as on 30 th august 2012
DESCRIPTION
As on 30 th August 2012. Front side view. Front view. Back side view. Entrance. Basement. Ground Floor. 1 st Floor. 2 nd Floor. Construction work on 3rd Floor. - PowerPoint PPT PresentationTRANSCRIPT
As on 30th August 2012
Front side view
Front view
Back side view
Entrance
Basement
Ground Floor
1st Floor
2nd Floor
Construction work on 3rd Floor