Asset Life Cycle Management
Case Studies onAsset Life Cycle Cost Modelling
![Page 2: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/2.jpg)
Contents
• The Basics
• The Process
• Different Models
• Examples / Case Studies
![Page 3: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/3.jpg)
Asset Life Cycle Cost Basics
Tota
l Cos
t
Time
Replacement
Life Span (Assessment Period)
Life Cycle (Asset Estimated Life)
Financial Year
Refurbishment
![Page 4: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/4.jpg)
Step 1:Define the Scope of the Analysis
Step 2:Develop or adjust the LCC Model
Step 3:Define Team. Collect Information
Step 4:Populate the Model
Step 5:Review and Optimise the Model
Step 7:Maintain the Model
Step 6:Decision and Implement the Solution
Life Cycle Cost Modelling Process• Stakeholder involvement• Project plan review• Scope of analysis• Data requirements analysis
• Model selection• Depreciation policies and rates• Governing accounting practices• Categorisation of cost contributors• Validation of the model by Accounting
• Data verification• Audit trail for data entries• Consensus discussion• Base results demonstration
• Team identification• Responsibility allocation• Data collection and configuration
• Reality checks• Sensitivity analysis• Variations
• Presentation to Stakeholders• Consensus• Budget alignment and Project Team appointment• Implementation project definition and activation
• Populate actual data• Adjust and review
![Page 5: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/5.jpg)
Different Models
• Optimum Replacement Age
• Repair / Replacement
• Alternative Decision Making
• Maintenance Strategy Selection
• Other Uses
![Page 6: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/6.jpg)
Optimum Replacement Age Models
Optimal Asset Life?
Replace every Year
Life Cycle Cost
LCC 1
LCC 2
LCC 3
LCC 4
LCC X
Replace Every 2 Years
Replace Every 3 Years
Replace Every 4 Years
Etc.
![Page 7: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/7.jpg)
Cost Summations across Life Span (Example)Replacement Interval Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 LCC
Every Year 9.00 8.40 7.80 7.45 7.05 6.80 6.65 6.35 6.25 6.20 6.00 $77.95M
Every 2 Years 3.20 8.40 1.00 7.45 1.35 6.80 3.65 6.35 1.60 6.20 1.95 $47.95M
Every 3 Years 3.30 3.70 7.80 0.85 1.05 6.80 1.40 3.50 6.25 1.30 1.55 $37.5M
Every 2 Years 3.70 4.20 4.05 7.45 0.85 1.00 1.05 6.35 3.30 1.25 1.25 $34.45M
Every 6 Years 3.90 4.50 3.65 3.50 3.45 3.30 6.65 0.65 0.80 0.85 1.25 $32.5M
Every 7 Years 3.90 4.50 3.65 3.50 3.60 3.75 3.90 6.35 0.50 0.70 0.85 $35.2M
Every 8 Years 3.90 4.50 3.65 3.50 3.60 3.65 4.40 4.25 6.25 0.45 0.75 $38.9M
Every 9 Years 3.90 4.50 3.65 3.50 3.60 3.75 4.65 3.75 3.80 6.20 0.40 $41.7M
Every 4 Years 3.85 4.50 3.60 3.55 7.05 0.80 0.90 0.95 1.15 6.20 1.10 $33.65M
Every 5 Years 3.90 4.50 3.65 3.45 3.50 6.80 0.70 0.85 0.95 1.20 3.05 $32.55M
Every 10 Years 3.90 4.50 3.65 3.50 3.60 3.75 4.75 3.55 3.75 4.10 6.00 $45.05M
Cos
ts [$
M]
Time
Y10Y9Y8Y7Y6Y5Y4Y3Y2Y1Y0
1
2
3
4
5
6
7
8
9
![Page 8: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/8.jpg)
Excel based Model Representation
![Page 9: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/9.jpg)
Asset Life Determination
![Page 10: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/10.jpg)
Asset Life Determination
![Page 11: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/11.jpg)
Repair or Replace?
Old Truck?
New Truck?
![Page 12: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/12.jpg)
Repair / Replacement Models
Maintain orReplace?
Replace After 1 Year
Life Cycle Cost
LCC 1
LCC 2
LCC 3
LCC 4
LCC X
Replace After2 Years
Replace After3 Years
Replace After4 Years
Etc.
![Page 13: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/13.jpg)
Cost Summations across Life Span (Example)Replacement Year Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 LCC
Replace Y0 9.00 1.00 1.25 1.45 1.75 3.75 1.40 1.60 1.80 2.00 2.30 $27.30MReplace Y1 3.20 8.40 1.00 1.20 1.35 1.65 3.65 1.30 1.60 1.75 1.95 $27.05MReplace Y2 3.30 3.70 7.80 0.85 1.05 1.15 1.40 3.50 1.20 1.30 1.55 $26.80MReplace Y3 3.70 4.20 4.05 7.45 0.85 1.00 1.05 1.35 3.30 1.25 1.25 $29.45M
Replace Y6 3.90 4.50 3.65 3.50 3.45 3.30 6.65 0.65 0.80 0.85 1.25 $32.50MReplace Y7 3.90 4.50 3.65 3.50 3.60 3.75 3.90 6.35 0.50 0.70 0.85 $35.20MReplace Y8 3.90 4.50 3.65 3.50 3.60 3.65 4.40 4.25 6.25 0.45 0.75 $38.90MReplace Y9 3.90 4.50 3.65 3.50 3.60 3.75 4.65 3.75 3.80 6.20 0.40 $41.70M
Replace Y4 3.85 4.50 3.60 3.55 7.05 0.80 0.90 0.95 1.15 3.20 1.10 $30.65MReplace Y5 3.90 4.50 3.65 3.45 3.50 6.80 0.70 0.85 0.95 1.20 3.05 $32.45M
Replace Y10 3.90 4.50 3.65 3.50 3.60 3.75 4.75 3.55 3.75 4.10 6.00 $45.05M
Cos
ts [$
M]
Time
Y10Y9Y8Y7Y6Y5Y4Y3Y2Y1Y0
1
2
3
4
5
6
7
8
9
0 10 20 30 40 [$M]
Replacement Capital
Maintenance Costs
Lost Productivity
Disposal
Process Costs
![Page 14: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/14.jpg)
Excel based Model Representation
![Page 15: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/15.jpg)
Repair/Replace Model
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
Replac
e Y0 (
2006
)
Replac
e Y1 (
2007
)
Replac
e Y2 (
2008
)
Replac
e Y3 (
2009
)
Replac
e Y4 (
2010
)
Replac
e Y5 (
2011
)
Replac
e Y6 (
2012
)
Replac
e Y7 (
2013
)
Replac
e Y8 (
2014
)
Replac
e Y9 (
2015
)
Replac
e Y10
(201
6)
Replac
e Y11
(201
7)
Replac
e Y12
(201
8)
Replac
e Y13
(201
9)
Replac
e Y14
(202
0)
Replac
e Y15
(202
1)
Replac
e Y16
(202
2)
Replac
e Y17
(202
3)
Replac
e Y18
(202
4)
Replac
e Y19
(202
5)
Replac
e Y20
(202
6)
Replac
e Y21
(202
7)
Replac
e Y22
(202
8)
Replac
e Y23
(202
9)
Replac
e Y24
(203
0)
Replac
e Y25
(203
1)
Replacement Year
Net
Pre
sent
Val
ues
[Mill
ions
]
Current Machine DepreciationDisposalShutdown Lost ProductivityLost ProductivityLump Sum CapitalLump Sum OPEXRoutine ProcessRoutine MaintenanceReplacement Capital
![Page 16: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/16.jpg)
Coal Terminal Assets
![Page 17: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/17.jpg)
Stacker Repair / Replace Model
![Page 18: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/18.jpg)
Reclaimer Repair / Replace Model
![Page 19: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/19.jpg)
![Page 20: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/20.jpg)
![Page 21: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/21.jpg)
![Page 22: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/22.jpg)
Repair/Replacement Model Example 1
![Page 23: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/23.jpg)
Alrode L9 Pasteuriser IQMS Results
0
10
20
30
40
50
60
70
80
90
100
Apr-00
May-00
Jun-00
Jul-00
Aug-00
Sep-00
Oct-00
Nov-00
Dec-00
Jan-01
Feb-01
Mar-01
Apr-01
May-01
Jun-01
Month
IQM
S R
esul
ts [%
]
Pasteuriser Performance Improvement
![Page 24: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/24.jpg)
Alternative Decision Making
![Page 25: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/25.jpg)
Cyclic fatigue cracking
Maintenance Strategy Selection
ReinforcingReinforcingReinforcing webs
![Page 26: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/26.jpg)
Maintenance Strategy Selection
Risk Based Maintenance Task LCC Comparison
0
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
RBM: Condition BasedMaintenance
RBM: Usage BasedMaintenance
RBM: Run to failureMaintenance
RBM: DesignImprovementMaintenance
Non-RBM Maintenance
Maintenance Types of Work
TLC
C N
PV [A
UD
]
Alternative Risk Based Maintenance Solutions
(Mitigated Risk)
Current Risk
![Page 27: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/27.jpg)
Life Span Impact
![Page 28: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/28.jpg)
Life Cycle Cost Modelling
Other Uses
![Page 29: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/29.jpg)
Life Cycle Cost Management
Time
$
Life Cycle Costs
Replacement Year Scenarios
10 12 14 16 18 20 22 24 26 30
Replacement Scenario Costs
Rolling Years X?)Assets
0 4 8 12 16 20 24 28 32 361234567
Fleet Total LCC $ $ $ $ $ $ $ $ $ $
Fleet Plan
22
![Page 30: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/30.jpg)
Life Cycle Cost
![Page 31: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/31.jpg)
Machine Benchmarking
Cum
ulat
ive
Cos
ts
Usage
Target (Model)Machine 1Machine 2
![Page 32: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/32.jpg)
Dubai Festival City / Dubai Palm Jumeirah
![Page 33: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/33.jpg)
Modelling Software Tools
• Excel
• APT Lifespan (Woodhouse Partnership)
• AssetLife (Hansen Corporation)
• Meridium Reliability Solution Life Cycle Cost Module
![Page 34: Asset Life Cycle · PDF fileAsset Life Cycle Management ... Stacker Repair / Replace Model. Reclaimer Repair / Replace Model](https://reader034.vdocuments.site/reader034/viewer/2022042515/5a7675e97f8b9aa3688d3fc3/html5/thumbnails/34.jpg)
ReferencesStandards:• Australian Federal Income Tax Legislation• AS 15288: 2003 Systems Engineering – System Life Cycle Processes• AS/NZS 4356: Life cycle costing ‐ An application guide• Australian Accounting Standard AAS 4 Depreciation• Australian Accounting Standard AAS 116 Property, Plant and Equipment• International Financial Reporting Standards (lFRS) IAS 16 and IAS 36 Standards • Australian Government Depreciation Guidelines• Australian Master Tax Guide• TR 2009/4: Taxation Ruling ‐ Income tax: effective life of depreciating assets• GAAP (Generally Acceptable Accounting Practices)• Life cycle costing Better Practice Guide – Australian National Audit Office
Books:• Maintenance, Replacement and Reliability, A.K.S. Jardine• Life‐Cycle Cost and Economic Analysis, Prentice‐Hall, Englewood Cliffs, NJ• Life Cycle Cost, Reliability, Maintainability, and Supportability Guidebook, Warrendale, PA• Life Cycle Costing: Techniques, Models and Applications, B. S. Dhillon• Life‐Cycle Cost and Economic Analysis, Benjamin S. Blanchard, Fabrycky, Wolter J
Websites:• APT Lifespan: www.reliability.com.au• LCC Ware 3: www.aptools.co.uk• Barringer & Associates, Inc: http://www.barringer1.com/