appro products and solutions

16
Appro Products and Solutions Anthony Kenisky, Vice President of Sales Appro , Premier Provider of Scalable Supercomputing Solutions: 4/16/09

Upload: seth-padilla

Post on 03-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Appro Products and Solutions. Appro , Premier Provider of Scalable Supercomputing Solutions: 4/16/09. Anthony Kenisky, Vice President of Sales. Competitive Advantages. :: Technology Differentiation. Network Communications Performance. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Appro Products and Solutions

Appro Products and SolutionsAppro Products and Solutions

Anthony Kenisky, Vice President of Sales

Appro , Premier Provider of Scalable Supercomputing Solutions: 4/16/09Appro , Premier Provider of Scalable Supercomputing Solutions: 4/16/09

Page 2: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

Competitive Advantages:: Technology Differentiation

No need for LWK (Light-Weight-Kernel) which allows system to run a wider range of commercial applications

Diskless Operation withStd Linux OS support

ACE™ Cluster Management Software to simplify management of large, complex systems

Complete Cluster Management

System can be partitioned to support multiple operating environments to provide flexibility in 3rd party applications support

Dynamic Virtual ClusterOperation

Directed Airflow, an innovative air cooling system architecture which supports very dense systems and lowers facility cooling costs

Packaging

Scalable dual-rail, 3D Torus Topology, providing superior network communications performance

Network CommunicationsPerformance

Page 3: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

GreenBlade™ SystemHyperClusters™Xtreme™ SuperComputer

:: Diverse Product Line

Appro Product Portfolio

Performance and availability for Large-Sized Deployments

Modular Solution for Small to Mid-Sized Deployments

Flexibility and Choice for Medium to Large-Sized Deployments

Page 4: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

• Appro Xtreme-X™ Supercomputer– Balanced Architecture (CPU/Memory/Network)

– Scalability (SW & Network)

– Reliability (Real RAS: Network, Node, SW)

– Facilities (30% less Space, 28% less Power & Cooling)

• Appro GreenBlade™ System– Price/Performance/Value

– N+1 90%+ Efficient Power design

– Hot swap blades w/Local Storage option

– Density Advantage 10 nodes/80 core per system

• Appro HyperClusters™– Cluster based on GreenBlade systems or rack-mount servers

– Choice of CPU’s or GPU’s

– Standard 19” rack support

– Price/Performance per watt, reliability and flexibility

:: Feature Summary

Product Portfolio

Page 5: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

:: Performance and Availability

Xtreme-X™ Supercomputer

Management NettowkGbE Switch (Dual Rail)

36-port QDR Infiniband Switch

16 Compute nodes’ Subrack

• Power/Cooling efficient solution with lower TCO

• 512 cores based nodes/Rack

• Peak Performance/Rack: 6.1TF

• Memory Capacity/Rack: 1.5TB

• Dual Rail Management Network

• Efficient Cooling Architecture : 28.8KW/Rack

• Redundant PSU 90% Efficiency, 5+1, PFC

• Redundant Fan: Up to 460W power/Node

• Appro Cluster Engine™ Management Software

• Complete package with improved (RAS)

• Ideal for large deployments, > 1000 nodes

• Scales up to 1000TF of computing power

Page 6: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

• Improved cooling efficiency increasing computing capacity up to 28% with the same amount of cooling

• 100% of AC flow is forced through the entire system increasing system cooling efficiency

• Reduced total cost of ownership and increased computing capacity

• Improved cooling efficiency increasing computing capacity up to 28% with the same amount of cooling

• 100% of AC flow is forced through the entire system increasing system cooling efficiency

• Reduced total cost of ownership and increased computing capacity

:: Directed Airflow Cooling Methodology

Top View –Datacenter Floor Space

Top View –Datacenter Floor Space

Xtreme-X™ Supercomputer

Page 7: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

Renault F1 Racing Team

Delivered 38TFs Xtreme-X

Supercomputer for Virtual Wind tunnel

project

Customer Quote “Appro not only offered

us a cost effective solution but they also improved our required technical specification

through better reliability, greater fault

tolerance and redundancy as well as more flexibility with regards to system

scalability.”

Bob Bell,Technical Director, ING

Renault F1 Team

:: Recent Design Deployment

Xtreme-X™ Supercomputer

Page 8: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

PA

GE

| 8

:: HPC Building Block Solution

GreenBlade™ System

• Green Architecture– Power-optimized design resulting in

reduction of power consumption of platform cooling sub system

• Increased Density– Double the density of standard 1U

servers

• Improved R/A/S– Shared N+1 power design

– Shared cooling (3+3) design

– Hot-swappable blades

– Hot-swappable power supplies

– Hot-swappable cooling fans

Front View

Rear View

Page 9: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

• Three-year Savings in Power Cost per Server vs. GreenBlade™

– To adequately cool a compact 1U server, typical cooling system of 1U platform is designed as follows:

• Standard 1U uses up to six compact fans to cool one system

• Popular Twin 1U uses six compact fans to cool two systems

– On the other hand, GreenBlade™ uses six larger(120mm), more reliable fans to cool up to 10 systems

– Example below translates to lower TCO for a GreenBlade™ solution over competition

Power Draw @ peak (W)

Power Draw (kWh) – 3 yrs

Power Draw & Cooling (kWh)**

3 yr cost of pwr & cooling in US

($)*

Additional Cost over

GreenBlade™

Total Additional Cost for 1000

servers

GreenBlade™ 297.2W 7,810 12,496 $1,624 - -

1U Twin Server 330.2W 8,677 13,883 $1,804 $180 $180,000

1U Standard Server

366.5W 9,631 17,335 $2,253 $629 $629,000

* Power cost calculated at $0.13/kWh as per Dept of Energy Commercial power cost national estimate report in 2007** Cooling power requirement estimated at 60% of total power supplied

:: Benefits vs. standard 1U servers

GreenBlade™ System

Page 10: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

:: Latest Processor and GPU Technologies

New - Appro HyperClusters™

Appro HyperGreen™ ClusterPower-Efficient, based on GreenBlade System

Appro HyperPower™ ClusterGPU, Performance Optimized Clusters

Coming May/2009

• Based on an open architecture designed for medium to large deployments

• Delivers performance, scalability and greater flexibility in a dense cluster architecture

• Offers the latest processor and GPU computing technologies

• Open cluster management options in an economical and power efficient compute platform

• Choice of server, networking and software with a variety of configuration options

• Tested and pre-integrated solution deployed as a complete package

• HPC professional services and support available

• Based on an open architecture designed for medium to large deployments

• Delivers performance, scalability and greater flexibility in a dense cluster architecture

• Offers the latest processor and GPU computing technologies

• Open cluster management options in an economical and power efficient compute platform

• Choice of server, networking and software with a variety of configuration options

• Tested and pre-integrated solution deployed as a complete package

• HPC professional services and support available

Page 11: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

Specifications

:: Maximum Rack Configuration

HyperGreen™ Cluster

• Cluster Solution based on the Appro GreenBlade System

• Up to 80 DP GreenBlades™/640 cores per 42U Rack

• Up to 5.12TB of system memory

• Up to 80TB of local storage

• Fully populated rack weighs ~1,749 lbs

• Rack-level power consumption is ~16kW to 32kW

• 20% power reduction per node compared to 1U servers

• Supports multi-configuration and interconnect options

• Standards IPMI or Appro BladeDome remote server mgmt

• Choice of open software solutions using Rocks+ and MOAB

• Ideal for mid to large-sized HPC and high-density computing

Page 12: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

• Specifications– Supports up to 8x Sub-Racks– Supports up to 80x DP Compute Blades

• Use one SXB100 or 200 as Master node• Some blades can be configured as network

storage nodes for the cluster– Supports up 7.6TF per rack– Supports up to 5.12TB of system memory– Support up to 160x internal 2.5” HDDs, equal

to 80TB of local storage– 2RU rack space left for switches– IB switches should be installed in a separate

infrastructure rack– Fully populated rack weighs ~1,749 lbs– Depending on system configuration, rack-level

power consumption is 16kW to 32kW

:: One Scalable Unit – Cluster Recipe

HyperGreen™ Cluster

Page 13: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

7U 144p IB SW

1U LCD KVM2U Mgmnt Server

:: 136 Node- Sample Cluster Configurations

• Specifications – 136 Node Cluster– 14x Sub-Racks

– 140x DP Compute Blades

– 4x spare Compute Blades

– 13TF Cluster (using 3GHz CPU)

– 6.5TB of system memory

– 2U Management Node

– 1U Rackmount LCD/KVM

– 7U 144p DDR IB Switch

HyperGreen™ Cluster

Page 14: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

14U 288p IB SW

2U Mgmnt Server

:: 288 Node- Sample Cluster Configurations

• Specifications – 288 Node Cluster– 29x Sub-Racks

– 290x DP Compute Blades

– 2x spare Compute Blades

– 27.6TF Cluster (using 3GHz CPU)

– 13.8TB of system memory

– 2U Management Node

– 14U 288p DDR IB Switch

HyperGreen™ Cluster

Page 15: Appro Products and Solutions

APPRO CORPORATE PRESENTATION

30U864p IBSwitch

2U Mgmnt Server

:: 864 Node- Sample Cluster Configurations

• Specifications – 864 Node Cluster– 88x Sub-Racks– 880x DP Compute Blades– 16x spare Compute Blades– 82.9TF Cluster (using 3GHz CPU)– 41.4TB of system memory– 2U Management Node– 30U 864p DDR IB Switch

HyperGreen™ Cluster

Page 16: Appro Products and Solutions

Appro Products and SolutionsAppro Products and Solutions

Anthony Kenisky, Vice President of Sales

Appro , Premier Provider of Scalable Supercomputing Solutions: 4/16/09Appro , Premier Provider of Scalable Supercomputing Solutions: 4/16/09