Page 1: Ash Grove Chanute Presentation
Page 2: Ash Grove Chanute Presentation

A Case Study inCement Plant

Wear Solutions

1-888-4WEARCON1 011 816-587-1923 Cell: 586-925-0581

www.wearcon.com

Page 3: Ash Grove Chanute Presentation

• Fourth largest cement company in U.S.

• Chanute, KS is the home of Ash Grove’s first cement plant

• Plant started on July 28, 1908

•164,500 tons were produced in the first year

• Major improvements in 1911, 1920, and 1964

• Final major expansion in July 2001

• Over 1.4 Million MTPY of clinker production

Ash Grove Cement Company Chanute, KS

Page 4: Ash Grove Chanute Presentation

• Capable of grinding 340 MTPH

• Crushing 4” Limestone to a product size of 80% passing 200 mesh (74 micron)

• Raw mill equipped with high- efficiency classifier

Vertical Roller Mill FRM 48/234

Page 5: Ash Grove Chanute Presentation

Wear Issues and

Wear-Con’s Solutions

2002

Page 6: Ash Grove Chanute Presentation

• First wear developed in ductwork above vertical roller mill. Holes developed in first 6 months of operation

• Ductwork made of mild steel and patches were applied over the holes in first year

• Ductwork temp patched in 2002 with WC700 Chrome Carbide

Page 7: Ash Grove Chanute Presentation

• Raw Mill Water Spray Box protector upgraded to WC700/900 in March 2002

• Initially no protection. WC700 lasted 3 months and

WC900 lasted 6 months

Page 8: Ash Grove Chanute Presentation

Wear Issues and

Wear-Con’s Solutions

2003

Page 9: Ash Grove Chanute Presentation

Raw Mill Separator Vanes upgraded to VB96 in Jan 03

VB96 lasted 1 year vs. AR Vanes which lasted only 3 months

Page 10: Ash Grove Chanute Presentation
Page 11: Ash Grove Chanute Presentation

• Raw Mill Separator Cone upgraded to WC90 Ceramic in July 03

Page 12: Ash Grove Chanute Presentation

Wear Issues and

Wear-Con’s Solutions

2004

Page 13: Ash Grove Chanute Presentation

• Wear in the Bonnet and Transition became excessive and metal repairs were only a temporary solution

• Wear-Con’s field crew installed WC90 Ceramic in the corner

of Transition and Bonnet on site in Feb 04

Page 14: Ash Grove Chanute Presentation

Wear Issues and

Wear-Con’s Solutions

2005

Page 15: Ash Grove Chanute Presentation

• Wear in Duct, Bonnet, Transition, Splitter Box, and Classifier Cone was very severe

• Ash Grove contacted Wear-Con in Jan 05

• In only 4 weeks, Wear-Concepts submitted proposal, mobilized crews and began project on Feb 28, 2005!

Wear-Con gets another call

2005

Page 16: Ash Grove Chanute Presentation

Over 12,300 WC90 ceramic bricks were installed in only 12 days!

Page 17: Ash Grove Chanute Presentation

Ash Grove inspected the final work and could not find any discrepancies with workmanship

Page 18: Ash Grove Chanute Presentation

All work was completed safely,on time, and within budget.

Page 19: Ash Grove Chanute Presentation

• Original linings installed during 2002 thru 2005 timeframe are still providing wear protection

• Additional work is scheduled to be done in 2006

Was Customer Satisfied?

Page 20: Ash Grove Chanute Presentation

• Build Relationships

• Solve wear issues, not just ‘sell products’

• Provide ‘Turn-Key Solutions’

• Provide Peace of Mind

Wear-Con’s Keys to ensuringCustomer Satisfaction

when solving wear issues