ARKANSAS STATE PARKS CAPITAL IMPROVEMENT PROJECTS AMENDMENT 75 Park / Museum District # County Accomplishments as of June 30, 2016 Costs AR Museum of Natural Resources Sen. 27 Union + Renovation of the Fire Sprinkler System $ 75,489 AR Museum of Natural Resources Rep. 7 Union + Waterline extension-Tie-in museum with City of Smackover water system $ 78,177 AR Museum of Natural Resources Union + Phase I: Design, fabricate & install exhibits in Galleries 4, 5, 7 & 8 $ 693,600 AR Museum of Natural Resources Union + Phase II: Design, fabricate & install exhibits in Galleries 9,10 & 12 $ 798,160 AR Museum of Natural Resources Union + Phase II: Design, fabricate & install exhibits in Gallery 13-Bromine Industry (A-75 only; FY06 ANCRC 3KE $394,700) $ 105,300 AR Museum of Natural Resources Union + Installation of HVAC system in Museum Building $ 126,200 AR Museum of Natural Resources Union + Construction of new landscape sprinkler system (A-75 only; $12,000 donated by Southwest Arkansas Planning & Development District) $ 328 AR Museum of Natural Resources Union $ 1,877,254 Arkansas Post Museum Sen. 25 Arkansas + Installation of Fire & Security Alarm System $ 52,470 Rep. 12 Arkansas $ 52,470 Bull Shoals/White River Sen. 17 Baxter/Marion + Bank Stabilization/Erosion Control along White River from Big Spring to park boundary $ 358,031 Bull Shoals/White River Rep.99,100 Baxter/Marion + Construction of barrier-free fishing area on river revetment adjacent to marina, including parking and access $ 16,830 Bull Shoals/White River Baxter/Marion + Construct playground to meet Consumer Product Safety Commission & ADA guidelines $ 31,381 Bull Shoals/White River Baxter/Marion + Construct Wildflower Interpretive Garden including ADA parking and barrier-free trail (In-house) $ 81,912 Bull Shoals/White River Baxter/Marion + Renovation/repair of Area "D" campground bathhouse, to include barrier-free modifications (In- house) $ 41,841 Bull Shoals/White River Baxter/Marion + Wastewater Treatment Analysis/Report $ 3,650 Bull Shoals/White River Baxter/Marion + Construct employee residence (A-75 only) (ANCRC $176,825) $ 11,175 Bull Shoals/White River Baxter/Marion + Construction of sewer improvements including force main to City of Bull Shoals wastewater treatment plant $ 290,458 Bull Shoals/White River Baxter/Marion + Construction of new barrier-free bathhouse at Area "C" campground, to include parking, access and utilities $ 179,123 Bull Shoals/White River Baxter/Marion + Construction of Visitor Center, including barrier-free parking, access, utilities, exhibits (A-75 only) and FFE (ANCRC FY06 - $358,133) $ 5,261,280 Bull Shoals/White River Baxter/Marion + Lakeview Day Use Area improvements, Big Spring Area Access improvements and new barrier-free Amphitheater Improvements to include Parking $ 465,873 Bull Shoals/White River Baxter/Marion + Cultural Resource Survey for new COE lease area $ 4,500 Bull Shoals/White River Baxter/Marion + Environmental Assessment report for new COE lease area $ 19,280 Bull Shoals/White River Baxter/Marion + Signage for Oak Ridge Mountain Bike Trail $ 3,942 Bull Shoals/White River Baxter/Marion + Installation of P1 pump at Visitor Center $ 3,628 Bull Shoals/White River Baxter/Marion + Modification / reconstruction of the existing water feature to a landscape feature at the James A. Gaston Visitor Center. $ 16,065 1 6-30-2016

Upload: vokiet

Post on 14-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

AR Museum of Natural Resources Sen. 27 Union + Renovation of the Fire Sprinkler System $ 75,489

AR Museum of Natural Resources Rep. 7 Union + Waterline extension-Tie-in museum with City of Smackover water system $ 78,177

AR Museum of Natural Resources Union + Phase I: Design, fabricate & install exhibits in Galleries 4, 5, 7 & 8 $ 693,600

AR Museum of Natural Resources Union + Phase II: Design, fabricate & install exhibits in Galleries 9,10 & 12 $ 798,160

AR Museum of Natural ResourcesUnion + Phase II: Design, fabricate & install exhibits in Gallery 13-Bromine Industry (A-75 only; FY06

ANCRC 3KE $394,700) $ 105,300

AR Museum of Natural Resources Union + Installation of HVAC system in Museum Building $ 126,200

AR Museum of Natural ResourcesUnion + Construction of new landscape sprinkler system (A-75 only; $12,000 donated by Southwest Arkansas

Planning & Development District) $ 328

AR Museum of Natural Resources Union $ 1,877,254

Arkansas Post Museum Sen. 25 Arkansas + Installation of Fire & Security Alarm System $ 52,470

Rep. 12 Arkansas $ 52,470

Bull Shoals/White River Sen. 17 Baxter/Marion + Bank Stabilization/Erosion Control along White River from Big Spring to park boundary $ 358,031

Bull Shoals/White River Rep.99,100 Baxter/Marion + Construction of barrier-free fishing area on river revetment adjacent to marina, including parking and

access $ 16,830

Bull Shoals/White River Baxter/Marion + Construct playground to meet Consumer Product Safety Commission & ADA guidelines $ 31,381

Bull Shoals/White River Baxter/Marion + Construct Wildflower Interpretive Garden including ADA parking and barrier-free trail (In-house) $ 81,912

Bull Shoals/White River Baxter/Marion + Renovation/repair of Area "D" campground bathhouse, to include barrier-free modifications (In-

house) $ 41,841

Bull Shoals/White River Baxter/Marion + Wastewater Treatment Analysis/Report $ 3,650

Bull Shoals/White River Baxter/Marion + Construct employee residence (A-75 only) (ANCRC $176,825) $ 11,175

Bull Shoals/White River Baxter/Marion + Construction of sewer improvements including force main to City of Bull Shoals wastewater

treatment plant $ 290,458

Bull Shoals/White River Baxter/Marion + Construction of new barrier-free bathhouse at Area "C" campground, to include parking, access and

utilities $ 179,123

Bull Shoals/White River Baxter/Marion + Construction of Visitor Center, including barrier-free parking, access, utilities, exhibits (A-75 only)

and FFE (ANCRC FY06 - $358,133) $ 5,261,280

Bull Shoals/White River Baxter/Marion + Lakeview Day Use Area improvements, Big Spring Area Access improvements and new barrier-free

Amphitheater Improvements to include Parking $ 465,873

Bull Shoals/White River Baxter/Marion + Cultural Resource Survey for new COE lease area $ 4,500

Bull Shoals/White River Baxter/Marion + Environmental Assessment report for new COE lease area $ 19,280

Bull Shoals/White River Baxter/Marion + Signage for Oak Ridge Mountain Bike Trail $ 3,942

Bull Shoals/White River Baxter/Marion + Installation of P1 pump at Visitor Center $ 3,628

Bull Shoals/White River Baxter/Marion + Modification / reconstruction of the existing water feature to a landscape feature at the James A.

Gaston Visitor Center. $ 16,065

1 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Bull Shoals/White River Baxter/Marion + Repair / modifications of the Geothermal System and associated equipment at the James A. Gaston

Visitor Center. $ 26,253

Bull Shoals/White River Baxter/Marion + Repair Marina Store due to flood damage. $ 10,726

Bull Shoals/White River Baxter/Marion + Installation of site furnishings, trailhead signage, and wayside exhibits on a barrier-free trail.($20,000

to be reimbursed by AGFC Wildlife Observation Trail Grant) $ 24,753

Bull Shoals/White River Baxter/Marion $ 6,850,700

Cane Creek Sen. 26 Lincoln + Parking/Paving Improvements $ 87,680

Cane Creek Rep. 12 Lincoln + Construction of employee residence & multi-purpose pavilion including barrier-free access & utilities

(Including Furnishings, Fixtures and Equipment) $ 549,931

Cane Creek Lincoln + Construction of employee residence with associated access and utilities $ 175,584

Cane Creek Lincoln + Acquisition of manufactured home for employee residence $ 13,350

Cane Creek Lincoln + Conduct Cultural Resources Survey for new Cane Creek Lake Trail. $ 3,697

Cane Creek Lincoln + Construction of a new courtesy dock adjacent to campground. (Project also funded from ANCRC

FY04 - $29,152 & ANCRC FY06 - $29,477) $ 19,487

Cane Creek Lincoln + Construction of Two (2) Trail Shelters on Cane Creek Lake Trail. $ 20,797

Cane Creek Lincoln + Construction of Grill Shelters (2) adjacent to Day-Use Pavilions. $ 18,567

Cane Creek Lincoln + Continuation of construction of Timberland Cut-off Trail $ 3,119

Cane Creek Lincoln + Construction of new Wastewater Treatment Plant $ 281,143

Cane Creek Lincoln $ 1,173,355

Conway Cemetery Sen. 11 Lafayette + Construction of new entrance road and barrier-free access improvements $ 96,243

Conway Cemetery Rep. 2 Lafayette $ 96,243

Cossatot Sen. 10 Polk + Water systems improvements - tie-in to City of Wickes water system $ 271,842

Cossatot Rep. 19,20 Polk + Construction of new employee residence including access and utilities (Including FFE) $ 171,890

Cossatot Polk + Construction of new Visitor Center, including site improvements, access, utilities and exhibits

(Including FFE) $ 2,951,727

Cossatot Polk + Addition/expansion of maintenance facility, equipment shed and flammable storage building $ 189,787

Cossatot Polk + Design, fabrication and installation of exhibits at the new Visitor Center $ 684,400

Cossatot Polk + Road and parking improvements $ 15,805

Cossatot Polk + Harris Creek Trailhead improvements (A-75 only) $ 688

Cossatot Polk + Water, sewer and electrical improvements, including water line extension to maintenance building

and installation of septic tank and leach field $ 188,624

Cossatot Polk + Appraisal of five (5) tracts of land $ 2,500

Cossatot Polk + Construction of new campground and composting toilet at Sandbar Area (In-house) (A-75 only;

FY04 ANCRC 1WT $65,666.68) $ 57,212

Cossatot Polk + Acquisition one (1) tract of land approximately 40 acres (ANCRC FY-06 $139,577) $ 96,065

2 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Cossatot Polk + Purchase and installation of a manufactured home, including new drilled well, small maintenance

building and complex, access, and utilities at Hwy 246 area. (In-house) $ 119,644

Cossatot Polk + Funding for Bat study $ 5,000

Cossatot Polk + Construction of composting toilet to include site and access improvements at Brushy Creek Day-Use

Area. $ 175,995

Cossatot Polk + Construction / Installation of a new Amphitheater w/barrier free access and Playground adjacent to

Visitor Center (In-House) $ 45,817

Cossatot Polk + Repairs to Exhibits in the Visitor Center. $ 17,496

Cossatot Polk + Upgrade recycling bins in park. $ 21,017

Cossatot Polk + Continuation of repairs/renovations to the River Corridor Trail (A-75 only; $92,450.00 FY09

ANCRC) $ 909

Cossatot Polk ++ Construction of River Ridge Group Camp to include road, access, parking, utilities, campsites,

shelters, and a restroom. $ 135,000

Cossatot Polk $ 5,151,418

Crater of Diamonds Sen. 10 Pike + Renovation of campground bathhouse/public laundry, including barrier-free modifications (In-house) $ 56,709

Crater of Diamonds Rep. 19 Pike + Diamond search area clearing $ 6,000

Crater of Diamonds Pike + River trail improvements, including barrier-free accessibility and exhibits $ 181,426

Crater of Diamonds Pike + Develop Interpretive Plan for media and Programs $ 19,500

Crater of Diamonds Pike + Develop overall Concept Plan for Park development $ 17,160

Crater of Diamonds Pike + Construct Diamond Springs Water Park, including site improvements, barrier-free access and utilities

(A-75 only; LWCF $461,000; Total Cost $1,253,141) $ 792,141

Crater of Diamonds Pike + Restroom trailer rental during Construction of Diamond Springs Water Park $ 14,668

Crater of Diamonds Pike + Asbestos surveys for selected park structures to meet state and federal regulations $ 2,983

Crater of Diamonds Pike + Acquisition and appraisal of one (1) tract of land (approximately 23.41 acres) $ 106,119

Crater of Diamonds Pike + Construction of a Diamond Discovery Center, including site improvements, access, utilities and

exhibits $ 1,684,587

Crater of Diamonds Pike + Relocate existing playground to campground due to construction of DDC (FY 05) $ 42,500

Crater of Diamonds Pike + Restoration of existing guardhouse (In-house construction) $ 15,929

Crater of Diamonds Pike + Phase I Improvements - construct 2 employee residences, renovate bathhouse, day-use area, wildlife

blind and amphitheater (A-75 only; FY01 ANCRC 1DG $838,296; Including FFE) $ 385,228

Crater of Diamonds Pike + Extension of electrical lines to the Diamond Springs Water Park. $ 75,575

Crater of Diamonds Pike + Sewer Pump / Lift Station Improvements $ 78,991

Crater of Diamonds Pike + Acquisition and set up two (2) manufactured homes including access and utilities $ 200,234

Crater of Diamonds Pike + Asbestos survey on four (4) structures scheduled for demolition. $ 1,145

Crater of Diamonds Pike + Expand parking for overflow visitation. $ 11,139

3 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Crater of Diamonds Pike + Diamond Discovery Center (DDC) improvements to include an awning over the Demonstration Area,

installation of concrete block walls for additional storage, extension of a chain link fence adjacent to

the building for better security and installation of vinyl curtain enclosure on the lower level. $ 17,092

Crater of Diamonds Pike + Construct picnic area at service road/overflow parking area.(In-House) $ 4,918

Crater of Diamonds Pike + Modifications to Day-Use Pavilion for temporary re-use as a Visitor Center. $ 51,661

Crater of Diamonds Pike + Renovation / Repair / Expansion of the Visitor Center to correct structural, roof, and exterior siding

problems. (A-75 only, $532,331 - General Improvement Fund) $ 277,589

Crater of Diamonds Pike + Installation of fitness equipment cluster system ($4,395 Cash [$4,000 donation - America's State Park

Foundation + $395 Cash Funds]) $ 5,586

Crater of Diamonds Pike + Construction of ADA compliant modifications to the Mineral Washing Pavilion and the Clean-up

Station. $ 28,377

Crater of Diamonds Pike + Construction / installation of a swimming pool liner at Diamonds Springs. $ 59,688

Crater of Diamonds Pike + Construction / structural repair to the ramp at the northwest corner of the Diamond Discovery Center $ 22,716

Crater of Diamonds Pike $ 4,159,661

Crowley's Ridge Sen. 20 Greene + Road and parking improvements $ 170,513

Crowley's Ridge Rep. 56 Greene + Construct vending shelter by VIC, renovate campground bathhouse and make ADA modifications at

the Group Area Dining Hall $ 183,058

Crowley's Ridge Greene + Phase I dredging of Lake Ponder Swimming Lake $ 9,950

Crowley's Ridge Greene + Asbestos surveys for selected park structures to meet state and federal regulations $ 3,029

Crowley's Ridge Greene + Installation of recreational equipment at swimming lake $ 6,844

Crowley's Ridge Greene + Replace deteriorated pedal boat dock and construct new attendant shelter, including

barrier-free access (In-house) $ 30,703

Crowley's Ridge Greene + Acquisition of one (1) tract of land with four (4) structures (Approximately 2.6 acres) $ 110,369

Crowley's Ridge Greene + Archeology work at Lake Ponder for dredging project $ 9,897

Crowley's Ridge Greene + Lake research-water quality study for algae problem $ 10,000

Crowley's Ridge Greene + Construction of a new boat ramp on Walcott Lake. (In-house) $ 4,171

Crowley's Ridge Greene + Construction of Gravity Main Extenstion (A75 only; FY14 Major Maintenance $13,166) $ 63,821

Crowley's Ridge Greene ++ Construction of two (2) employee residences to include site improvements, road, access, all utilities,

and appliances. $ 760,000

Crowley's Ridge Greene $ 1,362,355

Daisy Sen. 10

Rep. 19

Pike + Construct barrier-free campground bathhouse in Area "B", pavilion with restrooms and

renovate/expand maintenance building $ 458,475

Daisy Pike + Construct employee residence including access, utilities and appliances $ 160,133

Daisy Pike + Shoreline stabilization/erosion control along lake shore $ 115,978

Daisy Pike + Replace primary sewer lift station $ 46,377

Daisy Pike + Road and parking improvements $ 209,511

4 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Daisy Pike + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,324

Daisy Pike + Renovate Area "E" campground to include all utilities and access roads and construct barrier-free

bathhouse (A-75 only) $ 568,019

Daisy Pike + Acquisition of one (1) tract of land (approximately 3.78 acres) with improvements $ 127,625

Daisy Pike + Renovation/Repair of newly acquired employee residence $ 39,740

Daisy Pike $ 1,727,182

Davidsonville Historic Sen. 19 Randolph + Construct pavilion with restroom including parking improvements and barrier-free access $ 137,176

Davidsonville Historic Rep. 60 Randolph + Parking, access improvements and construction of barrier-free trail $ 83,210

Davidsonville Historic Randolph + Installation of barrier-free playground $ 38,861

Davidsonville Historic Randolph + Phase II Archeology $ 61,180

Davidsonville Historic Randolph + Asbestos surveys for selected park structures to meet state and federal regulations $ 923

Davidsonville Historic Randolph + Purchase of manufactured home to include site improvements, access and all utilities. $ 94,734

Davidsonville Historic Randolph + Construction of basic ghost structures of the first Courthouse and the original Post Office. (A-75

only; also funded by FY13 ANCRC - $106,113.68) $ 48,797

Davidsonville Historic Randolph ++ Construction of a newVisitor Center to include site improvements, all utilities, exhibits, and FF&E

(Furnishings, Fixtures and Equipment) $ 895,000

Davidsonville Historic Randolph $ 1,359,881

DeGray Sen. 10,13 Hot Springs + Lodge renovate (Phase I; A-75 only; Total Cost $3,178,525.82) $ 1,978,526

DeGray Rep. 18, 26 Hot Springs + Lodge renovation (Phase II) $ 3,804,437

DeGray Hot Springs + Complete renovation of Caddo Bend Day-Use area, parking and picnic site improvements $ 567,327

DeGray Hot Springs + Replace golf course irrigation system including pump house, pumps, and distribution lines $ 611,580

DeGray Hot Springs + Construct DeRoche Ridge campground bathhouse, pavilion and restroom at Caddo Bend Day-Use

are, including utilities and barrier-free access $ 416,949

DeGray Hot Springs + Golf course clubhouse landscaping and plaza, including expanded golf cart loading area $ 328,634

DeGray Hot Springs + Construct service and fuel dispensing dock at marina $ 461,453

DeGray Hot Springs + Installation of water lines and hydrants at De Roche Ridge campground $ 105,982

DeGray Hot Springs + Construct perimeter fencing on boundary adjacent to golf course $ 27,990

DeGray Hot Springs + Installation of a new fuel line and monitoring system at marina (A-75 only) $ 81,875

DeGray Hot Springs + Construction of three (3) employee residences, renovation/expansion of sub-standard residence,

including access and utilities (Including FFE) $ 678,485

DeGray Hot Springs + Water treatment plant renovations $ 99,639

DeGray Hot Springs + Construction of one (1) employee residence including access and utilities (A-75 only; FY99 ANCRC

$130,940) $ 39,118

DeGray Hot Springs + Construct three (3) restrooms and demolish four (4) existing restrooms at Caddo Bend Day-Use Area,

install new water distribution line, construct one (1) employee residence including access, utilities

and site improvements (Including FFE) $ 599,153

5 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

DeGray Hot Springs + Asbestos surveys for selected park structures to meet state and federal regulations $ 5,853

DeGray Hot Springs + Acquisition of two (2) manufactured homes for employee residences $ 60,503

DeGray Hot Springs + Installation of new underground electrical in DeRoche Ridge Campground $ 101,982

DeGray Hot Springs + Construction of breakwater system for the lodge courtesy dock $ 149,922

DeGray Hot Springs + Repair/Installation of new Ramp Rider Car for ABA accessibility at Lodge Courtesy Dock $ 19,142

DeGray Hot Springs + Electrical system upgrade for the Park Administration Offices $ 66,478

DeGray Hot Springs + HVAC improvements at Lodge including advertising $ 58,651

DeGray Hot Springs + Cultural Resources Survey for wastewater treatment plant and new pavilion. $ 2,506

DeGray Hot Springs + Construct new wastewater treatment plant and three (3) new sewer lift stations $ 1,333,683

DeGray Hot Springs + Renovation of Golf Course Greens (Holes 1-9 completed) (Holes 10-18 competed) (In-house) $ 85,252

DeGray Hot Springs + Installation of new Park wide Telecommunications System to include Data Cabling, trenching, and

equipment $ 514,510

DeGray Hot Springs + Continuation of Marina lift station modifications to correct piping problems. $ 19,400

DeGray Hot Springs + Relocate Marina Service Dock, Dock "A" and all associated utilities due to repetitive low water

conditions. $ 162,587

DeGray Hot Springs + Construction of new Disc Golf Course. $ 17,612

DeGray Hot Springs + Repairs to the Lodge concrete columns. $ 14,373

DeGray Hot Springs + HVAC renovations to the Hot Tub Room in the Lodge. $ 55,043

DeGray Hot Springs ++ Complete renovation of the DeRoche Ridge Campground to include access and all utilites. $ 2,000,000

DeGray Hot Springs ++ Construction for the repair of State Highway 600 Drives $ 75,699

DeGray Hot Springs ++ Renovation of the DeRoche Ridge Day Use Area (A-75 only; FY14 ANCRC - $16,913.85 and FY15

ANCRC - $221,905.67) $ 317,735

. Hot Springs $ 14,862,079

Delta Heritage Trail Sen. 25, 26 Phillips + Construct 3.64 mile hike/bike trail including bridge and trailhead improvements and signage $ 518,493

Delta Heritage Trail Rep. 11, 12 Phillips + Acquisition of four (4) tracts of land (approximately 10.197 acres) with improvements $ 218,946

Delta Heritage Trail Phillips + Acquisition of one (1) tract of land (approximately 3.150 acres) with improvements $ 345,831

Delta Heritage Trail Phillips + Construction of Lick Creek Trail Head ($21,520 reimbursed by AHTD) $ 40,018

Delta Heritage Trail Phillips + Appraisal for existing rail on trail corridor to meet AHTD bid requirements $ 24,365

Delta Heritage Trail Phillips + Construct Trail Extension (A-75 only; General Improvement 3HC $1,500,000.00) $ 17,525

Delta Heritage Trail Phillips + Lighting Improvements at the Benzal Bridge, Construct Group Camp & Day-Use Area Improvements

at Barton Trail Head. (In-house) $ 44,920

Delta Heritage Trail Phillips + Appraisal services for rail and other track material (OTM), $ 26,750

Delta Heritage Trail Phillips + Construction of approx. seven (7) miles of trail, trailhead, site furnishings, and associated

improvements from Lakeview to Elaine; parking and barrier-free access improvements at Barton

Visitor Center (A-75 only, Trail Grant - $146,075.00 and Cash - $42,416.17) $ 1,230,717

Delta Heritage Trail Phillips ++ Construction of approx. twenty nine (29) miles of trail, trailheads, and associated improvements from

Arkansas River to Arkansas City. (A-75 only; GIF - $3,250,000 and Cash - $5,773,316.74) $ 6,000,000

Delta Heritage Trail Phillips $ 8,467,565

6 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Devil's Den Sen. 5 Washington + Re-roofing seven (7) buildings $ 18,041

Devil's Den Rep. 80,81 Washington + Construct new barrier-free bathhouse at Campground "E", including parking, access and utilities $ 202,769

Devil's Den Washington + Parking, paving & utility improvements at selected locations in park; Replace Primary Sewer Lift

Station $ 582,184

Devil's Den Washington + Construct two (2) employee residences, including site improvements, access and utilities $ 474,017

Devil's Den Washington + Renovation/restoration of the interior of seven (7) CCC era cabins (Including FFE) $ 729,855

Devil's Den Washington + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,218

Devil's Den Washington + Acquisition of one (1) manufactured home for an employee residence $ 16,466

Devil's Den Washington + Reconstruct two (2) CCC-era cabins, Yellow Rock overlook shelter including barrier-free access and

parking improvements; Replace one (1) bathhouse in Campground "E"; Archeology work at original

Cabin sites $ 529,925

Devil's Den Washington + Renovation/replacement of swimming pool and CCC bathhouse including barrier-free parking and

access improvements (A-75 only; total cost $624,458) $ 580,269

Devil's Den Washington + Renovation of Area "E" Campground, including access, all utilities and advertising $ 1,338,533

Devil's Den Washington + Repair/renovation of flood damage at dam. Removal of silt and repair damage to retaining wall.

(Reimbursed by FEMA) $ 817,050

Devil's Den Washington + Renovate 8 CCC Cabins (A-75 only; 948-Federal Funds $253,522.59) $ 724,937

Devil's Den Washington + Campground "A" Improvements due to Flood Damage; Riprap Replacement; Day-Use area

improvements (Reimbursement received from FEMA) $ 226,780

Devil's Den Washington + Reconstruct Pedestrian Suspension Bridge that was destroyed by flood (to be reimbursed by FEMA)

$ 309,972

Devil's Den Washington + Construction of a new employee residence (A-75 only, FY14 ANCRC $284,867)

$ 16,036

Devil's Den Washington + Construction / relocation of Hwy 220 waterline.

$ 12,050

Devil's Den Washington ++ Construction/Renovation of Campground B to include a new Bathhouse, six (6) Camper Cabins,

access, road, parking, and all utlilites. $ 996,000

Devil's Den Washington $ 7,576,102

Hampson Archeological Museum Sen. 22 Mississippi + Construction of playground to meet consumer Product Safety Commission & ADA guidelines $ 31,381

Hampson Archeological Museum Rep. 55 Mississippi + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,093

Hampson Archeological Museum Mississippi + Acquisition of Employee Residence $ 65,000

Hampson Archeological Museum Mississippi $ 97,474

Herman Davis Sen. 22 Mississippi + Access, parking and landscaping improvements $ 46,362

Herman Davis Rep. 54 Mississippi + Installation of irrigation system $ 13,944

Herman Davis Mississippi $ 60,306

7 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Historic Washington Sen. 10

Rep. 3

Hempstead + Renovation of the 1940 WPA Gym including equipment, barrier-free access and parking

improvements (Including FFE) $ 624,199

Historic Washington Hempstead + Renovation of the 1874 Courthouse and reconstruction of the 1839 Clerk's Office, including barrier-

free access (A-75 only) $ 1,181,149

Historic Washington Hempstead + Renovation of the 1914 schoolhouse, including construction of adjacent bathhouse (A-75 only) $ 330,560

Historic Washington Hempstead + Asbestos surveys for selected park structures to meet state and federal regulations $ 6,656

Historic Washington Hempstead + Appraisal of one (1) track of land (Old Jail) $ 3,200

Historic Washington Hempstead + Acquisition of one (1) tract of land (approximately .5 acres) and one (1) structure (A-75 only;

FY98ANCRC) $ 800

Historic Washington Hempstead + Acquisition of one (1) tract of land (approximately .94 acres) $ 7,347

Historic Washington Hempstead + Acquisition of one (1) tract of land (approximately 1.118 acres) with improvements $ 154,234

Historic Washington Hempstead + Crouch House Museum exhibits (In-house) $ 14,423

Historic Washington Hempstead + Repair/reconstruction of the Sanders Barn and exhibits due to fire damage $ 37,295

Historic Washington Hempstead + Upgrade 1874 Courthouse Exhibits (In-house) $ 46,500

Historic Washington Hempstead ++ Renovation / rehabilitation of the Brunson House to include site improvements, access, all utilities,

and Furniture, Fixtures, and Equipment (FF&E) $ 1,550,000

Historic Washington Hempstead ++ Construction of a new Equipment Shed (A-75 only; FY15 ANCRC - $49,967.43) $ 88,199

Historic Washington Hempstead $ 4,044,562

Hobbs Sens. 3,5 Benton + Water main extension-tie-in park to Madison County Rural Water Association $ 168,830

Hobbs Rep. 96,97 Benton + Conduct archeological investigations at Van Hollow (Van Winkle site; Phase I) $ 10,000

Hobbs Benton + Continuations of archeological investigations at Van Hollow (Van Winkle site; Phase II) $ 10,000

Hobbs Benton + Continuations of archeological investigations at Van Hollow (Van Winkle site; Phase III) $ 11,000

Hobbs Benton + Analysis of artifacts and data from Van Winkle Site (A-75 only) $ 6,364

Hobbs Benton + Acquisition of one (1) tract of land (approximately 5.10 acres) with one (1) structure $ 139,951

Hobbs Benton + Acquisition of one (1) tract of land (approximately 10.40 acres) $ 42,480

Hobbs Benton + Acquisition of one (1) tract of land (approximately 41.76 acres) $ 185,918

Hobbs Benton + Acquisition of one (1) tract of land (approximately 37.55 acres) with five (5) structures $ 218,013

Hobbs Benton + Acquisition of one (1) tract of land (approximately 17.40 acres) with one (1) structure $ 202,011

Hobbs Benton + Acquisition of one (1) tract of land (approximately 201.41 acres) (ANCRC FY03 $552,586) $ 228,590

Hobbs Benton + Acquisition of four (4) tracts of land (approximately 94.807 acres) $ 586,362

Hobbs Benton + Acquisition of one (1) tract of land (approximately 3.04 acres) $ 27,272

Hobbs Benton + Acquisition of one (1) tract of land (approximately .78 acres) with improvements $ 65,789

Hobbs Benton + Acquisition of one (1) tract of land (approximately 2.00 acres) with improvements $ 86,555

Hobbs Benton + Construct Multi-Use Trail (approximately sixteen (16) miles and two (2) trailheads $ 52,565

Hobbs Benton + Complete renovation of Shooting Range (A-75 only) $ 31,566

Hobbs Benton + Construct Van Hollow Trail including barrier-free access, parking improvements and restroom $ 612,813

8 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Hobbs Benton + Construction of Maintenance Facility including maintenance building, equipment shed, flammable

storage building, access and utilities $ 367,365

Hobbs Benton + Installation/Construction of underground electrical distribution lines to tie-in new park development $ 345,773

Hobbs Benton + Construction of multi-use trail including trailhead parking, signage, and toilet at Townsend Ridge (In-

house) $ 110,026

Hobbs Benton + Construction of new Visitor Center including site improvements, access and utilities $ 4,551,080

Hobbs Benton + Purchase of Furniture, Fixtures and Equipment (FFE) for new Visitor Center. $ 93,947

Hobbs Benton + Design, fabrication and installation of exhibits in the new Visitor Center. $ 858,904

Hobbs Benton + Construction of hitching rails and fence for the horse corral adjacent to the Visitor Center. $ 4,702

Hobbs Benton + Purchase of materials for in-house construction of picnic site on grounds of the new Visitor Center

and Van Winkle trailhead. $ 11,100

Hobbs Benton + Installation of site furnishings, trailhead signage, and wayside exhibits on a barrier-free trail. (To be

reimbursed by AGFC Wildlife Observation Trail Grant) $ 17,356

Hobbs Benton + Construction of a storm water collection facility and rain garden to drain into the existing wildlife

pond. ($2,800 donation from Beaver Water District) $ 9,378

Hobbs Benton $ 9,055,709

Jacksonport Sen. 23 Jackson + Renovation of both interior & exterior of the Jacksonport Courthouse (A-75 only; total cost

$1,818,683) $ 41,185

Jacksonport Rep. 47 Jackson + Shoreline stabilization/erosion control along White River adjacent to campground $ 249,950

Jacksonport Jackson + Construct equipment shed and employee residence including access and utilities $ 211,918

Jacksonport Jackson + Restoration of Mary Woods No. 2 Riverboat following 1997 tornado (A-75 only; total cost $896,303)

$ 34,302

Jacksonport Jackson + Road and parking improvements $ 113,223

Jacksonport Jackson + Construct new residence including site improvements, access and utilities (Including FFE) $ 198,762

Jacksonport Jackson + Replace deteriorated underground electrical and pedestals in campground (A-75; In-house) $ 31,611

Jacksonport Jackson + Acquisition of one (1) tract of land (approximately 0.992 acres) with improvements $ 25,017

Jacksonport Jackson + Water system improvements $ 187,202

Jacksonport Jackson + Acquisition of one (1) tract of land (approximately .3331 acres) ` $ 5,068

Jacksonport Jackson + Phase I Cultural Resource Surveys for the proposed Visitor Center area of disturbance. $ 5,976

Jacksonport Jackson + Acquisition of one (1) track of land totaling .50 acres (Wilmans) $ 3,119

Jacksonport Jackson + Continuation of acquisition of shelving for the new Collections Management Facility $ 68,809

Jacksonport Jackson + Repainting the roof of the Courthouse $ 52,532

Jacksonport Jackson $ 1,228,674

Jenkins Ferry Sen. 13,12 Grant + Road, parking and boat ramp improvements $ 85,724

Jenkins Ferry Rep. 15 Grant + Asbestos survey of restroom to meet state and federal regulations $ 324

Jenkins Ferry Grant $ 86,048

9 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Lake Catherine Sen.13 Garland + Renovation of day-use area. $ 22,881

Lake Catherine Rep. 26 Garland + Construct swim beach bathhouse, construct bathhouse in Area "B", construct two (2) residences and

renovate exterior of three (3) rental cabins $ 950,206

Lake Catherine Garland + Construct new five slip boat dock including access and utilities $ 102,732

Lake Catherine Garland + Various parking and road improvements in cabin area and construction of new boat launch ramp $ 233,164

Lake Catherine Garland + Renovation and expansion of sub-standard employee residence $ 106,425

Lake Catherine Garland + Swim beach improvements $ 74,262

Lake Catherine Garland + Construction of new maintenance facility including maintenance building, equipment shed,

flammable storage building and fenced compound (Including FFE) $ 299,268

Lake Catherine Garland + Asbestos surveys for selected park structures to meet state and federal regulations $ 4,329

Lake Catherine Garland + Renovation/repair of Area "A" campground bathhouse, including barrier-free modifications

(In-house) $ 31,451

Lake Catherine Garland + Renovation of Wastewater Treatment Plant $ 166,760

Lake Catherine Garland + Renovation of Area "C" Campground bathhouse including ADA modifications (In-house) $ 39,666

Lake Catherine Garland + Renovation of Campgrounds "A" & "C" including access road, new campsites with amenities and all

utilities (water, sewer, and electric) $ 1,825,775

Lake Catherine Garland + Construct new employee residence including access, utilities, FFE and advertising $ 170,039

Lake Catherine Garland + Conduct Phase I Cultural Resources Survey of Campgrounds "A" and "C" $ 5,500

Lake Catherine Garland + Replace Entergy's primary underground electrical conductors in campground to include digging

trench, installing conduit and backfill. $ 27,890

Lake Catherine Garland ++ Construction of parking and installation of site furnishings, traihead signage, and wayside exhibits on

a barrier-free trail ($100,000 to be reimbursed by AGFC Wildlife Observation Trail Grant) $ 146,000

Lake Catherine Garland ++ Construction / installation of a larger fuel tank at the Marina. $ 210,000

Lake Catherine Garland ++ Renovation of the CCC Nature Cabin (A-75 only; FY14 ANCRC - $8,510 and FY15 ANCRC -

$170,583.56) $ 22,672

Lake Catherine Garland $ 4,439,020

Lake Charles Sen.20 Lawrence + Construct maintenance complex, including maintenance building, equipment shed, flammable storage

building and fenced compound, employee residence and day-use restroom $ 540,122

Lake Charles Rep. 60 Lawrence + Road and parking improvements $ 146,305

Lake Charles Lawrence + Renovation of two (2) day-use area restrooms to include ADA modifications (In-house) $ 47,471

Lake Charles Lawrence + Water lines and hydrant installation in Area "C" campground $ 28,723

Lake Charles Lawrence + Asbestos surveys for selected park structures to meet state and federal regulations $ 2,733

Lake Charles Lawrence + Acquisition and appraisal of one (1) tract of land (approximately 23.98 acres) $ 243,328

Lake Charles Lawrence + Improvements to Cedar Trail (Phase I) $ 187,524

Lake Charles Lawrence ++ Replacement of the Bathhouse in Area C Campground (A-75 only; FY15 ANCRC - $222,152.53) $ 25,726

Lake Charles Lawrence $ 1,221,932

10 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Lake Chicot Sen. 26 Chicot + Day use improvements and bank stabilization, erosion control adjacent to campground and cabins $ 628,524

Lake Chicot Rep. 11 Chicot + Water, sewer and drainage improvements park wide $ 534,056

Lake Chicot Chicot + Construct equipment shed, restroom, enclose pavilion, and ADA parking $ 215,964

Lake Chicot Chicot + Construct gasoline dock with dispensing system, courtesy docks for Area "F" campground $ 235,964

Lake Chicot Chicot + Renovation/Expansion of Visitor Information Center, including parking and barrier-free access

(Including FFE) $ 459,406

Lake Chicot Chicot + Fabrication/installation of exhibits at VIC. (In-house Exhibit Shop) $ 22,246

Lake Chicot Chicot + Installation of new underground electrical in Areas "B" and "D" campgrounds $ 179,809

Lake Chicot Chicot + Installation of recreational equipment at swimming pool $ 6,844

Lake Chicot Chicot + Renovation of temporary Visitor Information Center $ 24,832

Lake Chicot Chicot + Renovation/Expansion of existing sub-standard residence, including ADA modifications (In-house) $ 11,808

Lake Chicot Chicot + Relocation of park residence $ 13,856

Lake Chicot Chicot + Tie-in park sewer system to the City of Lake Village Sewer System (A-75 only) $ 44,237

Lake Chicot Chicot + Acquisition of four (4) tracts of land (approximately 78.789 acres) $ 54,062

Lake Chicot Chicot + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 11,166

Lake Chicot Chicot + Renovation/Expansion of three (3) duplex cabins, including ADA parking, access and utilities $ 712,867

Lake Chicot Chicot + Construction of new Park Store (to replace structure destroyed by fire), including parking, barrier-free

access, Furniture, Fixtures, & Equipment (FFE) and advertising $ 343,746

Lake Chicot Chicot + Repair of Fire Damage at Cabin 11 $ 90,611

Lake Chicot Chicot + Construct new Swimming Pool, Bathhouse, access parking and all utilities including FFE (A-75 only;

FY05 ANCRC 2KU $1,316,603.57) $ 910,996

Lake Chicot Chicot $ 4,500,994

Lake Dardanelle Sens. 6,16

Reps.71,73

Pope + Construct fishing pavilion tournament weigh-in, including barrier-free parking , access and utilities

with purchase of benches and trash receptacles $ 176,138

Lake Dardanelle Pope + Construction of Visitor Information/Education Center, including barrier-free parking, access and

utilities (Including FFE) $ 2,413,531

Lake Dardanelle Pope + Design, fabricate/install Visitor Information Center exhibits (A-75 only) $ 469,850

Lake Dardanelle Pope + Repair/renovation of breakwater system $ 198,544

Lake Dardanelle Pope + Construct boat dock/fishing pier with barrier-free parking and access in Dardanelle area (In-house) $ 13,745

Lake Dardanelle Pope + Asbestos surveys for selected park structures to meet state and federal regulations $ 470

Lake Dardanelle Pope + Construction of new park entrance road and sewer lift station $ 137,322

Lake Dardanelle Pope + Construction of employee residence, including new access & utilities (Russellville unit; Including

FFE) $ 199,571

Lake Dardanelle Pope + Acquisition of one (1) manufactured home for employee residence $ 27,519

Lake Dardanelle Pope + Construction of employee residence and small maintenance area, including access and utilities and

other site improvements (Dardanelle unit) $ 314,567

11 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Lake Dardanelle Pope + Fishing Tournament Weigh-In Pavilion expansion to include barrier-free public restrooms, additional

storage vending area and all ancillary utilities $ 190,198

Lake Dardanelle Pope + Adaptive re-use of old Visitor Center for new Region I office (In-house) $ 44,628

Lake Dardanelle Pope + Construction of new sewer dump station at the Dardanelle unit $ 5,273

Lake Dardanelle Pope + Construction of a new employee residence to include access, and all utilities. $ 297,044

Lake Dardanelle Pope ++ Construction of the replacement of the campground Bathhouse and resurfacing campground road and

spurs. (A-75 only; FY15 ANCRC - $1,512.57) $ 297,682

Lake Dardanelle Pope $ 4,786,082

Lake Fort Smith Sen. 5 Crawford + Installation of recreational equipment at swimming pool $ 6,849

Lake Fort Smith Rep. 81 Crawford + Asbestos surveys for selected park structures to meet state and federal regulations $ 318

Lake Fort Smith Crawford + Remodel 3 WPA cabins (ANCRC $100,895) $ 16,106

Lake Fort Smith Crawford + Installation of Telecommunications and Data for new Park development. $ 334,625

Lake Fort Smith Crawford + Design, fabrication and installation of exhibits at Visitor Center. $ 617,654

Lake Fort Smith Crawford + Construction of new park development to replace relocated Park. $ 9,776,381

Lake Fort Smith Crawford + Purchase of Furniture, Fixtures, & Equipment (FFE) for new park. $ 291,765

Lake Fort Smith Crawford + Construct Trails within new Park development. $ 9,277

Lake Fort Smith Crawford + Installation of septic system and purchase of appliances for Residence 3 $ 4,956

Lake Fort Smith Crawford + Construction of Dining Hall and Group Lodge "B" $ 2,319,900

Lake Fort Smith Crawford + Purchase of Furniture, Fixtures, & Equipment (FFE) for Dining Hall and Group Lodge "B" $ 91,184

Lake Fort Smith Crawford + Completion of Design and construction of new employee residence to include site improvements,

access, utilities and furniture, fixtures and equipment (FF&E) $ 249,739

Lake Fort Smith Crawford + Construction of ten (10) Housekeeping Cabins to include access, all utilities, and FF&E (Furinshings,

Fixtures and Equipment) $ 2,165,007

Lake Fort Smith Crawford $ 15,883,761

Lake Frierson Sen. 20 Craighead + Road and parking improvements $ 70,357

Lake Frierson Rep. 60 Craighead + Construct new composting toilet at boat launch ramp and construction of pavilion/restroom including

utilities and barrier-free access $ 263,773

Lake Frierson Craighead + Renovation of day-use are restroom including ADA modifications (In-house construction) $ 16,388

Lake Frierson Craighead + Asbestos survey of restroom to meet state and federal regulations $ 318

Lake Frierson Craighead + Fabrication of exhibits at VIC (In-house Exhibit Shop) $ 13,386

Lake Frierson Craighead + Construction of a new equipment shed to include site improvements, access, and all utilities. $ 86,084

Lake Frierson Craighead $ 450,306

Lake Ouachita Sen. 14 Garland + Dock improvements (i.e. new floatation, tread material, etc) $ 82,020

Lake Ouachita Rep. 18 Garland + Completion of interpretive exhibits for VIC (In-house Exhibit Shop) $ 24,502

Lake Ouachita Garland + Renovation of Area "A" (west) & Area "B" campground bathhouse (In-house) $ 31,951

12 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Lake Ouachita Garland + Construct new bathhouses in campground Areas "A" between "C" & "D", new day-use area restroom

including parking, utilities and barrier-free access $ 481,171

Lake Ouachita Garland + Construction of tertiary unit at the wastewater treatment plant $ 103,423

Lake Ouachita Garland + Renovation of Three Sisters Spring including rockwork & signage $ 34,962

Lake Ouachita Garland + Installation of new fuel lines and monitoring wells at marina $ 81,875

Lake Ouachita Garland + Acquisition of manufactured home for employees residence $ 55,300

Lake Ouachita Garland + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 8,254

Lake Ouachita Garland + Renovate Day-use area & Construct new barrier-free access to the Amphitheater $ 344,096

Lake Ouachita Garland + Construct two (2) replacement cabins and demolish one (1) to include road, parking improvements,

utilities and advertising $ 393,275

Lake Ouachita Garland + Purchase of a manufactured home for employee residence to include site improvements and all

utilities $ 106,271

Lake Ouachita Garland + Complete renovation of Campground A including access and utilities (A-75 only; FY05 ANCRC

2KU $1,166,335.88) $ 33,166

Lake Ouachita Garland + Relocation of two (2) A-Frame Rental Cabins for Seasonal Staff housing. $ 32,968

Lake Ouachita Garland + Construction of Four (4) Housekeeping Cabins. $ 1,097,143

Lake Ouachita Garland + Purchase of Furniture, Fixtures, & Equipment (FFE) for Four (4) Housekeeping Cabins. $ 133,119

Lake Ouachita Garland + Construction of a new equipment shed to include site improvements, access, and all utilities. $ 131,379

Lake Ouachita Garland + Construction/Renovation of Area C Campground to include site improvements, all utilities, road,

parking, campsite amenities. $ 476,157

Lake Ouachita Garland ++ Construction/Renovation of Area D Campground to include site improvements, all utilities, road,

parking, campsite amenities and four (4) camper cabins. $ 772,805

Lake Ouachita Garland + Construction of a new Breakwater Structure to protect the Marina. $ 452,014

Lake Ouachita Garland + Pump Station Renovation (A-75 only, FY14 ANCRC $87,556) $ 8,170

Lake Ouachita Garland + Renovation of the lower Bathhouse in Area A Campround (In-House)(A-75 only; FY15 ANCRC -

$134,399.57) $ 3,262

Lake Ouachita Garland $ 4,887,283

Lake Poinsett Sen. 22 Poinsett + Road, parking and campsite improvements $ 232,842

Lake Poinsett Rep. 52 Poinsett + Appraisal of thirteen (13) tracts of land (approximately 18.25 acres) $ 1,000

Lake Poinsett Poinsett + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 7,428

Lake Poinsett Poinsett ++ Construction of new equipment shed to include utilities, gravel parking, and fence. $ 160,000

Lake Poinsett Poinsett $ 401,270

Logoly Sen. 12 Columbia + Renovation/Expansion of sub-standard residence $ 81,024

Logoly Rep. 5 Columbia + Construction of playground to meet consumer Product Safety Commission and ADA guidelines $ 28,052

Logoly Columbia + Replace sewer lift station $ 26,397

Logoly Columbia + Asbestos survey of Visitor Information Center to meet state and federal regulations $ 730

13 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Logoly Columbia ++ Construction of a new Visitor Center to include access, parking, all utilities, exhibits, and FF&E

(furnishings, fixtures, and equipment) (A-75 only, also funded from FY14 ANCRC $616,283 and

FY15 ANCRC $1,660,031.26) $ 2,600,000

Logoly Columbia $ 2,736,203

Louisiana Purchase Sens. 23,25 Monroe/Lee/Phillips + Repair/Renovate interpretive boardwalk (960 ft.) to include wayside exhibits (FA) (AR Recreational

Trails Grant $35,520) $ 8,880

Louisiana Purchase Rep. 12,48 Monroe/Lee/Phillips $ 8,880

Lower White River Museum Sen. 28 Prairie + Renovation/Expansion of museum and fabrication, installation of exhibits $ 259,592

Lower White River Museum Rep. 13 Prairie + Asbestos surveys of museum building to meet state and federal regulations $ 550

Lower White River Museum Prairie $ 260,142

Mammoth Spring Sen. 19 Fulton + Construct water supply intake and distribution line from spring to fish hatchery (A-75 only) $ 354,511

Mammoth Spring Rep. 61 Fulton + Parking and access improvements $ 124,541

Mammoth Spring Fulton + Improvements to trail and day-use area including barrier-free access $ 517,163

Mammoth Spring Fulton + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 35,721

Mammoth Spring Fulton + Construction of boat dock for rental equipment $ 4,270

Mammoth Spring Fulton + Water line replacement park wide $ 39,950

Mammoth Spring Fulton + Construct new pavilion and associated access, parking, utilities, FFE and advertising $ 181,542

Mammoth Spring Fulton $ 1,257,698

Mark's Mill Sen. 27 Cleveland + Renovation of day-use area including barrier free access $ 2,713

Mark's Mill Rep. 8 Cleveland $ 2,713

Millwood Sen. 11 Little River + Construction of campground Area "D" bathhouse including access and utilities $ 165,873

Millwood Rep. 4 Little River + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 31,680

Millwood Little River + Renovation of Area "C" campground bathhouse (In-house) $ 25,214

Millwood Little River + Construction of new campground bathhouse between Areas "A" & "B" $ 222,566

Millwood Little River + Renovation of sub-standard employee residence $ 25,551

Millwood Little River + Asbestos surveys & abatement for selected park structures to meet state and federal regulations $ 3,398

Millwood Little River + Construction of day-use area restroom, including parking and access improvements (A-75) $ 26,362

Millwood Little River + Renovation of wastewater treatment plant $ 149,898

Millwood Little River + Shoreline erosion control and replace deteriorated sub-standard boat ramp (In house) (Game & Fish

to fund boat ramp $36,000.00 budget, est.) $ 3,068

Millwood Little River + Purchase of water meter for the tie-in of the park water system to the Little River County Rural Water

System. $ 2,146

Millwood Little River + Renovation of Campgrounds A & B to include access, all utillities, and campsite amenities. $ 1,009,787

14 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Millwood Little River ++ Replacement / repair of Park Facilities to include bathhouses, restrooms, pavilions, campgrounds,

access, and utilities due to flood damage. $ 500,000

Millwood Little River $ 2,165,543

Mississippi River Sen. 24 Lee + Appraisals of surplus properties to be sold $ 2,500

Mississippi River Rep. 12,48 Lee + Re-acquisition of Mississippi River land (Spears) $ 13,921

Mississippi River Lee + Construction of Phase I Park Development to include new Park Residence to include access, parking

and utilities. $ 263,423

Mississippi River Lee + Relocation & Installation of 2 Gunnison precast concrete vault toilet buildings within Bear Creek

Recreation Area. $ 16,900

Mississippi River Lee + Clearing and grubbing of 15 ft. wide 1,430 ft. long wooded area for electrical right-of-way. $ 4,620

Mississippi River Lee + Construction of Phase I Park Development to include new Beech Point Campground to include

access, parking and utilities. $ 1,935,180

Mississippi River Lee + Engineering analysis on Lee County Water Association water distribution lines serving the proposed

Visitor Center $ 2,032

Mississippi River Lee + Construction of new Visitor Center to include site improvements, parking, access, utilities, barrier-

free trial & Furniture, Fixtures, and Equipment (FF&E) and installation of new Exhibits. ($245,972

FHWA Byways Grant) $ 5,213,793

Mississippi River Lee + Fabrication of new Exhibits for the new Visitor Center (A-75 only) (also FY13 ANCRC -

$177,171.00) $ 871,057

Mississippi River Lee + Installation of site furnishings, trailhead signage, and wayside exhibits on a barrier-free trail. (To be

reimibursed by AGFC Wildlife Observation Trail Grant) $ 60,000

Mississippi River Lee $ 8,383,426

Moro Bay Sen. 26 Bradley + Parking/paving improvements $ 51,244

Rep. 8 + Shoreline Erosion Control $ 18,535

Moro Bay Bradley + Construction of new campground bathhouse, including construction/expansion of septic/leach field $ 279,993

Moro Bay Bradley + Enclose day-use pavilion including ADA modifications (In-house) $ 12,652

Moro Bay Bradley + Renovation of two (2) day-use area restrooms including ADA modifications (In-house) $ 28,215

Moro Bay Bradley + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 41,539

Moro Bay Bradley + Asbestos surveys for selected park structures to meet state and federal regulations $ 2,694

Moro Bay Bradley + Expand residence including barrier-free modifications (In-house) $ 13,416

Moro Bay Bradley + Marina repairs to include painting of telescoping anchors $ 5,880

Moro Bay Bradley + Construction of (5) five housekeeping cabins and laundry building including parking, access, and

utilities. $ 1,594,534

Moro Bay Bradley + Purchase / Acquisition of Furniture, Fixtures and Equipment for (5) five housekeeping cabins and

laundry building. $ 108,855

Moro Bay Bradley + Construction of Phase I Shoreline Erosion Control (FY02-03) $ 609,397

15 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Moro Bay Bradley $ 2,766,954

Mt. Magazine Sen. 6 Logan + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 7,029

Mt. Magazine Rep. 74 Logan + Roadway improvements (A75 Only; Total Cost $1,061,623) $ 150,471

Mt. Magazine Logan + Renovation/repair of Cameron Bluff overlook $ 50,823

Mt. Magazine Logan + Construct Visitor Information Center, employee residence, maintenance building, upgrade eighteen

(18) campsites to Class A and construct bathhouse at Cameron Bluff campground, develop associated

roads, parking & utilities. (General Improvement Funds; ANCRC-FY 98; A-75) (A-75 Only)

$ 5,469

Mt. Magazine Logan + Renovate Historic Fire Tower Cabin to serve as seasonal employee residence. (ANCRC-FY 00;

General Improvement Funds; A-75)(A-75 Only) $ 5,814

Mt. Magazine Logan + Archeological documentation of development areas (USFS) $ 50,000

Mt. Magazine Logan + Construct two (2) Standard Residences including site improvements, new access, all utilities, FFE

and advertising $ 541,380

Mt. Magazine Logan + Furnishings, Fixtures and Equipment (FFE) for Lodge, dormitory in lodge basement, entrance sign,

exhibits, cabin patio at ADA cabin, and other miscellaneous close-out items $ 1,372,421

Mt. Magazine Logan + Repairs to the passenger elevator located in the Lodge. $ 173,329

Mt. Magazine Logan + Improvements to the water distribution system. $ 66,158

Mt. Magazine Logan + Replacement of Lodge kitchen flooring $ 96,515

Mt. Magazine Logan + Benefield Restroom Replacement (A-75 only, FY14 ANCRC $3,896) $ 67,244

Mt. Magazine Logan ++ Roofing Imrpovements and Lightening Protection $ 519,751

Mt. Magazine Logan ++ Phase I Exterior Improvements $ 542,124

Mt. Magazine Logan $ 3,648,528

Mt. Nebo Sen. 6 Yell + Parking lot improvements at VIC, CCC pavilion and swimming pool/bathhouse, including barrier-

free access $ 273,201

Mt. Nebo Rep. 73 Yell + Complete construction of approximately 1,800 feet of sewer line (A-75 only) $ 6,887

Mt. Nebo Yell + Wastewater improvements, including the addition of selected facilities to the wastewater plant that

was previously in septic tanks $ 241,919

Mt. Nebo Yell + Renovate and expand two (2) "A" frame cabins and materials for two (2) additional cabins $ 500,879

Mt. Nebo Yell + Repair/renovation of two (2) CCC era cabins (In-house) $ 63,596

Mt. Nebo Yell + Construct new "A" frame cabin, including parking and barrier-free access (In-house) $ 66,735

Mt. Nebo Yell + Construct employee residence, including access and utilities $ 200,462

Mt. Nebo Yell + Construct new swimming pool and renovate bathhouse $ 514,422

Mt. Nebo Yell + Acquisition of two (2) tracts of land (approximately .860 acres) $ 39,259

Mt. Nebo Yell + Acquisition of one (1) tract of land (approximately 40 acres) $ 67,052

Mt. Nebo Yell + Asbestos surveys and abatement for selected park structures to meet state and fed, regulations $ 6,126

Mt. Nebo Yell + Repair/renovation work on CCC Pavilion, residence and VIC $ 18,573

16 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Mt. Nebo Yell + Repair/renovation and expansion of employee residence including FFE and advertising $ 139,443

Mt. Nebo Yell + Appraisal Reports on two (2) tracts of land (PR) $ 3,000

Mt. Nebo Yell + Acquisition of 80 acres of land (Cowger) (PR) $ 153,214

Mt. Nebo Yell + Continuation of rehabilitation of Cornwell House Exhibit. (A-75 only, FY08 ANCRC - $194,185) $ 6,989

Mt. Nebo Yell + Installation of new roof, ceiling, and interior walls to the Fire Station. $ 15,688

Mt. Nebo Yell $ 2,317,445

Ozark Folk Center Sen. 18 Stone + HVAC renovations at selected building $ 142,250

Ozark Folk Center Reps. 62,64 Stone + Re-roof Administration Building, sales shop and two (2) southern sections flat roofs of large

auditorium (MM) (A-75 only) $ 14,800

Ozark Folk Center Stone + Installation of new seating in large auditorium $ 103,242

Ozark Folk Center Stone + ADA improvements/modifications in restrooms at craft sales shop, large auditorium and smokehouse;

rehabilitation of a barrier-free pavilion, lodge door & lock replacement, restaurant roof replacement,

and construction of roof over restroom access at craft sales shop $ 284,053

Ozark Folk Center Stone + Appraisal of one (1) tract of land (Approximately 3.46 Acres) w/ 2 structures $ 450

Ozark Folk Center Stone + Asbestos surveys for selected park structures to meet state and federal regulations $ 4,791

Ozark Folk Center Stone + Renovation/expansion of Skillet Restaurant including replacement/updating of all kitchen equipment $ 882,951

Ozark Folk Center Stone + Re-roof Administration Building $ 249,824

Ozark Folk Center Stone + HVAC replacement at Administration Building and Skillet Restaurant. $ 435,764

Ozark Folk Center Stone + Re-roof Cabin Check-In and Conference Buildings. (A75 only -General Improvement Fund -

$50,000) $ 206,656

Ozark Folk Center Stone + Construction to modify access to the General Store to allow after hours access to the restrooms. $ 3,912

Ozark Folk Center Stone + Installation of new gas lines within park. $ 25,315

Ozark Folk Center Stone + HVAC replacement at the Music Auditorium. (A75 only; $3890.00-39X, $5182.47 - 39Y) $ 665,054

Ozark Folk Center Stone + Connect and convert the Smokehouse and the Skillet Restaurant from propane gas to natural gas. $ 22,004

Ozark Folk Center Stone + Expand the parking area in the cul-de-sac between the Skillet Restaurant and the Administration

Building and the lower west parking lot of the Skillet Restaurant. $ 38,043

Ozark Folk Center Stone $ 3,079,109

Parkin Sen. 24 Cross + Road and parking improvements $ 144,627

Parkin Rep. 50 Cross + Construct new pavilion and restroom in Day Use Area including barrier-free access and utilities $ 204,060

Parkin Cross + Asbestos surveys for selected park structures to meet state and federal regulations $ 5,621

Parkin Cross + Construction of playground to meet consumer Product Safety Commission and ADA guidelines $ 31,382

Parkin Cross + Acquisition of four (4) tracts of land (approximately 41.71 acres) $ 176,667

Parkin Cross + Construct maintenance building, equipment shed & flammable storage building, including site

improvements, access and utilities (Including FFE) $ 492,668

Parkin Cross + Native American paintings for Visitor Center $ 15,000

Parkin Cross + Archeology work on historic cemetery within Park $ 70,000

17 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Parkin Cross $ 1,140,025

Petit Jean Sens. 15

Rep. 65

Conway + Construct new barrier-free boardwalk to Cedar Falls and Petit Jean Grave Overlook, ADA parking,

access improvements at Visitors Information Center and Mather Lodge $ 1,188,021

Petit Jean Conway + Interior renovations for five (5) duplex cabins (Including FFE) $ 271,007

Petit Jean Conway + Construct two (2) employee residences including access and utilities, exterior renovation on

five (5) duplex cabins $ 603,605

Petit Jean Conway + Re-roof six (6) buildings $ 182,500

Petit Jean Conway + Completion of renovation work on swimming pool bathhouse (A-75 only) $ 10,468

Petit Jean Conway + Interior renovation/stabilization and re-roofing VIC and adjacent public restrooms; repair/renovate

and ADA modifications to Area "D" campground bathhouse $ 256,156

Petit Jean Conway + Replace two (2) sewer lift stations $ 59,010

Petit Jean Conway + Renovation of boat house (In-house) $ 40,634

Petit Jean Conway + Renovation of Cedar Creek Cabin (In-house) $ 21,054

Petit Jean Conway + Installation of recreational equipment at swimming pool $ 7,040

Petit Jean Conway + Runway Reconstruction and New Taxiway, Apron, and Fly-in Campground (A-75 only; total cost

$1,385,755) $ 308,488

Petit Jean Conway + Acquisition of one (1) tract of land (approximately 5.030 acres) $ 189,458

Petit Jean Conway + Asbestos surveys for selected park structures to meet state and federal regulations $ 5,995

Petit Jean Conway + Renovation of the Group Campground, including new campsites, barrier-free bathhouse, parking and

utilities $ 316,886

Petit Jean Conway + Repaint/re-roofing of two (2) hangars at airport $ 102,927

Petit Jean Conway + Construction of new wastewater treatment plants to replace two (2) old wastewater treatment plants

including new distribution lines and lift stations for tie-in $ 828,113

Petit Jean Conway + Acquisition of land (approximately 0.65 acres) $ 32,517

Petit Jean Conway + Acquisition and appraisal of land (approximately 55.53 acres) $ 449,114

Petit Jean Conway + Construction of Restroom in Museum of Automobiles (In-house) $ 2,897

Petit Jean Conway + Construction of Employee Residence including site improvements, access, and utilities (In-house) $ 129,544

Petit Jean Conway + Renovation of Campground "A" including access road, new campsites, and all utilities (including

sewer) $ 1,532,088

Petit Jean Conway + Improvements to Petit Jean Airport to include lighting and other navigational aids. (To be reimbursed

by The Federal Aviation Administration (FFA) and State Aeronautics Commission.) $ 457,178

Petit Jean Conway + Fabrication and installation of a CCC Commemorative Statue $ 26,365

Petit Jean Conway + Repair roof due to wind damage (2/11/2009) at the Museum of Automobiles. (To be reimbursed by

insurance proceeds.$67,985.92) $ 100,372

Petit Jean Conway + Installation / Construction of road bore across HWY 154 for fire hydrant and access for a dry hydrant

at Lake Bailey. $ 10,736

Petit Jean Conway + Construction of Airport Fuel System (A-75 only, ANCRC FY08 - $315,573). $ 8,305

18 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Petit Jean Conway + Construction / Renovation of the kitchen, dining area, registration area and swimming pool at Mather

Lodge to include site improvements, barrier-free access, parking and all utilities.(A-75 only)

(ANCRC FY10 & FY11 $3,925,401) $ 568,780

Petit Jean Conway + Feasibility Study for Hardison Hall. $ 14,900

Petit Jean Conway ++ Resurfacing of Airport Runway $ 325,000

Petit Jean Conway $ 8,049,158

Pinnacle Mountain Sens.15,32 Pulaski + Road, parking, trail improvements throughout the park $ 340,772

Pinnacle Mountain Reps. 31,35 Pulaski + Day-use area and trail improvements; erosion control measures along Kingfisher Trial, new barrier-

free fishing pier at Big Maumelle River $ 394,865

Pinnacle Mountain Pulaski + Interior renovations at Visitor Information Center $ 130,169

Pinnacle Mountain Pulaski + Develop arboretum watering system $ 6,000

Pinnacle Mountain Pulaski + Water line tie-in with City of Little Rock water system $ 117,296

Pinnacle Mountain Pulaski + Acquisition of one (1) tract of land (approximately 137.470 acres) (A-75 only) $ 298,625

Pinnacle Mountain Pulaski + Acquisition of approximately 89.38 acres (one (1) tract) of land (FY 03 $583,404) $ 2,900

Pinnacle Mountain Pulaski + Asbestos surveys and abatement for selected park structures to meet state and federal regulations $ 3,108

Pinnacle Mountain Pulaski + Acquisition of two (2) tracts of land (appraisal only) $ 2,900

Pinnacle Mountain Pulaski + Construct new pavilion and restroom with associated access, utilities, and furnishings. $ 508,262

Pinnacle Mountain Pulaski + Phase I Cultural Resources Survey - Stuckey Property $ 9,210

Pinnacle Mountain Pulaski + Phase I Cultural Resources Survey - Base Trail Corridor $ 4,621

Pinnacle Mountain Pulaski + Construct Pedestrian bridge on new trail connecting Day-Use Area to overflow Parking Area. (A-75

only)(Partners for Pinnacle $16,100) $ 8,154

Pinnacle Mountain Pulaski + Phase I Cultural Resources Survey for proposed mountain bike trail corridor. $ 5,516

Pinnacle Mountain Pulaski + Acquisition and installation of new playground (A-75 only; reimbursed by private donation

$200,000) $ 4,697

Pinnacle Mountain Pulaski + Site improvements for Horse Concession including archeology for the proposed horse corridor trail. $ 5,690

Pinnacle Mountain Pulaski + Construction of bridge located near Red Bluff along the Ouachita Trail. $ 7,641

Pinnacle Mountain Pulaski + Construction of new Day Use Area Restroom (A-75 only, FY13 ANCRC $305,924 and FY14

ANCRC $122,653) $ 111,865

Pinnacle Mountain Pulaski ++ Construction of a new playground at the Big Maumelle Pavilion area (A-75 only; FY15 ANCRC -

$15,200) $ 97,693

Pinnacle Mountain Pulaski $ 2,059,984

Plantation Agriculture Museum Sen. 30 Lonoke + Stabilization Plan and Historic Structures Report for Seed Warehouse $ 28,877

Plantation Agriculture Museum Rep. 14 Lonoke + Access and drainage improvements $ 47,954

Plantation Agriculture Museum Lonoke + Acquisition of one (1) tract of land (approximately 3.09 acres) $ 59,790

Plantation Agriculture Museum Lonoke + Asbestos surveys for selected park structures to meet state and federal regulations $ 593

Plantation Agriculture Museum Lonoke + Conservation of gin equipment and exhibits for the reconstructed Dortch Cotton Gin (A-75 only) $ 542,078

19 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Plantation Agriculture Museum Lonoke + Renovation / repair of museum building porch and roof components $ 117,525

Plantation Agriculture Museum Lonoke $ 796,817

Poison Spring Sen. 12 Ouachita + Day use area and parking lot improvements, including barrier-free access and perimeter fence $ 107,146

Poison Spring Rep. 5 Ouachita $ 107,146

Powhatan Historic Sen. 20 Lawrence + Parking area and barrier-free access improvements at Courthouse $ 9,069

Powhatan Historic Rep. 60 Lawrence + Re-roof 1888 courthouse $ 307,471

Powhatan Historic Lawrence + Acquisition of four (4) tracts of land (approximately 3.304 acres) with improvements $ 96,509

Powhatan Historic Lawrence + Acquisition of one (1) tract of land (approximately 14.70 acres) with two (2) structures (Clark) $ 55,850

Powhatan Historic Lawrence + Acquisition of one (1) tract of land .517 acres (BLEVINS) $ 45,770

Powhatan Historic Lawrence + Restoration of Male & Female Academy, including barrier-free access & parking improvements (A-

75 only; FY00 ANCRC $419,112) $ 127,949

Powhatan Historic Lawrence + Renovate and restore interior of the historic 1888 Courthouse including Asbestos Survey and

advertising $ 808,804

Powhatan Historic Lawrence + Renovate Telephone Exchange Building and furnish $ 17,015

Powhatan Historic Lawrence + Appraisal of one tract of land $ 1,500

Powhatan Historic Lawrence + Acquisition of one (1) tract of land totaling .08 acres $ 3,690

Powhatan Historic Lawrence $ 1,473,627

Prairie Grove Sen. 2 Washington + Road, parking lot, trail and utility improvements $ 621,988

Prairie Grove Rep. 80 Washington + Construct battlefield overlook with exhibits, utilities and landscaping (A-75 only) $ 59,852

Prairie Grove Washington + Acquisition of land (approximately 70.0 acres) (Black) $ 878,115

Prairie Grove Washington + Day-use area improvements including barrier-free access $ 117,005

Prairie Grove Washington + Renovation of day-use area restroom and amphitheater restroom $ 47,582

Prairie Grove Washington + Acquisition of four (4) tracts of land (approximately 254.39 acres) with improvements and appraisal

of (8) tracts of land $ 2,320,952

Prairie Grove Washington + Construction of Maintenance building, equipment shed, flammable storage building, access &

utilities $ 358,777

Prairie Grove Washington + Appraisals on 8 tracts of land $ 8,490

Prairie Grove Washington + State match (81,000 - Federal) for Cultural Resource Studies, Historical Research and Archeological

Studies to delineate battlefield features. $ 20,000

Prairie Grove Washington $ 4,432,761

Queen Wilhelmina Sen. 10 Polk + Installation of new HVAC and fire alarm system at lodge (A-75 only; FY98 ANCRC $487,205) $ 12,492

Queen Wilhelmina Rep. 20,21 Polk + Purchase of Flow Meter for the new Wastewater Treatment Plant $ 2,003

Queen Wilhelmina Polk + Construct new sewer treatment plant and lift station (A75 Only; FY98 ANCRC 1CE $92,549) $ 390,719

Queen Wilhelmina Polk + Drill new water well and construct pump house $ 70,218

20 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Queen Wilhelmina Polk + Day-use area improvements, including barrier-free access $ 256,649

Queen Wilhelmina Polk + Construct campground bathhouse with parking, access and utilities $ 226,432

Queen Wilhelmina Polk + Lodge renovations including upgrade of two (2) standard rooms to "premium" rental units and

replacement of registration desk $ 122,016

Queen Wilhelmina Polk + Infrastructure improvements to include water line and hydrant installation in campground and

installation of new water line from water well to lodge $ 340,136

Queen Wilhelmina Polk + Remove/replace sidewalk, patio and resurfaced loading dock access $ 7,716

Queen Wilhelmina Polk + Construct new employee residence including access and utilities $ 187,487

Queen Wilhelmina Polk + Asbestos surveys for selected park structures to meet state and federal regulations $ 4,298

Queen Wilhelmina Polk + Construction/Installation of new water line to Depot Concession (In-house) $ 1,552

Queen Wilhelmina Polk + Re-Roof Lodge, Phase II (A-75 only; FY06 ANCRC $65,000) $ 2,858

Queen Wilhelmina Polk + Acquisition of manufactured home to include site improvements, access, and all utilities. $ 92,882

Queen Wilhelmina Polk ++ Exterior / interior renovation, repair, and expansion of the Lodge to include site improvements,

landscaping, parking and access improvements, and all utilities. A-75 only (FY12 ANCRC -

$2,081,155, FY13 ANCRC - $86,211, FY14 ANCRC - $1,536,920 & Cash - $200,000) $ 6,075,000

Queen Wilhelmina Polk ++ Construction of clearing a right of way for water line repairs to include repair / renovation of the

water system. $ 300,000

Queen Wilhelmina Polk + Renovation of Lodge Overlook. $ 73,022

Queen Wilhelmina Polk ++ Construction for the repair of State Highway 600 Drives. $ 31,139

Queen Wilhelmina Polk $ 8,196,619

Toltec Mounds Sen. 28 Lonoke + Acquisition of manufactured home for employee residence $ 17,800

Toltec Mounds Rep. 14 Lonoke + Construction of Education Pavilion including barrier-free access, parking and utilities. $ 351,353

Toltec Mounds Lonoke + Improvements to picnic sites with shelters. Replace wastewater treatment plant (FY03 ANCRC

$139,689) $ 2,495

Toltec Mounds Lonoke + Renovation of VIC public restroom including barrier-free modifications (In-house) $ 4,793

Toltec Mounds Lonoke + Acquisition of manufactured home for employee residence $ 16,869

Toltec Mounds Lonoke + Construction of a new Storage Building (In House Construction) $ 12,706

Toltec Mounds Lonoke ++ Construction of new/replacement Wastewater Treatment System to include demolition of the existing

Waste Water Treatment Plant. $ 149,000

Toltec Mounds Lonoke $ 555,016

Village Creek Senn.23 Cross + Swim beach renovation at Lake Austell for improved safety $ 114,545

Village Creek Rep.49 Cross + Renovation of four (4) campground bathhouses, Visitor Information Center restrooms to include

ADA modifications; construct new equipment shed and underpin ten cabins $ 436,711

Village Creek Cross + Renovation of employee residences $ 12,709

Village Creek Cross + Replace sewer lift station $ 39,450

Village Creek Cross + Golf course feasibility study, update, and preparation of RFP, RFQ and evaluation information $ 29,760

21 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Village Creek Cross + Market Feasibility Analysis for the proposed Lodge, golf course development from Wellington

International, LLC (ASP only) $ 17,403

Village Creek Cross + Asbestos surveys for selected park structures to meet state and federal regulation $ 4,964

Village Creek Cross + Renovation of West Campground including site renovations, site amenities, access and utilities

(Water, sewer, electric) $ 826,501

Village Creek Cross + Design for the construction of a 27-hole signature golf course $ 205,050

Village Creek Cross + Construction of rental equestrian stables including utilities (In-house) $ 61,707

Village Creek Cross + Construct new Wastewater Treatment Plant $ 664,312

Village Creek Cross + Golf Course Construction - Phase II contract increased and Change Orders to contract. (ASP only) $ 883,664

Village Creek Cross + Cultural Resources Survey on Approx.22 miles of Multi-Use Trail. $ 15,733

Village Creek Cross + Repair of landscaping disturbances along roads and side slopes located at Village Creek Golf Course. $ 33,261

Village Creek Cross + Construction of The Ridges at Village Creek, Phase I & Phase II. Improvements to include

infrastructure, new Club House, Cart Barn, and two (2) restrooms(A-75 only)(Cash - $2,285,217) $ 3,055,180

Village Creek Cross $ 6,400,950

White Oak Lake Sen. 12 Nevada + Construct new campground and access road, including barrier-free parking and utilities $ 801,684

White Oak Lake Rep. 5 Nevada + Day-use area improvements, including barrier-free access and parking $ 55,535

White Oak Lake Nevada + Construct sediment basin to prevent silt build-up at launch ramp $ 303,096

White Oak Lake Nevada + Asbestos surveys for day-use area restroom to meet state and federal regulations $ 224

White Oak Lake Nevada + Construct new employee residence, including access and utilities $ 204,448

White Oak Lake Nevada + Construct Boat Launch Ramp, Parking Improvements, access, utilities, and associated walkways for

relocated Marina (In-house) (A-75 only; AG&F $65,000) $ 94,177

White Oak Lake Nevada + Repair Sediment Basin due to flood damage. $ 19,555

White Oak Lake Nevada + Continuation of construction of a new Wastewater Collection/ Distribution and Treatment Plant (A-

75 only) (FY10 ANCRC - $547,380) $ 31,677

White Oak Lake Nevada ++ Renovation of existing Wastewater Treatment Plant. $ 177,500

White Oak Lake Nevada $ 1,687,896

Withrow Springs Sen. 5 Madison + VIC expansion and pavilion enclosure including barrier-free access to pavilion restroom $ 181,445

Withrow Springs Rep. 97 Madison + Installation of recreational equipment at swimming pool $ 6,844

Withrow Springs Madison + Renovation of swimming pool bathhouse (In-house) $ 18,607

Withrow Springs Madison + Asbestos surveys for selected park structures to meet state and federal regulations $ 708

Withrow Springs Madison + Acquisition of one (1) track of land (approximately 3.45 acres) with improvements $ 45,019

Withrow Springs Madison + Parking and access improvements at Swimming Pool and Day-use Pavilion $ 318,869

Withrow Springs Madison + Construct new campground facilities, including access, utility improvements and advertising $ 1,475,569

Withrow Springs Madison + Installation of Concrete Wheel Stops at the Ball field Parking Area. $ 3,750

Withrow Springs Madison ++ Construction of a new Campground (Walk-in tent camp area) $ 350,000

Withrow Springs Madison ++ Construction of an Equipment Storage Shed. (A-75 only; FY15 ANCRC - $165,834.02) $ 8,286

22 6-30-2016

ARKANSAS STATE PARKS

CAPITAL IMPROVEMENT PROJECTS

AMENDMENT 75

Park / Museum District # County Accomplishments as of June 30, 2016 Costs

Withrow Springs Madison $ 2,409,097

Woolly Hollow Sen. 18 Faulkner + Construction of playground to meet Consumer Product Safety Commission and ADA guidelines $ 33,572

Woolly Hollow Rep. 66 Faulkner + Construct ADA fishing pier in funding partnership with AR Game & Fish Commission $ 15,341

Woolly Hollow Faulkner + Construct one (1) and renovate one (1) employee residence to include access, site improvements and

utilities (Including FFE) $ 293,141

Woolly Hollow Faulkner + Road, parking and trail improvements including barrier-free access $ 348,935

Woolly Hollow Faulkner + Replace two (2) sewer lift stations $ 87,395

Woolly Hollow Faulkner + Acquisition of one (1) tract of land (approximately 39.93 acres) $ 71,115

Woolly Hollow Faulkner + Asbestos surveys for selected park structures to meet state and federal regulations $ 1,916

Woolly Hollow Faulkner + Tie-in park water supply system to Community Water System, Inc. $ 73,808

Woolly Hollow Faulkner + Construction for the renovation of fifteen (15) & addition of new campsites (Class A) with

bathhouse, utilities & road (A-75 only )(Design FY 08 ANCRC - $67,500) (Construction FY09

ANCRC -$851,031)

$ 73,671

Woolly Hollow Faulkner + Construction of a new Bathhouse to include site improvements, to replace the Bathhouse destroyed

by fire.

$ 74,994

Woolly Hollow Faulkner ++ Construction of a new mountain bike trail to include parking, trailhead, and trailhead signage. $ 110,527

Woolly Hollow Faulkner $ 1,184,415

+ PROJECTS - Completed $ 144,741,300

++ PROJECTS - Underway $ 26,238,538

GRAND TOTAL $ 170,979,838

23 6-30-2016