    Architecture@08 reviews the next gen

    o Asia-Paciic to encourage regional d

    issues such as identity, sustainability, i

    Each project is reviewed over our pag

    site plans, loor plans, elevations, rend

    inormation. Forty-ive projects, which

    ace o regional architecture, were sele

    projects reported by BCI Asia and BC

    In compiling inormation on these proj

    interviewed almost hal a million archit

    and contractors.

    Image on the cover is a rendering ofS

    Plazaby MAD.

    Singapore edition

    BCI Asia is the preeminent construction inormation and media

    group covering China, Southeast Asia and Australia. From 19

    ofces, the BCI Group o Companies publishes more than 100,000

    reports a year on uture building and construction projects. It

    publishes the FuturArc journal o New Architecture and hosts the

    BCI Asia Top 10 awards or architectural frms with the greatest

    portolios.MICA (P) 166/11/2006

  • 8/9/2019 Arc@08 Sample

    2/8

    AustrAliA

    Halmarick House 14

    20 Currie Street 18

    Perth Arena 22

    Shavran Tower 26

    White Rabbit Gallery 30

    ChinA

    Shenzhen Kingkey Financial Tower 36

    Sheraton Hotel 40

    SinoSteel International Plaza 44

    Suzhou Cultural and Sports Centre 48

    Xinxiang Pingyuan Museum 52

    hong Kong

    Centennial Campus, University of Hong Kong 58

    Private Residence 62

    Macao Studio City 66

    Sheng Kung Hui Holy Spirit Church and Aged Care Complex 70

    St. Pauls Hospital 74

    indonesiA

    Financial Tower

    Lembang Permata Residence

    Museum Joang 45

    Sahid Perdana Towers

    The Campuan

    MAlAysiA

    Bukit Ledang Gardens

    Jadehills

    Suruhanjaya Tenaga Headquarters

    The Paradigm

    The Wave

    PhiliPPines

    Antel Spa Residences

    The Blue Sapphire

    Manila Polo Club

    Robinsons Place Otis

    Southville Foreign Colleges

    Contents

  • 8/9/2019 Arc@08 Sample

    3/8

    teChnologies@08

    Acoustic & vibration technology: SIAC Pte Ltd

    Automated waste system: Envac Singapore Pte Ltd

    Bathroom appliances & accessories:

    Rigel Technology (S) Pte Ltd

    Blinds & curtains: Hunter Douglas Singapore Pte Ltd

    Benchtops, laminates & joinery:

    TAK Products & Services Pte Ltd

    Ceilings: suspended & systems:

    Hunter Douglas Singapore Pte Ltd

    Cladding: Hunter Douglas Singapore Pte Ltd

    Curtain walling: YKK AP Singapore Pte Ltd

    Doors: commercial & automation: GEZE Asia Sales Ltd

    Doors: hardware: Tiki International Enterprises Pte Ltd

    Design software: Autodesk Asia Pte Ltd

    Electrical distribution, cabling & switching:

    LEGRAND (S) Pte Ltd

    Fasteners: Welmate Pte Ltd

    Faucets, taps & showerheads: Steldor Pte Ltd

    Floorcovering: carpets: Goodrich Global Pte Ltd

    singAPore

    Fusionopolis 2A 146

    Marina Bay Financial Centre 150

    The Marina Bay Sands Integrated Resort 154

    Reflections at Keppel Bay 158

    Treelodge @ Punggol 162

    thAilAnd

    Innovation Cluster II 168

    The Beach Jomtien 172

    The Makkasan Complex 176

    The Western Corridor 180

    Veranda Bangkok 184

    VietnAM

    Asia Commercial Bank Offices 190

    Dai Quang Tower Complex 194

    Dong Tang Long Social Housing Zone 198

    Phu Xuan Central Park Apartments 202

    REE Office Building 206

  • 8/9/2019 Arc@08 Sample

    4/8

    Flooring: laminates: Goodrich Global Pte Ltd 229

    Floorcovering: timber, tiles & others: 230

    Wood Doctor (Far East) Pte Ltd

    Glazing & architectural glass: 231

    AGC Flat Glass Asia Pacific Pte Ltd

    Insulation: Eltraco Holdings Pte Ltd 232

    Interior art & accessories: 233

    Swarovski Singapore Trading Pte Ltd

    Kitchen appliances & accessories: Brandt Asia Pte Ltd 234

    Louvres & vents: Hunter Douglas Singapore Pte Ltd 236

    Paint & coatings: Nippon Paint Singapore Co Pte Ltd 237

    Lighting: Philips Electronics Hong Kong Ltd. 238

    Recreation equipment: PLAYPOINT (Singapore) Pte Ltd 240

    Roof cladding & systems: 241

    BlueScope Lysaght (Singapore) Pte Ltd

    Sanitary ware: Kohler Co. 242

    Sealants & fillers: Momentive Performance Materials 243

    Wall covering: Goodrich Global Pte Ltd 244

    Water fountain design: OASE Asia Pacific Pte Ltd

    Windows, skylights & window hardware: Fascina Pte Ltd

    indiCes

    Companies in projects (in alphabetical order)

    Companies in Technologies@08 (in alphabetical order)

  • 8/9/2019 Arc@08 Sample

    5/8

    The Campuan

    The Campuan, a resort villa development located in Ubud, Bali, departs rom typical Balinese resort

    design that reers to traditional local architecture with pitched-roo buildings set up in a village-like

    kampong setting. The resorts owner, instead, sought a development that adopted a new approach,

    both architecturally and environmentally.

    The Campuan resort comprises seven three-bedroom villas, each with a private pool, laid out down

    a steep slope overlooking the Ayung Gorge. Aiming to respect the resorts natural environment, the

    architects wanted to limit the visibility o the buildings and create a contemporary look.

    As such, the villas are low-prole buildings, mindul o their surroundings. Flat, lea-shaped roos

    minimise the resorts silhouette. Roo gardens blanket each building, giving the resort the appearanc

    o a chain o interlocking leaves. Jack ruit and coconut trees spring up through open spaces in the

    roos.

    Skylights introduce natural light during the day, and illuminate the gardens at night. The buildings ar

    constructed o raw concrete, which provides a sharp contrast to their sleek, rened interiors. The vil

    are laid out to fow seamlessly rom one room to another.

    The architects have incorporated a number o environmentally riendly building strategies into the

    design. A lush tropical garden utilises wastewater rom the resort or irrigation. The water fows down

    the resorts sloping site, ltered by vegetation, and is then recycled or toilets.

    Other green strategies include using solar panels to supplement electricity; recycled ironwood rom

    old boat or pool decking; and solar heat to warm up the water.

    In addition to the villas, the resort has reception acilities, a restaurant and bar, and a spa.

    Ubud

    Bali

    Indonesia

    96

    Perspective view

    Client

    PT. Campuan Bali

    Architecture Firm

    Edy Semara Architect International

    (E.S.A. International)

    Principal Architect

    Putu Edy Semara

    Other Architects

    Eri Andria; Fei Efendy

    Consulting Engineer

    Adi Susila

    Contractor

    PT. Arteka

    Site Area

    8,000 square metres

    Gross Floor Area

    2,500 square metres

    Building Height (storeys)

    2 (maximum)

    Expected Construction

    Completion Date

    April 2009

    Putu Edy

  • 8/9/2019 Arc@08 Sample

    6/8

    98

    Main entrance

    Master plan Main entrance Perspective view

  • 8/9/2019 Arc@08 Sample

    7/8

    The Marina Bay SandsIntegrated Resort

    The Marina Bay Sands Integrated Resort, an iconic development planned or Singapores waterront,

    will redefne the city-states urban landscape. Designed by Boston-based Moshe Sadie Associates

    with Aedas Singapore, the over-S$5 billion project includes a fve-star hotel and casino; meeting,

    convention and exhibition acilities; internationally renowned restaurants and an array o retail outlets.

    Positioned between the Marina Bay waterront and the extensive Garden at Marina South, the Marina

    Bay Sands aims to become the defning landmark or Singapore.

    The projects silhouette is defned by the three hotel towers, which split and splay towards the bottom,

    creating the space or a glazed atrium that connects the three buildings. They are also angled to

    enhance the sculptural eect. The aade acing the Garden at Marina South brings the greenery onto

    the towers through landscaped balconies, contrasting with the glazed aade acing Marina Bay.

    The Sky Park, a one-hectare rootop space set atop the three hotel towers, will eature spas and

    restaurants. A sculptured garden, planted with lush greenery and set amidst swimming pools, jogging

    paths and terraces, will serve as a tranquil sanctuary or visitors. A public observation deck at one end

    o the Sky Park will oer 360-degree views o Singapores skyline and the surrounding area.

    Another key highlight o the developments design will be the unique structure o the ArtScience

    Museum, positioned on the Marina Bay side o the development. Its lotus-inspired roo is a symbolic

    welcome gesture to visitors to Singapore. The museum aims to advance the exploration o the arts

    and sciences, and the connections between them. The other low-rise components are unifed visually

    through their sculptural wave-like roos.

    Las Vegas Sands Corp. was awarded the project tender in May 2006. The project is in its design

    development stage and is slated to be completed in 2009.

    Bayfront Avenue

    Singapore

    Client

    Marina Bay Sands Pte Ltd

    Design Consultant

    Moshe Safdie and Associates, Inc

    Project Architect

    Aedas Pte Ltd

    Landscape Consultant

    Peter Walker and Partners

    Landscape Architects

    Landscape Architect

    Peridian Asia Pte Ltd

    154

    Mechanical & Electrical

    Design Consultant

    R.G. Vanderweil Engineers, LLP

    Mechanical & Electrical

    Engineer

    Parsons Brinckerhoff Pte Ltd

    Civil & Structural Engineer

    (Traffic, Acoustics, Risk-

    Security, Faade and Fire

    Engineering)

    Arup Pte Ltd

    Rear view

    Quantity Surveyor

    Rider Levett Bucknall

    Site Area

    154,936.6 square metres

    Gross Floor Area

    570,000 square metres

    Expected Construction

    End Date

    2009

    Night view

    Aerial view from the bay

    Ma ri na B ay Sa nd s Pt e. L td . 20 0 6. Al l r ig h ts re se rv ed . Ma ri na B ay Sa nd s Pt e. L td . 20 06 . A ll ri g ht s re se rv e d.

    Marina Bay Sands Pte. Ltd. 2006. All rights reserved.

  • 8/9/2019 Arc@08 Sample

    8/8

    156

    The ArtScience MuseumSkating rink

    Retai l spine Marina Bay Sands Pte. Ltd. 2006. All rights reserved.

    Marina Bay Sands Pte. Ltd. 2006. All rights reserved.

    View corridor

    Marin a Bay Sands Pt e. L td. 200 6. All righ ts reserved. Marina B ay Sand s P te. Ltd . 2 006. All rig hts reserv ed.