application for a new divisible load oversize/overweight vehicle

1
TRUCK PERMITTING UNIT Permit # Phone: (646) 252-7136 Email: [email protected] Visit Us @ www.mta.info/bandt/traffic/trucker.html 4 4/7/2014 Rev. 6 APPLICATION for a NEW DIVISIBLE LOAD OVERSIZE/OVERWEIGHT VEHICLE PERMIT Instructions: 1) Fill out the form completely (please fill in information directly, this is a “Fillable” form). 2) Click the "Save" buttom to save the form, give a logical file name. 3) Email completed request form to [email protected] (make sure you attach the form to the email). Applicant’s Information Date of Request: Request Made By (Company): Contact Person: Address: Phone Number: Email Address: _________________________________ Date of Travel: Must be between 10 pm on to 5 am on Facility to be Crossed: Direction of Travel: (Bound) Description of Load: Truck Towing Vehicle Plate No: Trailer Plate No: Total Gross Weight: _____________ Pounds Number of Axles: ______________________ AXLE # STEERING 2 3 4 5 6 7 8 9 10 11 AXLE WEIGHTS (lb) AXLE SPACING (4’ MIN, in ft - in) ft in ft in ft in ft in ft in ft in ft in ft in ft in ft in VEHICLE DIMENSIONS: Overall Width ____ft _____in Overall Length ____ft _____in Overall Height ____ft _____in To guarantee the return of the application/permit in time for planned crossing the applicant shall submit the application two (2) business days in advance of crossing date. All vehicles shall be off the facility by 5 AM. All vehicles are subject to inspections. All permits shall be carried at all times in the vehicle, including NYCDOT & NYSDOT issued permits. On the basis of the above stated loading conditions and/or dimensions this vehicle may cross the MTA Bridge or Tunnel , subject to all New York State, New York City, and MTA B&T rules and regulations, and special instructions listed below (if any). For Official Use Only Approved by: Date: ______________ Permitting Engineer Special Instructions:

Upload: others

Post on 12-Sep-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPLICATION for a NEW DIVISIBLE LOAD OVERSIZE/OVERWEIGHT VEHICLE

TRUCK PERMITTING UNIT Permit #Phone: (646) 252-7136 Email: [email protected]

Visit Us @ www.mta.info/bandt/traffic/trucker.html 4

4/7/2014 Rev. 6

APPLICATION for a NEW DIVISIBLE LOAD OVERSIZE/OVERWEIGHT VEHICLE PERMIT Instructions: 1) Fill out the form completely (please fill in information directly, this is a “Fillable” form). 2) Click the "Save" buttom to save the form, give a logical file name.

3) Email completed request form to [email protected] (make sure you attach the form to the email). Applicant’s Information Date of Request: Request Made By (Company): Contact Person: Address: Phone Number: Email Address: _________________________________ Date of Travel: Must be between 10 pm on to 5 am on Facility to be Crossed: Direction of Travel: (Bound) Description of Load: Truck Towing Vehicle Plate No: Trailer Plate No:

Total Gross Weight: _____________ Pounds Number of Axles: ______________________

AXLE # STEERING 2 3 4 5 6 7 8 9 10 11 AXLE WEIGHTS (lb)

AXLE SPACING (4’ MIN, in ft - in)

ft in ft in ft in ft in ft in ft in ft in ft in ft in ft in

VEHICLE DIMENSIONS:

Overall Width ____ft _____in Overall Length ____ft _____in Overall Height ____ft _____in

To guarantee the return of the application/permit in time for planned crossing the applicant shall submit the application two (2) business days in advance of crossing date.All vehicles shall be off the facility by 5 AM. All vehicles are subject to inspections. All permits shall be carried at all times in the vehicle, including NYCDOT & NYSDOT issued permits. On the basis of the above stated loading conditions and/or dimensions this vehicle may cross the MTA Bridge or Tunnel , subject to all New York State, New York City, and MTA B&T rules and regulations, and special instructions listed below (if any).

For Official Use Only

Approved by: Date: ______________ Permitting Engineer

Special Instructions: