apqp and control plan to iso_ts16949_2002

Upload: rameshdesign

Post on 14-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Apqp and Control Plan to Iso_ts16949_2002

    1/2

    APQP and Control Plan to ISO/TS 16949:2002 Cross Reference

    Page 1 of 2

    APQP Introduction Organize the Team Team-to-Team Training

    Production Quality Timing Plan

    1.0 Plan and Define the Program

    Inputs

    1.13 Management Support

    2.0 Product Design and Development

    Inputs Design Goals Reliability and Quality Goals Preliminary Process Flow Chart Preliminary Listing of Special Product

    Characteristics Outputs

    2.1 DFMEA2.2 Design for Manufacturability2.3 Design Verification2.4 Design Reviews

    Design Verification Product and Process Validation

    2.5 Prototype build Control Plan2.9 Drawings and Specification Changes

    2.10 New Equipment

    2.11 Special Product and ProcessCharacteristics2.12 Gages

    2.13 Team Feasibility

    TS 7.3.1.1Multidisciplinary ApproachTS 7.3.1.1Multidisciplinary ApproachTS 6.2.2 Training

    TS 7.3.1 Design and Development PlanningTS 7.1 Planning of Product RealizationTS 7.2 Customer Related ProcessesTS 8.2.1 Customer SatisfactionTS 7.2.1 Determination of Requirements Related

    to the ProductTS 7.2.2 Review of Requirements Related to the

    ProductTS 7.2.2.2 Organization manufacturing feasibility

    TS 7.3.2 Design and Development InputsTS 7.3.2.1Product Design InputTS 7.3.2.1Product Design InputTS 7.3.2.2Manufacturing Process Design InputTS 3.1.12 Special CharacteristicTS 7.3.2.3Special CharacteristicsTS 7.3.3 Design and Development OutputsTS 7.3.3.1Product Design Outputs Supp.TS 7.3.3.2Manufacturing Process Design OutputTS 7.3.5 Design and Development VerificationTS 7.3.4 Design and Development ReviewTS 7.3.5 Design and Development VerificationTS 7.3.6 Design and Development ValidationTS 7.3.6.2Prototype ProgrammeTS 7.3.7 Control of Design and Development

    ChangesTS 7.2.2.2Organization manufacturing feasibilityTS 7.3.3.2Manufacturing Process Design InputTS 3.1.12 Special CharacteristicTS 7.3.2.3Special CharacteristicsTS 7.3.3.2Manufacturing Process Design InputTS 7.3.4.1MonitoringTS 7.2.2.2Organization manufacturing feasibility

  • 7/30/2019 Apqp and Control Plan to Iso_ts16949_2002

    2/2

    APQP and Control Plan to ISO/TS 16949:2002 Cross Reference

    Page 2 of 2

    3.0 Process Design and Development Introduction Inputs

    DFMEA

    Design Reviews Engineering Drawings Engineering Specifications Special Product and Process

    Characteristics Gages/Testing Equipment

    Requirements Outputs

    Process Flow Chart Floor Plan Layout PFMEA

    Pre-Launch Control Plan Process Instructions

    3.3 Process Flow Chart3.4 Floor Plan Layout

    3.6 PFMEA3.7 Pre-Launch Control Plan

    3.8 Process Instructions3.12 Management Support

    4.0 Production and Process Validation4.1 Production Trial Run4.4 Production Part Approval4.5 Production Validation Testing4.7 Production Control Plan4.8 Quality Planning Sign-Off and Management

    Support

    5.0 Feedback, Assessment, and CorrectiveAction

    5.1 Reduced Variation

    6.0 Control Plan Methodology

    TS 7.3.1 Design and Development PlanningTS 7.3.2 Design and Development InputsTS 7.3.2.2Manufacturing Process Design InputTS 7.3.3.1Product Design Outputs Supp.

    TS 7.3.3.1Product Design Outputs Supp.TS 7.3.3.1Product Design Outputs Supp.TS 7.3.3.1Product Design Outputs Supp.TS 7.3.3.1Product Design Outputs Supp.TS 7.3.3.1Product Design Outputs Supp.TS 7.3.3.1Product Design Outputs Supp.

    TS 7.3.3 Design and Development OutputsTS 7.3.3.2 Manufacturing Process Design InputTS 7.3.3.2 Manufacturing Process Design InputTS 7.3.3.2 Manufacturing Process Design Input

    TS 7.3.3.2 Manufacturing Process Design InputTS 7.3.3.2 Manufacturing Process Design InputTS 7.5.1.2Work InstructionsTS 7.3.3.2Manufacturing Process Design InputTS 6.3.1 Plant, Facility and Equipment

    PlanningTS 7.3.3.2Manufacturing Process Design InputTS 7.3.3.2Manufacturing Process Design InputTS 7.3.5 Design and Development VerificationTS 7.3.6 Design and Development ValidationTS 7.3.3.2Manufacturing Process Design InputTS 7.2.2.2Organization manufacturing feasibilityTS 7.3.4 Design and Development Review

    TS 7.3.6 Design and Development ValidationTS 7.3.6.2Prototype ProgrammeTS 7.3.6.3Product Approval ProcessTS 7.3.6 Design and Development ValidationTS 7.5.1.1Control PlanTS 7.2.2.2Organization manufacturing feasibilityTS 7.3.4 Design and Development Review

    TS 8 Measurement, Analysis andImprovement

    TS 7.3.3.2Manufacturing Process Design InputTS 7.5.1.1Control Plan