api 16c choke and kill equipment - my committeesmycommittees.api.org/standards/ecs/sc16/meeting...

6
1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough API 16C chairman [email protected] Troy Powell API 16C co-chairman [email protected] Jan 26, 2015

Upload: ngongoc

Post on 18-Apr-2018

356 views

Category:

Documents


12 download

TRANSCRIPT

Page 1: API 16C Choke and Kill Equipment - My Committeesmycommittees.api.org/standards/ecs/sc16/Meeting Materials/2015... · 1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough

1

API 16C Choke and Kill Equipment

SC 16 Winter Update

Chris Scarborough

API 16C chairman

[email protected]

Troy Powell

API 16C co-chairman

[email protected]

Jan 26, 2015

Page 2: API 16C Choke and Kill Equipment - My Committeesmycommittees.api.org/standards/ecs/sc16/Meeting Materials/2015... · 1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough

1220 L Street, NW • Washington, DC 20005-4070 • www.api.org 2

API 16C 2nd Edition

• Ballot comment resolution process has been completed.

• Ballot results and recirculation draft sent in September

• Total ballots – 28

• Total responses – 22

• Affirmative – 20

• Negative – 1

• Abstain - 1

• Estimated publish date – February 2015

Page 3: API 16C Choke and Kill Equipment - My Committeesmycommittees.api.org/standards/ecs/sc16/Meeting Materials/2015... · 1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough

API 16C 2nd Ed. – Summary of changes

• Title changed from “Systems” to “Equipment.”

• Normative references updated to current

editions & ISO equivalent standards added.

• Requirements for 6A components revised and

clarified.

• ASME design basis replaced with API Standard

6X.

• Requirements for choke & kill manifold

assemblies added.

1220 L Street, NW • Washington, DC 20005-4070 • www.api.org 3

Page 4: API 16C Choke and Kill Equipment - My Committeesmycommittees.api.org/standards/ecs/sc16/Meeting Materials/2015... · 1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough

API 16C 2nd Ed. – Summary of changes

• Requirements for buffer chambers added.

• End & outlet connection options expanded.

• Body test pressure for 5000-psi RWP

equipment changed from 10,000 to 7500 psi.

• Maximum bore size changed from 4-1/16 inch to

5-1/8 inch.

• Annex for calibration of heat-treat equipment

added.

• Test pressure for manifold assembly revised to

RWP with conditions.

1220 L Street, NW • Washington, DC 20005-4070 • www.api.org 4

Page 5: API 16C Choke and Kill Equipment - My Committeesmycommittees.api.org/standards/ecs/sc16/Meeting Materials/2015... · 1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough

1220 L Street, NW • Washington, DC 20005-4070 • www.api.org 5

The next revision

• Complete and submit Standards Resource & Research Request Form to

the CSOEM.

• Begin drafting 3rd edition of 16C

• It is recognized by the TG that the 2nd edition is not a perfect

document, but was published as it closes some important gaps

• The intent of the 3rd edition is to be a comprehensive re-write of the

document

Page 6: API 16C Choke and Kill Equipment - My Committeesmycommittees.api.org/standards/ecs/sc16/Meeting Materials/2015... · 1 API 16C Choke and Kill Equipment SC 16 Winter Update Chris Scarborough

Intra TG communications

Are there any work fronts or activities in other TGs

that could impact the upcoming work for 16C?

1220 L Street, NW • Washington, DC 20005-4070 • www.api.org 6