AREVA NP Confidentiality AREVA NP(external) Property of AREVA NP - © AREVA NP All rights reserved, see liability notice p.1 BULATOM CONFERENCE - June 8th 2017 IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N “Advantages for the new maintenance and modernization contract in Kozloduy NPP” Varna, June 8th 2017 Matthias KRELL Director E Systemens & EDG IBGPE

Upload: others

Post on 16-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.1 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

“Advantages for the new maintenance and modernization contract in Kozloduy NPP”

Varna, June 8th 2017

Matthias KRELLDirector E – Systemens & EDG

IBGPE

Page 2: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.2 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Agenda

Structure of maintenance services

Review of 9 years of maintenance services

Operational Benefits

Future Expectations

Contribution to comprehensive assessment

Conclusion

Page 3: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.3 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Structure of maintenance services Cooperation Concept

flexible and adaptable

KNPP

• Outage services

• Year round services

• Ad hoc services

• Spare parts

management

• Consultancy

Preferred

localsubsupplier

Specialized

Subsuppliers

+ Local presence

+ Attractive rates

+ Controlled by AREVA

+ Trained by AREVA

+ Highly specialized

+ Arranged by AREVA

+ Controlled by AREVA

+ OEM warranty

provided by AREVA

sub1

sub2

sub3

Back Office

Local Office

+ Highly specialized personnel

+ Fast access to AREVA specialists

+ One contact person for a

spectrum of activities and

suppliers

+ Warranty provision

for maintenance activities and

spare parts

+ Fast response for ad-hoc

missions

Page 4: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.4 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Review of 9 years of maintenance servicesMaintained Systems

I&C Electrical Mechanical

• KÜS • Uninterrupted power supply Cat. I • Taprogge

• FLÜS • Uninterrupted power supply Cat. II • SUSI visual reactor floor inspection

• FAMOS • Unit diesel generator • Pilote valves

• H2-measurement • Recording system SIMEAS R

• Reactor coolant level • Excitation system Thyripol-D

• Seismic control and monitoring

system

• RF monitoring system

• Automated system TXP • ASO system of the 6kV switchgear

•Automated system for COP TXS • Digital electrical protections

• 6kV switchgear NXAIR-P

• Generator breaker HEC-7

• Fire detection and automatic fire

extinguishing system

• Open switchyard and bank

pump station

Page 5: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.5 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Review of 9 years of maintenance servicesTimeline of Service Innovations (1/3)

Close and engaged team of engineers

100% fulfillment of prescribed reaction time

Diagnostic tools

at local office

For highly

sophisticated

performance of

measurements and

diagnostics

EMPATH

Diagnosis for

electrical motors with

motor current

signature analysis

2008 2009 2010

WIS

Database for

maintenance

history

Page 6: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.6 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Review of 9 years of maintenance servicesTimeline of Service Innovations (2/3)

Inclusion of innovative

concepts and tools

SUSI Submarine Services

Tool for visual inspection of

the reactor floor

2011 2012 2013

DAW/ADAM

Mobile test bench for

valve and actuator

diagnostics

3D-measurement

3D visualization of

installed valves

Obsolescence

consultancy

For all equipments

included in the

maintenance scope

SIPLUG 4

Pilote project for valves

and actuator monitoring

Page 7: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.7 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Review of 9 years of maintenance servicesTimeline of Service Innovations (3/3)

Inclusion of innovative

concepts, tools and additional support

Unit 6 Generator

Power Upgrade

2014 2015 2016

Fatigue Monitoring

Evaluation with FAMOSi

Assessment of thermal

loads on primary circuit

components for fatigue

evaluationObsolescence

Management

For all equipments

included in the

maintenance scope

Page 8: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.8 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Operational Benefits

Benefits involving AREVA in your outage activities

Health Safety and

Environment

Protection

1

Work and plant safety have

highest priority

Highest quality

standards

Maintenance procedures

performed by qualified

personnel

2

Technology &

Innovation

Access to AREVA pool of

engineering and tools

4

Human Factor

Mix of KNPP and AREVA teams

and continuity of personnel

5

Optimized use of outage time

windows and personnel flexibility

3

Planning

flexibility

Page 9: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.9 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Future Expectations

Upgrades of systems according to obsolescence management

2017

EDG’s 1- 6 Excitation

system type

THYRIPART

Partial Upgrade of

obsolete components

2018-2020

Diagnosis Systems

KUS, FLUS

Partial Upgrade of

obsolete parts of the

systems

Page 10: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.10 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Contribution to KNPPComprehensive Assessment of Unit 5+6

Project is based on equipment condition documentation

Condition based maintenance

and walk downs

Reduce unavailability of

equipment, lack of spare

parts like cabinets/racks

Improve performance and

capabilities of operating

equipment.

Implementation of new functions,

smaller modifications

• Avoid plant unavailability • Manage obsolescence of components• Document equipment condition information

Perform aging analysis

Perform plant studies

Collect equipment

condition and

lifecycle information

Analysis of

operational statistics

Suggest program

Perform equipment modernization

Document possibilities and

measures of lifetime extension

Assure safe

and reliable

long term

operation

Page 11: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.11 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Conclusion

After 9 years of maintenance services, KNPP and AREVA have

continuously intensified their partnership

Close cooperation between KNPP, AREVA Local Office Engineers

and OEM experts

Involvement of sophisticated tools for diagnostics and condition

monitoring

Performance of engineering services and obsolescence evaluation

Possibilities to perform equipment modernization

of Electrical and I&C equipment in future

Service project can be enhanced to maintain

the installed equipment throughout its complete lifecycle

Page 12: “Advantages for the new maintenance and modernization ... · Maintenance procedures performed by qualified personnel 2 Technology & Innovation Access to AREVA pool of engineering

►AREVA NP ►Confidentiality AREVA NP(external)

►Property of AREVA NP - © AREVA NP

►All rights reserved, see liability noticep.12 BULATOM CONFERENCE - June 8th 2017 – IBGPE /M. Krell RESTRICTED AREVA - AL: N - ECCN: N

Thank you for your attention!

Varna, June 8th 2017

Matthias KRELLDirector E – Systemens & EDG

IBGPE