SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL Landrum & Brown Appendix B – Technical Review Committee October 2013 APPENDIX B TECHNICAL REVIEW COMMITTEE A Technical Review Committee (TRC) was established by the Port of Seattle (the Port) to assist the Port by actively contributing to, and reviewing, the technical products that are generated by the consulting team. The TRC was made up of planning staff from the six cities that surround the airport, in addition to representatives from King County, Washington State Department of Transportation, Boeing Field, the Federal Aviation Administration (FAA), the Puget Sound Regional Council and representatives from the airlines. Members of the Port staff were also on the committee. The TRC did not make policy decisions, but rather provided technical review and input regarding the analysis prepared for the study. Members of the TRC are listed below. Roster of Technical Review Committee Members Isaac Conlen, Planner, City of Federal Way Lynae Craig, Manager, Air Traffic Operations, Alaska Airlines Chip Davis, Planner, City of Burien Ron Fincher, District Manager, Seattle District, Air Traffic Control, FAA – NW Mountain Region JD Hood, ATC Liaison Pilot, Q400 Captain, Horizon Air Tom Hooper, Aviation Planner, Aviation Planning, Port of Seattle Stephen Kiehl, Principal Planner, PSRC Rob Kikillus, Development Manager, Airfield, Aviation Operations Planning, Port of Seattle Denise Lathrop, Planning Manager, City of Des Moines Stacy MacGregor, Assistant Planner, City of Tukwila Cayla Morgan, Environmental Protection Specialist, FAA Sharyn Parker, Noise Officer King County International Airport, King County Dept of Transportation Steve Rybolt, Environmental Management Specialist, Aviation Environmental Programs, Port of Seattle John Sibold, Aviation Director, WSDOT Al Torrico, Senior Planner, City of SeaTac Oscar Vela, Technical Pilot, Alaska Airlines Karen Wolf, Senior Planner, King County, Office of Strategic Planning and Performance Management

Upload: others

Post on 14-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    APPENDIX B TECHNICAL REVIEW COMMITTEE

    A Technical Review Committee (TRC) was established by the Port of Seattle (the Port) to assist the Port by actively contributing to, and reviewing, the technical products that are generated by the consulting team. The TRC was made up of

    planning staff from the six cities that surround the airport, in addition to representatives from King County, Washington State Department of Transportation,

    Boeing Field, the Federal Aviation Administration (FAA), the Puget Sound Regional Council and representatives from the airlines. Members of the Port staff were also on the committee. The TRC did not make policy decisions, but rather provided

    technical review and input regarding the analysis prepared for the study. Members of the TRC are listed below.

    Roster of Technical Review Committee Members

    Isaac Conlen, Planner, City of Federal Way

    Lynae Craig, Manager, Air Traffic Operations, Alaska Airlines

    Chip Davis, Planner, City of Burien

    Ron Fincher, District Manager, Seattle District, Air Traffic Control, FAA – NW Mountain Region

    JD Hood, ATC Liaison Pilot, Q400 Captain, Horizon Air

    Tom Hooper, Aviation Planner, Aviation Planning, Port of Seattle

    Stephen Kiehl, Principal Planner, PSRC

    Rob Kikillus, Development Manager, Airfield, Aviation Operations Planning, Port of Seattle

    Denise Lathrop, Planning Manager, City of Des Moines

    Stacy MacGregor, Assistant Planner, City of Tukwila

    Cayla Morgan, Environmental Protection Specialist, FAA

    Sharyn Parker, Noise Officer ‐ King County International Airport, King County Dept of Transportation

    Steve Rybolt, Environmental Management Specialist, Aviation Environmental Programs, Port of Seattle

    John Sibold, Aviation Director, WSDOT

    Al Torrico, Senior Planner, City of SeaTac

    Oscar Vela, Technical Pilot, Alaska Airlines

    Karen Wolf, Senior Planner, King County, Office of Strategic Planning and Performance Management

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    Local Jurisdiction Contacts

    City of Burien

    Deputy Mayor Rose Clark

    Councilmember Gordon Shaw

    City of Normandy Park

    Mayor George Hadley

    Councilmember Shawn McEvoy

    City of Des Moines

    Mayor Bob Sheckler

    City of SeaTac

    Mayor Terry Anderson

    City of Tukwila

    Mayor Jim Haggerton

    Councilmember Joan Hernandez

    City of Federal Way

    Mayor Linda Kochmar

    Highline School District

    School Board President Bernie Dorsey

    Individuals and Stakeholder Groups that have Expressed an Interest in the Part 150 Study

    City of Burien

    City of Normandy Park

    City of Des Moines

    City of Medina

    City of SeaTac

    City of Tukwila

    City of Federal Way

    Highline School District

    County Councilmember Julia Patterson

    Senator Karen Keiser

    Representative Dave Upthegrove

    Representative Tina Orwall

    Citizens Against SeaTac Expansion (CASE)

    Regional Commission on Airport Affairs (RCAA)

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    South Park Community Group (a neighborhood group)

    Greater Duwamish District Council

    Squire Park Community Group (a neighborhood group)

    Technical Review Committee Meetings Eight TRC meetings were conducted throughout the study, including a Part 150

    Data Review Session. Informal presentations were made at all of the TRC meetings followed by break-out sessions and open discussion. This format provided the

    opportunity for group discussions about land use and noise issues, airport operations, and implementation strategies. Presentations, meeting materials, and summary meeting notes from each of the TRC meetings are provided at the end of

    this appendix. The date, time, and location of each TRC meeting is provided below.

    TRC meeting #1: January 19, 2010 1:30 p.m. to 4:00 p.m.

    TRC meeting #2: April 15, 2010 10:00 a.m. to 12:00 p.m.

    TRC meeting #3: July 29, 2010

    10:00 a.m. to 12:00 p.m. Part 150 Data Review Session: July 29, 2010

    12:30 p.m. to 2:00 p.m.

    TRC meeting #4: September 23, 2010 1:00 p.m. to 2:30 p.m.

    TRC meeting #5: March 24, 2011 10:00 a.m. to 12:00 p.m.

    TRC meeting #6: October 1, 2012 2:00 p.m. to 4:00 p.m.

    TRC meeting #7: June 11, 2013

    10:00 a.m. to 12:00 p.m.

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    THIS PAGE INTENTIONALLY LEFT BLANK

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    Technical Review Committee Meeting #1

    January 19, 2010

    Agenda Presentation

    Meeting Summary

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    THIS PAGE INTENTIONALLY LEFT BLANK

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE

    Technical Review Committee

    January 19, 2010 1:30-4:00

    What Room Are We In?

    Meeting Agenda Meeting Facilitator: Margaret Norton-Arnold 1:30 Welcome – Let’s Get Started!

    --Margaret

    1:35 Thank You and Team Introductions --Stan Shepherd, Port of Seattle

    1:50 Presentation of the Part 150 Process --History of Aviation Noise Abatement Planning --Part 150 General Overview

    Process Major Elements Previous Study

    --Roles of Participants

    Port of Seattle Federal Aviation Administration (FAA) Consultant Team Technical Review Committee (TRC) Public

    --Important Facts about Part 150

    Calculation of Noise Responsibility for Land Use Planning Requirement for Environmental Processing

  • --Kicking Off the Part 150 Goals of the Part 150 Review of Scope Overall Project Schedule Next 90 Days --Rob Adams, Part 150 Project Manager

    2:45 Break 3:00 Hearing from the Committee --Questions on Rob’s presentation?

    --What are your recommendations on the ways in which we can make this Part 150 process as effective as possible?

    4:00 Adjourn

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 1

    Pro

    ject

    Kic

    k-O

    ff M

    eeti

    ng

    Pro

    ject

    Kic

    kP

    roje

    ct K

    ick

    -- Off

    Meeti

    ng

    Off

    Meeti

    ng

    Seatt

    le T

    aco

    ma I

    nte

    rnati

    on

    al

    Air

    po

    rt

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 2

    �W

    elc

    om

    e a

    nd

    In

    tro

    du

    ctio

    ns

    �H

    isto

    ry o

    f A

    via

    tio

    n N

    ois

    e A

    bate

    men

    t P

    lan

    nin

    g�

    Part

    15

    0 G

    en

    era

    l O

    verv

    iew

    �R

    ole

    s o

    f P

    art

    icip

    an

    ts�

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0�

    Cu

    rren

    t P

    art

    15

    0Ag

    en

    da

    Ag

    en

    da

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 3

    �P

    ort

    of

    Seatt

    le-

    Ow

    ns

    and o

    per

    ates

    the

    airp

    ort

    -Sponso

    r of th

    e Pa

    rt 1

    50 S

    tudy

    -M

    ain c

    onta

    ct:

    Sta

    n S

    hep

    herd

    �C

    on

    sult

    an

    t Team

    -La

    ndru

    m &

    Bro

    wn w

    ill lea

    d t

    he

    Part

    150 S

    tudy

    -60 y

    ears

    of

    avia

    tion p

    lannin

    g-

    Exp

    erts

    in a

    ircr

    aft

    nois

    e an

    d lan

    d u

    se p

    lannin

    g-

    Mar

    gar

    et N

    ort

    on-A

    rnold

    and S

    yner

    gy

    Consu

    ltin

    g w

    ill

    support

    L&

    B-

    Mai

    n c

    onta

    ct:

    Ro

    b A

    dam

    s

    �Tech

    nic

    al

    Ad

    vis

    ory

    Co

    mm

    itte

    e:

    -Exp

    erts

    in y

    our

    indiv

    idual

    fie

    lds

    Welc

    om

    e a

    nd

    In

    tro

    du

    ctio

    ns

    Welc

    om

    e a

    nd

    In

    tro

    du

    ctio

    ns

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 4

    �Je

    t A

    ge +

    Rap

    id E

    xp

    an

    sio

    n o

    f A

    irp

    ort

    s +

    Su

    bu

    rban

    Develo

    pm

    en

    t/S

    pra

    wl =

    Adve

    rse

    Nois

    e Im

    pac

    ts�

    Avia

    tio

    n N

    ois

    e A

    bate

    men

    t P

    oli

    cy o

    f 1

    97

    6�

    Avia

    tio

    n S

    afe

    ty a

    nd

    No

    ise A

    bate

    men

    t A

    ct

    of

    19

    79

    -FA

    R P

    art

    150 (

    1981)

    esta

    blis

    hed

    req

    uirem

    ents

    for

    airp

    ort

    ow

    ner

    s w

    ho c

    hoose

    to s

    ubm

    it n

    ois

    e ex

    posu

    re

    map

    s an

    d d

    evel

    op n

    ois

    e co

    mpat

    ibili

    ty p

    lannin

    g

    pro

    gra

    ms

    to t

    he

    FAA for

    revi

    ew a

    nd a

    ppro

    val.

    -Volu

    nta

    ry o

    n t

    he

    par

    t of th

    e sp

    onso

    r an

    d is

    not

    a re

    quirem

    ent

    of th

    e Fe

    der

    al g

    ove

    rnm

    ent.

    His

    tory

    of

    Avia

    tio

    n N

    ois

    e

    His

    tory

    of

    Avia

    tio

    n N

    ois

    e

    Ab

    ate

    men

    t P

    lan

    nin

    gA

    bate

    men

    t P

    lan

    nin

    g

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 5

    �A

    irp

    ort

    No

    ise a

    nd

    Cap

    aci

    ty A

    ct o

    f 1

    99

    0-

    Est

    ablis

    hed

    phas

    e-out

    tim

    elin

    e of Sta

    ge

    2 a

    ircr

    aft

    (Com

    mer

    cial

    aircr

    aft

    >75,0

    00 lbs)

    -Res

    tric

    ted a

    irport

    s fr

    om

    im

    posi

    ng loca

    lly b

    ased

    , non-v

    olu

    nta

    ry r

    estr

    ictions

    without

    firs

    t co

    mple

    ting a

    Par

    t 161 S

    tudy

    �FA

    A F

    inal

    Po

    licy

    on

    Part

    15

    0 N

    ois

    e

    Mit

    igati

    on

    Measu

    res

    (Oct

    ob

    er

    1,

    19

    98

    )-

    Indiv

    idual

    s build

    ing a

    hom

    e w

    ithin

    an a

    ppro

    ved

    and p

    ublis

    hed

    nois

    e ex

    posu

    re c

    onto

    ur

    are

    NO

    T

    elig

    ible

    for

    rem

    edia

    l nois

    e m

    itig

    atio

    n.

    His

    tory

    of

    Avia

    tio

    n N

    ois

    e

    His

    tory

    of

    Avia

    tio

    n N

    ois

    e

    Ab

    ate

    men

    t P

    lan

    nin

    gA

    bate

    men

    t P

    lan

    nin

    g

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 6

    �P

    art

    15

    0 S

    tud

    ies

    are

    Pla

    nn

    ing

    Stu

    die

    s-

    Iden

    tify

    nois

    e an

    d lan

    d u

    se im

    pac

    ts t

    hat

    exi

    st t

    oday

    an

    d in t

    he

    futu

    re-

    Work

    to d

    evel

    op s

    olu

    tions

    within

    the

    FAA’s

    fra

    mew

    ork

    �P

    art

    15

    0 S

    tud

    ies

    can

    op

    en

    fu

    nd

    ing

    so

    urc

    es

    -Fo

    llow

    ing P

    art

    150 g

    uid

    elin

    es m

    akes

    airport

    elig

    ible

    fo

    r gra

    nts

    for

    imple

    men

    ting r

    ecom

    men

    dat

    ions

    of

    the

    study

    -Fu

    ndin

    g is

    not

    guar

    ante

    ed-

    Lim

    ited

    to a

    reas

    exp

    ose

    d t

    o a

    t le

    ast

    65 D

    NL

    �P

    art

    15

    0 S

    tud

    ies

    do

    no

    t:-

    Rec

    om

    men

    d c

    losi

    ng a

    n a

    irport

    or

    imple

    men

    ting

    man

    dat

    ory

    rest

    rict

    ions

    on a

    ircr

    aft

    -Pr

    ovi

    de

    envi

    ronm

    enta

    l ap

    pro

    val fo

    r im

    ple

    men

    ting

    nois

    e ab

    atem

    ent

    or

    land u

    se p

    rogra

    ms

    Part

    15

    0 G

    en

    era

    l O

    verv

    iew

    Part

    15

    0 G

    en

    era

    l O

    verv

    iew

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 7

    Part

    15

    0 P

    roce

    ssP

    art

    15

    0 P

    roce

    ss

    Data

    Col

    lect

    ion

    Rada

    r/M

    onito

    r

    Exis

    ting

    Nois

    e Ex

    posu

    re

    Futu

    re N

    oise

    Exp

    osur

    e

    Impl

    emen

    tatio

    n Pl

    anLan

    d Us

    e M

    anag

    emen

    t Alte

    rnat

    ives

    Land

    Use

    Man

    agem

    ent P

    lan

    Nois

    e Ab

    atem

    ent

    Plan

    Nois

    e Ab

    atem

    ent

    Alte

    rnat

    ives D

    raft

    Noi

    se C

    ompa

    tibili

    ty P

    rogr

    am

    Draf

    t Doc

    umen

    ts a

    nd P

    ublic

    Hea

    ring

    s

    Reco

    mm

    ende

    d No

    ise

    Com

    patib

    ility

    Pro

    gram

    Revi

    ew a

    nd A

    ppro

    val

    Stud

    y In

    itiat

    ion

    Fore

    cast

    Val

    idat

    ion

    We a

    re h

    ere

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 8

    Part

    15

    0 M

    ajo

    r Ele

    men

    tsP

    art

    15

    0 M

    ajo

    r Ele

    men

    ts�

    No

    ise E

    xp

    osu

    re M

    ap

    s (N

    EM

    s)

    �N

    ois

    e C

    om

    pati

    bil

    ity P

    rog

    ram

    s (N

    CP

    s)

    �P

    ub

    lic

    Ou

    treach

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 9

    Part

    15

    0 M

    ajo

    r Ele

    men

    tsP

    art

    15

    0 M

    ajo

    r Ele

    men

    ts�

    No

    ise E

    xp

    osu

    re M

    ap

    s (N

    EM

    s)-

    Map

    s dep

    icting t

    he

    exis

    ting a

    nd t

    he

    futu

    re n

    ois

    e le

    vels

    aro

    und t

    he

    airp

    ort

    alo

    ng w

    ith r

    esid

    ential

    an

    d o

    ther

    nois

    e-se

    nsi

    tive

    lan

    d u

    ses

    -Pa

    rt 1

    50 g

    uid

    elin

    es p

    rovi

    de

    direc

    tion o

    n t

    he

    size

    , sc

    ale,

    and e

    lem

    ents

    to b

    e in

    cluded

    -Thes

    e m

    aps

    are

    the

    star

    ting p

    oin

    t fo

    r id

    entify

    ing

    wher

    e th

    ere

    are

    nois

    e im

    pac

    ts

    -Exi

    stin

    g c

    onditio

    n is

    bas

    ed o

    n 1

    2 m

    onth

    s of dat

    a

    -Fu

    ture

    conditio

    n p

    roje

    cts

    nois

    e le

    vels

    fiv

    e ye

    ars

    out

    -Fu

    ture

    conditio

    n s

    hould

    tak

    e in

    to a

    ccount

    any

    chan

    ges

    (phys

    ical

    or

    oper

    atio

    nal

    ) th

    at m

    ay h

    ave

    an a

    ffec

    t on t

    he

    nois

    e le

    vels

    aro

    und t

    he

    airp

    ort

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    10

    Part

    15

    0 M

    ajo

    r Ele

    men

    tsP

    art

    15

    0 M

    ajo

    r Ele

    men

    ts�

    No

    ise C

    om

    pati

    bil

    ity P

    rog

    ram

    s (N

    CP

    s)-

    Rec

    om

    men

    dat

    ions

    for

    elim

    inat

    ing,

    min

    imiz

    ing,

    and/o

    r m

    itig

    atin

    g a

    ircr

    aft

    nois

    e an

    d lan

    d u

    se

    conflic

    ts.

    �N

    ois

    e Abat

    emen

    t

    �La

    nd U

    se M

    itig

    atio

    n

    �Im

    ple

    men

    tation M

    easu

    res

    �P

    ub

    lic

    Invo

    lvem

    en

    t-

    Critica

    l to

    the

    succ

    ess

    and a

    ppro

    val of a

    Part

    150

    -Typ

    ical

    ly c

    onsi

    sts

    of Pu

    blic

    Work

    shops,

    Rev

    iew

    Com

    mitte

    es,

    web

    site

    s, n

    ewsl

    ette

    rs,

    etc.

    -G

    oal

    is

    to g

    ather

    input

    on t

    he

    findin

    gs

    and

    pro

    vide

    reco

    mm

    endat

    ions

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    11

    Pre

    vio

    us

    Part

    15

    0 S

    tud

    yP

    revio

    us

    Part

    15

    0 S

    tud

    y�

    Gen

    era

    l-

    Stu

    dy

    was

    com

    ple

    ted in 2

    002

    -It

    was

    the

    3rd

    Par

    t 150 p

    repar

    ed for

    SEA

    -O

    per

    atio

    n o

    f th

    e th

    ird r

    unw

    ay w

    as n

    ot

    incl

    uded

    due

    to

    the

    tim

    efra

    me

    �N

    ois

    e E

    xp

    osu

    re M

    ap

    s-

    Exi

    stin

    g N

    EM

    was

    for

    1998 c

    onditio

    ns

    -Fu

    ture

    NEM

    was

    for

    2004 c

    onditio

    ns

    �N

    ois

    e C

    om

    pati

    bil

    ity P

    rog

    ram

    -Am

    ended

    4 a

    nd c

    reat

    ed 5

    new

    nois

    e ab

    atem

    ent

    mea

    sure

    s-

    Am

    ended

    4 lan

    d u

    se m

    easu

    res

    -Am

    ended

    2 a

    nd c

    reat

    ed 1

    new

    im

    ple

    men

    tation m

    easu

    res

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    12

    Pre

    vio

    us

    Part

    15

    0 S

    tud

    yP

    revio

    us

    Part

    15

    0 S

    tud

    y

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    13

    Ro

    les

    of

    Part

    icip

    an

    tsR

    ole

    s o

    f P

    art

    icip

    an

    ts�

    Po

    rt o

    f S

    eatt

    le

    �Fed

    era

    l A

    via

    tio

    n A

    dm

    inis

    trati

    on

    (FA

    A)

    �C

    on

    sult

    an

    t Team

    �Tech

    nic

    al

    Revie

    w C

    om

    mit

    tee (

    TR

    C)

    �P

    ub

    lic

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    14

    Ro

    le o

    f th

    e P

    ort

    of

    Seatt

    leR

    ole

    of

    the P

    ort

    of

    Seatt

    le�

    Sp

    on

    sor

    the P

    art

    15

    0 S

    tud

    y

    �M

    an

    ag

    e t

    he p

    roce

    ss

    �C

    ert

    ify N

    EM

    s are

    acc

    ura

    te

    �S

    ub

    mit

    Part

    15

    0 f

    or

    ap

    pro

    val

    to F

    AA

    �P

    rep

    are

    SEP

    A r

    evie

    w o

    f re

    com

    men

    dati

    on

    s

    �Im

    ple

    men

    t re

    com

    men

    dati

    on

    s

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    15

    �P

    rovid

    e g

    uid

    an

    ce o

    n p

    erf

    orm

    ing

    Part

    15

    0

    stu

    die

    s

    �P

    rovid

    e f

    un

    din

    g t

    hro

    ug

    h A

    IP f

    or

    the

    stu

    dy a

    nd

    po

    ten

    tiall

    y t

    he i

    mp

    lem

    en

    tati

    on

    o

    f th

    e r

    eco

    mm

    en

    dati

    on

    s

    �R

    evie

    w/

    acc

    ep

    t N

    EM

    S

    �R

    evie

    w/

    ap

    pro

    ve t

    he i

    nd

    ivid

    ual

    measu

    res

    of

    the N

    CP

    �Lead

    NEP

    A r

    evie

    w f

    or

    no

    n a

    ir t

    raff

    ic

    measu

    res

    Ro

    le o

    f FA

    A

    Ro

    le o

    f FA

    A --

    Air

    po

    rts

    Air

    po

    rts

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    16

    �P

    rovid

    e a

    n u

    nd

    ers

    tan

    din

    g o

    f exis

    tin

    g

    air

    space

    an

    d p

    roce

    du

    res

    �P

    rovid

    e t

    ech

    nic

    al

    gu

    idan

    ce o

    n t

    he s

    afe

    ty

    an

    d f

    easi

    bil

    ity t

    o i

    mp

    lem

    en

    t alt

    ern

    ati

    ve

    pro

    ced

    ure

    s

    �Lead

    th

    e N

    EP

    A r

    evie

    w o

    f air

    tra

    ffic

    m

    easu

    res

    �Im

    ple

    men

    t air

    tra

    ffic

    no

    ise a

    bate

    men

    t p

    roce

    du

    res

    Ro

    le o

    f FA

    A

    Ro

    le o

    f FA

    A --

    Air

    Tra

    ffic

    A

    ir T

    raff

    ic

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    17

    Ro

    le o

    f th

    e C

    on

    sult

    an

    t Team

    Ro

    le o

    f th

    e C

    on

    sult

    an

    t Team

    �En

    sure

    th

    at

    the p

    roce

    ss i

    s b

    ein

    g f

    oll

    ow

    ed

    �P

    rovid

    e t

    ech

    nic

    al

    serv

    ices

    (no

    ise

    mo

    deli

    ng

    an

    d l

    an

    d u

    se p

    lan

    nin

    g)

    �M

    an

    ag

    e t

    he o

    utr

    each

    eff

    ort

    an

    d p

    rep

    are

    d

    ocu

    men

    tati

    on

    �D

    evelo

    p n

    ois

    e a

    bate

    men

    t an

    d l

    an

    d u

    se

    alt

    ern

    ati

    ves

    for

    revie

    w b

    y t

    he P

    ort

    �P

    rovid

    e r

    eco

    mm

    en

    dati

    on

    s re

    gard

    ing

    th

    e

    sele

    ctio

    n o

    f alt

    ern

    ati

    ves

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    18

    Ro

    le o

    f th

    e T

    RC

    Ro

    le o

    f th

    e T

    RC

    �P

    rovid

    e t

    ech

    nic

    al

    exp

    ert

    ise

    �R

    evie

    w d

    ata

    �A

    id t

    o i

    mp

    lem

    en

    tati

    on

    �Exp

    ect

    ati

    on

    s o

    f th

    e T

    RC

    -M

    eet

    8 t

    imes

    ove

    r th

    e co

    urs

    e of 2 y

    ears

    -M

    eeting m

    ater

    ials

    pro

    vided

    in a

    dva

    nce

    -O

    pport

    unitie

    s fo

    r gro

    up a

    nd indiv

    idual

    dis

    cuss

    ions

    -Enco

    ura

    ge

    you t

    o b

    e pre

    sent

    at p

    ublic

    work

    shops

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    19

    Ro

    le o

    f th

    e P

    ub

    lic

    Ro

    le o

    f th

    e P

    ub

    lic

    �P

    rovid

    e s

    ug

    gest

    ion

    s

    �P

    rovid

    e f

    eed

    back

    on

    exis

    tin

    g c

    on

    dit

    ion

    s

    �P

    rovid

    e c

    om

    men

    ts o

    n t

    he r

    eco

    mm

    en

    ded

    m

    easu

    res

    �O

    ffer

    ideas

    an

    d s

    ug

    gest

    ion

    s

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    20

    Ro

    le o

    f th

    e P

    ub

    lic

    Ro

    le o

    f th

    e P

    ub

    lic

    �P

    art

    15

    0 g

    uid

    eli

    nes

    are

    cle

    ar

    that

    pu

    bli

    c in

    pu

    t is

    cri

    tica

    l an

    d r

    eq

    uir

    ed

    �G

    oal

    is t

    o b

    e r

    esp

    on

    sive t

    o t

    he p

    ub

    lic’

    s d

    esi

    re f

    or

    info

    rmati

    on

    �A

    cco

    mp

    lish

    th

    is b

    y p

    rovid

    ing

    op

    tio

    ns

    for

    tho

    se w

    ith

    dif

    fere

    nt

    inte

    rest

    levels

    Casu

    al

    Ob

    serv

    er

    Very

    Inte

    rest

    ed

    -Webs

    ite

    -Requ

    estsD

    raft/

    FinalD

    ocume

    nts

    -Atte

    ndPub

    lic

    Works

    hop

    -Requ

    eststo

    beon

    mailin

    glist

    -Requ

    estsS

    pecial

    Presen

    tation

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    21

    Calc

    ula

    tio

    n o

    f N

    ois

    e

    �Ther

    e ar

    e a

    num

    ber

    of

    way

    s to

    des

    crib

    e nois

    e le

    vels

    (m

    axim

    um

    lev

    el,

    aver

    age,

    90

    th

    per

    centile

    , et

    c.)

    �Par

    t 150 S

    tudie

    s ar

    e re

    quired

    to u

    se t

    he

    Day

    Nig

    ht

    Ave

    rage

    Sound L

    evel

    (D

    NL)

    -24-H

    our

    aver

    age

    -Pen

    alty

    for

    nig

    htt

    ime

    (10 p

    .m.–

    6:5

    9 a

    .m.)

    flig

    hts

    (x1

    0)

    �N

    atio

    nal

    sta

    ndar

    d f

    or

    all Fe

    der

    al a

    gen

    cies

    -65 D

    NL

    thre

    shold

    for

    signific

    ant

    impac

    t

    �Id

    entifica

    tion o

    f im

    pac

    ts a

    nd f

    undin

    g f

    or

    mitig

    atio

    n is

    65 D

    NL

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0Im

    po

    rtan

    t Fact

    s A

    bo

    ut

    Part

    15

    0

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    22

    Calc

    ula

    tio

    n o

    f N

    ois

    e (

    con

    tin

    ued

    )

    �Pre

    par

    ed u

    sing t

    he

    FAA’s

    Inte

    gra

    ted N

    ois

    e M

    odel

    (IN

    M)

    Ver

    sion 7

    .0a

    �N

    ois

    e m

    easu

    rem

    ents

    are

    use

    d t

    o v

    erify

    the

    input

    into

    the

    INM

    , N

    OT t

    o c

    alcu

    late

    nois

    e

    �N

    ois

    e m

    easu

    rem

    ents

    ver

    sus

    nois

    e m

    odel

    -Cre

    atin

    g a

    nois

    e co

    nto

    ur

    from

    mea

    sure

    d d

    ata

    would

    re

    quire

    thousa

    nds

    of m

    onitors

    24 h

    ours

    a d

    ay for

    a fu

    ll ye

    ar-D

    ata

    colle

    cted

    would

    rep

    rese

    nt

    that

    one

    year

    per

    iod

    -N

    ois

    e m

    odel

    ing a

    llow

    s fo

    r fu

    ture

    yea

    rs t

    o b

    e an

    alyz

    ed-N

    ois

    e m

    odel

    ing a

    llow

    s fo

    r al

    tern

    ativ

    e co

    nditio

    ns

    to

    anal

    yze

    “what

    if”

    sce

    nar

    ios

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0Im

    po

    rtan

    t Fact

    s A

    bo

    ut

    Part

    15

    0

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    23

    Est

    ab

    lish

    ing

    Im

    pact

    s

    �FA

    A h

    as e

    stab

    lished

    lan

    d u

    se c

    om

    pat

    ibili

    ty

    guid

    elin

    es f

    or

    iden

    tify

    ing a

    ircr

    aft

    nois

    e im

    pac

    ts

    �In

    gen

    eral

    , <

    65 D

    NL

    is c

    om

    pat

    ible

    with a

    ll use

    s

    �N

    ois

    e-se

    nsi

    tive

    use

    s ar

    e co

    nsi

    der

    ed n

    on-

    com

    pat

    ible

    at

    or

    above

    65 D

    NL

    -Res

    iden

    tial

    -Sch

    ools

    -Churc

    hes

    -H

    osp

    ital

    s

    -N

    urs

    ing h

    om

    es

    -D

    ayca

    re fac

    ilities

    wher

    e lic

    ense

    d e

    duca

    tion o

    ccurs

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0Im

    po

    rtan

    t Fact

    s A

    bo

    ut

    Part

    15

    0

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    24

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0Im

    po

    rtan

    t Fact

    s A

    bo

    ut

    Part

    15

    0FA

    A L

    an

    d U

    se C

    om

    pati

    bil

    ity G

    uid

    eli

    nes

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    25

    Resp

    on

    sib

    ilit

    y f

    or

    Lan

    d U

    se P

    lan

    nin

    g

    �Port

    of

    Sea

    ttle

    does

    not

    hav

    e zo

    nin

    g a

    uth

    ority

    to

    pre

    vent

    non-c

    om

    pat

    ible

    lan

    d u

    ses

    �Lo

    cal ju

    risd

    ictions

    are

    resp

    onsi

    ble

    for

    imple

    men

    ting p

    reve

    ntive

    lan

    d u

    se c

    ontr

    ols

    �Im

    port

    ant

    for

    the

    loca

    l ju

    risd

    ictions

    to b

    e in

    volv

    ed in t

    he

    pro

    cess

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0Im

    po

    rtan

    t Fact

    s A

    bo

    ut

    Part

    15

    0

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    26

    Req

    uir

    em

    en

    t fo

    r En

    vir

    on

    men

    tal

    Ap

    pro

    val

    �Par

    t 150 is

    not

    a su

    bst

    itute

    for

    form

    al

    envi

    ronm

    enta

    l re

    view

    �The

    reco

    mm

    ended

    pla

    n w

    ill r

    equire

    SEPA

    revi

    ew/a

    ppro

    val prior

    to im

    ple

    men

    tation

    �Som

    e re

    com

    men

    dat

    ions

    may

    req

    uire

    NEPA

    revi

    ew/a

    ppro

    val prior

    to im

    ple

    men

    tation

    Imp

    ort

    an

    t Fact

    s A

    bo

    ut

    Part

    15

    0Im

    po

    rtan

    t Fact

    s A

    bo

    ut

    Part

    15

    0

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    27

    �Exp

    ect

    ati

    on

    s o

    f th

    e P

    art

    15

    0

    Conduct

    Par

    t 150 s

    tudy

    in a

    n o

    pen

    and e

    ngag

    ing w

    ay

    Focu

    s Pa

    rt 1

    50 s

    tudy

    on iss

    ues

    rel

    ated

    to t

    he

    third

    runw

    ay

    Look

    for

    opport

    unitie

    s th

    at h

    ave

    not

    bee

    n t

    hought

    of

    vers

    us

    re-l

    ooki

    ng a

    t old

    iss

    ues

    65 D

    NL

    will

    be

    the

    thre

    shold

    for

    iden

    tify

    ing im

    pac

    ts

    and e

    ligib

    ility

    for

    mitig

    atio

    n

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Go

    als

    Go

    als

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    28

    �M

    ajo

    r S

    cop

    e T

    ask

    s

    -D

    ata

    colle

    ctio

    n-

    Prep

    arat

    ion o

    f fo

    reca

    st o

    f ac

    tivi

    ty-

    Cre

    atin

    g N

    ois

    e Exp

    osu

    re M

    aps

    -D

    evel

    opin

    g a

    nd e

    valu

    atin

    g n

    ois

    e ab

    atem

    ent

    alte

    rnat

    ives

    -D

    evel

    opin

    g a

    nd e

    valu

    atin

    g lan

    d u

    se a

    lter

    nat

    ives

    -Sel

    ecting indiv

    idual

    mea

    sure

    s fo

    r th

    e N

    ois

    e Com

    pat

    ibili

    ty p

    rogra

    m-

    Prep

    arin

    g d

    ocu

    men

    tation

    -Pu

    blic

    invo

    lvem

    ent

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    29

    Data

    Co

    llect

    ion

    - G

    en

    era

    l

    �In

    tensi

    ve inve

    nto

    ry:

    -Airport

    dat

    a-

    Air t

    raffic

    dat

    a-

    Flig

    ht

    trac

    king s

    yste

    m d

    ata

    -N

    ois

    e m

    onitoring s

    yste

    m d

    ata

    -N

    ois

    e co

    mpla

    int

    dat

    a-

    Eco

    nom

    ic d

    ata

    of

    the

    regio

    n-

    Exi

    stin

    g lan

    d u

    ses

    -Zonin

    g a

    nd futu

    re lan

    d u

    se p

    lans

    -Sta

    tus

    of

    airp

    ort

    mitig

    atio

    n p

    rogra

    ms

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    30

    Data

    Co

    llect

    ion

    - N

    ois

    e M

    on

    ito

    rin

    g A

    naly

    sis

    �Val

    idat

    e/ve

    rify

    the

    input

    dat

    a in

    the

    INM

    �O

    bta

    in “

    real

    -life”

    nois

    e m

    easu

    rem

    ents

    to a

    ssis

    t in

    under

    stan

    din

    g t

    he

    tota

    l nois

    e en

    viro

    nm

    ent

    �Colle

    ct n

    ois

    e m

    onitor

    dat

    a fr

    om

    26 e

    xist

    ing s

    ites

    �Conduct

    additio

    nal

    monitoring a

    s nee

    ded

    -

    No c

    ove

    rage

    by

    exis

    ting s

    ites

    -U

    niq

    ue

    nois

    e se

    ttin

    g t

    hat

    war

    rants

    monitoring

    -Rec

    om

    men

    dat

    ions

    from

    the

    Port

    , FA

    A o

    r co

    mm

    unity

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    31

    Fo

    reca

    st o

    f A

    ctiv

    ity

    �Fo

    reca

    st b

    eing p

    repar

    ed s

    pec

    ific

    ally

    for

    Par

    t 150

    �Critica

    l pie

    ce o

    f in

    form

    atio

    n t

    o h

    elp u

    nder

    stan

    d

    the

    futu

    re a

    ctiv

    ity

    at t

    he

    airp

    ort

    �Key

    eff

    ort

    s:-

    Inte

    rvie

    ws

    with a

    irlin

    es-

    Colle

    ctio

    n o

    f his

    toric

    oper

    atin

    g d

    ata

    -Eco

    nom

    ic a

    nal

    ysis

    of th

    e Sea

    ttle

    mar

    ket

    -Anal

    ysis

    of av

    iation indust

    ry t

    rends

    �Fo

    reca

    st w

    ill p

    roduce

    the

    follo

    win

    g:

    -Annual

    oper

    atio

    ns

    for

    2016 a

    nd 2

    021

    -Pe

    ak h

    our

    oper

    atio

    ns

    for

    various

    conditio

    ns

    -Ave

    rage-

    day

    flig

    ht

    sched

    ule

    s w

    ith a

    ircr

    aft

    types

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    32

    Cre

    ati

    ng

    No

    ise E

    xp

    osu

    re M

    ap

    s

    �Exi

    stin

    g N

    ois

    e Exp

    osu

    re M

    ap t

    o r

    efle

    ct c

    urr

    ent

    oper

    atin

    g c

    onditio

    ns

    (2010/1

    1)

    �Fu

    ture

    Nois

    e Exp

    osu

    re M

    ap t

    o r

    efle

    ct f

    ive-

    year

    fu

    ture

    conditio

    ns

    (2016)

    �D

    ay-N

    ight

    Ave

    rage

    Sound L

    evel

    (D

    NL)

    conto

    urs

    of

    65,

    70,

    and 7

    5 D

    NL

    will

    be

    pre

    par

    ed

    �Conto

    urs

    will

    be

    ove

    rlai

    d o

    nto

    a lan

    d u

    se

    bas

    emap

    and n

    on-c

    om

    pat

    ible

    lan

    d u

    ses

    will

    be

    iden

    tified

    /quan

    tified

    �The

    NEM

    s an

    d c

    ounts

    of

    non-c

    om

    pat

    ible

    use

    s w

    ill h

    elp g

    uid

    e th

    e al

    tern

    ativ

    es p

    roce

    ss

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    33

    No

    ise A

    bate

    men

    t A

    ltern

    ati

    ves

    �D

    esig

    ned

    to r

    educe

    nois

    e at

    the

    sourc

    e

    �Exa

    mple

    s in

    clude:

    -Fl

    ight

    trac

    k ch

    anges

    -Runw

    ay u

    se p

    rogra

    ms

    -Fa

    cilit

    y dev

    elopm

    ent

    -Fl

    ight

    pro

    cedure

    chan

    ges

    �Sys

    tem

    atic

    eva

    luat

    ion:

    -Saf

    ety

    -Fe

    asib

    ility

    -M

    eanin

    gfu

    l nois

    e re

    duct

    ion

    -D

    oes

    not

    shift

    nois

    e fr

    om

    one

    area

    to t

    he

    nex

    t

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    No

    ise A

    bate

    men

    t Evalu

    ati

    on

    Pro

    cess

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    34

    Lan

    d U

    se A

    ltern

    ati

    ves

    �D

    esig

    ned

    to p

    reve

    nt

    or

    corr

    ect

    land u

    se

    inco

    mpat

    ibili

    ties

    �Exa

    mple

    s in

    clude:

    -Zonin

    g c

    han

    ges

    -Build

    ing c

    ode

    chan

    ges

    -D

    iscr

    etio

    nar

    y re

    view

    by

    the

    Port

    of Sea

    ttle

    -Sound insu

    lation

    -Volu

    nta

    ry a

    cquis

    itio

    n-

    Sal

    es a

    ssis

    tance

    �Pre

    ventive

    lan

    d u

    se m

    easu

    res

    require

    loca

    l ju

    risd

    ictions

    to im

    ple

    men

    t

    �Corr

    ective

    lan

    d u

    se m

    easu

    res

    can b

    e im

    ple

    men

    ted b

    y th

    e Port

    of

    Sea

    ttle

    , but

    fundin

    g

    is s

    ubje

    ct t

    o F

    AA g

    rants

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    35

    Develo

    pin

    g N

    ois

    e C

    om

    pati

    bil

    ity P

    rog

    ram

    �Rec

    om

    men

    ded

    nois

    e ab

    atem

    ent

    and lan

    d u

    se

    mea

    sure

    s w

    ill b

    e ev

    aluat

    ed in v

    ario

    us

    com

    bin

    atio

    ns

    to iden

    tify

    the

    bes

    t pro

    gra

    m

    �Im

    ple

    men

    tation m

    easu

    res

    will

    be

    dev

    eloped

    to

    support

    the

    reco

    mm

    ended

    nois

    e ab

    atem

    ent

    and lan

    d u

    se m

    easu

    res

    �Tim

    efra

    mes

    , re

    sponsi

    bili

    ties

    , co

    sts,

    fundin

    g

    sourc

    es,

    and a

    dditio

    nal

    ste

    ps

    will

    be

    iden

    tified

    as

    par

    t of

    the

    pla

    n

    �Entire

    pro

    gra

    m w

    ill b

    e put

    fort

    h t

    o t

    he

    public

    , th

    e Port

    Com

    mis

    sion,

    and t

    he

    FAA f

    or

    revi

    ew

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    36

    Part

    15

    0 D

    ocu

    men

    tati

    on

    �Tw

    o f

    orm

    al d

    ocu

    men

    ts w

    ill b

    e pro

    duce

    d:

    -D

    raft

    Par

    t 150

    -Fi

    nal

    Par

    t 150

    �Tec

    hnic

    al a

    nal

    ysis

    will

    be

    sum

    mar

    ized

    and

    pre

    sente

    d t

    o t

    he

    TAC a

    nd t

    o t

    he

    public

    in

    work

    shops

    �Pro

    ject

    web

    site

    will

    house

    all

    of

    the

    tech

    nic

    al

    sum

    mar

    ies

    and t

    he

    form

    al d

    ocu

    men

    ts

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    37

    Pu

    bli

    c In

    vo

    lvem

    en

    t

    �G

    oal

    s in

    clude:

    -To e

    ngag

    e peo

    ple

    direc

    tly

    -Solic

    it m

    eanin

    gfu

    l in

    put

    -Pr

    ovi

    de

    the

    most

    acc

    ura

    te d

    ata

    as p

    oss

    ible

    -Conduct

    the

    study

    in a

    tra

    nsp

    aren

    t w

    ay

    �O

    utr

    each

    eff

    ort

    s in

    clude:

    -Pu

    blic

    work

    shops

    with b

    reak

    out

    sess

    ions

    -Pr

    ovi

    din

    g for

    focu

    s gro

    up/s

    pec

    ial pre

    senta

    tions

    -H

    old

    ing a

    Public

    Hea

    ring

    -D

    edic

    ated

    pro

    ject

    web

    site

    -U

    tiliz

    ing t

    he

    Port

    of Sea

    ttle

    ’s e

    mai

    l dis

    trib

    ution s

    ervi

    ce-

    Inco

    rpora

    ting info

    rmat

    ion into

    the

    Air M

    ail new

    slet

    ters

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    38

    Pu

    bli

    c In

    vo

    lvem

    en

    t –

    TR

    C

    �N

    on-v

    oting/a

    dvi

    sory

    com

    mitte

    e�

    Pla

    nnin

    g u

    p t

    o 8

    TRC m

    eetings

    -Tim

    ed t

    o o

    ccur

    at k

    ey m

    ilest

    ones

    1.

    Kic

    koff

    2.

    Rev

    iew

    of nois

    e in

    put

    dat

    a3.

    Rev

    iew

    of

    fore

    cast

    s an

    d d

    raft

    NEM

    s4.

    Rev

    iew

    and e

    valu

    ate

    nois

    e ab

    atem

    ent

    alte

    rnat

    ives

    5.

    Rev

    iew

    and e

    valu

    ate

    land u

    se m

    itig

    atio

    n a

    lter

    nat

    ives

    6.

    Dis

    cuss

    eva

    luat

    ion o

    f al

    tern

    ativ

    es7.

    Rev

    iew

    rec

    om

    men

    dat

    ions

    of

    the

    study

    8.

    Final

    mee

    ting t

    o d

    iscu

    ss a

    ny

    item

    s-

    Goal

    is

    to g

    et m

    eeting info

    rmat

    ion o

    ut

    to y

    ou in

    adva

    nce

    of th

    e m

    eeting (

    not

    alw

    ays

    poss

    ible

    )-

    Som

    e m

    eetings

    will

    incl

    ude

    bre

    akout

    sess

    ions

    to

    gat

    her

    im

    port

    ant

    info

    rmat

    ion f

    rom

    par

    tici

    pan

    ts-

    Com

    men

    ts w

    ill b

    e ac

    cepte

    d for

    up t

    o t

    wo w

    eeks

    aft

    er

    each

    work

    shop

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    39

    Pu

    bli

    c In

    vo

    lvem

    en

    t –

    Pu

    bli

    c W

    ork

    sho

    ps

    �Pla

    nnin

    g u

    p t

    o 6

    public

    work

    shops

    -Tim

    ed t

    o o

    ccur

    at k

    ey m

    ilest

    ones

    -

    Will

    incl

    ude

    pre

    senta

    tion b

    y Pa

    rt 1

    50 t

    eam

    -Bre

    akout

    sess

    ions

    will

    be

    conduct

    ed w

    ith fac

    ilita

    tors

    to

    gat

    her

    im

    port

    ant

    info

    rmat

    ion f

    rom

    par

    tici

    pan

    ts-

    Entire

    gro

    up w

    ill r

    econve

    ne

    to s

    har

    e w

    hat

    eac

    h g

    roup

    lear

    ned

    -O

    pport

    unitie

    s to

    lea

    ve w

    ritt

    en c

    om

    men

    ts w

    ill b

    e pro

    vided

    at

    each

    work

    shop

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    40

    Pu

    bli

    c In

    vo

    lvem

    en

    t –

    Sp

    eci

    al

    Pre

    sen

    tati

    on

    s

    �Pro

    vidin

    g f

    or

    spec

    ial m

    eetings

    -W

    ill o

    ccur

    when

    nec

    essa

    ry t

    o a

    ddre

    ss a

    n iss

    ue

    -Pa

    rtic

    ula

    rly

    hel

    pfu

    l in

    addre

    ssin

    g loca

    lized

    iss

    ues

    or

    conce

    rns

    -Fo

    rmat

    and v

    enue

    will

    be

    det

    erm

    ined

    as

    nee

    ded

    -M

    eeting m

    ater

    ials

    and n

    ote

    s w

    ill b

    e publis

    hed

    to t

    he

    web

    site

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    41

    Pu

    bli

    c In

    vo

    lvem

    en

    t –

    Pu

    bli

    c H

    eari

    ng

    �Public

    Hea

    ring w

    ill b

    e hel

    d t

    o o

    bta

    in f

    orm

    al

    com

    men

    ts-

    Hea

    ring t

    o b

    e hel

    d a

    ppro

    xim

    atel

    y 30 d

    ays

    afte

    r th

    e D

    raft

    Par

    t 150 is

    publis

    hed

    -Pr

    esen

    tation w

    ill b

    e giv

    en b

    y Pa

    rt 1

    50 t

    eam

    on t

    he

    reco

    mm

    endat

    ions

    of th

    e st

    udy

    -Sep

    arat

    e ar

    ea for

    mak

    ing c

    om

    men

    ts w

    ith a

    court

    re

    port

    er a

    nd h

    earing o

    ffic

    er w

    ill b

    e av

    aila

    ble

    -W

    ritt

    en c

    om

    men

    ts w

    ill a

    lso b

    e ac

    cepte

    d a

    t th

    e hea

    ring

    and for

    two w

    eeks

    aft

    er t

    he

    hea

    ring

    -All

    com

    men

    ts w

    ill b

    e re

    sponded

    to in t

    he

    Final

    Par

    t 150

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    42

    Pu

    bli

    c In

    vo

    lvem

    en

    t –

    Pro

    ject

    Web

    site

    �D

    edic

    ated

    Par

    t 150 w

    ebsi

    te w

    ill b

    e m

    ainta

    ined

    -Ser

    ve a

    s an

    offic

    ial si

    te for

    the

    study

    -Pr

    ovi

    de

    notice

    s of

    upco

    min

    g m

    eetings

    -A r

    eposi

    tory

    of al

    l m

    eeting s

    um

    mar

    ies

    and m

    ater

    ials

    -Li

    nks

    to k

    ey info

    rmat

    ion t

    hat

    would

    be

    hel

    pfu

    l to

    the

    public

    -Allo

    w for

    emai

    ls t

    o b

    e se

    nt

    to t

    he

    Part

    150 t

    eam

    -D

    raft

    and F

    inal

    docu

    men

    ts w

    ill b

    e av

    aila

    ble

    for

    dow

    nlo

    ad w

    hen

    ava

    ilable

    -Site

    will

    continue

    to b

    e pre

    sent

    afte

    r st

    udy

    is c

    om

    ple

    te

    to p

    rovi

    de

    the

    public

    info

    rmat

    ion o

    n t

    he

    study

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    43

    Pu

    bli

    c In

    vo

    lvem

    en

    t –

    Ele

    ctro

    nic

    New

    slett

    ers

    �Port

    of

    Sea

    ttle

    ’s E

    mai

    l D

    eliv

    ery

    Sys

    tem

    -Pe

    riodic

    em

    ails

    will

    be

    sent

    to t

    hose

    reg

    iste

    red o

    n t

    he

    study

    -Pr

    ovi

    de

    notice

    s of

    upco

    min

    g m

    eetings

    -Pr

    ovi

    de

    late

    st n

    ews

    updat

    es-

    Direc

    t peo

    ple

    to t

    he

    web

    site

    or

    oth

    er loca

    tions

    for

    info

    rmat

    ion

    �Air M

    ail

    -Po

    rt o

    f Sea

    ttle

    sen

    ds

    Air M

    ail new

    slet

    ter

    out

    per

    iodic

    ally

    -Pa

    rt 1

    50 w

    ill b

    e a

    topic

    of fo

    ur

    Air M

    ail new

    slet

    ters

    -Pr

    ovi

    de

    notice

    s of

    upco

    min

    g m

    eetings

    -Sum

    mar

    ize

    key

    findin

    gs

    to d

    ate

    -D

    irec

    t peo

    ple

    to t

    he

    web

    site

    or

    oth

    er loca

    tions

    for

    info

    rmat

    ion

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sco

    pe

    Sco

    pe

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    44

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sch

    ed

    ule

    Sch

    ed

    ule

    2010

    2011

    2012

    Task

    Jan

    Feb

    May

    Apr

    Jun

    May

    Jul

    Jun

    Aug

    Jul

    Sep

    Aug

    Oct

    Sep

    Oct

    Dec

    Jan

    Feb

    Mar

    Apr

    Notic

    e to

    Proc

    eed

    Proj

    ect K

    ick-o

    ff/Da

    ta C

    ollec

    tion

    Exist

    ing

    Noise

    Exp

    osur

    e

    Futu

    re B

    aseli

    ne N

    oise

    Exp

    osur

    e

    Noise

    Aba

    tem

    ent A

    ltern

    ative

    s

    Land

    Use

    Miti

    gatio

    n Al

    tern

    ative

    s

    Noise

    Com

    patib

    ility P

    rogr

    am

    Publ

    ic He

    arin

    g /D

    raft

    Docu

    men

    t

    Subm

    it Fi

    nal t

    o FA

    A

    FAA

    Revie

    ws N

    EM/N

    CP

    Publ

    ic In

    volve

    men

    t- T

    RC M

    eetin

    gs- P

    ublic

    Wor

    ksho

    ps- S

    pecia

    l Pre

    sent

    atio

    ns

    1

    Nov

    Dec

    Jan

    Prep

    are A

    viatio

    n Fo

    reca

    sts

    Affe

    cted

    Env

    ironm

    ent

    Feb

    Mar

    Nov

    12

    352

    34

    45

    66

    78

    on

    dem

    an

    d- W

    ebsit

    e- A

    ir Ma

    il1

    23

    45

    6

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    45

    Fir

    st 9

    0 D

    ays

    (no

    w t

    hro

    ug

    h A

    pri

    l)

    �D

    ata

    colle

    ctio

    n-

    Gat

    her

    ing h

    isto

    ric

    activi

    ty d

    ata

    -Conduct

    ing inte

    rvie

    ws

    -Pr

    oce

    ssin

    g r

    adar

    and n

    ois

    e m

    onitoring d

    ata

    �Avi

    atio

    n f

    ore

    cast

    -D

    evel

    opin

    g a

    lter

    nat

    e fu

    ture

    oper

    atin

    g s

    cenar

    ios

    -Pr

    epar

    ing d

    raft

    Fore

    cast

    docu

    men

    t

    �Public

    outr

    each

    -Pu

    blic

    Work

    shop #

    1 –

    Feb

    ruar

    y 24th

    -

    TRC #

    2 –

    mid

    -April (f

    ocu

    s on d

    ata

    colle

    ctio

    n)

    -Air M

    ail #

    2 –

    April 14

    th

    Cu

    rren

    t P

    art

    15

    0

    Cu

    rren

    t P

    art

    15

    0 --

    Sch

    ed

    ule

    Sch

    ed

    ule

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y

    46

    Qu

    est

    ion

    s/A

    nsw

    ers

    Qu

    est

    ion

    s/A

    nsw

    ers

  • Seattle-Tacoma International Airport Part 150 Noise Compatibility Study Update

    Technical Review Committee

    Meeting Report January 19, 2010

    1:30 – 4:00

    Committee Attendees Chip Davis Ron Fincher JD Hood Stephen Kiehl Stacy MacGregor Cayla Morgan Sharyn Parker John Sibold Al Torrico Karen Wolf

    Port of Seattle Attendees Michael Carroll Mary Ann Chamberlin Tom Fagerstrom Tom Hooper Karen Kalanick Rob Kikillus Colleen Miller Steve Rybolt Marlys St. Laurent Stan Shepherd Kym Sullivan Diane Summerhays Michelle Taylor

    Consultant Team Rob Adams, Landrum & Brown, Consultant Project Manager Margaret Norton-Arnold, Norton-Arnold & Company, Facilitator Fala Frazier, Norton-Arnold & Company, Committee Administrator

    Introductions Diane Summerhays, Director of Community Development at Sea-Tac Airport, welcomed committee members and thanked them for their participation. She reminded those members representing neighbor cities to let the Port know if their city councils could benefit from Part 150 briefings.

    Sea-Tac Airport Part 150 Study Update Page 1 Technical Review Committee Meeting #1 Report

  • Stan Shepherd, Port of Seattle Part 150 project manager, introduced himself. He has worked for the airport for about twenty years and was involved with the last Part 150 Study. This is the fourth Part 150 Update for Sea-Tac Airport. Rob Adams, consultant project manager with Landrum & Brown, specializes in these types of studies and has managed numerous Part 150 Studies, many of them controversial. Committee introductions included: Ron Fincher, FAA Seattle District Manager has been peripherally involved in several Part 150 studies, but this is the first time he has been directly involved in a Part 150 Study. Al Torrico is a Senior Planner with the City of SeaTac and served as a liaison to the Port. This is his first Part 150 Study. Chip Davis is a Planner with the City of Burien. This is his first Part 150 Study. John Sibold, Aviation Director for WSDOT, was involved in the Part 150 Study for the Port of Bellingham. Stacy MacGregor is an Assistant Planner with the City of Tukwila. This is her first Part 150 Study. Karen Wolf is a Senior Planner for King County, and this is her first Part 150 Study. Stephen Kiehl, Principal Planner with PSRC, has been working closely with the Port on 3rd runway issues for about 13 years. He wrote the Port of Bellingham’s Part 150 Update, and served on the advisory committee for the 2002 Part 150 Update for Sea-Tac. Cayla Morgan, Environmental Protection Specialist, has worked for the Federal Aviation Administration for the past twenty years. She was involved in the last Part 150 for Sea-Tac, and has been involved with other Part 150 updates for other airports. Sharyn Parker, Noise Officer with King County Airport, was involved recently with King County Airport’s Part 150 Study, and is currently engaged in implementing the results of that study. JD Hood is a pilot with Horizon Airlines; this is his first Part 150 process.

    Sea-Tac Airport Part 150 Study Update Page 2 Technical Review Committee Meeting #1 Report

  • Presentation of the Part 150 Study Process Rob Adams provided the Technical Review Committee with an introduction and overview of the Part 150 process. His presentation included background information on airport noise regulations; the elements of the Part 150 Study; a description of the various agencies, parties and their roles associated with the process; and an overview of the public participation program related to the Part 150. A copy of Rob’s presentation was provided to all committee members and is also available on the project website at: www.airportsites.net/sea-part150

    Committee Questions and Discussion Rob had noted that the Federal Airport Noise and Capacity Act prohibits airports from imposing locally-based restrictions such as closing runways at specific times of the day. In response to a question, however, Rob said that a few airports – for example, Burbank and John Wayne – do have local restrictions that were in place prior to 1990, and were grandfathered in at those locations. Group members had questions about the noise exposure maps, and wondered if Landrum & Brown might be looking beyond a five year planning horizon. Rob responded that the study would likely be expanded to a ten-year noise exposure/forecast to be used for land use planning purposes only. During the discussion a TRC member wondered about the FAA’s role in the forecast, and Rob responded that the forecast is submitted to FAA for approval before it is used to guide the remainder of the Part 150 Study. Rob further noted that, while this Part 150 will certainly include a study of noise impacts from the third runway, any and all physical changes, such as new taxiways and holding pads, will also be examined. A member wondered how long a Part 150 Study maintained its validity, and Rob responded that the FAA suggests updating the Part 150 every five years or if significant changes in the operating environment occur. In response to a question, Rob said that Sea-Tac’s Fly Quiet Program is a good example of a measure that has been implemented as part of a noise compatibility program. There was some discussion about “Next Generation” technology for aircraft, and for newer landing approaches, etc. that are designed to create less noise impact. Stan responded that Sea-Tac was working on these technologies, but that they were unlikely to be integral to the Part 150 process because they generally do not benefit the 65 DNL. A committee member wondered why Stage 3 aircraft (quieter technology) would still generate peak noise above 65 DNL. Rob responded that

    Sea-Tac Airport Part 150 Study Update Page 3 Technical Review Committee Meeting #1 Report

  • while Stage 3 aircraft are an improvement over older technology, they are not completely silent, and can still be the source of noise impacts. A group member wondered about single event analysis (the impacts of just one plane vs. multiple flights), and Rob responded that the measurement of single events would be a question to the public at the scoping meeting in late February. Rob’s presentation included information on the role of the FAA, the Port of Seattle, the consulting team, and the Technical Review Committee (TRC). The TRC will review elements of the Part 150, providing data to the study, reviewing the analysis, and offering technical feedback on noise mitigation measures. Although it is not a voting body, the comments of the TRC are important to the Part 150, and will be considered very carefully as the plan is being put together. The TRC will meet eight times throughout the course of the study. The consultant team will be in touch with TRC members soon (especially those who represent surrounding cities) to get comprehensive plans and zoning documents. The Port already has 25 noise monitors in place, and the team will be asking TRC members, as well as the general public, where temporary noise monitors should be placed. A robust public participation program is not only required by Part 150 regulations, but is critical to the overall success of the Part 150. A written public involvement plan will be developed over the next two weeks, and will include public meetings, briefings with small groups, interaction with the Highline Forum, a website, newsletters, and email updates to the general public. Six public meetings are scheduled throughout the Part 150 Study. In response to a TRC member question, Port staff said that the focus of the advertising for public meetings would be communities within the 65 DNL. The “Air Mail” newsletter is mailed to 33,000 households, an email listserv will be used for notification, advertising will be placed in the Seattle Times and Highline Times, and elected officials will be notified. The intent is to conduct the Part 150 Study in as open, transparent, and engaging way as much as possible. During the discussion, Rob made the point that the noise compatibility program would not pit one neighborhood against another, that is, we are not going to shift noise from one community to another.

    Sea-Tac Airport Part 150 Study Update Page 4 Technical Review Committee Meeting #1 Report

  • Technical Review Committee Feedback The primary discussion question at this first Technical Review Committee meeting was: What are your recommendations on ways to make this Part 150 process as effective as possible? How do we achieve success? TRC members made a number of constructive suggestions: It is really difficult to have to explain the constraint about the 65 DNL to the

    public. It is a very hard pill for the public to swallow, and it seems like such a narrow corridor. You really need to explain it well, and I recommend that you have a larger study area in the background as a companion to the Part 150. Please don’t have the “it’s not my problem” type of answer when you are trying to define and defend this with the public.

    The Port has a very good story to tell about its noise mitigation program. The

    public does not have a lot of awareness about this, for example, the effectiveness of the Fly Quiet program and the millions of dollars spent on noise insulation. You need to get this information out. Perhaps you could describe the Port of Seattle in comparison with other airports around the country, and share information about the programs you have put in place.

    Be very clear at the outset of the study what you can and cannot do. Describe

    the “box” that we live in, for example, we can’t just decide to close down the airport. It’s really important to manage expectations in this type of process –get that framework established early. Here’s what we can do given the data, the timeframe, and the money available.

    Use the public participation program to provide the public with an education.

    How do air traffic controllers operate, for example? Provide the bigger picture.

    A lot of valuable information was provided in today’s presentation. This same

    information should be provided to the public in a quick and concise manner. Recognize in the public process that there will be a great deal of anger about

    the 3rd runway. It will be important to try to separate this from the Part 150. You do need to recognize that many of the issues that will be raised are outside the 65 DNL.

    You’ll need to set a firm tone and groundrules at the very first public

    meeting.

    Sea-Tac Airport Part 150 Study Update Page 5 Technical Review Committee Meeting #1 Report

  • Sea-Tac Airport Part 150 Study Update Page 6 Technical Review Committee Meeting #1 Report

    Don’t look beyond a 5-year framework. Too much can change in that time. For example, King County drew boundaries based on more than five years. Everything changed due to the bad economy, and now that airport has a boundary that doesn’t make any sense. Deal with the realities of the next five years.

    In the noise remedy program, don’t distinguish between a rental unit and a

    home or condo. We should be treating everyone equally – why should apartment dwellers be worse off because they can’t replace their windows?

    Next Steps The first public workshop on the Part 150 is scheduled for February 24. TRC members will be receiving information about that meeting, as well as the detailed public participation plan that will be in place throughout the study. TRC members are strongly encouraged to attend the workshop. The website will also be activated soon. The next meeting of the Technical Review Committee will be held in mid-April; specific date to be announced.

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    Technical Review Committee Meeting #2

    April 15, 2010

    Agenda Presentation

    Meeting Summary

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE FINAL

    Landrum & Brown Appendix B – Technical Review Committee

    October 2013

    THIS PAGE INTENTIONALLY LEFT BLANK

  • SEATTLE-TACOMA INTERNATIONAL AIRPORT PART 150 NOISE COMPATIBILITY STUDY UPDATE

    Technical Review Committee

    April 15, 2010 10:00 am - Noon

    Seoul Conference Room --Meeting Agenda--

    Meeting Facilitator: Margaret Norton-Arnold 10:00 Welcome – Let’s Get Started!

    --Margaret

    10:05 Review of February 24th Public Workshop --Rob Adams, Part 150 Project Manager

    --Meeting Overview --Feedback on the Issues --Action Items

    --Feedback on the Format of the Workshop

    Question back to group: --Questions/comments about the public workshops?

    10:30 Review of Baseline Operations Data --Rob Adams, Part 150 Project Manager --Vince Mestre, Landrum & Brown

    --Description of Existing Condition Scenarios - Scenario 1: 2009 Actual (2 & 3 runway configurations) - Scenario 2: 2009 Extrapolated 3 runway configuration --Description of Operations Data

  • - Operating Levels and Aircraft Types - Noise Levels by Aircraft Type - Flight Track Data

    - Runway Use Data - Ground Noise/Run up Data Question back to group: -- Are there other data sources that we should utilize to supplement what we have already?

    - Measured Data from Port’s Noise Monitoring System

    Question back to group: -- Suggestions for noise measurement locations or conditions?

    Question back to group: -- Suggestions for improving the way we are displaying/presenting data?

    11:30 Question and Answer

    Noon Adjourn

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 1

    Part

    15

    0 P

    rese

    nta

    tio

    n

    Tech

    nic

    al

    Revie

    w C

    om

    mit

    tee

    Ap

    ril

    15

    , 2

    01

    0

    Part

    15

    0 P

    rese

    nta

    tio

    nP

    art

    15

    0 P

    rese

    nta

    tio

    n

    Tech

    nic

    al

    Revie

    w C

    om

    mit

    tee

    Tech

    nic

    al

    Revie

    w C

    om

    mit

    tee

    Ap

    ril

    15

    , 2

    01

    0A

    pri

    l 1

    5,

    20

    10

    Seatt

    le T

    aco

    ma I

    nte

    rnati

    on

    al

    Air

    po

    rt

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 2

    �W

    elc

    om

    e a

    nd

    In

    tro

    du

    ctio

    ns

    �R

    evie

    w o

    f Feb

    ruary

    24

    th P

    ub

    lic

    Wo

    rksh

    op

    �R

    evie

    w o

    f B

    ase

    lin

    e O

    pera

    tin

    g D

    ata

    �Feed

    back

    fro

    m C

    om

    mit

    tee

    Ag

    en

    da

    Ag

    en

    da

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 3

    Revie

    w o

    f Feb

    ruary

    24

    Revie

    w o

    f Feb

    ruary

    24

    ththW

    ork

    sho

    pW

    ork

    sho

    p�

    Hel

    d a

    t M

    t. R

    ainie

    r H

    igh S

    chool in

    Des

    Moin

    es-Appro

    xim

    atel

    y 150 p

    eople

    att

    ended

    -Beg

    an w

    ith a

    pre

    senta

    tion o

    n P

    art

    150

    -15 B

    reak

    out

    stat

    ions

    wher

    e peo

    ple

    wer

    e in

    vite

    d t

    o

    pro

    vide

    direc

    t in

    put

    to a

    ssis

    t in

    ref

    inin

    g t

    he

    scope

    -Bre

    akout

    sum

    mar

    y pro

    vided

    inst

    ant

    feed

    bac

    k-Ended

    with a

    Q&

    A s

    essi

    on

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 44

    Bre

    ako

    ut

    Sess

    ion

    Su

    mm

    ary

    Bre

    ako

    ut

    Sess

    ion

    Su

    mm

    ary

    Way

    s to

    Red

    uce

    Noi

    se

    •Li

    mits

    on C

    argo

    •D

    eal w

    ith R

    unups

    •N

    ew w

    ays

    to fund m

    itig

    atio

    n o

    uts

    ide

    65 D

    NL

    •Bet

    ter

    com

    munity

    pla

    nnin

    g e

    ffort

    •In

    crea

    se a

    ltitudes

    on a

    rriv

    al•

    Curf

    ews

    on f

    lights

    •N

    ois

    e Ber

    ms/

    veget

    atio

    n•

    Buyo

    ut

    or

    sale

    s as

    sist

    ance

    •Sound insu

    lation

    •M

    ove

    airport

    •Im

    ple

    men

    t nois

    e ab

    atem

    ent

    •In

    sula

    tion b

    y hom

    eow

    ner

    s•

    Quie

    ter

    airc

    raft

    at

    nig

    ht

    •H

    ush

    house

    •H

    om

    e im

    pro

    vem

    ents

    the

    Port

    can

    mak

    e•

    Shar

    e m

    ore

    info

    rmat

    ion a

    bout

    new

    te

    chnolo

    gy

    •N

    ew m

    onitors

    for

    3rd

    runw

    ay•

    Tra

    nsp

    aren

    cy a

    bout

    3rd

    runw

    ay•

    Flig

    ht

    sched

    ulin

    g d

    uring n

    ightt

    ime

    •Bet

    ter

    adve

    rtis

    ing o

    f outr

    each

    eve

    nts

    •Pl

    ace

    tax

    on n

    ightt

    ime

    pas

    senger

    s•

    Look

    at t

    axiw

    ay e

    xits

    •Allo

    win

    g d

    ata

    colle

    cted

    to b

    e sh

    ared

    with

    Port

    /air

    lines

    •In

    sula

    ting t

    o 5

    5 D

    NL

    02

    46

    8

    Nigh

    ttim

    e No

    ise

    3rd

    Runw

    ay

    Runu

    ps/g

    roun

    d no

    ise

    Heal

    th is

    sues

    65 D

    NL n

    ot v

    alid

    Prop

    erty

    Val

    ues

    Mul

    tiple

    Ai

    rcra

    ft

    Sing

    le-

    even

    ts

    Mos

    t peo

    ple

    wer

    e co

    ncer

    ned

    abou

    t...

    Sing

    le e

    vent

    noi

    se v

    s. m

    ultip

    le a

    ircra

    ft...

  • SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 55

    Revie

    w o

    f Feb

    ruary

    24

    Revie

    w o

    f Feb

    ruary

    24

    ththW

    ork

    sho

    pW

    ork

    sho

    p�

    Feed

    bac

    k on M

    ain C

    once

    rns

    -W

    hat

    conce

    rns

    peo

    ple

    -W

    hat

    info

    rmat

    ion t

    hey

    wan

    t to

    com

    e fr

    om

    the

    Stu

    dy

    -Sugges

    tions

    on w

    ays

    to r

    educe

    nois

    e-W

    ays

    to b

    ette

    r co

    mm

    unic

    ate

    with t

    hem

    �Act

    ion I

    tem

    s-D

    evel

    oped

    a M

    eeting S

    um

    mar

    y-Rev

    iew

    ing t

    he

    input

    to d

    eter

    min

    e w

    hat

    can

    or

    can’t b

    e im

    ple

    men

    ted a

    nd r

    eport

    ing b

    ack

    to t

    he

    public

    -Pu

    blis

    h o

    n t

    he

    web

    site

    and d

    iscu

    ss a

    t th

    e nex

    t w

    ork

    shop

    (June

    9th)

    �Fe

    edbac

    k on M

    eeting F

    orm

    at-O

    verw

    hel

    min

    gly

    posi

    tive

    -La

    ter

    star

    t tim

    e an

    d incr

    ease

    adve

    rtis

    ing/n

    otifica

    tion

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 6

    �Exis

    tin

    g C

    on

    dit

    ion

    s:

    -Sce

    nar

    io 1

    : Act

    ual

    2009 C

    onditio

    ns

    -Com

    bin

    atio

    n o

    f 2 a

    nd 3

    runw

    ay c

    onfigura

    tions

    -Rep

    rese

    nts

    what

    act

    ual

    ly o

    ccurr

    ed d

    uring 2

    009

    -Sce

    nar

    io 2

    : 2009 E

    xtra

    pola

    ted 3

    Runw

    ay C

    onfigura

    tion

    -Rep

    rese

    nts

    what

    would

    hav

    e hap

    pen

    ed in 2

    009 w

    ith a

    3

    runw

    ay c

    onfigura

    tion

    -Pro

    vides

    a b

    ette

    r in

    dic

    atio

    n o

    f w

    hat

    the

    ‘typ

    ical

    ’ oper

    atin

    g

    mode

    will

    be

    �Fu

    ture

    Base

    lin

    e C

    on

    dit

    ion

    s:-

    2016 O

    per

    atin

    g lev

    els

    and a

    ircr

    aft

    types

    -O

    ther

    fac

    tors

    , su

    ch a

    s lo

    cation o

    f flig

    ht

    trac

    ks a

    nd h

    ow

    oft

    en e

    ach r

    unw

    ay is

    use

    d,

    will

    be

    the

    sam

    e as

    exi

    stin

    g-

    Provi

    des

    a 3

    runw

    ay b

    asel

    ine

    with f

    utu

    re o

    per

    atin

    g lev

    els

    to

    beg

    in d

    evel

    opin

    g w

    ays

    to r

    educe

    nois

    e.

    Base

    lin

    e O

    pera

    tio

    ns

    Data

    Base

    lin

    e O

    pera

    tio

    ns

    Data

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 7

    �Exis

    tin

    g C

    on

    dit

    ion

    s:

    -S

    ou

    rce:

    Cal

    endar

    yea

    r 2009 d

    ata

    from

    Airport

    Nois

    e an

    d

    Oper

    atio

    ns

    Monitoring S

    yste

    m (

    AN

    OM

    S)

    and F

    AA

    -A

    nn

    ual

    Op

    era

    tio

    ns:

    318,6

    00 (

    873 a

    vera

    ge

    annual

    day

    )-

    Fle

    et

    Mix

    :-

    Boei

    ng 7

    37 “

    Nex

    t G

    en”

    are

    the

    most

    com

    mon a

    ircr

    aft

    -Boei

    ng 7

    47-4

    00 is

    the

    larg

    est

    airc

    raft

    �Fu

    ture

    Base

    lin

    e C

    on

    dit

    ion

    s:-

    Fore

    cast

    of Avi

    atio

    n A

    ctiv

    ity

    under

    way

    -W

    ill incl

    ude

    chan

    ges

    in o

    per

    atin

    g lev

    els

    and f

    leet

    mix

    Base

    lin

    e D

    ata

    : O

    pera

    tio

    ns

    Base

    lin

    e D

    ata

    : O

    pera

    tio

    ns

    SEA

    Part

    15

    0 N

    ois

    e C

    om

    pati

    bil

    ity S

    tud

    y 8

    Base

    lin

    e D

    ata

    : O

    pera

    tio

    ns

    Base

    lin

    e D

    ata

    : O

    pera

    tio

    ns

    050

    100

    150

    200

    250

    300

    Tota

    l Ope

    ratio

    ns in

    200

    9: 3

    18,6

    00A

    vera

    ge O

    pera

    tions

    per