asmecode

16
 Operation and Maintenance of Nuclear Power Plants  A N A M E R I C A N N A T I O N A L S T A N D A R D  ASME OM-2012 (Revision of ASME OM-2009)

Upload: paivensolidsnake

Post on 04-Nov-2015

11 views

Category:

Documents


0 download

DESCRIPTION

ASME OM

TRANSCRIPT

  • Operation and Maintenance of Nuclear Power Plants

    A N A M E R I C A N N A T I O N A L S T A N D A R D

    ASME OM-2012(Revision of ASME OM-2009)

  • ASME OM-2012(Revision of ASME OM-2009)

    Operation andMaintenance ofNuclear PowerPlants

    A N A M E R I C A N N AT I O N A L S TA N D A R D

    Two Park Avenue New York, NY 10016 USA

  • Date of Issuance: April 8, 2013

    The next edition of this Code is scheduled for publication in 2015.

    ASME issues written replies to inquiries concerning interpretations of technical aspects of this Code.Periodically certain actions of the ASME OM Committee may be published as Code Cases. CodeCases and interpretations are published on the ASME Web site under the Committee Pages athttp://cstools.asme.org/ as they are issued.

    Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the date posted.

    The Committee Pages can be found at http://cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting Errata in the PublicationInformation section.

    ASME is the registered trademark of The American Society of Mechanical Engineers.

    This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.

    ASME does not approve, rate, or endorse any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with any

    items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own responsibility.

    Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.

    ASME accepts responsibility for only those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.

    No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,

    without the prior written permission of the publisher.

    The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990

    Copyright 2013 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERS

    All rights reservedPrinted in U.S.A.

  • CONTENTS(A Detailed Contents Precedes Each Division)

    Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ivPreparation of Technical Inquiries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vCommittee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiPreface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ixSummary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi

    Division 1 OM Code: Section IST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    Division 2 OM Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109

    Division 3 OM Guides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 309

    iii

  • DIVISION 1: OM CODE: SECTION IST

    CONTENTS

    SUBSECTION ISTA GENERAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

    ISTA-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6ISTA-1100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6ISTA-1200 Jurisdiction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6ISTA-1300 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6ISTA-1400 Referenced Standards and Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6ISTA-1500 Owners Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6ISTA-1600 Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    ISTA-2000 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    ISTA-3000 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8ISTA-3100 Test and Examination Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8ISTA-3200 Administrative Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8ISTA-3300 Corrective Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    ISTA-4000 Instrumentation and Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9ISTA-4100 Range and Accuracy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9ISTA-4200 Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    ISTA-5000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    ISTA-6000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    ISTA-7000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    ISTA-8000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    ISTA-9000 Records and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9ISTA-9100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9ISTA-9200 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9ISTA-9300 Retention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

    TableISTA-1400-1 Referenced Standards and Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

    SUBSECTION ISTB INSERVICE TESTING OF PUMPS IN LIGHT-WATER REACTORNUCLEAR POWER PLANTS PRE-2000 PLANTS . . . . . . . . . . . . . . . . . . . . . . 11

    ISTB-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11ISTB-1100 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11ISTB-1200 Exclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11ISTB-1300 Pump Categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11ISTB-1400 Owners Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

    ISTB-2000 Supplemental Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

    ISTB-3000 General Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11ISTB-3100 Preservice Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11ISTB-3200 Inservice Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12ISTB-3300 Reference Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12ISTB-3400 Frequency of Inservice Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13ISTB-3500 Data Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    1

  • ISTB-4000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

    ISTB-5000 Specific Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14ISTB-5100 Centrifugal Pumps (Except Vertical Line Shaft Centrifugal

    Pumps) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14ISTB-5200 Vertical Line Shaft Centrifugal Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16ISTB-5300 Positive Displacement Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

    ISTB-6000 Monitoring, Analysis, and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20ISTB-6100 Trending . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20ISTB-6200 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20ISTB-6300 Systematic Error . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21ISTB-6400 Analysis of Related Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    ISTB-7000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    ISTB-8000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    ISTB-9000 Records and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21ISTB-9100 Pump Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21ISTB-9200 Test Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21ISTB-9300 Record of Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21ISTB-9400 Record of Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    FigureISTB-5223-1 Vibration Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

    TablesISTB-3000-1 Inservice Test Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12ISTB-3400-1 Inservice Test Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13ISTB-3510-1 Required Instrument Accuracy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13ISTB-5121-1 Centrifugal Pump Test Acceptance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . 15ISTB-5221-1 Vertical Line Shaft Centrifugal Pump Test Acceptance Criteria . . . . . . . 17ISTB-5321-1 Positive Displacement Pump (Except Reciprocating) Test Acceptance

    Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19ISTB-5321-2 Reciprocating Positive Displacement Pump Test Acceptance

    Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

    SUBSECTION ISTC INSERVICE TESTING OF VALVES IN LIGHT-WATER REACTOR NUCLEARPOWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

    ISTC-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22ISTC-1100 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22ISTC-1200 Exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22ISTC-1300 Valve Categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22ISTC-1400 Owners Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

    ISTC-2000 Supplemental Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

    ISTC-3000 General Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23ISTC-3100 Preservice Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23ISTC-3200 Inservice Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23ISTC-3300 Reference Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23ISTC-3400 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23ISTC-3500 Valve Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23ISTC-3600 Leak Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25ISTC-3700 Position Verification Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26ISTC-3800 Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

    ISTC-4000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

    ISTC-5000 Specific Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26ISTC-5100 Power-Operated Valves (POVs) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26ISTC-5200 Other Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

    2

  • ISTC-6000 Monitoring, Analysis, and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    ISTC-7000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    ISTC-8000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    ISTC-9000 Records and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31ISTC-9100 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31ISTC-9200 Test Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    TableISTC-3500-1 Inservice Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

    SUBSECTION ISTD PRESERVICE AND INSERVICE EXAMINATION AND TESTING OF DYNAMICRESTRAINTS (SNUBBERS) IN LIGHT-WATER REACTOR NUCLEARPOWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

    ISTD-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32ISTD-1100 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32ISTD-1400 Owners Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32ISTD-1500 Snubber Maintenance or Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32ISTD-1600 Snubber Modification and Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32ISTD-1700 Deletions of Unacceptable Snubbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32ISTD-1800 Supported Component(s) or System Evaluation . . . . . . . . . . . . . . . . . . . . . 33

    ISTD-2000 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

    ISTD-3000 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33ISTD-3100 General Examination Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33ISTD-3200 General Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

    ISTD-4000 Specific Examination Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34ISTD-4100 Preservice Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34ISTD-4200 Inservice Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

    ISTD-5000 Specific Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35ISTD-5100 Preservice Operational Readiness Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . 35ISTD-5200 Inservice Operational Readiness Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36ISTD-5300 The 10% Testing Sample . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38ISTD-5400 The 37 Testing Sample Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39ISTD-5500 Retests of Previously Unacceptable Snubbers . . . . . . . . . . . . . . . . . . . . . . . . 40

    ISTD-6000 Service Life Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40ISTD-6100 Predicted Service Life . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40ISTD-6200 Service Life Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40ISTD-6300 Cause Determination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41ISTD-6400 Additional Monitoring Requirements for Snubbers That Are

    Tested Without Applying a Load to the Snubber Piston Rod . . . . . . 41ISTD-6500 Testing for Service Life Monitoring Purposes . . . . . . . . . . . . . . . . . . . . . . . . 41

    ISTD-7000 Reserved. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

    ISTD-8000 Reserved. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

    ISTD-9000 Records and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41ISTD-9100 Snubber Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41ISTD-9200 Test Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41ISTD-9300 Record of Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41ISTD-9400 Record of Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

    FigureISTD-5431-1 The 37 Testing Sample Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40

    3

  • TableISTD-4252-1 Visual Examination Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

    SUBSECTION ISTE RISK-INFORMED INSERVICE TESTING OF COMPONENTS IN LIGHT-WATER REACTOR NUCLEAR POWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . 42

    ISTE-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42ISTE-1100 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42ISTE-1200 Alternative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42ISTE-1300 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

    ISTE-2000 Supplemental Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

    ISTE-3000 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43ISTE-3100 Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43ISTE-3200 Probabilistic Risk Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43ISTE-3300 Integrated Decision Making . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43ISTE-3400 Evaluation of Aggregate Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44ISTE-3500 Feedback and Corrective Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

    ISTE-4000 Specific Component Categorization Requirements. . . . . . . . . . . . . . . . . . . . . . 44ISTE-4100 Component Risk Categorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44ISTE-4200 Component Safety Categorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45ISTE-4300 Testing Strategy Formulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46ISTE-4400 Evaluation of Aggregate Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46ISTE-4500 Inservice Testing Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    ISTE-5000 Specific Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47ISTE-5100 Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47ISTE-5200 Check Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48ISTE-5300 Motor Operated Valve Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48ISTE-5400 Pneumatically and Hydraulically Operated Valves . . . . . . . . . . . . . . . . . . 48ISTE-5500 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

    ISTE-6000 Monitoring, Analysis, and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48ISTE-6100 Performance Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48ISTE-6200 Feedback and Corrective Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

    ISTE-7000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

    ISTE-8000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

    ISTE-9000 Records and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49ISTE-9100 Plant Expert Panel Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49ISTE-9200 Component Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

    TableISTE-5121-1 LSSC Pump Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

    SUBSECTION ISTF INSERVICE TESTING OF PUMPS IN LIGHT-WATER REACTORNUCLEAR POWER PLANTS POST-2000 PLANTS. . . . . . . . . . . . . . . . . . . . . 50

    ISTF-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-1100 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-1200 Exclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-1300 Owners Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

    ISTF-2000 Supplemental Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

    ISTF-3000 General Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-3100 Preservice Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-3200 Inservice Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-3300 Reference Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50ISTF-3400 Frequency of Inservice Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

    4

  • ISTF-3500 Data Collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

    ISTF-4000 To Be Provided at a Later Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52

    ISTF-5000 Specific Testing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52ISTF-5100 Centrifugal Pumps (Except Vertical Line Shaft Centrifugal

    Pumps) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52ISTF-5200 Vertical Line Shaft Centrifugal Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53ISTF-5300 Positive Displacement Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

    ISTF-6000 Monitoring, Analysis, and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55ISTF-6100 Trending . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55ISTF-6200 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55ISTF-6300 Systematic Error . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55ISTF-6400 Analysis of Related Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

    ISTF-7000 Reserved. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

    ISTF-8000 Reserved. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

    ISTF-9000 Records and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56ISTF-9100 Pump Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56ISTF-9200 Test Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56ISTF-9300 Record of Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56ISTF-9400 Record of Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

    TablesISTF-3000-1 Inservice Test Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51ISTF-3510-1 Required Instrument Accuracy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52ISTF-5120-1 Centrifugal Pump Test Acceptance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . 53ISTF-5220-1 Vertical Line Shaft and Centrifugal Pump Test Acceptance

    Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54ISTF-5320-1 Positive Displacement Pump (Except Reciprocating) Test Acceptance

    Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55ISTF-5320-2 Reciprocating Positive Displacement Pump Test Acceptance

    Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

    Mandatory AppendicesI Inservice Testing of Pressure Relief Devices in Light-Water

    Reactor Nuclear Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57II Check Valve Condition Monitoring Program . . . . . . . . . . . . . . . . . . . . . . . . 73III Preservice and Inservice Testing of Active Electric Motor

    Operated Valve Assemblies in Light-Water Reactor PowerPlants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75

    IV Intentionally Left Blank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80V Pump Periodic Verification Test Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

    Nonmandatory AppendicesA Preparation of Test Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82B Dynamic Restraint Examination Checklist Items . . . . . . . . . . . . . . . . . . . . . 85C Dynamic Restraint Design and Operating Information . . . . . . . . . . . . . . . 86D Comparison of Sampling Plans for Inservice Testing of Dynamic

    Restraints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87E Flowcharts for 10% and 37 Snubber Testing Plans . . . . . . . . . . . . . . . . . . . 88F Dynamic Restraints (Snubbers) Service Life Monitoring Methods . . . . 91G Application of Table ISTD-4252-1, Snubber Visual Examination . . . . . . 93H Test Parameters and Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95J Check Valve Testing Following Valve Reassembly . . . . . . . . . . . . . . . . . . . 97K Sample List of Component Deterministic Considerations . . . . . . . . . . . . 98L Acceptance Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99M Design Guidance for Nuclear Power Plant Systems and Component

    Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102

    5

  • DIVISION 2: OM STANDARDS

    CONTENTS

    PART 2 PERFORMANCE TESTING OF CLOSED COOLING WATER SYSTEMS IN LIGHT-WATER REACTOR POWER PLANTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113

    PART 3 VIBRATION TESTING OF PIPING SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114

    1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114

    3 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115

    4 Visual Inspection Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119

    5 Simplified Method for Qualifying Piping Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119

    6 Rigorous Verification Method for Steady-State and Transient Vibration . . . . . . . . . 124

    7 Instrumentation and Vibration Measurement Requirements . . . . . . . . . . . . . . . . . . . 125

    8 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126

    Figures1 Typical Components of a Vibration Monitoring System (VMS) . . . . . . . . . . . . . . 1152 Deflection Measurement at the Intersection of Pipe and Elbow . . . . . . . . . . . . . 1203 Single Span Deflection Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1204 Cantilever Span Deflection Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1205 Cantilever Span/Elbow Span in Plane Deflection Measurement . . . . . . . . . . . . 1206 Cantilever Span/Elbow Guided Span in Plane Deflection Measurement . . . . 1217 Span/Elbow Span Out-of-Plane Deflection Measurement, Span Ratio

    < 0.5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1218 Span/Elbow Span Out-of-Plane Deflection Measurement, Span Ratio

    > 0.5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1219 Span/Elbow Span Out-of-Plane Configuration Coefficient Versus

    Ratio of Spans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12110 Correction Factor C1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123

    Tables1 System Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1172 Examples of Specifications of VMS Minimum Requirements . . . . . . . . . . . . . . . . 126

    Nonmandatory AppendicesA Instrumentation and Measurement Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127B Analysis Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130C Test/Analysis Correlation Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131D Velocity Criterion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132E Excitation Mechanisms, Responses, and Corrective Actions . . . . . . . . . . . . . . . . . 133F Flow Chart Outline of Vibration Qualification of Piping Systems . . . . . . . . 135G Qualitative Evaluations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 137H Guidance for Monitoring Piping Steady-State Vibration Per Vibration

    Monitoring Group 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138I Acceleration Limits for Small Branch Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 143

    109

  • PART 12 LOOSE PART MONITORING IN LIGHT-WATER REACTOR POWER PLANTS. . . . . . . . . . 145

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146

    4 Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147

    5 Program Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157

    6 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161

    Figures1 Typical Broadband Sensor Response to Nearby Impact . . . . . . . . . . . . . . . . . . . . . 1482 Typical Broadband Sensor Response to More Distant Impact . . . . . . . . . . . . . . . 1483 Range of Loose Part Signal Amplitude and Predominant

    Frequency Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1494 Field Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1495 Direct Stud Mount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1506 Clamped Mount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1507 Recommended Sensor Array for PWR With U-Tube Steam Generator . . . . . . . 1528 Recommended Sensor Array for PWR With Once-Through

    Steam Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1539 Recommended Sensor Array for BWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15410 Block Diagram for Charge Converter Calibration Tests . . . . . . . . . . . . . . . . . . . . . 15811 Cable Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159

    Tables1 Recommended PWR Accelerometer Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1512 Recommended BWR Accelerometer Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153

    Nonmandatory AppendixA References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162

    PART 16 PERFORMANCE TESTING AND INSPECTION OF DIESEL DRIVE ASSEMBLIESIN LIGHT-WATER REACTOR POWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163

    2 Post-Major Maintenance Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166

    3 Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166

    4 Inservice Testing of Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167

    5 Other Diesel Drive Testing Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171

    6 Alarm and Shutdown During Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171

    7 Engine Operating Data and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172

    Figure1 Boundary and Support Systems of Emergency Diesel

    Generator Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164

    Nonmandatory AppendicesA Post-Major Maintenance Test Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 173B Functional/Inservice Test Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174C Data Trending Examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175

    PART 21 INSERVICE PERFORMANCE TESTING OF HEAT EXCHANGERS IN LIGHT-WATER REACTOR POWER PLANTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181

    110

  • 3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183

    4 Selection and Prioritization of Heat Exchangers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 184

    5 Basic Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 184

    6 Selection of Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 185

    7 Testing and Monitoring Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 193

    8 Errors, Sensitivities, and Uncertainties. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 194

    9 Acceptance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 195

    10 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 196

    11 Records and Record Keeping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 196

    Figures1 Intervals, Limits, and Parameter Trending (Typical) . . . . . . . . . . . . . . . . . . . . . . . . 1862 Method Selection Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187

    Nonmandatory AppendicesA Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 198B Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 201C Examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204

    PART 24 REACTOR COOLANT AND RECIRCULATION PUMP CONDITION MONITORING . . . . . . 235

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237

    4 Machine Faults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237

    5 Vibration, Axial Position, and Bearing Temperature MonitoringEquipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237

    6 Vibration Data Analysis System Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 240

    7 Seal Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 242

    8 Vibration, Axial Position, and Bearing Temperature Monitoring . . . . . . . . . . . . . . . . 243

    9 Alarm Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245

    10 Analysis and Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246

    11 Additional Technologies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247

    12 Other . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 248

    Tables1 Pumpset Mechanical Faults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2382 Seal Faults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2383 Electrical Motor Faults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2394 Minimum Monitoring and Recording Intervals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2435 Typical Thrust Position Alarm Setpoints for a Pump With Normal

    Upthrust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 246

    Nonmandatory AppendicesA References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 249B Thermography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 250C Lube Oil Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 251D Motor Current Signature Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252E Loose Parts Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253

    PART 25 PERFORMANCE TESTING OF EMERGENCY CORE COOLING SYSTEMS INLIGHT-WATER REACTOR POWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 254

    111

  • PART 26 DETERMINATION OF REACTOR COOLANT TEMPERATURE FROM DIVERSEMEASUREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256

    4 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256

    5 Develop Test Procedures and Perform Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256

    6 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258

    Nonmandatory AppendixA Measurement Equipment Uncertainties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259

    PART 28 STANDARD FOR PERFORMANCE TESTING OF SYSTEMS IN LIGHT-WATERREACTOR POWER PLANTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 260

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 261

    4 General Testing Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 261

    5 Specific Testing Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266

    6 Evaluate Test Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266

    7 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 266

    Mandatory AppendicesI Specific Testing Requirements of Emergency Core Cooling Systems in BWR

    Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 268II Specific Testing Requirements of Emergency Core Cooling Systems in PWR

    Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 272III Specific Testing Requirements of Auxiliary or Emergency Feedwater

    Systems in LWR Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 275IV Specific Testing Requirements of Closed Cooling Water Systems in LWR

    Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 277V Specific Testing Requirements of Emergency Service Water Systems in

    LWR Power Plants (Open Cooling Water Systems) . . . . . . . . . . . . . . . . . . . . . . . 281VI Specific Testing Requirements of Instrument Air Systems in LWR Power

    Plants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 284

    Nonmandatory AppendicesA Industry Guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 289B Guidance for Testing Certain System Characteristics . . . . . . . . . . . . . . . . . . . . . . . 293C Measurement Accuracy of System Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . 299

    PART 29 ALTERNATIVE TREATMENT REQUIREMENTS FOR RISC-3 PUMPS ANDVALVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 306

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 306

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 306

    3 General Programmatic Requirements for RISC-3 Pumps and Valves . . . . . . . . . . . . 306

    4 Alternative Treatment for Reasonable Confidence of RISC-3 Pump and ValvePerformance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 307

    5 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 307

    6 Feedback and Treatment Adjustment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308

    7 Records. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 308

    112

  • DIVISION 3: OM GUIDES

    CONTENTS

    PART 5 INSERVICE MONITORING OF CORE SUPPORT BARREL AXIAL PRELOAD INPRESSURIZED WATER REACTOR POWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312

    1 Purpose and Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312

    2 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312

    3 Program Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 314

    4 Baseline Phase. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 314

    5 Surveillance Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 316

    6 Diagnostic Phase. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 316

    Figure1 Reactor Arrangement Showing Typical Ex-Core Detector Locations . . . . . . . . . 313

    Table1 Summary of Program Phases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 315

    Nonmandatory AppendicesA Theoretical Basis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 318B Data Reduction Techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 320C Data Acquisition and Reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 322D Data Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 325E Guidelines for Evaluating Baseline Signal Deviations . . . . . . . . . . . . . . . . . . . . . . . 329F Correlation of rms Amplitude of the Ex-Core Signal (Percent Noise) and

    Amplitude of Core Barrel Motion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 334G Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 335

    PART 7 REQUIREMENTS FOR THERMAL EXPANSION TESTING OF NUCLEAR POWERPLANT PIPING SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336

    1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336

    3 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337

    4 Reconciliation Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 338

    5 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 340

    6 Instrumentation Requirements for Thermal Expansion Measurement . . . . . . . . . . . 340

    Figures1 System Heatup, Reconciliation, and Corrective Action . . . . . . . . . . . . . . . . . . . . . 3392 Typical Components of a TEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 341

    Table1 An Example of Specification of TEMS Minimum Requirements . . . . . . . . . . . . . 341

    Nonmandatory AppendicesA Guidelines for the Selection of Instrumentation and Equipment of

    a Typical TEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 343B Thermal Stratification and Thermal Transients . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 346

    309

  • PART 11 VIBRATION TESTING AND ASSESSMENT OF HEAT EXCHANGERS. . . . . . . . . . . . . . . . . 349

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 349

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 349

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 349

    4 Background Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 349

    5 Selection of Equipment to Be Tested. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350

    6 Selection of Test Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351

    7 Test Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352

    8 Test Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359

    9 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359

    10 Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359

    Figure1 Tube Bundle Configuration With Tube Groupings Most Susceptible to

    Fluidelastic Instability Denoted by Cross-Hatching . . . . . . . . . . . . . . . . . . . . . . 353

    Nonmandatory AppendicesA Causes of Vibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 360B Methods for Comparative Evaluation of Fluidelastic and Turbulence-

    Induced Vibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 364C Test Guidelines for Dynamic Characterization of Tubes . . . . . . . . . . . . . . . . . . . . 367D External Vibration Surveys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 368E Detection Methods and Data Interpretation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 369F Vibration Acceptance Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 384G Installation of Strain Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 386

    PART 14 VIBRATION MONITORING OF ROTATING EQUIPMENT IN NUCLEAR POWERPLANTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 387

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 388

    4 Vibration Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 389

    5 Establishing the Baseline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 393

    6 Establishing Vibration Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 395

    7 Data Acquisition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 397

    8 Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 398

    9 Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 398

    Figures1 An Example of a Vibration Data Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3942 An Example of a Vibration Trend Curve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3953 Vibration Level Trend Plot of Condition One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3964 Vibration Level Trend Plot of Condition Two . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 397

    Tables1 Comparison of Periodic and Continuous Monitoring and Relative

    Advantages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3892 Transducer Location Guidelines Turbines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3903 Transducer Location Guidelines Equipment With

    Antifriction Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 390

    310

  • 4 Transducer Location Guidelines Horizontal Pumps FluidFilm Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 391

    5 Transducer Location Guidelines Motor-Driven Vertical Pumps Fluid Film Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 391

    6 Transducer Location Guidelines Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . . 3927 Vibration Troubleshooting Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 399

    Nonmandatory AppendicesA Instrumentation Selection and Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400B Transducers and Analysis Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 402

    PART 17 PERFORMANCE TESTING OF INSTRUMENT AIR SYSTEMS IN LIGHT-WATERREACTOR POWER PLANTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 407

    PART 19 PRESERVICE AND PERIODIC PERFORMANCE TESTING OF PNEUMATICALLY ANDHYDRAULICALLY OPERATED VALVE ASSEMBLIES IN LIGHT-WATER REACTORPOWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 408

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 408

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 408

    3 Test Guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 409

    4 Test Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 409

    5 Analysis and Evaluation of Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 410

    6 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 411

    PART 23 INSERVICE MONITORING OF REACTOR INTERNALS VIBRATION INPRESSURIZED WATER REACTOR POWER PLANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 412

    1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 412

    2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 412

    3 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 414

    4 Internals Vibration Excitation Sources, Responses, and Modes . . . . . . . . . . . . . . . . 415

    5 Signal Database. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 415

    6 Data Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 420

    Figures1 Schematic of a Pressurized Water Reactor (PWR) Showing Typical

    Sensor Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4132 Beam and Shell Mode Vibration of a PWR Core Support Barrel . . . . . . . . . . . . 4163 Typical Components in a Signal Data Acquisition System . . . . . . . . . . . . . . . . . . 418

    Tables1 Sensor Types and Potential Applications in Reactor Noise Analysis . . . . . . . . . 4172 Relationships Between Sampling Rates and Analysis Results . . . . . . . . . . . . . . . 418

    Nonmandatory AppendicesA Discussion of Spectral Functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 422B Supporting Information on Component Vibrations . . . . . . . . . . . . . . . . . . . . . . . . . 426C Pump-Induced Vibrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 428D Sampling Rate and Length of Data Record Requirement to Resolve a

    Spectral Peak . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 434

    311

    CONTENTS FOREWORD PREPARATION OF TECHNICAL INQUIRIESCOMMITTEE ROSTER STANDARDS COMMITTEE SPECIAL COMMITTEE ON STANDARDS PLANNING SUBCOMMITTEE ON OM CODES Subgroup ISTA/ISTC SC-OMC Subgroup ISTB SC-OMC Subgroup ISTD SC-OMC Subgroup ISTE SC-OMC Subgroup on Air-Operated Valves SC-OMC Subgroup on Check Valves SC-OMC Subgroup on Diesel Generators SC-S/G Subgroup on Functional Systems SC-S/G Subgroup on Motor-Operated Valves SC-OMC Subgroup on OM-29 SC-S/G Task Group on New Reactor OM Codes Subgroup on Piping Systems SC-S/G Task Group on Pump Performance Based IST Subgroup on Relief Valves SC-OMC Subgroup on Rotating Equipment SC-S/G

    PREFACE SUMMARY OF CHANGES DIVISION 1: OM CODE: SECTION IST CONTENTS Subsection ISTA General RequirementsISTA-1000 INTRODUCTIONISTA-1100 ScopeISTA-1200 JurisdictionISTA-1300 ApplicationISTA-1310 Components Subject to Testing and Examination.ISTA-1320 Classifications.

    ISTA-1400 Referenced Standards and SpecificationsISTA-1500 Owners ResponsibilitiesISTA-1600 Accessibility

    ISTA-2000 DEFINITIONSISTA-3000 GENERAL REQUIREMENTSISTA-3100 Test and Examination ProgramISTA-3110 Test and Examination Plans.ISTA-3120 Inservice Examination and Test IntervalISTA-3130 Application of Code CasesISTA-3140 Application of Revised Code Cases.ISTA-3150 Application of Annulled Code Cases.ISTA-3160 Test and Examination Procedures.

    ISTA-3200 Administrative RequirementsISTA-3300 Corrective Actions

    ISTA-4000 INSTRUMENTATION AND TEST EQUIPMENTISTA-4100 Range and AccuracyISTA-4200 Calibration

    ISTA-5000 TO BE PROVIDED AT A LATER DATEISTA-6000 TO BE PROVIDED AT A LATER DATEISTA-7000 TO BE PROVIDED AT A LATER DATEISTA-8000 TO BE PROVIDED AT A LATER DATEISTA-9000 RECORDS AND REPORTSISTA-9100 ScopeISTA-9200 RequirementsISTA-9210 Owners ResponsibilityISTA-9220 PreparationISTA-9230 Inservice Test and Examination Results.ISTA-9240 Record of Corrective Actions.

    ISTA-9300 RetentionISTA-9310 Maintenance of Records.ISTA-9320 Reproduction.ISTA-9330 Test and Examination Records.

    TableTable ISTA-1400-1 Referenced Standards andSpecifications

    Subsection ISTB Inservice Testing of Pumps in Light-Water Reactor Nuclear Power Plants -- Pre-2000 Plants1ISTB-1000 INTRODUCTIONISTB-1100 ApplicabilityISTB-1200 ExclusionsISTB-1300 Pump CategoriesISTB-1400 Owners Responsibility

    ISTB-2000 SUPPLEMENTAL DEFINITIONSISTB-3000 GENERAL TESTING REQUIREMENTSISTB-3100 Preservice TestingISTB-3200 Inservice TestingISTB-3300 Reference ValuesISTB-3310 Effect of Pump Replacement, Repair, and Maintenance on Reference Values.ISTB-3320 Establishment of Additional Set of Reference Values.

    ISTB-3400 Frequency of Inservice TestsISTB-3410 Pumps in Regular Use.ISTB-3420 Pumps in Systems Out of Service.ISTB-3430 Pumps Lacking Required Fluid Inventory.

    ISTB-3500 Data CollectionISTB-3510 GeneralISTB-3520 PressureISTB-3530 Rotational Speed.ISTB-3540 VibrationISTB-3550 Flow Rate.

    ISTB-4000 TO BE PROVIDED AT A LATER DATEISTB-5000 SPECIFIC TESTING REQUIREMENTSISTB-5100 Centrifugal Pumps Except Vertical Line Shaft Centrifugal PumpsISTB-5110 Preservice Testing.ISTB-5120 Inservice TestingISTB-5121 Group A Test Procedure.ISTB-5122 Group B Test Procedure.ISTB-5123 Comprehensive Test Procedure.

    ISTB-5200 Vertical Line Shaft Centrifugal PumpsISTB-5210 Preservice Testing.ISTB-5220 Inservice TestingISTB-5221 Group A Test Procedure.ISTB-5222 Group B Test Procedure.ISTB-5223 Comprehensive Test Procedure.

    ISTB-5300 Positive Displacement PumpsISTB-5310 Preservice Testing.ISTB-5320 Inservice TestingISTB-5321 Group A Test Procedure.ISTB-5322 Group B Test Procedure.ISTB-5323 Comprehensive Test Procedure.

    ISTB-6000 MONITORING, ANALYSIS, AND EVALUATIONISTB-6100 TrendingISTB-6200 Corrective ActionISTB-6300 Systematic ErrorISTB-6400 Analysis of Related Conditions

    ISTB-7000 TO BE PROVIDED AT A LATER DATEISTB-8000 TO BE PROVIDED AT A LATER DATEISTB-9000 RECORDS AND REPORTSISTB-9100 Pump RecordsISTB-9200 Test PlansISTB-9300 Record of TestsISTB-9400 Record of Corrective Action

    TablesTable ISTB-3000-1 Inservice Test ParametersTable ISTB-3400-1 Inservice Test FrequencyTable ISTB-3510-1 Required Instrument AccuracyTable ISTB-5121-1 Centrifugal Pump Test Acceptance CriteriaTable ISTB-5221-1 Vertical Line Shaft Centrifugal Pump Test Acceptance CriteriaTable ISTB-5321-1 Positive Displacement Pump (Except Reciprocating) Test Acceptance CriteriaTable ISTB-5321-2 Reciprocating Positive Displacement Pump Test Acceptance Criteria

    FigureFig. ISTB-5223-1 Vibration Limits

    Subsection ISTC Inservice Testing of Valves in Light-Water Reactor Nuclear Power PlantsISTC-1000 INTRODUCTIONISTC-1100 ApplicabilityISTC-1200 ExemptionsISTC-1300 Valve CategoriesISTC-1400 Owners Responsibility

    ISTC-2000 SUPPLEMENTAL DEFINITIONSISTC-3000 GENERAL TESTING REQUIREMENTSISTC-3100 Preservice TestingISTC-3200 Inservice TestingISTC-3300 Reference ValuesISTC-3310 Effects of Valve Repair, Replacement, or Maintenance on Reference Values.ISTC-3320 Establishment of Additional Set of Reference Values.

    ISTC-3400 To Be Provided at a Later DateISTC-3500 Valve Testing RequirementsISTC-3510 Exercising Test Frequency.ISTC-3520 Exercising RequirementsISTC-3521 Category A and Category B Valves.ISTC-3522 Category C Check Valves.

    ISTC-3530 Valve Obturator Movement.ISTC-3540 Manual Valves.ISTC-3550 Valves in Regular Use.ISTC-3560 Fail-Safe Valves.ISTC-3570 Valves in Systems Out of Service.

    ISTC-3600 Leak Testing RequirementsISTC-3610 Scope of Seat Leakage Rate Test.ISTC-3620 Containment Isolation Valves.ISTC-3630 Leakage Rate for Other Than Containment Isolation Valves.

    ISTC-3700 Position Verification TestingISTC-3800 Instrumentation

    ISTC-4000 TO BE PROVIDED AT A LATER DATEISTC-5000 SPECIFIC TESTING REQUIREMENTSISTC-5100 Power-Operated Valves POVsISTC-5110 Power-Operated Relief Valves PORVs.ISTC-5111 Valve Testing RequirementsISTC-5112 Leak Testing.ISTC-5113 Valve Stroke TestingISTC-5114 Stroke Test Acceptance Criteria.ISTC-5115 Corrective Action

    ISTC-5120 Motor-Operated ValvesISTC-5130 Pneumatically Operated ValvesISTC-5131 Valve Stroke TestingISTC-5132 Stroke Test Acceptance Criteria.ISTC-5133 Stroke Test Corrective Action

    ISTC-5140 Hydraulically Operated ValvesISTC-5141 Valve Stroke TestingISTC-5142 Stroke Test Acceptance Criteria.ISTC-5143 Stroke Test Corrective Action

    ISTC-5150 Solenoid-Operated ValvesISTC-5151 Valve Stroke TestingISTC-5152 Stroke Test Acceptance Criteria.ISTC-5153 Stroke Test Corrective Action

    ISTC-5200 Other ValvesISTC-5210 Manually Operated Valves.ISTC-5220 Check ValvesISTC-5221 Valve Obturator MovementISTC-5222 Condition-Monitoring Program.ISTC-5223 Series Valves in Pairs.10ISTC-5224 Corrective Action.

    ISTC-5230 Vacuum Breaker Valves.ISTC-5240 Safety and Relief Valves.ISTC-5250 Rupture Disks.ISTC-5260 Explosively Actuated Valves

    ISTC-6000 MONITORING, ANALYSIS, AND EVALUATIONISTC-7000 TO BE PROVIDED AT A LATER DATEISTC-8000 TO BE PROVIDED AT A LATER DATEISTC-9000 RECORDS AND REPORTSISTC-9100 RecordsISTC-9110 Valve Records.ISTC-9120 Record of Tests.ISTC-9130 Record of Corrective Action.

    ISTC-9200 Test Plans

    TableTable ISTC-3500-1 Inservice Test Requirements

    Subsection ISTD Preservice and Inservice Examination and Testing of Dynamic Restraints Snubbers in Light-Water Reactor Nuclear Power PlantsISTD-1000 INTRODUCTIONISTD-1100 ApplicabilityISTD-1110 Exclusions.

    ISTD-1400 Owners ResponsibilityISTD-1500 Snubber Maintenance or RepairISTD-1510 Maintenance or Repair Before Examination or Testing.ISTD-1520 Post-Maintenance or Repair Examination and Testing.

    ISTD-1600 Snubber Modification and ReplacementISTD-1610 Suitability.ISTD-1620 Examination and Testing.

    ISTD-1700 Deletions of Unacceptable SnubbersISTD-1750 Transient Dynamic Event.

    ISTD-1800 Supported Components or System Evaluation

    ISTD-2000 DEFINITIONSISTD-3000 GENERAL REQUIREMENTSISTD-3100 General Examination RequirementsISTD-3110 Examination Boundary.ISTD-3120 Visual Examination.

    ISTD-3200 General Testing RequirementsISTD-3210 Operational Readiness Testing Loads.ISTD-3220 Test Correction Factors.ISTD-3230 Snubber Test Parameters and Methods.ISTD-3300 General Service Life Monitoring Requirements.

    ISTD-4000 SPECIFIC EXAMINATION REQUIREMENTSISTD-4100 Preservice ExaminationISTD-4110 Preservice Examination Requirements.ISTD-4120 Reexamination.ISTD-4130 Preservice Thermal Movement Examination Requirements.ISTD-4131 Incremental Movement Verification.ISTD-4132 Swing Clearance.ISTD-4133 Total Movement Verification.

    ISTD-4140 Preservice Examination Corrective Action.

    ISTD-4200 Inservice ExaminationISTD-4210 Method and Objective.ISTD-4220 Snubber CategorizationISTD-4230 Visual Examination Requirements.ISTD-4231 Restrained Movement.ISTD-4232 Thermal Movement.ISTD-4233 Design-Specific Characteristics.

    ISTD-4240 Operational Readiness Test Evaluation.ISTD-4250 Inservice Examination IntervalsISTD-4251 Initial Examination Interval.ISTD-4252 Subsequent Examination Intervals

    ISTD-4260 Inservice Examination Sample Size.ISTD-4270 Inservice Examination Failure Evaluation.ISTD-4280 Inservice Examination Corrective Action.

    ISTD-5000 SPECIFIC TESTING REQUIREMENTSISTD-5100 Preservice Operational Readiness TestingISTD-5110 General.ISTD-5120 Test Parameters.ISTD-5130 Preservice Operational Readiness Testing Failures Corrective ActionISTD-5131 Test Failure Evaluations.ISTD-5132 Design Deficiency.ISTD-5133 Other Deficiencies.ISTD-5134 Retest Requirements.

    ISTD-5200 Inservice Operational Readiness TestingISTD-5210 Test Parameters.ISTD-5220 Test MethodsISTD-5221 Test as Found.ISTD-5222 Restriction.ISTD-5223 In-Place Test.ISTD-5224 Bench Test.ISTD-5225 Subcomponent Test.ISTD-5226 Correlation of Indirect Measurements.ISTD-5227 Parallel and Multiple Installations.ISTD-5228 Fractional Sample Sizes.

    ISTD-5240 Test Frequency.ISTD-5250 Defined Test Plan Group DTPGISTD-5251 DTPGs General Requirement.ISTD-5252 DTPG Alternatives.ISTD-5253 Additional DTPG Requirements for Pressurized Water Reactors.

    ISTD-5260 Testing Sample PlansISTD-5261 Sample Plans.ISTD-5262 Plan Selection.ISTD-5263 Plan Application.

    ISTD-5270 Continued Testing.ISTD-5271 Test Failure Evaluation.ISTD-5272 FMGs.ISTD-5273 FMG BoundariesISTD-5274 Snubbers in More Than One FMG.ISTD-5275 Additional FMG Review.

    ISTD-5280 Corrective Action.

    ISTD-5300 The 10% Testing SampleISTD-5310 The 10% Testing Sample Plan, Sample Size, and CompositionISTD-5311 Initial Sample Size and Composition.ISTD-5312 Additional Sample Size.ISTD-5313 Additional DTPG Sample Composition.ISTD-5314 FMG Sample Composition.

    ISTD-5320 The 10% Testing Sample Plan Additional TestingISTD-5321 DTPG Testing.ISTD-5323 FMG Testing.

    ISTD-5330 The 10% Testing Sample Plan Completion.ISTD-5331 Testing Plan Mathematical Expression.

    ISTD-5400 The 37 Testing Sample PlanISTD-5410 The 37 Testing Sample Plan, Sample Size, and CompositionISTD-5411 Initial Sample Size and Composition.ISTD-5412 Additional Sample Size.ISTD-5413 Additional Sample Selection.

    ISTD-5420 The 37 Testing Sample Plan Additional TestingISTD-5421 DTPG Testing.ISTD-5423 FMG Testing.

    ISTD-5430 The 37 Testing Sample Plan Completion.ISTD-5431 Testing Plan Mathematical Expressions.

    ISTD-5500 Retests of Previously Unacceptable Snubbers

    ISTD-6000 SERVICE LIFE MONITORINGISTD-6100 Predicted Service LifeISTD-6200 Service Life EvaluationISTD-6300 Cause DeterminationISTD-6400 Additional Monitoring Requirements for Snubbers That Are Tested Without Applying a Load to the Snubber Piston RodISTD-6500 Testing for Service Life Monitoring Purposes

    ISTD-7000 RESERVEDISTD-8000 RESERVEDISTD-9000 RECORDS AND REPORTSISTD-9100 Snubber RecordsISTD-9200 Test PlansISTD-9300 Record of TestsISTD-9400 Record of Corrective Action

    FigureFig. ISTD-5431-1 The 37 Testing Sample Plan

    TablesTable ISTD-4252-1 Visual Examination Table

    Subsection ISTE Risk-Informed Inservice Testing of Components in Light-Water Reactor Nuclear Power PlantsISTE-1000 INTRODUCTIONISTE-1100 ApplicabilityISTE-1200 AlternativeISTE-1300 General

    ISTE-2000 SUPPLEMENTAL DEFINITIONSISTE-3000 GENERAL REQUIREMENTSISTE-3100 ImplementationISTE-3200 Probabilistic Risk AssessmentISTE-3210 Plant-Specific PRA.ISTE-3220 Living PRA.

    ISTE-3300 Integrated Decision MakingISTE-3310 Plant Expert Panel.ISTE-3320 Integrated Effects.ISTE-3330 Determination of HSSC and LSSC.

    ISTE-3400 Evaluation of Aggregate RiskISTE-3500 Feedback and Corrective Actions

    ISTE-4000 SPECIFIC COMPONENT CATEGORIZATION REQUIREMENTSISTE-4100 Component Risk CategorizationISTE-4110 Appropriate Failure Modes.ISTE-4120 Importance MeasuresISTE-4130 Screening Criteria.ISTE-4140 Sensitivity StudiesISTE-4150 Qualitative Assessments.ISTE-4160 Components Not Modeled.

    ISTE-4200 Component Safety CategorizationISTE-4210 Plant Expert Panel Utilization.ISTE-4220 Plant Expert Panel RequirementsISTE-4230 Plant Expert Panel Decision Criteria.ISTE-4240 Reconciliation.

    ISTE-4300 Testing Strategy FormulationISTE-4400 Evaluation of Aggregate RiskISTE-4410 Decision CriteriaISTE-4420 Quantitative AssessmentISTE-4430 Qualitative EvaluationISTE-4440 Defense in Depth.ISTE-4450 Safety Margins.

    ISTE-4500 Inservice Testing ProgramISTE-4510 Maximum Testing Interval.ISTE-4520 Implementation Schedule.ISTE-4530 Assessment of Aggregate Risk.ISTE-4540 Transition Plan.

    ISTE-5000 SPECIFIC TESTING REQUIREMENTSISTE-5100 PumpsISTE-5110 High Safety Significant Pump Testing.ISTE-5120 Low Safety Significant Pump TestingISTE-5121 Low Safety Significant Pump Testing -- Pre-2000 Plants 2ISTE-5122 Low Safety Significant Pump Testing -- Post-2000 Plants 3

    ISTE-5130 Maximum Test Interval -- Pre-2000 Plants.

    ISTE-5200 Check ValvesISTE-5210 High Safety Significant Check Valve Testing.ISTE-5220 Low Safety Significant Check Valve Testing.

    ISTE-5300 Motor Operated Valve AssembliesISTE-5310 High Safety Significant MOVs.ISTE-5320 Low Safety Significant MOVs.

    ISTE-5400 Pneumatically and Hydraulically Operated ValvesISTE-5410 High Safety Significant Pneumatically and Hydraulically Operated Valve Assemblies TestingISTE-5420 Low Safety Significant Pneumatically and Hydraulically Operated Valve Assemblies Testing.

    ISTE-5500 To Be Provided at a Later Date

    ISTE-6000 MONITORING, ANALYSIS, AND EVALUATIONISTE-6100 Performance MonitoringISTE-6110 HSSC Attribute Trending.ISTE-6120 LSSC Performance Trending.

    ISTE-6200 Feedback and Corrective ActionsISTE-6210 FeedbackISTE-6220 Corrective Action.ISTE-6230 Component Safety Significance Recategorization.

    ISTE-7000 TO BE PROVIDED AT A LATER DATEISTE-8000 TO BE PROVIDED AT A LATER DATETableTable ISTE-5121-1 LSSC Pump Testing

    ISTE-9000 RECORDS AND REPORTSISTE-9100 Plant Expert Panel RecordsISTE-9200 Component Records

    Subsection ISTF Inservice Testing of Pumps in Light-Water Reactor Nuclear Power Plants -- Post-2000 Plants1ISTF-1000 INTRODUCTIONISTF-1100 ApplicabilityISTF-1200 ExclusionsISTF-1300 Owners Responsibility

    ISTF-2000 SUPPLEMENTAL DEFINITIONSISTF-3000 GENERAL TESTING REQUIREMENTSISTF-3100 Preservice TestingISTF-3200 Inservice TestingISTF-3300 Reference ValuesISTF-3310 Effect of Pump Replacement, Repair, and Maintenance on Reference Values.ISTF-3320 Establishment of Additional Set of Reference Values.

    ISTF-3400 Frequency of Inservice TestsISTF-3410 Pumps in Regular Use.ISTF-3420 Pumps in Systems Out of Service.

    ISTF-3500 Data CollectionISTF-3510 GeneralISTF-3520 PressureISTF-3530 Rotational Speed.ISTF-3540 VibrationISTF-3550 Flow Rate.

    ISTF-4000 TO BE PROVIDED AT A LATER DATEISTF-5000 SPECIFIC TESTING REQUIREMENTSISTF-5100 Centrifugal Pumps Except Vertical Line Shaft Centrifugal PumpsISTF-5110 Preservice Testing.ISTF-5120 Inservice Testing.

    ISTF-5200 Vertical Line Shaft Centrifugal PumpsISTF-5210 Preservice Testing.ISTF-5220 Inservice Testing.

    ISTF-5300 Positive Displacement PumpsISTF-5310 Preservice Testing.ISTF-5320 Inservice Testing.

    ISTF-6000 MONITORING, ANALYSIS, AND EVALUATIONISTF-6100 TrendingISTF-6200 Corrective ActionISTF-6300 Systematic ErrorISTF-6400 Analysis of Related Conditions

    ISTF-7000 RESERVEDISTF-8000 RESERVEDISTF-9000 RECORDS AND REPORTSISTF-9100 Pump RecordsISTF-9200 Test PlansISTF-9300 Record of TestsISTF-9400 Record of Corrective Action

    TablesTable ISTF-3000-1 Inservice Test ParametersTable ISTF-3510-1 Required Instrument AccuracyTable ISTF-5120-1 Centrifugal Pump Test Acceptance CriteriaTable ISTF-5220-1 Vertical Line Shaft and Centrifugal Pump Test Acceptance CriteriaTable ISTF-5320-1 Positive Displacement Pump (Except Reciprocating) Test Acceptance CriteriaTable ISTF-5320-2 Reciprocating Positive Displacement Pump Test Acceptance Criteria

    Mandatory Appendix I Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power PlantsI-1000 GENERAL REQUIREMENTSI-1100 ApplicabilityI-1120 Limitations

    I-1200 DefinitionsI-1300 Guiding PrinciplesI-1310 GeneralI-1320 Test Frequencies, Class 1 Pressure Relief ValvesI-1330 Test Frequency, Class 1 Nonreclosing Pressure Relief Devices.I-1340 Test Frequency, Class 1 Pressure Relief Valves That Are Used for Thermal Relief Application.I-1350 Test Frequency, Classes 2 and 3 Pressure Relief ValvesI-1360 Test Frequency, Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-1370 Test Frequency, Classes 2 and 3 Primary Containment Vacuum Relief ValvesI-1380 Test Frequency, Classes 2 and 3 Vacuum Relief Valves, Except for Primary Containment Vacuum Relief Valves.I-1390 Test Frequency, Classes 2 and 3 Pressure Relief Devices That Are Used for Thermal Relief Application.

    I-1400 InstrumentationI-1410 Set-Pressure Measurement Accuracy.

    I-2000 BOILING WATER REACTORS BWR -- INTRODUCTIONI-3000 BWR PRESSURE RELIEF DEVICE TESTINGI-3100 Testing Before Initial InstallationI-3110 Class 1 Main Steam Pressure Relief Valves With Auxiliary Actuating Devices.I-3120 Class 1 Main Steam Pressure Relief Valves Without Auxiliary Actuating Devices.I-3130 Other Class 1 Pressure Relief Valves.I-3140 Class 1 Nonreclosing Pressure Relief Devices.I-3150 Classes 2 and 3 Pressure Relief Valves.I-3160 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-3170 Classes 2 and 3 Vacuum Relief Valves.

    I-3200 Testing Before Initial Electric Power GenerationI-3210 Class 1 Main Steam Pressure Relief Valves With Auxiliary Actuating Devices.I-3220 Class 1 Main Steam Pressure Relief Valves Without Auxiliary Actuating Devices.I-3230 Other Class 1 Pressure Relief Valves.I-3240 Class 1 Nonreclosing Pressure Relief Devices.I-3250 Classes 2 and 3 Pressure Relief Valves.I-3260 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-3270 Classes 2 and 3 Vacuum Relief Valves

    I-3300 Periodic TestingI-3310 Class 1 Main Steam Pressure Relief Valves With Auxiliary Actuating Devices.I-3320 Class 1 Main Steam Pressure Relief Valves Without Auxiliary Actuating Devices.I-3330 Other Class 1 Pressure Relief Valves.I-3340 Class 1 Nonreclosing Pressure Relief Devices.I-3350 Classes 2 and 3 Pressure Relief Valves.I-3360 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-3370 Classes 2 and 3 Vacuum Relief Valves

    I-3400 Disposition After Testing or MaintenanceI-3410 Class 1 Main Steam Pressure Relief Valves With Auxiliary Actuating DevicesI-3420 Class 1 Main Steam Pressure Relief Valves Without Auxiliary Actuating DevicesI-3430 Other Class 1 Pressure Relief ValvesI-3440 Class 1 Nonreclosing Pressure Relief Devices.I-3450 Classes 2 and 3 Pressure Relief ValvesI-3460 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-3470 Classes 2 and 3 Vacuum Relief Valves

    I-4000 BWR TEST METHODSI-4100 Set-Pressure TestingI-4110 Steam ServiceI-4120 Compressible Fluid Services Other Than SteamI-4130 Liquid Service

    I-4200 Seat Tightness TestingI-4210 Inlet Pressure.I-4220 Acceptable Seat Tightness Testing Methods.I-4230 Acceptance Criteria for Seat Leakage Testing.

    I-4300 Alternative Test MediaI-4310 Correlation.I-4320 Certification of Correlation Procedure.I-4330 Procedure.

    I-5000 BWR RECORDS AND RECORD KEEPINGI-5100 RequirementsI-5200 Record of TestI-5300 Record of Modification and Corrective Action

    I-6000 PRESSURIZED WATER REACTORS PWR -- INTRODUCTIONI-7000 PWR PRESSURE RELIEF DEVICE TESTINGI-7100 Testing Before Initial InstallationI-7110 Class 1 Safety Valves.I-7120 Class 1 Power Actuated Relief Valves.I-7130 Other Class 1 Pressure Relief Valves.I-7140 Class 1 Nonreclosing Pressure Relief Devices.I-7150 Classes 2 and 3 Pressure Relief Valves.I-7160 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-7170 Classes 2 and 3 Vacuum Relief Valves.

    I-7200 Testing Before Initial Electric Power GenerationI-7210 Class 1 Safety Valves.I-7220 Class 1 Power-Actuated Relief Valves.I-7230 Other Class 1 Pressure Relief Valves.I-7240 Class 1 Nonreclosing Pressure Relief Devices.I-7250 Classes 2 and 3 Pressure Relief ValvesI-7260 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-7270 Classes 2 and 3 Vacuum Relief Valves

    I-7300 Periodic TestingI-7310 Class 1 Safety Valves.I-7320 Class 1 Power Actuated Relief Valves.I-7330 Other Class 1 Pressure Relief Valves.I-7340 Class 1 Nonreclosing Pressure Relief Devices.I-7350 Classes 2 and 3 Main Steam Safety Valves.I-7360 Other Classes 2 and 3 Pressure Relief Valves.I-7370 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-7380 Classes 2 and 3 Vacuum Relief Valves

    I-7400 Disposition After Testing or MaintenanceI-7410 Class 1 Safety ValvesI-7420 Class 1 Power-Actuated Relief ValvesI-7430 Other Class 1 Pressure Relief ValvesI-7440 Class 1 Nonreclosing Pressure Relief Devices.I-7450 Classes 2 and 3 Main Steam Safety ValvesI-7460 Other Classes 2 and 3 Pressure Relief ValvesI-7470 Classes 2 and 3 Nonreclosing Pressure Relief Devices.I-7480 Classes 2 and 3 Vacuum Relief Valves

    I-8000 PWR TEST METHODSI-8100 Set-Pressure TestingI-8110 Steam ServiceI-8120 Compressible Fluid Services Other Than SteamI-8130 Liquid Service

    I-8200 Seat Tightness TestingI-8210 Inlet Pressure.I-8220 Acceptable Seat-Tightness Testing Methods.I-8230 Acceptance Criteria for Seat Leakage Testing.

    I-8300 Alternative Test MediaI-8310 Correlation.I-8320 Certification of Correlation Procedure.I-8330 Procedure.

    I-9000 PWR RECORDS AND RECORD KEEPINGI-9100 RequirementsI-9200 Record of TestsI-9300 Record of Modification and Corrective Action

    Mandatory Appendix II Check Valve Condition Monitoring ProgramII-1000 PURPOSEII-2000 GROUPINGSII-3000 ANALYSISII-4000 CONDITION-MONITORING ACTIVITIESII-5000 CORRECTIVE MAINTENANCEII-6000 DOCUMENTATION

    Mandatory Appendix III Preservice and Inservice Testing of Active Electric Motor Operated Valve Assemblies in Light-Water Reactor Power PlantsIII-1000 INTRODUCTIONIII-1100 ApplicabilityIII-1200 Scope

    III-2000 SUPPLEMENTAL DEFINITIONSIII-3000 GENERAL TESTING REQUIREMENTSIII-3100 Design Basis Verification TestIII-3200 Preservice TestIII-3300 Inservice TestIII-3310 Inservice Test Interval.

    III-3400 Effect of MOV Replacement, Repair, or MaintenanceIII-3500 Grouping of MOVs for Inservice TestingIII-3600 MOV Exercising RequirementsIII-3610 Normal Exercising Requirements.III-3620 Additional Exercising Requirements.

    III-3700 Risk-Informed MOV Inservice TestingIII-3710 Risk-I