BIM product sets

Simulating the model

Planned/Actual views via Progress

UK Training Prices:

Thame

£275 per delegate

London Bridge and other regional venues

£330 per delegate

On-site course for up to 8 delegates

£1,375 per day (plus expenses)

Asta Powerproject BIM - Training