ar 2010-abd elrahman hussein portfolio
TRANSCRIPT
![Page 1: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/1.jpg)
Abd elrahman Hussein portfolio
[Address: 112 Mostafa El Nahas, Nasr City, Cairo, Egypt. Mobile +02-01006980899, Home 02-22703993
E-mail:[email protected]
![Page 2: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/2.jpg)
Abd elrahman Hussein Abd ElLatif
Address: 112 Mostafa El Nahas, Nasr City, Cairo, Egypt. Mobile +02-01006980899, Home 02-22703993
E-mail:[email protected]
Personal Profile
Effective team member who is capable to work under pressure.
Hard-working and well organized.
Strong analytical and problem solving skills.
Willing to contribute to the growth of a progressive company where could practice and develop my communications and interpersonal skill.
Proficient user of Microsoft Word, PowerPoint, Excel, the Internet and E-mail.
Education and Qualifications
BSc. Of Architectural Engineering, (Year 2010) El Shorouk Academy.
Cumulative Grade: Good 73% & Project Grade: Very Good
Last year grade : Very good & Graduation project : Education center
Courses& Trainings
Experience in Revit for arch , design, working drawing and details .
Experience in 3DMax .
Experience in Photoshop .
Experience in AUTOCAD for arch , design, working drawing and details
Height Diploma in project management in AUC PRMG 50 , PRMG 30 , PRMG 20
and I will continual…
Work experience
Work at Vision Consultant Engineering office Architecture-urban in cairo for 1 year.
Work at The engineering consultant office for the Engineering Authority of the Armed forces for 2 year .
Work at Gira Consultant Engineering office Architecturein cairo for 1 year.
Work at BINLADIN GROUP until now.
![Page 3: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/3.jpg)
`
Personal Summary
Date of Birth: 4.12.1988.
Nationality: Egyptian.
Marital status: Single.
Internship and Work Experience:
From 1th of September 2010 to 30Th of April 2011 in VISION for engineering Consultancy
Shop Drawing for project faculty of engineering,king Khalid university ,Abha ,KSA.
3d presentation for moon city compound.
3d presentation for villas & towers .
From 1th of November 2011 to 1Th of October 2013 in The engineering consultant office for the Engineering Authority of the Armed forces
Participate on design & supervision for project &BOQ for ( Development The house of Engineering Authority).
Participate on design & supervision for project (planning the future city for Officers housing).
Participate on design for project (planning the Social housing in borg el arab & helwan )
From of December 2011 to 1Th of April 2012 in The EMASS for engineering Consultancy ( PART TIME).
Design & 3d presentation for ,villas & towers
From 1th of October 2013 to 1 th septamper 2014 in Gira for engineering Consultancy
Design & 3d presentation for compound ,villas & towers
Design & 3d presentation by 3d max for Tourist village in Hurghada
From 1th septamper 2014 to Now in BINLADIN GROUP
BIM ENGINEER Coordinator
> modling by Revit & Shop Drawing By Revit
Project: ( king faisal Specialist Hospital & Research centre in Jeddah-KSA)
AREA : 1.98 km2
Cost : 9,000,000,000 sr
References Furnished Upon Request
![Page 4: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/4.jpg)
BIM COORDINATOR
king faisal Specialist Hospital & Research centre in Jeddah-KSA
modling by Revit & Shop Drawing By Revit
modeling walls floor ceiling and skin as building information modeling
• Creating Revit Families and Tempelates. •Shop drawings. •As Built drawings. •Coordinate between ARCH, STR , MEP Teams. •Preparing RFI`s if needed
• 4D Construction Sequence Simulatin using NAVISWORKS if needed.
MAKE SHEETS AND SHOP DRAWING FROM REVIT AND EXPORD IT FOR PDF
SOME PICTURES RENDERING FROM REVIT
![Page 5: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/5.jpg)
VILLA AHMED ORABY
![Page 6: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/6.jpg)
Moon city compund
![Page 7: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/7.jpg)
Social housing 10 Ramdan city
![Page 8: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/8.jpg)
Wall and Gate for Military Production Club
![Page 9: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/9.jpg)
el maady tower
![Page 10: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/10.jpg)
towers
![Page 11: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/11.jpg)
2 villa in new cairo
![Page 12: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/12.jpg)
shots
![Page 13: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/13.jpg)
SHOTS
![Page 14: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/14.jpg)
SHOTS
![Page 15: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/15.jpg)
SHOTS
![Page 16: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/16.jpg)
SHOTS
![Page 17: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/17.jpg)
SHOTS
![Page 18: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/18.jpg)
![Page 19: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/19.jpg)
SHOTS
![Page 20: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/20.jpg)
SHOTS
![Page 21: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/21.jpg)
![Page 22: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/22.jpg)
![Page 23: Ar 2010-abd elrahman hussein portfolio](https://reader031.vdocuments.site/reader031/viewer/2022030119/58a040531a28ab5d2e8b744f/html5/thumbnails/23.jpg)
SHOTS