artisan task 1.3
DESCRIPTION
Artisan Task 1.3. Mapping of enterprise data [email protected]. Agenda. Mapping to Data Structure – Scenarios Structure of a textile ERP DS-S 1: online monitoring DS-S 2: mapping to production orders DS-S 3: model for produc groups: total DS-S 4: time profiles by group - PowerPoint PPT PresentationTRANSCRIPT
1ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
Artisan Task 1.3
Mapping of enterprise [email protected]
2ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
• Mapping to Data Structure – Scenarios• Structure of a textile ERP• DS-S 1: online monitoring• DS-S 2: mapping to production orders• DS-S 3: model for produc groups: total• DS-S 4: time profiles by group• DS-S 5: allocation for energy consumption• DS-S 6: allocation of embodied energy
Agenda
3ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
• Scenarios were agreed in the kick off meeting• Each scenario defines a data structure– Seven of them defined– They cover different areas in energy consumption
• Main objectives of Task 1.3– Map existing data to scenarios• Showing the structure of textile companies• Explaining if and where data are available
Mapping to Data Structure – Scenarios
4ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
• Textile companies are not all the same– Weaving mills– Spinning mills– Third party finishing / dyeing– Others...
• The main concepts are similar – Generic structure
• We will ignore thousands of customizations
Structure of a textile ERP
5ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
Structure of a textile ERPArticles may be fabrics, twisted or simple yarns, raw
material
Bill of Material says which yarns
compose a fabric, which raw material
composes a yarn
A generic workflow is
associated to the article
Order rows will feed the
production management
module
The batch table contains all
pieces in production
The actual Workflow and Bill
of Material are updated while
processing
6ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
DS-S 1: online monitoring
The plant
department
department
department office office
department
heating
engines
lamps
refrigerators
dryers
Heat suppliers Heat dispersors
walls
windows
air exchange
Introduce or dispose heat ?
7ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
Department Process
DS-S 1: online monitoring
Machine 1(loom)
Stage 1(weaving)
Stage 2
Stage 3
Machine 2
Machine 3
Ind. energy
Direct energy
Direct energy
Direct energy
Processes (examples)
Transformation from Yarn to FabricWet finishingPieces dyeing
RaisingStenter
Dry finishingFinal control and shipping
8ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
NAME PLACE UNIT DATA FORMAT CORR.
Electric power Sensors on machine, counter
KWh Sent on requestxml 15 minutes
+/- 2%
Gas Not categorized but no peaks
Cube meters per Hour
Xml (1 hour) +/- 5%
Steam Secondary. Measure of primary source
V[m3], P[bar], t[°C]
Water Consumption for heating and purification
V[m3], t [°C]
Compressed air
Consumption for production
V[m3]
Air conditioned
Offices, closed rooms V[m3] , t [°C] , humidity (%)
DS-S 1: online monitoring
9ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
• Total energy splitted in – Direct Energy (used in production)– Indirect Energy (used in the infrastructure)
DS-S 2: mapping to production orders
E(U) = EDir(U) + EInd(U)
• Direct Energy:– Sum energy of stages: Etot = E(f1)+ E(f2)+...+ E(fn)– Divide by total amount: EDir(U) = Etot / Qta
• Indirect energy– [EInd(u)] = (EInd department/working time)*Unit
production time
10ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
• Divide articles in groups:– Begin from commercial groups defined in ERP• Similar stages• Similar machines
– Refine grouping by «macro process»• Similar stages in process
• Example: group products having similar stages in «textile transformation from yarn to fabric»
DS-S 3: model for product group: total
11ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
ID Process Elapsed time
A Transformation from yarn to fabric
8.6 min
B Wet finishing 9.7 min
C Piece dye-works 4.3 min
D Raising 0
E Stenter 2.7 min
... 0.5 min
Y Dry finish 3.1 min
Z Final check and shipping 1 min
DS-S 4: time profiles by group
• Compute the average time of permanence of each macro process for a unit of product:
12ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
DS-S 5: allocation for energy consumption
Generic model of energy consumption.
Energy consumer
Energy provider
Tells the provider how much energy is needed or stops the consumer
The workflow, a set of stages, generate
the energy consumption
13ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
• Energy used for maintenance and emissions– Solid emissions
• Fibers• Plastic• Packaging• ...
– Liquid emissions• Water• Oil• Chemical products• ...
– Gas emissions• CO2
DS-S 6: allocation of embodied energy
14ARTISAN 1st ARTISAN 1st Plenary MeetingPlenary MeetingMay 8th – 9th 2012
Q & A