apv at visual airfields - icao.int meetings seminars and workshops... · maintenance of commercial...

16
APV at visual airfields Aena - Satellite Navigation Department Pablo Haro Brussels, 12-14 March 2014

Upload: lethien

Post on 03-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

APV at visual airfields

Aena - Satellite Navigation Department

Pablo Haro

Brussels, 12-14 March 2014

Introduction

Current regulations in Spain

A case study: La Perdiz aerodrome

ICAO Annex 14 –new definition of non-instrument runway

Conclusions

TABLE OF CONTENTS

APV at visual airfields Satellite Navigation Department 12-14 March 2014 2

• Instrument Approach Procedures (IAPs) based on satellite navigation offer a

means of serving smaller and less well equipped aerodromes.

• IAP, in particular APV, can increase safety and accessibility at those aerodromes.

• Requests for IAP from a number of small aerodromes in Spain.

INTRODUCTION

APV at visual airfields Satellite Navigation Department 12-14 March 2014 3

Initial guidance received in June 2013 from the Spanish National Supervisory

Authority (AESA) concerning current requirements for the implementation of APV at

visual airfields.

Runway requirements

• The runway should at least meet the Annex 14 requirements for non-precision

approach (NPA) runways with OCH ≥ 90 m (300 ft).

Limitation and removal of obstacles

• The Obstacle Limitation Surfaces (OLS) and the obstacle limitation requirements

should at least meet the Annex 14 requirements for NPA runways with OCH ≥ 90

m (300 ft).

On-board navigation systems and RNP APCH approval

• Aircraft and crew flying RNP APCH procedures down to LPV minima have to be

approved according to EASA AMC 20-27/28 or equivalent.

CURRENT REGULATIONS IN SPAIN (I)

APV at visual airfields Satellite Navigation Department 12-14 March 2014 4

Public/Restricted use aerodrome

Public use aerodrome

• Compatibility of the new instrument approach procedures with the nearby airspace;

• Aerodrome Flight Information Service (AFIS) at least;

• Flight Information Zone (FIZ) in the airspace associated to the AFIS aerodrome;

• Approval by CIDEFO joint commission (Ministries of Defence and Development);

• Both the aerodrome and the IFR procedures included in AIP-Spain;

• Certified aeronautical meteorological station.

CURRENT REGULATIONS IN SPAIN (II)

APV at visual airfields Satellite Navigation Department 12-14 March 2014

Commercial air transport operations of passengers (including aerotaxis), cargo and mail. Maintenance of commercial transport aircraft. Flight school base (commercial and aerotaxi pilots) Touristic flights base

Public use aerodrome

Other types of activity Restricted use aerodrome

5

Restricted use aerodrome

• Modification of the aerodrome authorisation:

– Compatibility with the nearby airspace;

– Environmental evaluation;

– Review of administrative documentation and technical study of the aerodrome;

– Inspection of the aerodrome infrastructure.

• Establishment of a controlled airspace (i.e. ATC) around the aerodrome

– Based on an article of the Rules of the Air drafted before the regulation

establishing the possibility of AFIS.

• Approval by CIDEFO joint commission (Ministries of Defence and Development);

• Both the aerodrome and the IFR procedures included in AIP-Spain.

• Certified aeronautical meteorological station.

CURRENT REGULATIONS IN SPAIN (III)

APV at visual airfields Satellite Navigation Department 12-14 March 2014 6

• Ongoing study in the frame of the EC 7FP ACCEPTA project.

• Study on EGNOS-based IAPs at visual runway-ends.

• A case study: La Perdiz (LEIZ) aerodrome www.lanava.net

– Private aerodrome (not open to public use)

– Prior Permission Required (PPR) is mandatory

– Runway 1917 x 23 m asphalt

– Class G airspace (up to FL150)

– VFR

– very low level of traffic

– Business jets (LPV-capable aircraft)

• With current regulations for IAP:

– Runway requirements

– AFIS

– COM

– MET

– Lighting

the business case is not positive.

A CASE STUDY: LA PERDIZ AERODROME (I)

APV at visual airfields Satellite Navigation Department 12-14 March 2014 7

Outcome of the ACCEPTA study:

• Runway: the instrument runway strip requirement is not met.

• ATS: IAPs only economically feasible if neither ATC nor AFIS is considered.

– Safety of VFR / IFR operations could likely be ensured based on:

o adequate airspace structure, (Aerodrome Traffic Zone – ATZ);

o flight planning and operating procedures;

o No more than one aircraft at a time to use the IAP;

o local air-to-air radio frequency.

– currently not permitted by Spanish regulations.

• Communications: LEIZ radio frequency to inform on wind, QNH and temperature.

– as current ops.

• MET: local non-certified station. QNH based on nearby airports plus a safety margin.

• Runway lighting (for H24): edge, end, threshold lights.

A CASE STUDY: LA PERDIZ AERODROME (II)

APV at visual airfields Satellite Navigation Department 12-14 March 2014 8

• Non-instrument runway. A runway intended for the operation of aircraft using visual

approach procedures or an instrument approach procedure down to minima equal to

or better than VMC.

• The runway infrastructure requirements need not be any different than visual

procedures to non-instrument runways since the final segment will always have the

same VMC requirements.

• Change being proposed by ICAO for introduction on the 13th November 2014

(Amendment 11-B).

ANNEX 14 – NEW DEFINITION OF NON-INSTRUMENT RUNWAY

APV at visual airfields Satellite Navigation Department 12-14 March 2014 9

• Current regulations do not facilitate the deployment of APV procedures at visual

airfields.

• In fact, with current regulations, it is unlikely that small aerodromes will perform the

necessary investments to allow the use of instrument procedures.

• On the other hand, it is acknowledged that the use of instrument procedures in such

aerodromes would enhance safety and accessibility.

• Amendment of ICAO Annex 14 (Nov 2014) – IAP possible at non-instrument runways.

• Instrument procedures have to be based on a safety case and cost-benefit analysis.

• Need for a uniform European policy and regulation.

CONCLUSIONS

APV at visual airfields Satellite Navigation Department 12-14 March 2014 10

Thank you www.aena.es

APV at visual airfields Satellite Navigation Department 12-14 March 2014

APV at visual airfields Satellite Navigation Department 12-14 March 2014

APV at visual airfields Satellite Navigation Department 12-14 March 2014

APV at visual airfields Satellite Navigation Department 12-14 March 2014

APV at visual airfields Satellite Navigation Department 12-14 March 2014