Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd. Prepared by Perfact Enviro Solutions Pvt. Ltd. PRE-FEASIBILITY REPORT FOR Expansion of “QUADRON BUSINESS PARK” at Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II, Hinjewadi, Pune BEING DEVELOPED BY: M/s Quadron Business Park Private Limited Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II, Hinjewadi, Pune Prepared by: Environmental Consultant M/s Perfact Enviro Solutions Pvt Ltd (NABET Registered Vide List of accredited Consultants organization/ Rev 48/16 th December 2016 at S.No.-110) 5 th Floor, NN Mall, Sector 3, Rohini, New Delhi Email: [email protected]; Phone: 011- 47528467

Upload: others

Post on 23-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

PRE-FEASIBILITY REPORT

FOR

Expansion of

“QUADRON BUSINESS PARK”

at Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II,

Hinjewadi, Pune

BEING DEVELOPED BY: M/s Quadron Business Park Private Limited

Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II, Hinjewadi, Pune

Prepared by:

Environmental Consultant

M/s Perfact Enviro Solutions Pvt Ltd (NABET Registered Vide List of accredited Consultants organization/ Rev 48/16th

December 2016 at S.No.-110) 5th Floor, NN Mall,

Sector 3, Rohini, New Delhi Email: [email protected]; Phone: 011- 47528467

Page 2: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.1 EXECUTIVE SUMMARY OF THE PROJECT 3.1.1 Activities:

The project will be an Expansion of “Quadron Business Park” which shall include:

• IT Offices • Retail Space • Food Court

3.1.2 Description & Details of Project: Project details are given in Table 3.

Particular PHASE-1 PHASE-II TOTAL Plot area 1,03,307 sqm 1,03,307 sqm 1,03,307 sqm Recreational Ground (O.S) 10,331 sqm 10,331 sqm 10,331 sqm Net plot area 92,976 sqm 92,976 sqm 92,976 sqm

G.C (Permissible) 41,323 sqm 41,323 sqm

G.C (Achieved) 22,451.00 sqm 18,871.00 sqm 41,322.00 sqm G.C. MLCP 1,990.00 sqm

Total Ground Coverage 24,441.00 sqm FSI permissible (2.0) 1,85,952.60 sqm Additional FSI 92,976.00 sqm 92,976.00 sqm

Max. FSI permissible (2.0 + 1.0) 1,85,952.60 sqm 92,976.00 sqm 278928.6 sqm FSI Proposed 1,45,303.77 sqm 30,717 sqm

TOTAL FSI (Proposed) 1,45,303.77 sqm 30,717 sqm 1,76020.77 sqm AREA SUMMARY OF BUILDING Q5 Proposed FAR IN Q5 32,317 sqm 32,317 sqm Proposed NON-FAR 26,829 sqm 26,829 sqm

Proposed Built up Area Including Parking

59,146 sqm 59,146 sqm

TOTAL Proposed Built-Up Area 1,45,303.77 sqm 59,146 sqm 2,04,450 sqm Green Area 15,496.05 sqm 5,165.35 sqm 20,661.40 sqm Max. No. of Floors Q1- 7 Floors

(LGF+UGF+5) Q2- 6 Floors (LGF+UGF+4) Q3- 7 Floors (LGF+UGF+5) Q4- 12 Floors (LGF+UGF+10)

Q5 - G+15 G+15

Max. Height of building 60 m 62 m 62 m

Total population 14530 7296 21826 Total Power Load 8818 KVA 6412.5 KVA 15230.5 KVA No. of DG sets 1 x 1000 KVA, 1 x 1010

KVA, 9 x 1500 KVA & 1 x 2000 KVA

3 x 2250 KVA (2 working + 1 standby)

1 x 1000 KVA, 1 x 1010 KVA, 9 x 1500 KVA, 1 x 2000 KVA & 3 x 2250 KVA (11 working + 4 standby)

Page 3: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

(9 working + 3 standby)

Parking required 2340 ECS 676 ECS 3016 ECS Parking provided 2535 ECS 689 ECS 3224 ECS

3.2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

3.2.1 Identification of the project & project proponent: We have already received Environmental Clearance vide letter No. J-12011/79/2005.IA.III (CIE) dated 16/06/2006 for the plot area (plot no. 28, 29, 2) 2,21,647 Sqm and built up area (on these plots) 3,98,964.59 Sqm under category 8(b) from MoEF for Business Park located at Plot No. 28 ,29 and PI-2 in Hinjawadi, MIDC Area, Pune, Maharashtra in the name of M/s DLF Akruti Info Parks (Pune) Ltd.

A land lease was done between Maharashtra Industrial Development Corporation (MIDC) and M/s DLF Akruti Info Parks (Pune) Ltd for plot area 2,21,647 sqm. Then MIDC subdivided land into two part and transfer PI-2 & Plot No.-29 to M/s Akruti City Magnum Ltd (Plot Area: 1,20,288 sqm) and Plot No. 28 to M/s DLF Akruti Info Parks (Pune) Ltd (Plot Area: 1,03,307 sqm). On 06-12-2016 the name of the company changed from M/s DLF Akruti Info Parks (Pune) Ltd. to M/s Quadron Business Park Private Limited.

Earlier M/s Quadron Business Park Private Limited was granted permissible FAR (on plot no. 28) of 1,45,303.77 sqm. Now additional FAR of 32,317 sqm and Non-FAR of 26,829 sqm has been granted. Thus, built up area will increase from 1,45,303.77 Sqm to 2,04,450 Sqm. Hence it falls under category 8 (b) of the EIA notification 2006.

3.2.2 Brief Description of the Nature of the Project: The project “Quadron Business Park” offers IT offices, retail space and food courts etc. The project has already been granted Environmental Clearance vide letter No. J-12011/79/2005.IA.III (CIE) dated 16/06/2006 for the plot area 2,21,647 Sqm and built up area 3,98,964.59 Sqm to M/s DLF Akruti Info Parks (Pune) Ltd. under category 8(b) of EIA Notification,2006.

Now the project is proposed on a plot area of 1,03,307 sqm and built up area of 2,04,450 sqm. Green area 20,661.40 sqm is proposed which includes shelter belt, avenue plantation, herbs & shrubs, landscape/water bodies etc. Need for the Project & its importance to the country or the region:

• It will increase Infrastructure of the area.

• It will provide healthy, green & safe premises.

Page 4: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

• It will provide a better work environment with amenities like Offices, commercial building, ATM, etc.

3.2.3 Need for the Project & its Importance to the Country or the region: • It will increase Infrastructure of the area & will provide better life style.

• The project will promote sustainability & will provide healthy environment

to the people at the site & nearby.

3.2.4 Demand & Supply Gap: In today’s world, there is a strong need of systematic & sustainable living so as to save resources for future generations and to provide them a better place to live by providing them a healthy environment.

This “Quadron Business Park” having a systematic land use planning for IT offices, and commercial area will provide a better working & educational environment. Sustainability in terms of Transport, Energy, Water & Waste is proposed in the project which will lead to a healthy present & future.

3.2.5 Import vs. Indigenous production: As this is a construction of Business Park (IT complex) so this section is not applicable

3.2.6 Export Possibilities: As this is a construction of Business Park (IT complex) so this section is not applicable

3.2.7 Domestic/Expert Markets: As this is a construction of Business Park (IT complex) so this section is not applicable

3.2.8 Employment Generation (Direct & Indirect) due to the Project: The Expansion of “Quadron Business Park” is providing employment of around 150 labourers during construction phase and employment to 19712 personnel as staff and supporting staff during operation phase. Staff will be required for IT offices and commercial area and other staff for miscellaneous purposes.

3.3 PROJECT DESCRIPTION 3.3.1 Type of Project including interlinked & interdependent Projects,

if any: This project is a construction project which comes under category 8 (b) of EIA Notification, 2006 and it is not an interlinked project.

Page 5: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.3.2 Location (with coordinates): Latitude Longitude Elevation

18°35'9.47"N 73°41'49.36"E 616 m

3.3.3 Map showing project location:

Page 6: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.3.4 Map showing project site layout:

The connectivity to the site is given in Table 5:

Table 5: Connectivity to the Site

S.No. Accessibility Description Distance & Direction

1. Highway/ Road NH-4 6.14 km E

2. Railway Station Akrudi Railway Station 9.85 km NE

3. Airport Pune Airport 22.3 km E

Page 7: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.3.5 Topographical Map

3.3.7 Selection of Site:

3.3.7.1 Details of alternate sites considered:

It is an expansion of existing complex; hence no alternate or interlinked site is being considered in this project.

3.3.7.2 Basis for site selection and the environmental considerations:

A land lease was done between Maharashtra Industrial Development Corporation (MIDC) and M/s DLF Akruti Info Parks (Pune) Ltd for plot area 2,21,647 sqm. Then MIDC subdivided land into two part and transfer PI-2 & Plot No.-29 to M/s Akruti City Magnum Ltd (Plot Area: 1,20,288 sqm) and Plot No. 28 to M/s DLF Akruti Info Parks (Pune) Ltd (Plot Area: 1,03,307

Page 8: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

sqm). On 06-12-2016 the name of the company changed from M/s DLF Akruti Info Parks (Pune) Ltd. to M/s Quadron Business Park Private Limited.

The surrounded area is moderately developed area. Area is well connected by road network and has power supply with all necessary amenities.

3.3.8 Size or Magnitude of Operation: After expansion, the total plot area of the project will remain same (1,03,307 sq m) & the total built-up area will be 2,04,450 sq m.

3.3.9 A schematic diagram showing project layout with components:

Page 9: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.3.10 Details of raw material required:

Raw materials source and Quantity:

3.3.11 Marketing area of final products:

As this is a construction of Business Park (IT complex) so this section is not applicable.

3.3.12 Mode of transport of raw materials and finished products:

The raw materials during construction will be transported by trucks and trolleys. Ambulances, cars, two wheelers etc. will be used during operational phase.

3.3.13 Resource optimization and reuse and recycling in project resources: The concept of reduce, recycle and reuse will be taken into consideration at every step of this project. The excavated soil/ rock will be properly stacked within the site under tarpaulin cover and will be reused for backfilling purpose. The top soil shall be preserved separately and will be used for landscaping purpose and the excess excavated soil will be disposed off to approve Municipal Filling Ground.

The treated water from STP will be reused in gardening and flushing purpose and same shall be followed in future. The quantification of the same is given later in Pre-Feasibility report.

The municipal solid waste will be segregated and sent to organic waste converter. The Organic waste from complex can be used as manure for landscaping. The quantification of the same is given later in Pre-Feasibility report.

Raw materials S. No. Name Source Quantity 1 Aggregate-brick, over burnt, stone,

stone chipping. Near By shop/ area As per requirement

2 Bitumen- Felt fibre base, hot sealing compound and coal tar

Near By shop/ area As per requirement

3 Cement, bricks, brushes, lime, caustic soda

Near By shop/ area As per requirement

4 G.I Pipes, back nuts, bend 90 degree, crosses, elbows, plugs, sockets, tees, unions.

Near By shop/ area As per requirement

5 Water coupling and closets Near By shop/ area As per requirement 6 UPVC single equal tee and double

equal tee. Near By shop/ area As per requirement

7 Sand cast iron and accessories Near By shop/ area As per requirement

Page 10: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.3.14 Management of Resources: 3.3.14.1 Water source and quantity: The total quantity of water required in the project will be 1311 KLD out of which fresh water requirement will be 462 KLD which will be met by MIDC.

3.3.14.2 Energy Source and requirement: The total power requirement will be 15230.5 kVA which will be met by Maharashtra State Electricity Distribution Company Limited.

DG sets of 1 x 1000 KVA, 1 x 1010 KVA, 9 x 1500 KVA, 1 x 2000 KVA & 3 x 2250 KVA (11 working + 4 standby) will be used for power back-up in common area of the sites. Proper stack height of 6 m above roof level are provided in existing and stack height of 6 m will be proposed.

3.3.15 Waste Management: 3.3.15.1 Amount of wastewater generated and STP capacity: The amount of waste water of 894 KLD will be generated from the Complex, which will be treatment in in-house 2 no. of STP of total 1075 KLD capacity (existing capacity 700 KLD & Proposed capacity 375 KLD).

3.3.15.2 Solid waste Management:

Total 2669 kg/day solid waste will be generated from the complex which will be properly managed and send to organic waste converter & approved vendors/recyclers.

The hazardous waste in the form of used oil will be 166 litres/month which will be given to approved vender of CPCB and E-waste of 4 - 5 kg/day will be handled as per e-waste management handling rules.

Battery waste generated from inverters & UPS. It will be properly managed as per Batteries (Management and Handling) Rules 2001.

Details of Solid Waste Management are given later in Pre-Feasibility Report.

3.3.16 Layout and Plans: • The Layout Plan is attached in Enclosure - 7

• The topographical Map is attached as Enclosure – 9

3.4 Site Analysis: 3.4.1 Connectivity: Site Location: Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II, Hinjewadi, Pune

Nearest railway station: Akrudi Railway Station :9.85 km NE

Page 11: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Nearest airport: Pune Airport: 22.3 km E

Nearest National Highway: NH-4 – 6.14 km E

3.4.2 Land form, land use and land ownership: The Expansion of “Quadron Business Park” is located at Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II, Hinjewadi, Pune. A land lease was done between Maharashtra Industrial Development Corporation (MIDC) and M/s DLF Akruti Info Parks (Pune) Ltd for plot area 2,21,647 sqm. Then MIDC subdivided land into two part and transfer PI-2 & Plot No.-29 to M/s Akruti City Magnum Ltd (Plot Area: 1,20,288 sqm) and Plot No. 28 to M/s DLF Akruti Info Parks (Pune) Ltd (Plot Area: 1,03,307 sqm). On 06-12-2016 the name of the company changed from M/s DLF Akruti Info Parks (Pune) Ltd. to M/s Quadron Business Park Private Limited.

3.4.3 Topographical map:

Page 12: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.4.4 Existing Land Use Pattern:

3.4.4.1 Land use of core zone

It is expansion of the existing project and plantation has already been started. Area where construction to be done is has no vegetation. Surrounding the plot are few residential areas.

3.4.4.2 Eco-sensitive areas with distance from project location: Water Bodies Mula River Hinjewadi Lake Kusegaon Dam Pavana River Manas Lake

2.57 km SE 3.02 km SE 5.36 km NW 7.70km NE 10.6 km SE

3.4.4.3 Existing Infrastructure: Hospital Lifepoint multispeciality hospital Post Office India Post Office Places of worship Dutta Mandir Alamgir Mosque Educational Padmasree Dr. D Y Patil institute of Engineering Management & Research Lotus Business School Akshara International School Indira College Bharati Vidyapeeth College of Engineering

6.25 km E 4.11 km E 7.15 km E 6.72 km E 6.30 km NE 6.34 km NE 5.58 km NE 6.05 km NE 6.79 km S

3.4.4.4 Soil classification: Soil quality of the area is Silt Loam. Colour of the soil is Dark-brown.

3.4.5 Climate data from secondary sources:

Page 13: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Page 14: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.4.5 Social Infrastructure available: Already provided in sec. no. 3.4.4.3 of pre-feasibility report.

3.5 Planning Brief: 3.5.1 Planning concept: The project “Quadron Business Park” offers IT offices, Retails space, food courts, etc. The project has already been granted Environmental Clearance. The existing plot area of plot no. 28 is 1,03,307 Sqm and built up area on this plot is 1,45,303.77 Sqm to M/s DLF Akruti Info Parks (Pune) Ltd. under category 8(a) of EIA Notification,2006.

3.5.2 Population projection: Total population of the project has been estimated after expansion to be 21826, out of which the 19712 as Staff & visitors will be 2114.

3.5.3 Land use Planning as per Environmental Clearance and proposed plan:

23.66%

15%

61.34%

EXISTING LAND USE (PLOT NO. 28)

Ground Coverage

Green Area

Road and open areaincluding surface parkingarea

Existing Land Use Land Use After Expansion

Land use Area (sq m) Percentage (%) Area (sq m) Percentage (%)

Ground Coverage 24,441 23.66 41,322 40 Green Area 15,496.05 15 20,661.4 20 Road and open area including surface parking area

63369.95 61.34 41,323.6 40

Total Plot area 1,03,307 100 % 1,03,307 100 %

Page 15: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.5.4 Assessment of infrastructure Demand (Physical and social): As the physical infrastructure already exists in the area there is no need for development of new infrastructure.

The development of “Quadron Business Park” in the project area will result in the increase in the social infrastructure as the population related to complex in form of staff, employees, visitors will increase.

3.5.5 Amenities/facilities: There will be IT Offices, Retail space, Food Court, etc.

3.6 Proposed Infrastructure: 3.6.1 Industrial area: This is the development of “IT Complex” so there will not be any production in the project area.

3.6.2 Other area: The proposed project will have IT Offices, Retails space, Food court etc.

3.6.3 Green development and Plantation Details: Green belt planning will be done with ecological perspectives for the project taking into consideration and availability of space and other aspects. This will help in increasing the aesthetic effect of the environment.

Since tree trunks are devoid of foliage, scrub should form there to give coverage to the trunks. The trees maintain the regional ecological balance and conform to soil and hydrological conditions. Indigenous species would be preferred.

40%

20%

40%

LAND USE AFTER EXPANSION (PLOT NO. 28)

Ground Coverage

Green Area

Road and open areaincluding surface parkingarea

Page 16: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Green belt/greenery will be developed along most of the periphery of the project area as well as along roads. Area under plantation/greenery after expansion will be 20,661.40 sq m with trees and plants. The trees planted will be of adequate height. Any trees that do not survive will be replaced. The plantation/greenery programme will be completed, simultaneously along with the project.

No. of trees required: Plot Area/80 Sqm= 1,03,307/80 = 1292 Nos.

3.6.3.1 Species to be planted:

Sr. No. Common Name Botanical Name 1 Champaka Michelia Champaca 2 Ashoka Polyalthia longifera 3 Neem Azadirachta Indica 4 Kadam Anthocephalus Cadamba

5 Chafa Plumeria Alba

3.6.4 Proposed Connectivity: Site location and connectivity

Site Location: Plot No. 28, Rajiv Gandhi Info Tech Park, Phase II, Hinjewadi, Pune

Nearest railway station: Akrudi Railway Station :9.85 km NE

Nearest airport: Pune Airport: 22.3 km E

Nearest National Highway: NH-4 – 6.14 km E

3.6.5 Drinking Water Management: 3.6.5.1 Source & Supply of Water:

Total quantity of wastewater generation after expansion will be 894 KLD. The generated sewage will be treated in in-house 2 no. of Sewage Treatment Plant capacity 1075 KLD (Existing: 700 KLD & Proposed: 375 KLD). The treated water generated 849 KLD which shall be utilized for Flushing, DG Cooling, HVAC Cooling, Misc. and Gardening purposes. It is zero discharge complex.

Water Management (for Existing part):

Population Factor in LPCD

Requirement in KLD

WASTE WATER in KLD

Staff 13080 45.00 589

Visitor 1450 15.00 22

Total 14530

611 Domestic: 183 KLD Flushing: 428 KLD

Domestic: 146 KLD Flushing: 428 KLD

Page 17: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Waste water discharge

574

Gardening

30

Nil DG Cooling

60

7

HVAC Cooling

100

Nil

Total

801 KLD

581 KLD

WATER BALANCE (FOR EXITING PART)

Water Management for Proposed Part:

Population Factor in LPCD

Requirement in KLD

WASTE WATER in KLD

Staff 6632 45.00 298

Visitor 664 15.00 10

Total 7296

308 Domestic: 92 KLD Flushing: 216 KLD

Domestic: 74 KLD Flushing: 216 KLD

Page 18: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Waste water discharge

290

Gardening

10

Nil DG Cooling

30

3

HVAC Cooling

157

16

Misc.

5

4 Total

510 KLD

313 KLD

WATER BALANCE FOR PROPOSED PART

Page 19: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Total Water Management (COMPLETE COMPLEX):

Population Factor in LPCD

Requirement in KLD

WASTE WATER in KLD

Staff 19712 45.00 887

Visitor 2114 15.00 32

Total 21826

919 Domestic: 275 KLD Flushing: 644 KLD

Domestic:220 KLD Flushing: 644 KLD

Waste water discharge

864

Gardening

40

Nil DG Cooling

90

10

HVAC Cooling

257

16

Misc.

5

4 Total

1311 KLD

894 KLD

TOTAL WATER BALANCE (COMPLETE COMPLEX)

Page 20: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.6.6 Sewage system: Total quantity of wastewater generation will be 894 KLD. The treated water 849 KLD shall be utilized for flushing, gardening, Misc. purposes, DG Cooling & HVAC Cooling. After expansion, the waste water generated will be treated in in-house Sewage Treatment Plant capacity 1075 KLD (Existing: 700 KLD & Proposed: 375 KLD). The STPs shall be based on MBR technology.

SCHEME OF SEWAGE TREATMENT PLANT:

The Membrane Bio Reactor Technology is the most advanced development in the field of biological treatment providing treated wastewater for recycling in smaller footprint and under stringent discharge norms.

Hollow Fiber membranes are introduced to mixed liquor to separate treated effluent from mixed liquor. Membrane being the absolute physical barriers ensures complete removal of suspended impurities. MBR applications include even retrofits of existing systems as well as installation of new systems, for both meeting the most stringent discharge norms and reuse. Treated wastewater from MBR can be even reused for cooling tower make-up, to generate high purity water through Reverse Osmosis and other non-potable applications. This process can help environment protection by treating wastewater and making it suitable for variety of application and thus conserve precious drinking water. Biological system designed for MBR process operates at higher MLVSS concentration with higher sludge retention time thus produces a low quantum of biological sludge thus reducing the sludge dewatering cost.

MBR technology combines the skills of our membrane specialists to deliver integrated treatment solutions with firm process guarantees such as BOD and TSS less than 5 mg/l and also removal of nutrient (nitrogen & phosphorous) and coliforms etc.

Biological process fluid (mixed liquor) is pumped to the Membrane Operating System (“MOS”). The mixed liquor is introduced to membrane, along with air, evenly across the bottom of the tank through a unique two-phase jet system. This mixed liquor fills the membrane tank and flows upward through the membrane submodules, creating cross-flow dynamics across the membrane surface. This cross-flow continuously scours the membrane surface and prevent solids dehydration at the membrane surface. Applying a low-pressure vacuum to the inside of the membrane fiber pulls water through the membranes and pumps the filtered water to the next process step. Solids, including organics, bacteria, and most viruses, are rejected by the membrane system and retained in the mixed liquor, which overflows the MOS back to the aeration tank.

The Membrane Operating System is an assembly with integral membrane modules arranged in rack assemblies, inserted into the membrane tank.

Page 21: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

MOS Mixed Liquor Distribution & Recirculation Jets are designed to distribute the air scour and mixed liquor flow evenly across the membrane submodules.

This feature eliminates potential polarisation (concentration) of suspended solids around the membrane fibers which could be main cause for the failure and damage of individual fibers thus submodules. Additionally, this feature provides even distribution of mixed liquor solids to each membrane unit, critical so that all membranes see the same process conditions. The return recirculation of mixed liquor ensures influent comes in intimate contact with the concentrated biomass, offering better organism selection and added flexibility in the anoxic cycle for advanced nitrogen removal, when required. This same jet system also acts as an integral part of the membrane cleaning system, providing an efficient scouring of the membranes with chlorine cleaning solution. The integrated cleaning system allows the submodules to be quickly cleaned in place. Additionally, the clean and efficient procedure eliminates the need for membrane removal from process tanks that can damage membranes and present risks to plant operators.

Relaxation, Maintenance and in situ CIP are exclusive features of this MBR Process to ensure consistent water quality and complete membrane life. The entire operation is PLC controlled.

The characteristics of Raw sewage and the characteristics required for the treated water will be as given in Table below respectively.

RAW SEWAGE CHARACTERISTICS

The Sewage Treatment Plant (STP) can give treated water, which can be reused for Flushing, Gardening, Cooling & Miscellaneous purposes.

TREATED SEWAGE CHARACTERISTICS

pH - 6.5-8.5 BOD mg / l <10 COD mg / l <60

Flow M3 / day 695 KLD pH - 6.5 – 8.5 BOD mg / l 350 - 400 COD mg / l 600 - 800 TSS mg / l 250 - 300 Oil & Grease mg / l Upto 50

Page 22: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

TSS mg / l <10 Oil & Grease mg / l <10

3.6.7 SCHEMATIC DIAGRAM OF STP:

3.6.8 Rain water harvesting: Rain water shall be channelized from the complex and discharge into existing drain of Phase-I.

3.6.9 INDUSTRIAL WASTE MANAGEMENT: As this is a construction of Business park so this section is not applicable

3.6.10 SOLID WASTE MANAGEMENT: For 21826 persons, around 9188 kg/day of municipal solid waste will be generated for proposed site. The solid waste categories and disposal method detail is shown is given in below:

Page 23: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Municipal Waste Management

Type of Waste

Colour of Bins

Category Disposal Method

Total Waste (Kg/day) (Existing)

Total Waste (Kg/day) (Proposed)

Total Waste (Kg/day) (Total)

Organics Green Bio Degradable

The waste will be disposed in Organic Waste Convertor

4272 2159 6431

Recyclable Items

Blue Recyclable Recycler 1831 925 2756

Total Municipal Waste 6104 3084 9188 kg/day

HAZARDOUS WASTE MANAGEMENT:

Hazardous waste is a waste with properties that make it dangerous or potentially harmful to human health or the environment. The universe of hazardous wastes is large and diverse. Hazardous wastes can be liquids, solids, contained gases, or sludge. They can be the by-products of manufacturing processes or simply discarded commercial products, like cleaning fluids or pesticides. All hazardous wastes are required to be treated and disposed off in the prescribed manner.

The main objective is to promote safe management and use of hazardous substances including hazardous chemicals and hazardous wastes, in order to avoid damage to health and environment.

Hazardous & E-Waste Management

Battery waste will be generated from inverters & UPS, which shall be treated as per the Batteries (Management & Handling) Rule

Type of Waste

Colours of Bins

Category Disposal Method Total Waste

Used Oil

Black With Label

Hazardous Waste

Waste shall be collected in leak proof containers at isolated place and then it will be given to approved vender of CPCB as per Hazardous Wastes (Management/ Handling/Transboundry Movement) Rules, 2008, as amended in 2016

166 lit/month

E-waste Black With Label

Hazardous Waste

E-Waste (Management & Handling) Rules, 2016

4-5 Kg/day

Page 24: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

3.6.11 POWER REQUIREMENT: 3.6.11.1.1 SOURCE: The total electric load after expansion for the complex will be 15230.5 kVA which will be sourced through Maharashtra State Electricity Distribution Company Limited.

3.6.11.1.2 BACK-UP: In case of power failure, power backup will be provided through DG sets 1 x 1000 KVA, 1 x 1010 KVA, 9 x 1500 KVA, 1 x 2000 KVA & 3 x 2250 KVA (Existing: 1 x 1000 KVA, 1 x 1010 KVA, 9 x 1500 KVA & 1 x 2000 KVA; Proposed: 3 x 2250 KVA) with stack height of 6m above roof level & will be kept in acoustically enclosed room.

3.7 REHABILITATION AND RESETTLEMENT (R&R) PLAN: 3.7.9 Details on Project Affected person: A land lease was done between Maharashtra Industrial Development Corporation (MIDC). No person resided on the land at the time of acquisition of land by MIDC. Hence, there will be no project affected persons.

3.8 PROJECT SCHEDULE & COST ESTIMATION: 3.8.9 Likely date of start of construction and date of completion: Construction shall be completed within 24 months after getting environmental clearance.

3.9 ANALYSIS OF PROPOSAL: 3.9.9 Social benefits to the local population:

• Exemption from duties on all imports for project development • Exemption from excise / VAT on domestic sourcing of capital goods for project

development • No foreign ownership restrictions in developing zone infrastructure and no

restrictions on repatriation • Freedom to develop township in to the SEZ with residential areas, markets, play

grounds, clubs and recreation centres without any restrictions on foreign ownership

• Income tax holidays on business income • Exemption from import duty, VAT and other Taxes • 10% FDI allowed through the automatic route for all manufacturing activities • Procedural ease and efficiency for speedy approvals, clearances and customs

procedures and dispute resolution • Simplification of procedures and self-certification in the labour acts

Page 25: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

• Artificial Harbour and handling bulk containers made operational throughout the year

• Houses both domestic and international air terminals to facilitate transit, to and fro from major domestic and international destinations

Page 26: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Enclosure 4: RISK ASSESSMENT

Page 27: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

During Construction Period: WELFARE:

• Potable drinking water is provided. • Mobile toilets shall be provided. • Proper crèche facilities for the construction labour children. • Liaison with hospitals for emergencies. • Third party insurance, etc.

SAFETY:

• Measures for first aid, fire-fighting and premises evacuation. • Necessary contacts with appropriate emergency services (first aid, emergency,

medical care, rescue work and fire-fighting). • Safety helmets, belts and slings, nets. • Properly braced scaffoldings. • Properly laid electrical cables and connections. • D.G. sets with acoustic enclosures to reduce noise pollution.

MITIGATION MEASURES FOR HANDLING OF CONSTRUCTION MATERIALS:

♦ Separate raw materials yard has been made. Cement is separately stored under cover in bales.

♦ Sand is stacked nearby under tarpaulin cover. ♦ To minimize the occupational health hazard, proper mask has been provided to

the workers who are engaged in dust generation activity.

During Operational Period:

1. Measures shall be taken to identify the Electrical Environment Impacts (Hazards) arising during the land preparation for use, building construction operation, and the entire cycle activities of the project and proper mitigation measures shall be adopted. The location of transformers, earth pits, electric panels, boards and distribution of power from power house or generator house/switch room, cable network shall be carefully monitored. All the standards, codes or legal requirements required to be adopted during the installation of electrical equipment, appliances, electric/ battery heating/ cooling appliances/ plant distribution lines/ cables network, switch boards, circuits, earthling/ bounding, earth pits, lightning arrestors and protective equipment and clothing shall be carefully fulfilled.

2. All Fire and Explosion Hazards in the entire cycle activities of the project and all possible sources of fire hazards and fire mitigation measures shall be noted. All the

Page 28: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

standards, codes & legal requirements of line diagram for fire protection systems including fire water supply, storage of water, overhead water tanks, underground water tanks and their capacity, water sprinkling system (moveable, stationary) shall be fulfilled. Emergency exits, fire ladders, fire protective clothing and equipments like helmets, safety belts, safety ladders, safety boots and goggles, fire suits, cranes used for fire-fighting and for the rescue of the people in case of fire in multi-storied buildings and others shall be provided. Proper Coordination with Local Municipal Fire Brigade, police, health surveillances (To treat the effected person in fire) shall be maintained. Proper Fire Management System shall be installed with time schedule giving how far is the fire station and how long it takes to reach the building. Provision of Training programme & mock drill shall be made at regular intervals.

3. Environment Management Plan shall be prepared with Emergency Procedures (Emergency Plan) to deal with localized fire and electrical hazards and hazards due to natural calamities at the entire cycle of the activities of the project. Provision of the communication systems to call to help and assistance from nearby building complexes bodies and other external authorities like district authority, fire services, police services, medical services, civil and defense services etc. shall be provided.

4. Provision of Health and Welfare Facilities will be provided to the labours engaged in land preparation and building construction at the entire cycle activities of the project such as:

I. Provision of drinking water from an approved source. II. Provision of latrines and urinals and accommodation as per the rules and their

drainage and disposal treatment. III. Provision of medical and first aid treatment. IV. Facilities for sitting, shelters, rest rooms and lunch rooms, crèches, canteen etc. V. Provision of working in shifts.

5. Provision of mitigation measures regarding the Health and Safety will be made to the workers employed or proposed to be employed in the entire cycle activities of the project.

Noise, vibrations, generated by lifting appliances, gears, earthmovers and transport.

Fencing of moving parts of the transmission machinery. Restriction of lifting and excessive weight material. Framing of Health and Safety Policy, On Site Emergency Plan. -Dangerous and harmful environment impact in the confined places (Excavation

and underground work).

Page 29: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Eyes and head protection. Sloping, tripping, cutting, drowning and falling hazards. Dust, gases, fumes, corrosive substances, toxic gases and chemicals. Chemical safety date sheet of diesel solvent and paints. Vehicular traffic. Illumination of passages, ways, stairs, roads excavation and basement work. Stacking of building materials, debris and their disposal. Means of communications, signals, warning, signboards and barricades at the

construction site. SAFETY MEASURES:

1. Fire Fighting scheme 2. Earthquake resistant structure 3. CCTV’s 4. Manual Scanners 5. Manual Car Checking

Page 30: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Enclosure 5: DISCLOSURE OF THE CONSULTANT

Page 31: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Page 32: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Enclosure 7: SITE PLAN

Page 33: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron
Page 34: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Enclosure 8: COPY OF EARLIER ENVIRONMENT CLEARANCE GRANTED

Page 35: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron
Page 36: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron
Page 37: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron
Page 38: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron
Page 39: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron
Page 40: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Enclosure 9: PROPOSED TOR

Page 41: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

253

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FORPROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

8(b):STANDARD TERMS OF REFERENCE FOR CONDUCTINGENVIRONMENT IMPACT ASSESSMENT STUDY FOR TOWNSHIP/AREA DEVELOPMENT PROJECTS AND INFORMATION TO BEINCLUDED IN EIA/EMP REPORT

1) Examine details of land use as per Master Plan and land use around 10 km radius of the project site.Analysis should be made based on latest satellite imagery for land use with raw images. Check onflood plain of any river.

2) Submit details of environmentally sensitive places, land acquisition status, rehabilitation of communities/villages and present status of such activities.

3) Examine baseline environmental quality along with projected incremental load due to the project.

4) Environmental data to be considered in relation to the project development would be (a) land, (b)groundwater, (c) surface water, (d) air, (e) bio-diversity, (f) noise and vibrations, (g) socio economicand health.

5) Submit a copy of the contour plan with slopes, drainage pattern of the site and surrounding area. Anyobstruction of the same by the project

6) Submit the details of the trees to be felled for the project.

7) Submit the present land use and permission required for any conversion such as forest, agricultureetc.

8) Submit Roles and responsibility of the developer etc for compliance of environmental regulationsunder the provisions of EP Act.

9) Ground water classification as per the Central Ground Water Authority.

10) Examine the details of Source of water, water requirement, use of treated waste water and preparea water balance chart.

11) Rain water harvesting proposals should be made with due safeguards for ground water quality.Maximize recycling of water and utilization of rain water. Examine details.

12) Examine soil characteristics and depth of ground water table for rainwater harvesting.

13) Examine details of solid waste generation treatment and its disposal.

14) Examine and submit details of use of solar energy and alternative source of energy to reduce thefossil energy consumption. Energy conservation and energy efficiency.

15) DG sets are likely to be used during construction and operational phase of the project. Emissionsfrom DG sets must be taken into consideration while estimating the impacts on air environment.Examine and submit details.

16) Examine road/rail connectivity to the project site and impact on the traffic due to the proposedproject. Present and future traffic and transport facilities for the region should be analysed withmeasures for preventing traffic congestion and providing faster trouble free system to reach differentdestinations in the city.

Page 42: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

254

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

17) A detailed traffic and transportation study should be made for existing and projected passenger andcargo traffic.

18) Examine the details of transport of materials for construction which should include source andavailability.

19) Examine separately the details for construction and operation phases both for EnvironmentalManagement Plan and Environmental Monitoring Plan with cost and parameters.

20) Submit details of a comprehensive Disaster Management Plan including emergency evacuationduring natural and man-made disaster.

21) Details of litigation pending against the project, if any, with direction /order passed by any Court ofLaw against the Project should be given.

22) The cost of the Project (capital cost and recurring cost) as well as the cost towards implementationof EMP should be clearly spelt out.

23) Any further clarification on carrying out the above studies including anticipated impacts due to theproject and mitigative measure, project proponent can refer to the model ToR available on Ministrywebsite "http://moef.nic.in/Manual/Townships".

*****

Page 43: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron

Expansion of “QUADRON BUSINESS PARK” M/s Quadron Business Park Pvt. Ltd.

Prepared by Perfact Enviro Solutions Pvt. Ltd.

Enclosure 10: TOPOGRAPHICAL MAP

Page 44: “QUADRON BUSINESS PARK”environmentclearance.nic.in/writereaddata/Online/TOR/18... · 2017-01-18 · 3.2.2 Brief Description of the Nature of the Project: The project “Quadron