ANNUAL PERFORMANCE REPORT - 2015-16
1
BRIEF HISTORY OF N.F. RAILWAY
The tea, oil and coal industries were set up in Upper Assam areaaround the 1860s and 70s. Transportation of the produce was by riverroutes down the Brahmaputra. A need was felt for construction of aRailway from the tea and oil producing centres in the hinterland to theriver port at Dibrugarh. The Assam Railways and Trading CompanyLimited which was incorporated in July 1881, took up the task ofconstruction of the first railway line - and the first Metre Gauge train inthe Northeast region chugged from the river ghat in Dibrugarh to Jeyporeroad on 1st May 1882.
By February, 1884 the railway line had reached the coalfields ofMargherita and by May, 1884 another line from Makum to Doomdoomawas constructed. This network formed what was known as the DibruSadiya Railway (DSR).
About this time, an overseas market had been created for tea andjute, the principal products of Assam and Eastern Bengal. The AssamBengal Railway (ABR) was formed in 1892 to connect the port ofChittagong by rail to upper Assam and provide an outlet for theseproducts for the overseas markets. The railway also expected to pickup some of the already existing road traffic between Dhaka andChittagong leading to the steady economic development of the area.The railway line from the port of Chittagong to Tinsukia (Makum) wasconstructed in three phases – from Chittagong to Badarpur with branchlines to Silchar and Laksham, from Badarpur to Lumding through theNorth Cachar Hills and in the third phase from Lumding further Northto connect the DSR at Makum. The line from Lumding to Guwahatiwas constructed as a branch line to this alignment from Makum toChittagong. The Chittagong-Badarpur section opened for traffic up toBadarpur on December 4, 1896 and was extended up to Silchar onNovember 8, 1898. It was for the first time that a part of the Northeastwas rail-linked to the rest of India (with a river crossing betweenChandpur and Goalundo).
NORTHEAST FRONTIER RAILWAY
2
Besides the Dibru-Sadiya Railway (DSR) and Assam Bengal Railway(ABR), the Eastern Bengal Railway (EBR) was the third importantconstituent of the present N. F. Railway. These three Railways weremerged during World War-II and came to be known as the BengalAssam (BA) Railway. Thereafter, some of the company-owned railwaysviz, Bengal Dooars Railway, Jorhat Provincial Railway, ChaparmukhSilghat Railway, Katakhal Lalabazar Railway etc. were also mergedwith the Bengal Assam Railway system.
With the partition of India in August 1947, the Bengal Assam Railwaywas bifurcated according to the political boundaries leading to theformation of the Assam Railway with its headquarters at Pandu. In1948, the Darjeeling Himalayan Railway (DHR) was taken over by theGovernment of India and merged with the Assam Railway.
The partition of India severed the links of the Assam Railway withthe rest of the country, connected as the two were, till then, through therailway network in East Pakistan. For restoration of the link to the AssamRailway, the Assam Rail Link Project was taken up on top priority toprovide the connection through the “chicken neck” corridor of NorthBengal. This link was completed in January 1950.
The re-organization of the railway zones in 1951 led to the mergerof the Assam Railway and Avadh Tirhut Railway and these two formedpart of the North Eastern Railway with headquarters at Gorakhpur. Thethen North Eastern Railway thus extended right across northern Indiacovering UP, Bihar, Bengal and Assam, from Bareilly to Tinsukia andBadarpur / Silchar.
The present day Northeast Frontier Railway was carved out of theNorth Eastern Railway and set up with its headquarters at Maligaon on15th of January, 1958.
ANNUAL PERFORMANCE REPORT - 2015-16
3
AN OVERVIEWSTATUS AS ON 01.04.2016
BG MG NG TotalRoute Length (Km)
3941.33 43.19 87.48 4022.00Track K.M. 5085.48 789.71 96.98 5972.17
No. of Stations 436* 48 10 494* including BG/MG - 2, BG/NG - 2 & BG/MG/NG - 1
State-wise route length (Km) :Assam - 2442.57 Arunachal - 11.67Bihar - 327.42 Meghalaya - 8.76Tripura - 192.54 Manipur - 1.35West Bengal - 1075.06 Mizoram - 1.50Nagaland - 11.13Total - 4072.00 KM
Coach Holding : 2937 (BG-2777,DEMU-96 &
NG - 64)
Mail & Exp. Services : BG -99.71 trains/day, MG-Nil
Passenger Services : BG - 112 trains/dayMG - NilDEMU - 11.17 trains/dayNG - 15 trains/day
Freight Daily Interchange (in Trains) :Taken Over Made Over
(FY 2015-16) ER 17.7 17.9
ECR 11.1 10.4
Passengers carried : 94.93 million (2.60 lakhs/day)(FY 2015--16)
Wagon Holding(FY 2015-16) : BG = 6175
NORTHEAST FRONTIER RAILWAY
4
Loco Holding : Diesel (406 BG + 4 NG) +Steam (14 NG)
Diesel Sheds at : Malda, Siliguri, New Guwahati,Lumding
Workshop outturn : (In vehicle units of POH)
Workshop Coaches/month Wagons/monthNew Bongaigaon 56 120
Dibrugarh 59 —
Originating LoadingFY 2013-14 : 12.15 MTFY 2014-15 : 11.53 MTFY 2015-16 (Target) : 12.75 MTFY 2015-16 (Actual) : 9.52 MT
Commodities(Inward) : Food grain, Cement,
Bitumen, Iron, Goods,Fertilizer, Clinker, Salt, Suger,Onion, Potato, Edible Oil, ,Containe.
(Outward) : Coal, Dolomite,Cement,Foodgrain, POL, Maize,Fertilizer, Bamboo, Gypsum,Paper, Container
Level crossing gates : Manned - 1107 (BG+MG): Unmanned - 576
(BG+MG+NG)
PRS Centers : 131 Nos.
UTS Location : 380 Nos.
UTS cum PRS : 102 Nos.
Total Originating EarningsFY 2013-14 : ` 3425.41 Cr.FY 2014-15 : ` 3679.83 Cr.FY 2015-16 (Target) : ` 3446.47 Cr.FY 2015-16 (Actual) : ` 3532.83 Cr.
ANNUAL PERFORMANCE REPORT - 2015-16
5
FreightFY 2013-14 : ` 1459.41 Cr.FY 2014-15 : ` 1449.52 Cr.FY 2015-16 (Target) : ` 1144.79 Cr.FY 2015-16 (Actual) : ` 1149.89 Cr.
Passenger
FY 2013-14 : ` 1222.13 Cr.FY 2014-15 : ` 1400.88 Cr.FY 2015-16 (Target) : ` 1468.34 Cr.FY 2015-16 (Actual) : ` 1513.35 Cr.
SundryFY 2013-14 : ` 606.13 Cr.FY 2014-15 : ` 673.89 Cr.FY 2015-16 (Target) : ` 657.14 Cr.FY 2015-16 (Actual) : ` 652.71 Cr.
Other CoachingFY 2013-14 : ` 137.74 Cr.FY 2014-15 : ` 155.54 CrFY 2015-16 (Target) : ` 176.15 Cr.FY 2015-16 (Actual) : ` 216.88 Cr.
Working ExpensesFY 2013-14 : ` 4473.08 Cr.FY 2014-15 : ` 4751.85 Cr.FY 2015-16 (Final Grant) : ` 4781.73 Cr.FY 2015-16 (Actual) : ` 4756.10 Cr.
Employees On Roll : 64941 (Gazetted - 989): (Non-Gazetted - 63952)
NORTHEAST FRONTIER RAILWAY
6
DIVISIONSKATIHAR –DIVISION
A. InfrastructureBG MG NG Total
Route K.M.760 12 88 860
Single Line 509 12 88 609
Double Line 251 — — 251
Track K.M. 1481 12 109 1602
No. of Railway station: (Comm.Classification, No and Name) Total : 132
A1-1 (New Jalpaiguri),A - 6 (Katihar, Kishanganj, Siliguri Jn, Jogbani, Raiganj, Purnia)B - 7 (Barsoi, Forbesganj, Aluabari, Araria Court, Jalpaiguri Road, Dalkola, Samsi)D - 15,E - 60,F - 43
Workshop : 1 (Tindharia)
Diesel Sheds : 2 (Malda - 82 Locos, Siliguri Jn 189 Locos)
Major Depots• Coaching maintenance Depot : Katihar & NJP• Wagon maintenance Depot : NJP• ROH Depot : NJP
` • DEMU Maintenance Depot : Siliguri• Stores Depot : NJP, KIR, MLDT & SGUJ• Ballast Depot : ADF
Printing Press : Kurseong
Crew lobby : 3 (Katihar, NJP, MLDT)
ANNUAL PERFORMANCE REPORT - 2015-16
7
Running Rooms : 6 (NJP, KIR, BLGT, JBN RDP & HDB)
Major fuelling points : 2 (Katihar, NJP)
Heritage line : NJP – DJ (DarjeelingHimalayan Railways)
B. Freight & Parcel Business
(a) Goods Goods sheds/Sidings : 13 (NJP, BORA/BPMS,
KNE, RNI, PRNA, JPG, KIR,JBN, DLK, MLFC, SJKL,RNX, JAG)
(Rakes/Wagons per month)
TOTAL DIVISIONAL OUTWARD LOADING
(2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
98.75 4378.83 105.17 4797.58 93.75 4282.67 TOTAL DIVISIONAL INWARD LOADING
(2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
174 7264.7 194 8066 206 8921
Earnings
Year 2013-14 (Actual) : ` 774.44 Cr.Year 2014-15 (Actual) : ` 870.12 Cr.Year 2015-16 (Target) : ` 1129.19 Cr.Year 2015-16 (Actual) : ` 842.81 Cr.
(b) Parcel
No. of Parcel Stations : 90 Nos.
NORTHEAST FRONTIER RAILWAY
8
Loading
Year 2013-14 (Actual) : ` 43113 TonYear 2014-15 (Actual) : ` 45433 TonYear 2015-16 (Target) : -Year 2015-16 (Actual) : ` 49976 Ton
Earnings
Year 2013-14 (Actual) : ` 7.75 Cr.Year 2014-15 (Actual) : ` 10.99 Cr.Year 2015-16(Target) : --Year 2015-16 (Actual) : ` 12.94 Cr.
C. Passenger Business Passengers originating
Year 2013-14 : ` 4.04 Cr.Year 2014-15 : ` 3.72 Cr.Year 2015-16(Target) : -Year 2015-16 (Actual) : ` 3.77 Cr.
Passengers Earning originatingYear 2013-14 : ` 377.82 Cr.Year 2014-15 : ` 406.03 Cr.Year 2015-16(Target) : ` 582.18 Cr.Year 2015-16 (Actual) : ` 407.66 Cr.
D. Sundry Earnings Total
Year 2013-14 : ` 19.31 Cr.Year 2014-15 : ` 21.39 Cr.Year 2015-16(Target) : ` 13.73 Cr.Year 2015-16 (Actual) : ` 22.33 Cr.
Commercial PublicityYear 2013-14 : ` 45.61 LakhsYear 2014-15 : ` 45.57 LakhsYear 2015-16(Target) : ` 79.75 LakhsYear 2015-16 (Actual) : ` 29.08 Lakhs
ANNUAL PERFORMANCE REPORT - 2015-16
9
E. Personnel Staff strength on roll : Gaz 121, Non.Gaz -13519,
Total - 13640
Total No. of Rly. quarters : 11544
Railway Schools : 3 (NJP, Siliguri, Barsoi)
Railway Hospitals : 3 (NJP, Katihar, Tindharia)Health unit - 09Subsidiary Dispensary - 01
F Passenger Amenity Adarsh stations : 38
Clean Train Stations : 2 (Katihar & NJP)
Watering Stations : 7 (KIR, NJP for all trains)(SGUJ, HDB, RDP, BLGT &JBN for terminal trains)
24 Coach/ stations : 15 (KIR, NJP, KNE, BOE,SGUJ, AUB, ADQ, TKG,NAK, EKI, DLK, LAV, MFA,RDP & JBN)
Departmental linen Depot : 2 ( Katihar & NJP)
Catering - Food plaza : 2 (NJP,KNE), J Ahar 1 (NJP)Mobile Pantry Services : Nil
Total PRS : 40Total UTS : 82UTS cum PRS - : 33Non - rail Head PRS : 21
JTBS : 12 (KIR-5, NJP-1,BOE-2,JBN-1, ARQ-1)
STBS : 06 (KKA-1,RWA-1,BORA-1,RQJ-1,MHI-1,KUQ-1)
Retiring Room Stations : 13 (KIR, NJP, SGUJ, KNE,BOE, PRNA, FBG, JBN, DLK,JPG, RGJ, SM, AUB)
NORTHEAST FRONTIER RAILWAY
10
ALIPURDUAR –DIVISIONA. Infrastructure
BG MG TotalRoute Km.
716.87 - 716.87
Single Line 623.88 - 623.88
Double Line 92.99 - 92.99
Track Km. 1015.95 - 1015.95
No. of Railway Stations
Total : 85 (72 + 13)
A1 : NilA : 04 (NCB, APDJ, COB, NOQ)B : 05 (KOJ, HSA, DHH, DQG, NMZ)D : 11E : 41F : 11
NOT YET CLASSIFIED : 13
Workshop : Nil
Diesel Shed : Nil
Major Depots
Coaching Maintenence Depot : 01(Alipurduar Jn.) Wagon Maintenence Depot : Nil ROH Depot : Nil Ballast Depot : 01 (JOQ) DEMU Maintenence Depot : Nil Stores Depot : Nil
Printing Press : Nil
Crew Lobby : 03 (APDJ,NCB & SGUT)
Running Rooms : 01 (New coochbehar)
Major Fuelling Points : Nil
Heritage Line : Nil
ANNUAL PERFORMANCE REPORT - 2015-16
11
B. Freight & Parcel Business(a) Goods
Goods Sheds/Sidings : 14(BNV,DLO,HSA,NOQ,GOGH,FKM,KOJ,BSGN,NCB, SXX, FLK, FLK/PCAL, SLKX/NTPC & DQG)
Outward /Inward loading (Rakes/Wagons per month)
TOTAL DIVISIONAL OUTWARD LOADING (2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
46.29 2366.25 49.16 2493.41 59.04 3106
TOTAL DIVISIONAL INWARD LOADING (2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
38.17 1661 36.58 1593.91 48.58 2292.41
Earnings
Year 2013-14 (Actual) : ` 160.40 Cr. Year 2014-15 (Actual) : ` 203.75 Cr. Year 2015-16 (Target) : ` 281.04 Cr Year 2015-16 (Actual) : ` 233.52 Cr
a) Parcel -
No. of Parcel stations : 23
Loading
Year 2013-14 (Actual) : ` 419568 Qtl Year 2014-15 (Actual) : ` 536151 Qtl Year 2015-16 (Target) : - Year 2015-16 (Actual) : ` 508516 Qtl
NORTHEAST FRONTIER RAILWAY
12
b) Earnings
Year 2013-14 (Actual) : ` 8.31 Cr. Year 2014-15 (Actual) : ` 13.13 Cr. Year 2015-16 (Target) : -
Year 2015-16 (Actual) : ` 9.44 CrC) Passenger Business
Passengers Originating
Year 2013-14 (Actual) : ` 1.24 Cr Year 2014-15 (Actual) : ` 1.21 Cr Year 2015-16 (Target) : - Year 2015-16 (Actual) : ` 1.19 Cr
Passenger earnings originating
Year 2013-14 : ` 158.86 Cr.Year 2014-15 : ` 182.33 Cr.Year 2015-16 (Target) : ` 185.21 Cr.Year 2015-16 (Actual) : ` 197.51 Cr.
D) Sundry EarningsYear 2013-14 : ` 9.99 Cr.Year 2014-15 : ` 9.26 Cr.Year 2015-16 (Target) : ` 9.67 Cr.Year 2015-16 (Actual) : ` 7.64 Cr.
Commercial Publicity -
Year 2013-14 : ` 0.03 CrYear 2014-15 : ` 0.05 Cr.Year 2015-16 (Target) : ` 0.06 Cr.Year 2015- 16 (Actual) : -
E) PersonnelStaff strength : 47+6(CMP)
Non-Gaz.–Sanctioned: 8140 Actual: 7079(including Security & Accounts)Total – Sanctioned::8140Actual: 7125+ 6 (CMP)(including Security& Accounts)
ANNUAL PERFORMANCE REPORT - 2015-16
13
Total No. of Railway Quarters : 6285
Railway Hospital : 01 (Alipurduar Jn.)Health Unit - 07
Railway School : 02 ( RHSS/ Boys & Girls/Alipurduar Jn.)
F) Passenger Amenity Adarsh stations : 30 stations.
Clean Train Stations : Nil.
Watering Stations : 03 (APDJ, NCB & NOQ)
24 Coach/Stations : 14 (NOQ, NCB, FLK, DQG, NMX,JPE , GOGH, FKM, KOJ, APDJ,HSA, DLO, BNV & NMZ)
Departmental Linen Depot : Nil
Crew Rest Room : 02 (DBB & BXT)
Catering – Food plaza : Nil.Mobile Pantry Services : 01 (S. Mahananda Exp.)
PRS Centres : 13 (Exclusive PRS)Non-Rail Head PRS : 02UTS-cum-PRS : 11Total UTS : 64 (Inclusive of UTS-cum-PRS)
JTBS : Nil.RTSA : Nil.
Retiring Room Stations : 12 ( APDJ, NOQ, NCB, FKM,FLK, DQG, KOJ, NMZ, HSA, BNV,NMX & COB)
NORTHEAST FRONTIER RAILWAY
14
RANGIYA –DIVISION
A. InfrastructureBG MG(Under G.C.) Total
Route K.M. 864.68 - 864.68
Single Line 864.68 - 864.68
Double Line — — —
Track K.M. 1068.23 - 1068.23
Number of Rly Stations:Total - 97A1 : NIL
A3 : 3 (BNGN, BPRD & RNY )
B1 : 1 (New Bongaigan)
D : 8
E : 66
F : 19
Workshop : New Bongaigaon,Engineering Workshop/Bongaigaon
Major Depots : Track Depot/Bongaigaon
Crew lobby : 2 (NBQ & RPAN)
Running Rooms : 5 (RNY, NBQ, DKGN, MZS & NLP)
Major fueling points : 2 (NBQ & RPAN)
B. Freight & Parcel Business(a) Goods -
Goods sheds/Sidings : 28(CGS, CFCC, BIZ, RNY, GOE,NLV, PBL, PBL Cement Sdg, BPRD, SBE, CPQ, NBQ, BRPNSdg, JPZ, PNVT, GLPT, DDNI, MNDP, BMGN,AZA, DKGN, HMY, TNL, BKTB, NLP, SPTR, MZS, BHNG)
ANNUAL PERFORMANCE REPORT - 2015-16
15
Outward /Inward loading
(Rakes/Wagons per month)
TOTAL DIVISIONAL OUTWARD LOADING
(2013-14) (2014-15) (2015-15)
Rake Wagon Rake Wagon Rake Wagon
134 6072.2 88.26 4138.33 51.54 2398.75
TOTAL DIVISIONAL INWARD LOADING
(2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
71.58 3113.7 91.0 3927.66 94.13 3915.5
Goods EarningsYear 2013-14 (Actual) : ` 592.89 CrYear 2014-15 (Actual) : ` 410.24 CrYear 2015-16 (Target) : ` 454.93 CrYear 2015-16 (Actual) : ` 265.30 Cr
B. Parcel :No. of Parcel Stations : 20 (NBQ, BNGN, BPRD,NLVRNY,GLPT,TNL,ULG, MJBT, RPAN, DKGN GOM, SPTR, TQM,MZS, BHNG, HMY, NLP & NHLN) Loading
Year 2013-14 : 10370 TonYear 2014-15 : 22560.4 TonYear 2015-16 (Target) : -Year 2015-16 (Actual) : 16103.9 Ton
EarningsYear 2013-14 : ` 2.02 Cr.Year 2014-15 : ` 3.50 Cr.Year 2015-16 (Target) : -Year 2015-16 (Actual) : ` 3.18 Cr.
NORTHEAST FRONTIER RAILWAY
16
C. Passenger Business: Passenger originating
Year 2013-14 : ` 1.15 Cr.Year 2014-15 : ` 1.34 Cr.Year 2015-16 (Target) : -Year 2015-16 (Actual) : ` 1.51 Cr.
Passenger earning originatingYear 2013-14 : ` 119.73 Cr.Year 2014-15 : ` 155.79 Cr.Year 2015-16 (Target) : ` 118.87 Cr.Year 2015-16 (Actual) : ` 173.69 Cr.
D. Sundry EarningsYear 2013-14 : ` 15.46 Cr.Year 2014-15 : ` 7.24 Cr.Year 2015-16 (Target) : -Year 2015-16 (Actual) : ` 10.24 Cr
Commercial PublicityYear 2013-14 : ` 9.08 LakhsYear 2014-15 : ` 5.00 LakhsYear 2015-16 (Target) : ` 25.00 LakhsYear 2015-16 (Actual) : ` 7.49 Lakhs
E. Personnel Staff strength on roll : Gaz. - 56, Non.Gaz - 8102,
: Total - 8158 Total No. of Railway Quarters : 8220 Railway Hospitals : 2 (NBQ & RPAN)
Health unit : 08Polyclinic : 01
F. Passenger Amenity Adarsh stations : 10 Watering Stations : 7 (NBQ, RPAN, NHLN,
RNY, NLP, MZS, MNDP) PRS : 23 (RH-9,NRH-14)
UTS : 54UTS cum PRS : 22
Retiring Room Stations : 07
ANNUAL PERFORMANCE REPORT - 2015-16
17
LUMDING –DIVISIONA. Infrastructure
BG MG Total
Route K.M. 918.80 125.39 1044.19
Single Line 895.63 125.39 1021.02
Double Line 23.17 — 23.17
Track K.M. 1028.41 132.07 1340.48
Number of Rly StationsTotal-144A1 : 1 (GHY)A : 4 (KYQ, LMG, DMV, SCL)B : 4 (HJI, DPU, HBN, AGTL)D : 14E : 100F : 21
Workshops : Nil
Diesel Sheds : 02 (New Guwahati-(BG)-104 Locomotives,29 of Shunting Locos
Fueling points : 05 (Lumding, Badarpur, Guwahati,New Guwahati & Kamakhya.)
Crew Lobbies : 04 (Lumding, Badarpur, Guwahati &New Guwahati)
Running Rooms : 08 at Lumding, New Guwahati, Guwahati,Shilghat, Mairabari, Agartala & Badarpur)
Rest Rooms : 01 at Chaparmukh
B.Freight & Parcel Business Goods Sheds –18 Nos (JID, NGC, LKA, LMG, NGCM, DMV,
SCA, SCL, JRNA, BPB, BHZ, MYD, UDPI, JRBM, AGTL,KUGT, DMR & BHRB)Goods Sheds Siding –12 Nos (IOC Siding – 05 + FCI Siding–
05 + HPC Siding – 02).
NORTHEAST FRONTIER RAILWAY
18
(a) Goods –
Outward/Inward loading
(Rakes/Wagons per month)
Earnings
Year 2013-14 : ` 135.38 CrYear 2014-15 : ` 176.86 CrYear 2015-16 (Target) : ` 274.00 CrYear 2015-16 (Actual) : ` 160.35 Cr
(b) Parcel No. of Parcel Stations : 60 Nos.
LoadingYear 2013-14 : 129213 TonYear 2014-15 : 131721 TonYear 2015-16 (Target) : -Year 2015-16 (Actual) : 164749 Ton
Earnings
Year 2013-14 : ` 41.17 CrYear 2014-15 : ` 52.95 CrYear 2015-16 (Target) : -Year 2015-16 (Actual) : ` 72.84 Cr
TOTAL DIVISIONAL OUTWARD LOADING (2013-14) (2014-15) (2015-15)
Rake Wagon Rake Wagon Rake Wagon
437.5 18411 698.5 29381 741.5 31454
TOTAL DIVISIONAL INWARD LOADING (2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
2582 110161 2752 119387 3002 130855
ANNUAL PERFORMANCE REPORT - 2015-16
19
C. Passenger Business
Passengers originatingYear 2013-14 : ` 2.75 CrYear 2014-15 : ` 2.33 CrYear 2015-16 (Target) : -Year 2015-16 (Actual) : ` 2.14 Cr
Passengers Earning originating
Year 2013-14 : ` 450.90 CrYear 2014-15 : ` 487.31 CrYear 2015-16 (Target) : ` 568.24 CrYear 2015-16 (Actual) : ` 507.09 Cr
D. Sundry Earnings
Total
2013-14 : ` 18.54 Cr.2014-15 : ` 23.79 Cr.2015-16 (Target) : ` 2.46 Cr.2015-16 (Actual) : ` 40.26 Cr.
Commercial Publicity
Year 2013-14 : ` 71.40 LakhsYear 2014-15 : ` 34.33 LakhsYear 2015-16 (Target) : ` 34.33 LakhYear 2015-16 (Actual) : ` 79.50 Lakhs
E. Personnel
Staff Strength : Gaz. - 103,Non-Gaz -16012,Total -16115
NORTHEAST FRONTIER RAILWAY
20
Total Number of Qrs. : 19520
Total Rly. Hospitals/Dispensaries : 2 (LMG & BPB)
Total No of Health Unit : 13 (JID, CPK, HJI, LMG,DMV, HGS, MBG, HZO,SCL, KXJ, DMR, GHY,NGC)
Total Railway Schools : 3 (LMG, DMV & BPB)
F. Passenger Amenity
Adarsh Stations : 06 Nos.
Clean Train Station : 01 No.
Watering Stations : 04 Nos.
Departmental Linen Depot : 01 at KYQ
Catering - Jan Ahar : 01(Guwahati)
PRS : 33 (PRS-17 + UTS cumPRS-16)
UTS : 109
Non rail Head PRS : 30
Retiring Room Stations : 14
ANNUAL PERFORMANCE REPORT - 2015-16
21
TINSUKIA-DIVISIONA. Infrastructure
BG MG NG Total
Route K.M. 534 20.58(closed) — 555
Single Line 534 20.58(closed) — 555
Double Line — — — —
Track K.M. 734 — — 734
Number of Rly Stations:Total : 72A1 : NILA : 3 (TSK, JTTN, DBRT)B : 3 (MXN, NTSK, DBRG)D : 14E : 27F : 25
Workshop : 1 (Dibrugarh Town)
Diesel Shed : NIL
Major Depots : 3 (DBRG-Coaching,NTSK-Wagon-coaching& DBWS - Stores)
Crew lobbys : 3 (Mariani, New Tinsukia,Dibrugarh)
Running Rooms : 7 (MXN, NTSK, DBRT,LLO, SLGR, NLR & FKG)
Major fuelling points : 1 (New Tinsukia)
B. Freight & Parcel Business(a) Goods
Goods sheds/Sidings : 17 nos.(G.Shed=9,Sdg=8)
NORTHEAST FRONTIER RAILWAY
22
Outward /Inward loading
(Rakes per month/Wagons per month)
Goods Earnings
Year 2013-14 : ` 271.96 Cr.Year 2014-15 : ` 295.26 Cr.Year 2015-16 (Target) : ` 263.31 Cr.Year 2015-16 (Actual) : ` 155.15 Cr.
(b) Parcel
No. of parcel Stations : 31 nos.
LoadingYear 2013-14 : 25757.8 TonYear 2014-15 : 11808 TonYear 2015-16 (Target) : NilYear 2015-16 (Actual) : 12462 Ton
Earnings
Year 2013-14 : ` 11.04 Cr.Year 2014-15 : ` 05.02 Cr.Year 2015-16 (Target) : NilYear 2015-16 (Actual) : ` 04.27 Cr.
TOTAL DIVISIONAL OUTWARD LOADING
(2013-14) (2014-15) (2015-15)
Rake Wagon Rake Wagon Rake Wagon
46 2068 50 2214 31.5 1506
TOTAL DIVISIONAL INWARD LOADING
(2013-14) (2014-15) (2015-16)
Rake Wagon Rake Wagon Rake Wagon
49 1330 56 2636 50 2100
ANNUAL PERFORMANCE REPORT - 2015-16
23
C. Passenger Business
Passenger originatingYear 2013-14 : ` 84.71 LakhsYear 2014-15 : ` 80.26 LakhsYear 2015-16 (Target) : ` NilYear 2015-16 (Actual) : ` 76.94 Lakhs
Passengers Earning originating
Year 2013-14 : ` 154.25 Cr.Year 2014-15 : ` 210.82 Cr.Year 2015-16 (Target) : ` 213.96 Cr.Year 2015-16 (Actual) : ` 237.88 Cr.
D. Sundry Earnings
TotalYear 2013-14 : ` 20.39 Cr.Year 2014-15 : ` 16.97 Cr.Year 2015-16 (Target) : ` 01.16 Cr.Year 2015-16 (Actual) : ` 16.72 Cr.
Commercial PublicityYear 2013-14 : ` 17.20 LakhsYear 2014-15 : ` 16.51 LakhsYear 2015-16 (Target) : ` 29.00 LakhsYear 2015-16 (Actual) : ` 10.32 Lakhs
E. Personnel Staff strength on roll : Gaz-50, Non.Gaz-6353
Total - 6403 Total No. of Railway Quarters : 6610 Railway Hospitals : 2 (New Tinsukia ,
Dibrugarh Town),Dispensary/H. Unit : 6
NORTHEAST FRONTIER RAILWAY
24
Railway Schools : 3 (NTSK, MXN &DBRT-2)
F. Passenger Amenity Adarsh stations : 01 (Jorhat Town) Watering Stations : 05 24 Coach stations : 07 Catering - Food plaza : 02 NTSK & Jan
Ahar(IRCTC) NTSK PRS : 9
UTS : 46UTS cum PRS : 14Non rail Head PRS : 07 (Majuli, Dinjan,
Sadiya, Tezu,Along, Roing &Hayuliang)
Retiring Room Stations : 10
ANNUAL PERFORMANCE REPORT - 2015-16
25
KEY PERFORMANCE PARAMETERSSAFETY
Category wise analysis of consequential Accidents
* Z-Zonal T-Total
Category 2013-2014 2014-15 2015-16
RB Z T RB Z T RB Z T
1. Collision 0 0 0 1 0 1 0 0 0
2. Derail- a) Station 0 0 0 0 0 0 0 0 0ment
b) Mid-Section 2 0 2 2 0 2 2 0 2
3. L. Xing a) Manned 0 0 0 0 0 0 0 0 0
b) Un-Manned 3 0 3 0 0 0 2 0 2
4. Fire in Trains 1 0 1 1 0 1 0 0 0
5. Misc 0 0 0 0 0 0 0 0 0
TOTAL 6 0 6 4 0 4 4 0 4
NORTHEAST FRONTIER RAILWAY
26
Summary of All Accidents
Accidents at Level Crossing
0
2
4
6
2013-14 2014-15 2015-16
6
4 4
0 0 0
6
4 4
RB Zonal Total
00.5
11.5
22.5
3
2013-14 2014-5 2015-16
0 0 0
3
0
2
Manned Un-manned
ANNUAL PERFORMANCE REPORT - 2015-16
27
Manning Of Level Crossing
Number Of Unauthorised X-ings
0
10
20
30
40
50
60
70
Target Progress Target Progress Prop. Target
Progres
2013-14 2014-15 2015-16
6065
40
30
20
4 4
6 49111
121
263 ALIPURDUAR
KATIHAR
LUMDING
RANGIYA
TINSUKIA
NORTHEAST FRONTIER RAILWAY
28
Freight Loading (MT)Target 2015-16 = 12.750(MT)
FRIEGHT LOADING & EARNINGS
0
2
4
6
8
10
12
14
2013-14 2014-15 2015-16 2015-16
12.14911.527
12.75
9.521
National Green Tribunal’s order banning rat-hole mining ofMeghalaya Coal, Loading of coal from RNY/LMG division has beenalmost stopped since June’2014. Food grain rebooking at NBQ CB Cell discontinued fromOct’14(Rangiya division) due to closure of LMG TPT.Maintenance blocks taken by Numaligarh and Bongaigaon refinery.Due to increase of freight class rates of Bamboo from LR-4 to LR-3.Loss of MG loading stopped after gauge conversion since 1st Oct’2014.Even after opening of BG, M/s HPC at Panchgram has not offered anyoutward traffic due to suspension of production.
ANNUAL PERFORMANCE REPORT - 2015-16
29
Loading On B.G. (In Wagons/Day)
400
420
440
460
480
500
520
540
2013-14 2014-15 2015-16
521 523
445
0
10
20
30
40
50
60
70
80
90
2012-1 3 2013-14 up to Sept 2013-14
up to Sept 2014-15
46
8 1
58 56
Gauge conversion work for LMG-BPB-SCL section started from 1st Oct/2014, thus MG section closed for traffic on 30th. Sept’2014.
Loading On M.G. (In Wagons/Day)
NORTHEAST FRONTIER RAILWAY
30
Freight earnings (Originating) Rs. in Crs.
0
200
400
600
800
1000
1200
1400
1600
2012-13 2013-14 2014-15 2015-16
1314.111459.41 1449.52
1149.89
104
106
108
110
112
114
116
118
120
122
2012-13 2013-14 2013-14 (up to Sept)
2014-15 (up to Sept)
113
118
121
110
Gauge conversion work for LMG-BPB-SCL secion started from 1st Oct/2014, thusMG section closed for traffic on 30th. Sept’2014
M.G. Throughput (Wagons/Day)
ANNUAL PERFORMANCE REPORT - 2015-16
31
Comparative Originating Earnings
Comparative Apportioned Earnings
3108
.91
3425
.41
3067
.87
3325
.66
0
500
1000
1500
2000
2500
3000
3500
4000
2013-14 2014-15 2015-16 (Target)
2015-16 (Actual)
Passenger Other Coaching Goods Sundry Total
1222
.13
137.
7414
59.4
1 3425
.41
1400
.88
155.
5414
49.5
267
3.89
3679
.83
1468
.39
1176
.15
1144
.79
657.
1434
46.4
7
1513
.35
1216
.88
1149
.89
652.
7135
32.8
3
0
500
1000
1500
2000
2500
3000
3500
4000
2013-14 2014-15 2015-16 (Target)
2015-16 (Actual )
Passenger Other Coaching Goods Sundry Total
904.
9614
2.15
1672
.42
3325
.66
606.
13 1023
.03
155.
7018
71.8
867
3.89
3724
.50
1000
.00
172.
3716
50.0
065
7.14 10
16.2
718
8.91
1930
.89
652.
71
3479
.51
3788
.78
606.
13
NORTHEAST FRONTIER RAILWAY
32
Punctuality Performance(%) Of Mail/Exp. Trains (BG)
Remarks :-
Punctuality performance of Mail/Exp trains during Feb/16 has touched thehighest ever in the last 4 years.
The punctuality performance of Mail/Exp trains has increased by 3.24% during2015-16 as compared to corresponding period of last year.
Board’s target of 90% could not be achieved mainly due to the followingreasons:Repercussion of accident (mainly betn SLKX-BSGN stations on23.05.15 of APDJ Div.)Repeated earthquake occurrences.Dense fog mostly in KIR & APDJ Divisions.Rain cut in several sections over RNY & APDJ Divs. and heavy stormover KIR and nearby areas.Congested path for Bundh, Rail Roko.Imposition of speed restrictions in APDJ-SGUJ section for wild Elephantmovement.Trains taken over excessively late from other railways and became out ofpath.Re-scheduling of trains for late arrival of link trains.
81
82
83
84
85
86
87
88
89
90
2013-14 2014-15 2015-16 2015-16(Target)
86
84
87
90Figure in %
ANNUAL PERFORMANCE REPORT - 2015-16
33
Punctuality Performance(%) Of Passenger Trains (BG)
84
86
88
90
92
94
96
2013-14 2014-15 2015-16 2015-16 (Target)
95
92
88
90
Figure in %
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
2013-14 2014-15 2015-16
Induction of FG for NE States
In Tonnes
3118
290
3523
212
2922
990
NORTHEAST FRONTIER RAILWAY
34
Nature of complaints:-
Type of complaints % (Nos.)i) Improper behavior, passenger booking
/Resevation -32.08% 36ii) Theft and pilferages, Bribary and
Corruption -70% 3 iii) Cleanliiness at station -90% 1
PASSENGER COMPLAINTS
SL Month 2014-15 2015-16 ImprovementNo. (in %)
1. April 19 17 -10.53
2. May 16 19 18.75
3. June 21 33 57.14
4. July 24 24 0.00
5. August 32 22 -31.25
6. September 25 19 -24
7. October 19 20 5.26
8. November 26 13 -50
9. December 16 21 31.25
10. January 17 18 5.88
11. Febrruary 12 12 0.00
12. March 18 20 11.11
Total 245 238 -2.86
ANNUAL PERFORMANCE REPORT - 2015-16
35
FINANCIAL REVIEWEARNINGS 2015-16Originating Earnings
Originating Earnings
3108
.91
3425
.41
0
500
1000
1500
2000
2500
3000
3500
4000
2013-14 2014-2015 Revised Target 2015-16
2015-16
Passenger Other Coaching Goods Sundry Total
1222
.13
137.
7414
59.4
160
6.13
3425
.41
1468
.39
1176
.15
1144
.79
657.
1434
46.4
7
1513
.35
1216
.88
1149
.89
652.
7135
32.8
3
Earnings Actual Actual Revised Actual Variation Variation2013-14 2014-15 Target 2015-16 with with
2015-16 Target last year(1) (2) (3) (4) (5) (6=5-4) (7=5-3)
Passenger 1222.13 1400.88 1468.39 1513.35 44.96 112.47
Other137.74 155.54 176.15 216.88 40.73 61.34
Coaching
Goods 1459.41 1449.52 1144.79 1149.89 5.10 --299.63
Sundries 606.13 673.89 657.14 652.71 -4.43 -21.18
Total 3425.41 3679.83 3446.47 3532.83 86.36 -147.00
1400
.88
155.
5414
49.5
2
3679
.83
673.
89
NORTHEAST FRONTIER RAILWAY
36
Apportioned Earnings(Figs in Crs of `)
3067
.87
3325
.66
0
500
1000
1500
2000
2500
3000
3500
4000
Actual 2013-14 Actual 2014-2015 Revised Target 2015-16
Actual 2015-16
Passenger Other Coaching Goods Sundry Total
Apportioned Earnings
904.
9614
2.15
1672
.42
3325
.66
606.
13 1023
.03
155.
7018
71.8
867
3.89
3724
.50
1000
172.
3716
5065
7.14 10
16.2
718
8.91
1930
.89
652.
71
3479
.51
3788
.78
Earnings Actual Actual Revised Actual Variation Variation2013-14 2014-15 Target 2015-16 with with
2015-16 Target last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3)
Passenger 904.96 1023.03 1000 1016.27 16.27 -6.76
Other142.15 155.70 172.37 188.91 16.54 33.21
Coaching
Goods 1672.42 1871.88 1650 1930.89 280.89 59.01
Sundries 606.13 673.89 657.14 652.71 -4.43 -21.18
Total 3325.66 3724.50 3479.51 3788.78 309.27 64.28
ANNUAL PERFORMANCE REPORT - 2015-16
37
(Fig in ` Cr)ANALYSIS OF REVENUE EXPENDITURE
Earnings Actual Actual Final Actual Variation Variation2013-14 2014-15 Grant 2015-16 with with
2015-16 FG last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3)
Dem-3(Genl. Sup.& Services) 316.30 341.26 349.04 347.15 1.89 5.89
Dem-4(Repairs& Main P/Way 617.30 698.23 701.99 701.89 0.10 3.66and works)
Dem-5(Repairs& Main Motive 165.25 178.61 210.82 195.72 15.10 17.11Power)
Dem-6(Repairs& Main Carriage 480.62 538.44 570.48 568.85 1.63 30.41& Wagaon)
Dem-7(Repairs& Plant & 224.83 246.17 245.41 245.09 0.32 -1.08Equipment)
Dem-8 (OperatingExpanses Rolling 286.91 316.28 356.16 355.21 0.95 38.93Stk. & Equipment)
Dem-9 (Opera-ting Expanses 413.59 497.45 553.25 553.83 -0.58 56.38Traffic)
Dem-10 (Opert. 1345.10 1230.66 1080.97 1080.30 0.67 -150.36Expanses Fuel)
Dem-11 (StaffWelfare & 326.87 366.13 387.16 387.32 -0.16 21.19Amenities)
Dem-12 (Misc. 253.03 285.21 262.55 261.44 1.11 -23.77Working Expences)
Dem-13 (PF,Pen & Other 43.28 53.41 63.90 59.30 4.60 5.89Retirementbenefits)
Total 3853.85 4751.85 4781.73 4756.10 25.63 4.25
NORTHEAST FRONTIER RAILWAY
38
CAPITAL EXPENDITURE PLANHEAD WISE(Fig in ` Cr)
PLAN - HEAD Actual Actual Final Actual Utiliza-2013-14 2014-15 Grant 2015-16 tion
2015-16 (in %)
1100 new Lines 1804.58 3081.18 4220.69 4219.39 99.97
1400 Guage Conversion 1614.59 2104.31 1505.89 1506.09 100.01
1500 Doubling 103.25 217.58 6.47 6.43 99.69
1600 Traffic Facilities 23.25 29.24 34.48 34.22 99.25
1700 Computerisation 2.35 2.95 2.17 1.44 66.36
2100 Rolling Stock 59.18 325.10 146.17 98.38 67.31
2200 Leased Assets 144.01 174.97 198.30 197.38 99.54
2900 Safety Works LC 22.76 22.09 36.50 35.65 97.67
3000 Safety Works 21.94 44.93 93.07 93.10 100.03RUB/ROB
3100 Track Renewals 125.48 149.23 225.18 204.37 90.76
3200 Bridge Works 10.25 18.52 20.90 20.61 98.61
3300 S & T Works 35.34 33.34 25.17 23.75 94.36
3600 Other Elec. Woeks 8.29 8.33 5.75 5.79 100.70
4100 Plant & Machinery 16.26 15.98 17.88 22.22 124.27
4200 Workshops 19.73 26.26 30.41 29.81 98.03
5100 Staff Quarters 28.12 24.67 21.17 20.98 99.10
5200 Amenities for Staff 23.87 21.66 20.67 19.90 96.27
5300 Pass. Amenities 41.89 44.71 54.16 54.09 99.87
6400 Other Specified 28.03 25.62 21.69 19.61 90.41Works
Gross Exclu. Susp) 4133.17 6370.67 6686.70 6613.21 98.90
ANNUAL PERFORMANCE REPORT - 2015-16
39
0
200 0
400 0
600 0
800 0
10000
12000
14000
A c tual2 0 1 3 -1 4
A ctu al2 0 1 4 -1 5
Targ e t 2 0 1 5 -1 6
A ctu al2 0 1 5 -1 6
CO A L P O L FO O D G R A IN S D O LO M ITE O TH ER S TO TA L
OPERATING RATIO (%)
COMMODITIES WISE LOADING
Figs in “000” Tonnes19
7036
2314
9312
6437
9912
149
1310
3486
1587
1340
3804
1152
7
1800
3650
1500
1275
0
538
3015
1682
640 36
46
175
180
185
190
195
200
205
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
193.08
187.08
202.95
185.71
Actual Actual Target Actual2013-14 2014-15 FG 2015-16 2015-16
193.08% 187.08% 185.71% 202.95%
1200 46
00
9521
NORTHEAST FRONTIER RAILWAY
40
Originating Passenger earnings in 2015-16 has increased by 8.03% over2014-15 and increased by 3.03% over the target
86
88
90
92
94
96
98
2013-14 2014-15 2015-16 (Target)
2015-16
97.62
90.84
95.7594.93
0
200
400
600
800
1000
1200
1400
1600
2012-13 2013-14 2015-16 (Target)
2015-16
1222.13
1400.881468.39
1513.35
NUMBER OF ORIGINATING PASSENGER (FIGS. IN MILLION)
ORIGINATING PASSENGER EARNINGS(FIGS. IN MILLION)
Number of Originating Passenger earnings in 2015-16 has increased by4.50% over 2014-15 and decreased by 0.86% over the target
ANNUAL PERFORMANCE REPORT - 2015-16
41
0
200
400
600
800
1000
1200
1400
1600
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
1459.41 1449.52
1144.79 1149.89
ORIGINATING FREIGHT EARNINGS 2015-16
(` In Crs.)
NORTHEAST FRONTIER RAILWAY
42
BG Release (No. Of Wagons/Day)6.76% improvement in comparison to same period of last year
700
750
800
850
900
950
2013-14 2014-15 2015-16
803
873
932
Figure in %
OPERATING DEPARTMENTBG Loaded Receipt (in wagons/day)
6.69% improvement in current year in comparison to sameperiod of last year
0
200
400
600
800
1000
1200
2013-14 2014-15 2015-16
9001031
1100
ANNUAL PERFORMANCE REPORT - 2015-16
43
Interchange with ER (No. Of Trains/Day)12.3% improvement in comparison to same period of last year
05
10152025303540
2013-14 2014-15 2015-16
29.231.7
35.6
Figure in %
19.5
20
20.5
21
21.5
22
22.5
2013-14 2014-15 2015-16
20.6
22.1
21.6
Figure in %Interchange With ECR (No. Of Trains)
NORTHEAST FRONTIER RAILWAY
44
Diesel KM has been affected due to speed restrictions imposed formovement of elephans on NJP-APDJ section due to congestion onNJP-ROJ-NCB ad KYQ-GHY line. Utilization is also affected due tolocos held up on ballast rakes to secttion under gauge conversion
BG Diesel KM/Day
460
480500520540
560580600
2013-14 2014-15 2015-16
586
509 507
ANNUAL PERFORMANCE REPORT - 2015-16
45
(Fig
ure
in `
lakh
s)
Com
mer
cial
Ear
ning
s(O
rigin
atin
g)
COMMERCIAL DEPARTMENT
55.9
550
.01
76.2
329
.73
Ope
ning
Bal
ance
as o
n 01
.04.
2015
Acc
rual
2015
-16
Cle
aran
ce20
15-1
6C
losi
ng B
alan
ce31
.03.
2016
Stat
ion
Out
stan
ding
(Goo
ds &
Coa
chin
g)(F
igur
e in
` la
khs)
Ear
ning
sA
chie
vem
ents
Targ
etA
ctua
lO
ver T
arge
rO
ver L
ast Y
ear
Par
ticul
ars
2015
-16
2015
-16
2013
-14
2014
-15
Par
cel &
7040
.17
8348
.87
9250
.00
1036
0.10
(+) 1
2.00
(+) 2
4.03
Lugg
age
Tick
et22
52.6
428
30.5
4Ta
rget
not
3003
.36
(-)(+
) 6.1
7C
heck
ing
rece
ived
from
Boa
rd
Com
mer
cial
146.
7212
0.62
220.
0081
.82
(-) 6
2.81
(-) 3
2.17
NORTHEAST FRONTIER RAILWAY
46
150
152
154
156
158
160
162
164
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
155.6
163.42161.54
163.09
0123456789
10
2 01 3 -1 4 2 0 1 4-1 5 2 0 15 -1 6 2 01 5 -16(Targe t)
2 0 15 -1 6(A ctual)
43.7
8 .5 8 .5 8 .2
3 .5 3 .93 .5 3 .5 3 .7
8 .39 .2 7
1 0 1 08.9 4
BG C o ach B G Wa g o n B G Lo co
MECHANICAL DEPARTMENT
Diesel Loco availibility (BG)
Ineffective % (Loco/Coach/Wagon)N
umbe
r/Mon
thN
umbe
r/Mon
th
ANNUAL PERFORMANCE REPORT - 2015-16
47
012345678
2013-14 2014-15 2015-16
7.136.13
5.17
0500
100015002000250030003500400045005000
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
Coach Wagon ROH
Workshop Out Turn (Coaching/Wagon)
Diesel Loco Reliabilty
Num
bers
/Mon
thFa
ilure
/100
loco
/mon
th
1427
1250
1358
4417
1240
4148
1452
1440
4800
1379 14
4046
90
NORTHEAST FRONTIER RAILWAY
48
00.5
11.5
22.5
33.5
44.5
20 13-1 4 201 4-15 2 01 5-16(Targe t)
2 015 -16(A ctual)
4 .0 6 4 .1 4 .04 4.09
1.981.6 8 1.9
1.51
Passenger G oods
Specific Fuel Consumption
Ltrs
./100
0 G
TKM
ANNUAL PERFORMANCE REPORT - 2015-16
49
ELECTRICAL DEPARTMENTTarget
SN Item/Activity 2013-14 2014-15 2015-16 2015-16A Train lighting & Air conditioning1 Certified Non-AC cases (Nos) 0 1 4 52 Punctuality loss (AC & Non-AC) 29 43 40 93
(Nos)3 Provision of Emergency Light 135 58 150 32
(Nos)4 Modification126 of Fuse distribu 402 170 540 82
-tion Board in GS&SCN CoachesB Electrical Power1 Electric energy consumption in 139.33 143.23 135 139.05
non traction area in MU2 Electrification of Railway 250 126 - 208
Quarters (Nos)3 Provision of energy efficient 60 1740 1597 814 1586
Woeiling fans (Nos)4 Use of CFL fittings at corridors,
staircases, toilet and bathroom 4199 5565 955 1923in place of incandescent lamps(Nos)
5 Rewiring of Staff quarters (Nos) 1388 1171 665 8636 Replacemnt of Convertional KW
meters by electronic KWh 1998 1716 1179 2003meters (Nos)
7 HSD oil consumption in DG set 574.48 571 540 411.09in KL
8 Provision of electric fan regula-tors in place of conventional fan 2111 2025 2125 2018regulators in ceiling fan (nos)
9 Use of solar street lights for(a) Remote places & colories(b) Training Institute 16 122 35 11(c) Retiring room(d) Officers rest house
10 Electrification of manned LC 63 57 8 26gates
NORTHEAST FRONTIER RAILWAY
50
020406080
100120140160
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
135
58
150
32
Emergency Light
0
20
40
60
80
100
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
2943 40
93
Punctuality Loss Cases of Train Lighting & AC
0
100
200
300
400
500
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
402
170
540
82
Modification of FDB covers
ANNUAL PERFORMANCE REPORT - 2015-16
51
0
500
1000
1500
2000
2500
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
19981716
1179
2003
130132134136138140142144
2013-14 2014-15 2015-16Target
2015-16(Actual)
139.33
143.23
135
139.05
Electric energy consumption in non traction area in MUElectric Energy Consumption in MU
0200400600800
100012001400
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
13881171
665863
Rewiring of staff quarter
Replacement of Conventional KWH meter by Electronic KWH meters
NORTHEAST FRONTIER RAILWAY
52
ENGINEERING DEPARTMENTSN Item Unit 2013-14 2014-15 2015-16
Target Progress
1 Track renewal CTR 75.55 34.09 54 94.52
2 Ballast Supply ‘000 400.00 407.76 360 414.16cum
3 Rail/Weld failure No. 34 53 55 36
4 Insertion of PSC Eq. 94.50 61 169.50 103Turnout sleeper Set
5 Scrap Offered MT 10055.25 9121.38 9000 12219
6 Removal of PSR No. 19 57 59 59
7 manning of UMLCs No. 65 30 20 44
8 Closure of LCs No. 23 18 24 46
9 Sundry Earnings Cr. of 29.39 44.21 44021 59.62Rs.
10 USFD testing KM 12936.36 13582.25 12400 14150
11 Rehabilitation of Br. No. 28 55 34 29
12 CSM (incl. TEX & DOU) Km 4017.08 3385.28 4943 4946
13 ISD Km 93.30 65.30 23 23.25
ANNUAL PERFORMANCE REPORT - 2015-16
53
SIGNAL & TELECOM DEPARTMENTSN
Item
20
12-1
320
13-1
4
2014
-15
20
15-1
6 2
015-
16
1.
RRI/P
I/EI
3
30
18
7
43
2.
Tota
l Tra
ck C
ircui
ting
(No.
of L
ocat
ions
)
20
120
68
-
162
3.
Blo
ck P
rovi
ng b
y Ax
leC
ount
er (B
PAC
)
14
33
34
30
3
7
4.
LED
Lit
Sign
al(N
os. o
f Sta
tions
)
4
29
16
-
40
5.
Dat
a Lo
gger
s
2
53
16
7
40
6.
Leve
l Cro
ssin
gIn
terlo
ckin
g
14
31
20
8
23
7.
Fina
ncia
lR
s. C
rs. (
PH 3
3)
39.
24 3
5.67
34.
2734
.68
2
4.82
NORTHEAST FRONTIER RAILWAY
54
Total Signal Failure
Total Actual Actual Target Actual %Signal 2013-14 2014-15 2015-16 15-16 Improvement
Failures in comparisionto 2015-16
4725 5923 6021 5684 4.04%
ASSET RELIABILITY: (S&T)
0
1000
2000
3000
4000
5000
6000
7000
2013-14 2014-15 2015-16(Target)
2015-16(Actual)
4725
5923 60215684
ANNUAL PERFORMANCE REPORT - 2015-16
55
INS
UR
GE
NC
Y -
R
EL
AT
ED
C
RIM
E
year
Sabo
tage
/Tr
ack-
Tem
perin
g
Apr.’
13to
63
51
32
525
Mar
,’14
Apr.’
14to
50
30
11
111
Mar
,’15
Apr.’
15to
12
60
22
316
Mar
,’16
Tota
l12
514
16
59
52
Rec
over
yof
Expl
osiv
eB
omb
Expl
osio
nAm
bush
/At
tack
Kid
nap
ping
Thre
atto
Exct
ortio
n
Mis
cell-
aneo
usIn
cide
ntTo
tal
NORTHEAST FRONTIER RAILWAY
56
INCIDENCE OF AGITATIONS : State-wiseFinancial
State BundhRail- Obstruction/
Total Year Roko Dharna
Assam 130 42 31 203
Bengal 7 4 6 17
Apr’13 Bihar 8 3 1 12
to Tripura 1 0 0 1
Mar,’14 Nagaland 2 0 0 2
Manipur 1 0 0 1
Total 149 49 38 236
Assam 69 59 34 162
Bengal 5 13 6 24
Apr’14 Bihar 11 3 5 19
to Mizoram 1 4 1 6
Mar,’15 Tripura 1 0 0 1
Arunachal 1 0 0 1
Total 88 79 46 213
Assam 71 48 12 131
Bengal 06 04 02 12
Apr,’15 Bihar 15 05 02 22
to Tripura 00 00 01 01
Mar,’16 Meghalaya 01 00 00 01
Arunachal` 02 00 00 02
Total 95 57 17 169
ANNUAL PERFORMANCE REPORT - 2015-16
57
STORE DEPARTMENT
Stor
es D
epar
tmen
t not
onl
y ac
hiev
ed th
e S
crap
sal
e ta
rget
fixe
d by
Rai
lway
Boa
rd fo
rth
e fin
anci
al y
ear 2
015-
16 b
ut s
upre
ssed
it b
y 13
.02%
.
2013
-14
2014
-15
2015
-16
2015
-16
Varia
tion
(Tar
get)
(Act
ual)
ASc
rap
disp
osal
(in `
Cr.)
` 82
.57
` 55
.33
` 62
Cr.
` 70
.07
+13.
02%
Fina
ncia
l Yea
r 201
5-16
NORTHEAST FRONTIER RAILWAY
58
0
20
40
60
80
100
2013-14 2014-15 2015-16(Target)
2015-16
82.27
55.3362
70.07
28.1
8%
18.5
8%
(Figure in ` Cr.)
Earnings from Scrap Disposal
Turn over Ratio with Fuel and without Fuel
- 1 0 .0 0 %
0 .0 0 %
1 0 .0 0 %
2 0 .0 0 %
3 0 .0 0 %
4 0 .0 0 %
5 0 .0 0 %
6 0 .0 0 %
W it h o u t Fu e l
W it h Fu e l
W it h o u t F u e l
W it h F u e l
W it h o u t Fu e l
W it h Fu e l
2 0 1 3 - 1 4 2 0 1 4 -1 5 2 0 1 5 - 1 6
Ta r g e t A c h ie v e m e n t
28.9
3%28
.18%
18.4
0%18
.58%
13.0
0%35
.52%
17.0
0%27
.80%
12.0
0%27
.57%
22.0
0%
39.2
7%
ANNUAL PERFORMANCE REPORT - 2015-16
59
MAN POWER PLANNING
MANPOWER - SALIENT FEATURES
Gazetted Cadre ('A' & 'B') Sanctioned - 1178
On-roll - 989 (including NFR Con. Org.)
Non-Gazetted Cadre
Sanctioned - 72915 On-Roll - 63952Total Vacancies - 8963
Safety Category Vacancies - 4809 (14.72%)[Cadre of 32,670].
Man Power Planning
Surrenders- 384
Creations - 283 (279 normal creation + 4workcharged) (InSafety and operational categories for New Assets/Activities)
Indents for Recruitment (Placed/Under Process):
With RRBs - 3047 and indent to RRCs will be placed shortly
452 Court cases pending (as on 01.04.2016). Winningpercentage of Court case is 76.27% (90 cases won duringApr’15 to Mar’16).
Single unified wage period successfully implemented.
99.32% disbursement of salary through banks.
NORTHEAST FRONTIER RAILWAY
60
ACHIEVEMENTS/SYSTEM/IMPROVEMENT Operating :
A) 1 Instroduction of new trains :-i) 02540/02541 Passenger between Darjeeling-New Jalpagur
Special (Daily) w.e.f. 12.06.15.ii) 52574 between Darjelling-Ghum - Darjeeling Joy Ride (Daily)
w.e.f. 12.06.15.iii) 52575 between Darjelling-Ghum - Darjeeling Joy Ride (Daily)
w.e.f. 12.06.15. iv) 52570/52571 between Darjeeling - Kurseong “Red Panda” (Tri-
weekly) w.e.f. 13.06.15.v) 52572 between Kurseong - Mahanadi “Himalayan on Wheels”
(Weekly) w.e.f. 13.06.2015.vi) 52573 between Mahanadi - Kurseong “Himalayan on Wheels”
(Weekly) w.e.f. 14.06.2015.vii) 15613/15614 between Guwahati - Murkongselek I/C Exp (Daily)
w.e.f. 10.08.2015.viii) 55719/55720 between Dekargaon - Bhalukpong Passenger
(Daily) w.e.f. 10.08.2015ix) 55721/55722 between Rangiya - Dekargaon Passenger (Daily)
w.e.f. 11.08.2015x) 55823/55824 between Rangiya North- Dekargaon Passenger
(Daily) w.e.f. 10.08.2015.x) 55615/55616 between Guwahati-Silchar Fast Passenger (Daily)
w.e.f. 21.11.2015xi) 15624/15623 between Kamakhya - Bhagat-ki-kothi Express
(Weekly) w.e.f. 04.03.2016xii) 75713/75714 between Siliguri-Changrabandha-New Coochbehar
(Daily) w.e.f. 04.03.2016.
2 Extension of trains :- i) 55613/55614 Dekargaon-Harmuti Passenger with new No as
55813/55814 w.e.f. 10.08.2015ii) 13247/13248 Kamakhya - Danapur KJ Exp w.e.f. 05.10.15.
ANNUAL PERFORMANCE REPORT - 2015-16
61
ii) 25657/25658 GHY-SCL KJ Exp w.e.f. 01.02.2016.ix) 12502/01 NDLS-GHY PSK Exp with new No as 15602/15601
NDLS-GHY-SCL Link PSK Exp w.e.f. 20.02.2016
3. Increase in Frequency :-i) 15903/15904 between Dibrugarh - Chandigarh Exp (Weekly) w.e.f
14.08.2015B) Clearance of extra rush for tourists and other passengers.
No of Spl Trains No of Trips Total Seat/Berth
34 1483 23,08,640
C) Coaches Augmented:-i) 3062 coaches augmented temporarily with provision of
12,58,656 seat/berths.ii) 81 coaches augmented permanently with provision of 6424
berths.
D) Parcel Cargo Exp.:- 141 rakes of Parcel Cargo Exp. were runduring 2014-15 between NGC-PTNR-NGC via CP with earningsof more than Rs.127.7 crore (approx).
E) Premium Special :- 11 trips Premium special trains were runduring 2015-16 between KYQ-NDLS with earnings of more thanRs.5.1 crore. (approx).
F) Suvidha Special:- 18 trips of Suvidha Spl. trains were runbetween KYQ-BNC with earnings of more than 8.58 Cr. (Approx)
G) Piecemeal Demand VPs:- 2436 VPs were loaded during 2015-16 with earnings of Rs. 28.1 Cr.(Approx).
H) Millennium parcel rakes:- 10 rakes were loaded withh earningsof more than Rs.2.1 Cr. (Approx)
I) FTR Special :- 15 Spl trains were run withh earnings of morethan Rs.4.36 Cr. (Approx)
J) FTR Coaches:- 46 FTR coaches were run with earnings of morethhan Rs.50.7 Lacs (Approx).
NORTHEAST FRONTIER RAILWAY
62
System Improvement in Coaching OperationDecongestion of GHY yard by integration of rakes viz.
• 12507 (TVC-GHY) Exp. & 15636 (GHY-Okha) Exp. lie over utilizedto run special trains.
• 15644/15643 KYQ-PURI Exp & 15640/15639 GHY-PURI Exp lieover utilized to run special trains.
• 15711/15712 KIR HWH Exp lie over urtilized to run special trains.ENGINEERING1.1 Problems of ERCs coming out of the Xing body inserts due to
elongation of insert eye holes was encountered in yards. Ac y l i n d r i c a lferrule typeliner ofthickness like0.5 to 1 mmw a sdeveloped andused in yardwhich issuccessful lyworking.
1.2 Rail Wheel Burns :At locations where Train engines stop and start, often rail table isdamaged due to wheel slipping, resulting in wheel burns, causing pitsupto 2mm/3mm depth at wheel contact. Trial have been made in one
such location inS S E / P . W a ysection by grindingthe wheel burnlocations with railprofile grinder withproper ramping ofdepth of burn andobtaining nearnew rail finish.
ANNUAL PERFORMANCE REPORT - 2015-16
63
0100000200000300000400000500000600000700000
2011-12 2012-13 2013-14 2014-15 2015-16
601331
420925359989
679284594524
Production of BG line Sleepers in Nos.
2.1 Production of BG line Sleepers:Despite contracts of two CSPs having been terminated, theproduction of PSC sleepers has been all time high during the FY.
2.2 Removal of Permanent Speed Restrictions:-
58 Nos. PSR has been removed against the annual target of 59.This is the best ever achievement in the history of the NFR.
0102030405060
2011-12 2012-13 2013-14 2014-15 2015-16
71
19
57 58
Removal of PRS (in Nos.)
1.3 Web and SMS based system of complaint redressal formaintenance of quarters has been started at Katihar by Katihardivision.
NORTHEAST FRONTIER RAILWAY
64
2.3 Sundry Earning:-
Sundry Earning of Rs.59.62 Crores have been made against Annualtarget of Rs.50 Crore, which is best in last five years.
2.4 USFD Testing:-
14150 Km of USFD has been done against the Annual target of 12400Kms . This is the highest achievement in last five years.
0
102030405060
2011-12 2012-13 2013-14 2014-15 2015-16
22.4426.96 28.59
44.2
59.62
Sundry Earnings (in ̀ Crs.)
020000400006000080000
100000120000
2011-12 2012-13 2013-14 2014-15 2015-16
10569.37 11244.65
116614.4
13582.25 14150
USFD (In Kms)
ANNUAL PERFORMANCE REPORT - 2015-16
65
2.5 Encroachment Removal:-
Despite resistance of public 2847 Nos. of encroachments havebeen removed and consequently 21.321 hectares of Railway Landcould be realized up to the month. This is the highest achievementin last five years.
2.6 Construction of LHS/RUB by Pre-cast Segmental method and MegaTraffic Blocks has been started in this Railway, 6 LHS had beenconstructed in 2014-15. In 2015-16, 31 LHS have been constructedso far. This has been achieved despite serious problem of waterlogging, high water table, less working season due to high rainfallarea etc.
0500
10001500200025003000
2011-12 2012-13 2013-14 2014-15 2015-16
624
42
1191
1939
2847
Removal of Encroachment (In Nos.)
NORTHEAST FRONTIER RAILWAY
66
3 2 03 4 03 6 03 8 04 0 04 2 0
A n n u alTa r g e t
P r o g r e ss2 0 1 5 -1 6
3 6 0
4 1 4 .1 6
02 04 06 08 0
1 0 0
A n n u alTa rg e t
P r o g r e ss2 0 1 5 -1 6
5 4
9 4 .5 2
1 8 31 8 41 8 51 8 61 8 71 8 81 8 9
A n n u alta r g e t
P r o g re ss2 0 1 5 -1 6
1 8 5
1 8 8 .2 6
2.7 Deep Screening:-
188.26 Km of track has been deep screened (125.00 Km byMachine and 63.26 Km Manually) which is higher than the annualtarget.of 185 Km
2.8 Track Renewal:94.52 CTR units (both Primary and Secondary) have been achievedupto the month against the annual target of 54 CTR units thusexceeding the target by 82.44%.
2.9 Ballast Supply:-414.16 cums of ballast has been supplied against the target of360,000 cums upto the month. Progress is 15% higher than theAnnual Target.
ANNUAL PERFORMANCE REPORT - 2015-16
67
2.10 Prevention of Rail Corrosion:-
To prevent corrosion of rail, precautionary measures like Greasingof ERCs (978.10 Km), Painting of rails (596.20 Km), Shifting ofliners (433.92 Km) etc. has been adopted. We have exceededannual targets in all these activities.
2.11 Raising of Speed
(i) Raising of speed on atihar-Mukuria section (35 Km) of TatiharDivision has been increased from 100 Kmph to 110 Kmph duringMay’2015 (Time saved=2 mts).
(ii) Raising of Speed on Ambari Falakata - Belakoba (10 KM) hasbeen increased from 75 Kmph to 110 Kmph during July’15 (Timesaved =2.89 mts.).
(iii) Raising of Speed on Belakoba-Raninagar Jalpaiguri (9.084 Km)has been increased from 75 Kmph to 110 Kmph during July’15(Time saved = 2.65 mts
(iv) Raising of Speed on Simaluguri - Moranhat (52.30 Km) andMoranhat - Dibrugarh (40.90 Km) has been increased from 75Kmph to 100 Lmph and 60 Kmph respectively (Time saved =10.71 mts + 16.81 mts)
(v) Raising of Speed on Rangiya - Rangapara (124.24) has beenincreased from 65 Kmph to 100 Kmph (Time saved =40.52 mts).
2.12 Performance of Track Machines:-
(i) CSM/TEX/DUO:- 4946 Kms of Track has been tamped by CSM/TEX/Duomatic machines against the Annual target of 4743 Kmsi.e. 4.28% of Annual target has been achieved.
(ii) PQRS:- 58 Km of progress of ISD work has been achievedagainst annual target of 47 Km, i.e. 123% of Annual target hasbeen achieved.
NORTHEAST FRONTIER RAILWAY
68
2.15 SAFETY MEASURES:-
(i) Manning of Unmanned Level Crossing:-
Year Target Progress
2013-14 60 65
2014-15 40 30
2015-16 20 44
Unmanned level Crossing
Year Low TVU LHS Divisions Manned Total
Tar Prog Tar Prog Tar Prog Tar Prog Tar Prog
‘13-14 2 7 25 10 8 5 60 65 95 87
‘14-15 3 0 25 6 7 7 40 30 43 95
15-16 2 1 15 31 2 3 20 44 39 79
(i) Closure of Level Crossing:-
ANNUAL PERFORMANCE REPORT - 2015-16
69
3.0 MEDICAL:
3.1. 357 numbers of Multipurpose Healtth checkup camps & 356 Nos.of Wellness camps were organised in all the division of N. F.Railway and 7609 nos.& 7418 no’s of beneficiaries were coveredduring this period
3.2. Special and Mass cleanliness drive under “Swachh BharatMission” were carried out succeessfully in entire Zone during2015-16.
3.3. 137 no. of registration & 98 no. of food licences under food safety& standad Act/2006 have been issued. More over 31 nos of foodsamples under food safety & standard Act/20006 have beencollected & sent to Food Analysist/GHY & Kolkatta where 15 no.of Food samples have beenn declared unsafe substandard &misbranded which have been put under Adijudication &prosecution in the Court of Law.
3.4 Two round of Pulse Polio Vaccination Campaiggn were organizedin the entirre N. F. Railway on 17.01.16 & 24.01.16 & 21.02.16 to23.02.16. All total 43,594 nos (both Rly non Rly) of childrenbetween age group of (0-5) years were immunized.
4.0 MECHANICAL:
4.1. NFR has acieved 2nd best Goods SFC figure (1.75 litre/1000GTKM) amongst 16 Zonal Railways. This has been possible bystrict enforcing of trip ration and focused maintenance of DieselLocomotives in NFR Sheds.
4.2. Introduction of ‘Clean My coach’ application for OBHS trains:-For effective monitoring of the working On Board HousekeepingServices(OBHS), a Web SMS based Passenger complaintsystem “Clean My Coach” has been introduced for trains coveredunder OBHS and originaing from the following stations;Dibrugarh,, Tinsukia, Guwahati, Kamakhya, Alipurduar, New
NORTHEAST FRONTIER RAILWAY
70
Jalpaiguri & Katihar. A total of 41 trains having OBHS have thusbeen covered. This is expected to go a long way in ensuringCustomer Satisfation.
4.3. Construction Coach Maintenance facilities (Pit line and Sick Line)at Kishanganj in Katihar Division has been completed and theDepot made functional with efffect from 12.08.2015. Accordingly,the maintenance of 15715/16 Garib Nawaj Exp.(Kishanganj-Ajmer) has been shifted from New Jalpaiguri to Kishanganj.
4.4. Modification of LED type Engineering Speed restrictionboard at Crew lobby, NBQ & LMG: Speed restriction board hasbeen modified by providing LED lights in the temporary speedrestriction (Less than 24 hrs) in blinking condition.
4.5.N. F. Railway had participated in the ‘Techniche 2015’- an annnualexhibition organized at IIT Guwahati. One of the main attractionsin this exhibition was the model of a Bio-Toilet displayed alongwith write-ups on the principle of working. This had created a lotof awareness among the public on the unique Green Initiative ofIndian Railway.
ANNUAL PERFORMANCE REPORT - 2015-16
71
STATUS OF PROJECT BEING EXECUTED BYCONSTRUCTION ORGANISATION
(New Lines/Gauge Conversion/Doubling)
fig. i
n C
rs o
f ` (P
ositi
on a
s on
01.
04.2
015)
Rem
arks
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
et
PresentFinancial
progress %
NEW
LIN
ES•
Jirba
mD
holak
hal (
12.5
Km)
Engi
ne R
ollin
g Do
ne o
n22
.03.
2012
and
sec
tion
com
mis
sion
ed o
n BG
by
runn
ing c
omm
ercia
l fre
ight
train
on 2
1.03
.201
6.•
18
Tunn
els
have
be
enco
mple
ted
till n
ow.
•St
age
1 cle
aran
ce fo
r 100
5Ha
of la
nd ha
s bee
n give
n by
MoE
F,Ne
w De
lhi
on07
.11.
2014
. Ra
ilway
depo
sited
Rs
104.
30 C
rs to
Cam
pa a
ccou
nt o
f M
oEF,
New
Delh
i on
07.0
1.20
15to
ward
s co
mpe
nsat
ory
affo
rest
ation
etc.
•St
age
2 C
leara
nce
await
ed.
•Ec
onom
ic Bl
ocka
de, A
TSUM
Band
hs, o
ther
Ban
dhs,
UNC
ban
etc.
hav
e be
en a
ffecti
ngth
e pr
ogre
ss o
f wor
ks. S
tate
Govt.
hav
e ho
weve
r bee
n
1Ne
w Lin
e fro
m Ji
ribam
2003
-04
9046
.72
3385
.58
1505
.00
1541
.76
54.4
7Ph
ase-
I : Ji
ribam
-to
Imph
al (1
10.6
25 K
ms)
Dolak
hal-
12.5
0 km
(NAT
IONA
L PR
OJEC
T)(C
omm
ission
ing)
July’
2016
Phas
e-II
:Dh
olakh
al-Tu
pul -
71.2
0 km
(Com
miss
ioning
)M
ar’20
17Ph
ase-
III :
Tupu
l - Im
phal-
26.9
25 k
m(C
omm
ission
ing)
Mar
201
9Ph
ase
-IV :
Jiriba
m- T
upul
- 83.
70 K
m(C
omm
ission
ing )
Mar
201
7Ph
ysic
al Pr
ogre
ss-3
6.02
%
NORTHEAST FRONTIER RAILWAY
72
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
2Bo
gibee
l Rail
-Cum
-19
97-9
848
57.1
435
77.9
351
6.00
512.
8584
.22
(Com
miss
ioning
)Ro
adBr
idge
over
rive
rJu
ne’20
17Br
ahm
aput
ra n
ear
Phys
ical
Bogib
eelw
ith lin
k lin
esPr
ogre
ss:-
betw
een
North
& S
outh
81.02
%Ba
nk lin
e (7
3 Km
s.)(N
ATIO
NAL
PROJ
ECT)
3Te
telia
to B
yrnih
at (2
1.20
06-0
778
0.00
239.
5055
.50
46.1
436
.62
(Com
miss
ioning
)50
Km
) in
lieu
of A
zara
-M
ar’20
18By
rniha
tPh
ysic
al(N
ATIO
NAL
PROJ
ECT)
(91.
75 K
m) (
NATI
ONAL
PROJ
ECT)
Prog
ress
:-26
.13 %
CRS
insp
ectio
n co
mpl
eted
for
Mor
anha
t-Ch
aulkh
owa
Secti
on (4
4.00
Km
) of B
ogibe
elBr
idge
Pr
ojec
t on
28
/04/
2009
.Tr
ack
linki
ng
for
68
km
com
plet
ed.
This
is th
e ne
w de
sign
all w
elded
gird
er b
eing
used
by
India
n Ra
ilway
s fo
r the
firs
t tim
e.Ou
t of t
otal
41 n
os o
f Gird
ers t
o be
laun
ched
,7
Nos
Gird
ers
have
bee
n lau
nche
d in
2014
-15
. Dur
ing 20
15-1
6. 12
th n
os G
irder
laun
ched
.19
th G
irder
laun
ched
on
23.3
.201
6.
•Fo
rest
C
lear
ance
:(21.
307
Ha.)
Prop
osal
of F
ores
t Clea
ranc
e su
bmitt
ed o
n02
.03.
2012
. As p
er ad
vice
of A
ddl. P
CCF,
joint
surv
ey c
ondu
cted
on a
gree
d ne
w bo
unda
ryan
d fre
sh p
ropo
sal s
ubm
itted
on 0
7.01
.201
4.Th
ere w
as pr
oblem
of m
ismat
ch of
coor
dinat
esbe
twee
n Fo
rest
Dep
tt. a
nd R
even
ue D
eptt.
of
Govt.
fo A
ssam
. The
issu
e ha
s sin
ce b
een
sorte
d ou
t. NO
C by
DC/
Kam
rup
(Met
ro) h
asbe
en is
sued
and
uplo
aded
on
MoE
F we
b sit
efo
r app
rova
l on
04.0
1.20
16.
•As
sam
Por
tion
:-i.
Patta
land
:- A
gains
t tota
l requ
irem
ent o
f 85.
26Ha
. Pat
ta la
nd, o
nly 52
.30
Ha. o
f land
han
ded
over
to R
ailwa
y on p
aper
. Lan
d own
ers a
re no
tall
owing
to st
art w
ork i
n 21.
95 H
a. d
ue to
non-
ANNUAL PERFORMANCE REPORT - 2015-16
73
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
4Ne
w BG
line
from
2007
-08
2513
.30
59.9
590
.00
87.5
75.
87(C
omm
ission
ing)
(Dim
apur
) Dha
nsiri
Mar
’2020
– Su
khob
i - Z
ubza
Phys
ical
Prog
ress
:- 2
.36 %
paym
ent o
f lan
d an
d Zi
rat c
ompe
nsat
ion.
Again
11.0
1 Ha.
of P
atta
land
is ye
t to be
hand
over
by G
ovt.
of A
ssam
.ii.
Govt.
land
:- Aga
inst to
tal re
quire
men
t of 3
5.42
Ha.,
all G
ovt.
land
hand
ed o
ver t
o Ra
ilway
on
pape
r. La
nd o
wner
s ar
e no
t allo
wing
to s
tart
work
in 1
1.03
Ha.
due
to n
on-p
aym
ent l
and
and
Zira
t com
pens
ation
.iii.
Land
acq
uisitio
n pr
oces
s is
held
up fo
r non
-fin
aliza
tion
of g
uideli
nes
of n
ew L
A Ac
t by
Govt
. of
Ass
am.
Mee
ting
are
bein
g he
ldre
gular
ly wi
th S
ecy.
Tran
spor
t, Go
vt of
Ass
amfo
r sor
ting o
ut th
e pro
blem
s. La
st m
eetin
g held
on 1
8.02
.201
6.
1. T
ake
off f
or th
is ne
w lin
e wa
s re
vised
from
stat
ion D
imap
ur (in
Ass
am) t
o sta
tion D
hans
iri(in
Nag
alan
d), a
t ab
out
19 K
m s
hort
ofDi
map
ur, to
avoid
zoolo
gical
park
& fo
rest
land
and a
lso du
e to p
rote
st by
loca
l resid
ents.
Also
,ali
gnm
ent i
s pr
opos
ed to
be
term
inate
d at
Zubz
a, a
bout
18
Km s
ort o
f Koh
ima,
due
tohig
h hil
l ran
ges
betw
een
Zubz
a &
Kohim
a.2.
Land
acq
uisitio
n in
Naga
land
has
alrea
dyst
arte
d. R
s 49
.94
Cr w
ere
trans
ferre
d to
Dim
apur
in M
arch
-15
towa
rds
com
pens
ation
for 1
15.0
8 he
ctare
land
& s
truct
ures
.
NORTHEAST FRONTIER RAILWAY
74
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
Disb
urse
men
t co
mpl
eted
. Th
is c
over
s th
eali
gnm
ent f
rom
Km
2.8
to K
m 1
8.40
.Lan
dac
quisi
tion
beyo
nd k
m 1
8.40
will
be in
itiate
daf
ter
re-s
urve
y to
avo
id Op
en w
eb g
irder
bridg
es in
curv
es.
3.Ab
out 1
0.5
hect
land
is to
be
acqu
ired
for 2
.8Km
. alig
nmen
t in A
ssam
(Kar
bi An
glong
Dist
t.)La
nd p
lans
& o
ther
doc
umen
ts a
re u
nder
prep
arat
ion.
4.De
taile
d es
timat
e fo
r the
pro
ject c
ostin
g Rs
2315
.30
Crs.
sanc
tione
d on
26.
08.2
015.
5.Fi
nal L
ocat
ion S
urve
y has
been
done
inclu
ding
reali
gnm
ent s
urve
y fro
m K
m 20
.00(
Sukh
ovi) t
o44
.00 (
Kha
ibung
).Fixa
tion o
f alig
nmen
t sta
rted
from
26.
12.2
015
from
Kha
ibung
end
.6.
Firs
t 16
km
Dha
nsiri
- Su
khob
i sec
tion,
Earth
work
& M
inor B
ridge
wor
k is i
n pro
gres
s.1.
Tota
l land
requ
ired:
944
.15
ha(a
) Ass
am: 1
4.12
2 ha
,(b
) Nag
aland
: 930
.028
ha
2.Dy
.CE/
C/Di
map
ur is
in re
gular
touc
h wi
th D
C/Di
map
ur &
DC/
Kohim
a ab
out l
and
acqu
isitio
npr
ocee
dings
. Mee
ting
held
with
DC/
Dim
apur
& Re
venu
e of
ficer
21.
12.2
015
& 22
.01.
2016
for f
inaliz
ed th
e pr
ogra
mm
ed o
f acq
uisitio
nbe
yond
Suk
hovi
(18.
4 Km
) to
Kaibu
ng (4
4.00
Km.)
rega
rding
han
d ov
er o
f land
to R
ailwa
y.
ANNUAL PERFORMANCE REPORT - 2015-16
75
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
5Ag
arta
la-Sa
broo
m20
08-0
933
51.0
010
24.3
050
5.00
545.
160
46.8
4i)
Udaip
ur -
(112
.00
Km)(N
ATIO
NAL
Sabr
oom
68
KmPR
OJEC
T)(C
omm
ission
ing)
Mar
’2018
ii) Ag
arta
la -
Udaip
ur 4
4 Km
(Coo
mss
ioning
)20
16 P
hysic
alPr
ogre
ss:-
47.69
%
6Bh
airab
i-Sair
ang
2008
-09
2820
.25
243.
9127
5.00
305.
9819
.5 (C
omm
ission
ing)
(51.
38 K
m)
Mar
’2019
(NAT
IONA
L PR
OJEC
T)Ph
ysic
alPr
ogre
ss:-2
4.08
%
1. 1
st B
G tri
al Tr
ain to
the
Stat
e of
Trip
ura
(Aga
rtala)
on 13
.01.
2016
was
rece
ived b
y Shr
iM
anoj
Sinh
a, H
on‘bl
e M
oSR
in th
e au
gust
pres
ence
of S
hri B
adal
Chou
dhur
y, Ho
n‘ble
Mini
ster
PW
D &
Reve
nue,
Shr
i Man
ik De
y,Ho
n‘bl
e M
inis
ter
Tran
spor
t, Ur
ban
Deve
lopm
ent a
nd S
hri D
ilip S
arka
r, Ho
n’ble
MP.
2.Ag
arta
la -
Uda
ipur
(44
Km
) ha
s be
enco
mm
ission
ed b
y ru
nning
com
mer
cial f
reigh
ttra
in on
28.
03.2
016.
Stat
us L
and
acqu
isitio
n:
Fina
l clea
ranc
e fo
r 9.9
4 Ha
Tris
hna
Wild
Life
Sanc
tuar
y For
est la
nd is
awa
ited
from
MoE
F.
Govt.
Lan
d 3.
3 Ha
. and
pat
ta la
nd 1
2.25
Ha.
not y
et h
ando
ver f
or a
ppro
ache
s RO
B/RU
Ban
d sta
tion a
ppro
ach R
oad.
The
wor
k affe
cted
Dive
rsion
of R
oads
Cl
eare
nce
for 1
88.11
Ha.
nor
mal
Fore
st la
ndgi
ven
by M
oEF
and
CC/
New
Del
hi o
n22
.6.2
015.
Phy
sical
poss
essio
n of
land
isaw
aited
.
La
nd A
cquis
ition
Entir
e lan
d re
quire
d fo
r the
pro
ject h
as b
een
acqu
ired.
NORTHEAST FRONTIER RAILWAY
76
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
7Si
vok-
Rang
po20
08-0
940
84.6
918
0.80
110.
5220
3.18
9.4
(Com
miss
ioning
)(4
4.39
Km
)(NAT
IONA
LM
ar’20
20PR
OJEC
T)Ph
ysic
alPr
ogre
ss:-0
%
1.Fi
nal L
ocat
ion S
urve
y com
plete
d and
Det
ailed
estim
ate f
or R
s. 40
84.6
9 Cr.
sanc
tione
d by R
lyBo
ard
on 0
2.12
.201
5 .
2.W
ork
has
been
ent
rust
ed t
o IR
CON
for
exec
ution
& M
OU si
gned
on
7.5.
2010
.3.
Geo
-phy
sica
l Inv
estig
atio
ns c
ompl
eted
.IR
CON
has
to r
e-su
bmit
Fina
l Alig
nmen
tRe
port.
(i)Fo
rest
land
acqu
isitio
n in M
ahan
anda
Wild
life
fore
st of
abo
ut 8
.85
Ha. i
n W
EST
BENG
AL :-
NBW
L ha
s ap
prov
ed t
he p
ropo
sal
on02
.06.
2015
and
cas
e to
be
filed
in Su
prem
eCo
urt f
or N
OC. N
orm
al Fo
rest
Land
in W
EST
BENG
AL:-
Supr
eme
cour
t has
gra
nted
NOC
and
Land
acq
uisitio
n is
in pr
ogre
ss.
(ii)Fo
rest
land
acqu
isitio
n in
Kurs
eong
(12.
34Ha
), Ka
limpo
ng (4
8.83
Ha)
and
Dar
jeelin
g(1
8.60
Ha)
Divi
sions
in W
est B
enga
l :-
Wes
tBe
ngal
MoE
F ha
s sen
t the
pro
posa
l to
MoE
Fon
05.
12.2
014
along
with
NOC
give
n by
DC.
MoE
F ha
s refe
rred t
he ca
se to
Mini
stry o
f Trib
alAf
fairs
(MOT
A) fo
r the
ir cle
aran
ce as
per F
RA20
06 b
ut M
OTA
has r
etur
ned
the
case
sayin
gth
at N
OC of
DM
, Dar
jeelin
g is n
ot a
ccep
table
,NO
C sh
ould
be o
btain
ed fr
om G
ram
Sab
ha/
Gram
Pan
chay
at.•
MO
TA h
as c
larifie
d on
08.1
0.20
15 t
hat
Gor
khal
and
Terri
toria
l
ANNUAL PERFORMANCE REPORT - 2015-16
77
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
8Ne
w BG
line
from
2010
-11
6000
.00
10.6
44.
874.
161
0.25
(Com
miss
ioning
)By
rniha
t-Shil
long
Mar
’2020
(108
.4 K
m)(N
ATIO
NAL
Phys
ical
PROJ
ECT)
Prog
ress
:- 0
%
Adm
inist
ratio
n is
com
pete
nt t
o co
nven
em
eetin
g of
Gra
m S
abha
und
er F
R ru
les. A
spe
r ins
tructi
on o
f MOT
A, S
ub-d
ivisio
nal le
vel
com
mitte
e and
distr
ict le
vel c
omm
ittee f
orm
edby
sta
te G
ovt.
of W
.B t
o re
solv
e th
eisu
ue.N
orm
al Fo
rest
Lan
d in
SIKK
IM:-F
inal
appr
oval
for t
rans
fer
of la
nd a
ccor
ded
on17
.08.
2015
by
MoE
F/Sh
illong
.
1.FL
S re
star
ted
from
Km
. 75.
00 o
n 08
.01.
2015
and
com
plete
d up
to K
m 1
03.0
0. T
here
isop
posit
ion
from
Kha
si St
uden
ts U
nion
inco
nduc
ting
FLS.
Reg
ular m
eetin
gs a
re b
eing
cond
ucte
d with
Sta
te G
ovt.
offic
ials t
o sor
t out
secu
rity a
nd o
ther
issu
es. M
eetin
gs w
ith D
C/Ri
Bho
i dist
rict/N
ongp
oh ar
e be
ing co
nduc
ted
for a
cquis
ition
of la
nd. L
ast m
eetin
g he
ld on
10.0
3.20
16 w
ith A
ddl.
Chief
Sec
y, Go
vt. o
fM
egha
laya
to so
rt ou
t the
pro
blem
.2.
Land
plan
com
plete
d fo
r 18
Km le
ngth
from
Byrn
ihat s
ide a
nd su
bmitt
ed to
DC/
Ribh
oi fo
rno
tifica
tion
u/s
4(1)
. Zira
t Sur
vey
com
plete
don
25
.06.
2015
be
twee
n St
ate
Gov
t.(A
gricu
lture
, Ser
icultu
re, R
even
ue e
tc.)
&Ra
ilway
s.3.
Now
as
per
FLS
som
e ch
ange
s in
the
align
men
t at a
few
locat
ion is
nece
ssar
y. Fr
om
NORTHEAST FRONTIER RAILWAY
78
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
9Ne
w BG
Line
from
2008
-09
565.
133.
130.
010.
000.
55No
t Fixe
dJa
lalga
rhK
ishan
ganj
Phys
ical
(50.
871
Km)
Prog
ress
:- 0%
10Ne
w BG
Line
: Gaz
ole
1983
-84
1336
.57
256.
952.
711.
4419
.33
Not F
ixed
Itaha
r (27
.20
Km),
Phys
ical
Itaha
rRaig
anj (
22.1
6 Km
)Pr
ogre
ss:-
1.29
%&
Iata
harB
uniad
pur
(27.
095
Km) a
s aM
ater
ial M
odific
ation
of
Eklak
hi to
Balu
rgha
t(8
6.76
Km)
New
Line
proje
ct:(T
otal=
163.
215K
m)
11Ne
w BG
line
from
1996
-97
614.
5444
9.91
53.7
661
.55
82.2
3Pr
oject
Com
plete
dHa
rmut
i - N
ahar
lagun
and
Com
miss
ioned
Km 1
8.60
to K
m 4
3.00
alig
nmen
t was
cha
nged
due
to n
ew C
entu
rion
Fore
st a
nd fr
om k
m78
.00
to K
m 9
2.00
, Km
97.
00 to
Km
103
.00
prop
osed
alig
nmen
t was
cha
nged
to a
void
Mili
tary
are
a, G
ovt.
offic
es,
and
Loca
lin
habi
tant
s of
pop
ulat
ed a
rea
of U
mro
i,Um
pling
and
Maw
kynr
ing.
R
ailwa
y Bo
ard
has
sanc
tione
d on
ly 7.
5 Km
.len
gth
estim
ate.
% T
he S
cope
sho
wn a
bove
for o
nly 7
.5 K
m le
ngth
.
Pau
city
of fu
nd.
Ek
lakhi
to B
alurg
hat (
86.7
6 km
) com
miss
ioned
on 3
0.12
.200
4.
Gazo
le-Ita
har (
27.2
0 km
), Ra
igan
j-Ita
har
(22.
16 km
) & It
ahar
to B
uniad
pur (
27.0
95 km
)ne
w lin
e wo
rk s
anct
ione
d as
a m
ater
ial
mod
ificat
ion to
Ekla
khi t
o Ba
lurgh
at p
rojec
t.
Rs.
67.4
1 lak
h paid
to D
M/M
alda a
gains
t land
acqu
isitio
n in
July’
14.
D
ue to
less
out
lay, n
o wo
rk p
lanne
d in
this
proje
ct.
Pau
city o
f fun
d
E
ngine
Roll
ing D
one
on 1
4.01
.201
4% C
RSIn
spec
tion
Com
plete
d on
29.
03.2
014%
Firs
t
ANNUAL PERFORMANCE REPORT - 2015-16
79
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
(21.
75 K
m)
Phys
ical
Prog
ress
:- 10
0%
12Ne
w BG
Line
from
New
2000
-01
2531
.34
1826
.22
340.
0039
9.75
987
.94
i) Y
conn
ectio
n 6.
5M
ayna
guri
to J
ogigh
opa
Km (C
omm
ission
New
Line
proje
cting
) 31.
5.20
16.
(226
.83
km) a
long
with
ii) Go
uripu
r -Ga
uge
Conv
ersio
n fro
mBi
laship
ara
-Ne
w M
al Jn
. to
Abha
yapu
ri 87
.02
Chan
grab
andh
aKm
(Com
miss
ion-
(62.
05 K
m)
ing) M
ar’20
18(T
otal-
288.
88 km
):iii)
New
Cha
ngra
-ba
andh
a - N
CB -
70 K
m (C
omm
is-sio
ning)
Mar
’2016
.iv)
Bila
shpa
ra -
Abha
yapu
ri &
Ylin
k an
d NM
X-NQ
H-M
YGG
-62
.777
(Com
miss
ioning
)M
ar’20
18Ph
ysic
alPr
ogre
ss:-
71.3
5%
Train
Ser
vice
Ran
on 0
7.04
.201
4
Phas
e-I
: G
olok
ganj
-Gau
ripur
(14
Km
).Co
mm
ission
ed w
ith G
.C. o
f Fak
iragr
am-D
hubr
i(6
7.43
Km
) Sec
tion.
Ph
I: Ne
w Co
ochb
ehar
-G
olak
ganj
(58
.92
Km)
CRS
Insp
ectio
nCo
mpl
eted
on
09
.11.
2011
&
Sect
ion
Com
miss
ioned
on
11.0
2.20
12.
Ph II
: New
Mal-
Chan
grab
andh
a (6
2.05
Km
):En
gine
Roll
ing d
one
on 0
7.02
.201
2. C
RSins
pecti
on h
eld o
n 30.
12.2
015 &
auth
oriza
tion
at
100k
mph
re
ceiv
ed
on06
.01.
2016
.Pas
seng
er tr
ain s
ervic
e st
arte
dfro
m 2
0.01
.201
6.Ph
III:
New
Chan
grab
anda
-New
Coo
chbe
har-
Engi
ne R
olling
don
e on
29.
03.2
013.
CRS
inspe
ction
held
on
New
Chan
grab
andh
a –
New
Cooc
hbeh
ar (7
0.00
Km
) sec
tion
of N
ewM
ayna
guri
– Jo
gigho
pa n
ew li
ne p
rojec
t on
28.0
1.20
16. A
utho
rizat
ion
at 1
00 K
mph
rece
ived
on 0
9.02
.201
6. P
asse
nger
trai
nse
rvice
sta
rted
from
04.
03.2
016.
N
orm
al Fo
rest
Lan
d in
Assa
m( 2
9.85
Ha.
) :Pr
opos
al su
bmitte
d on
06.0
9.20
13. F
RA-2
006
certi
ficat
e (N
OC)
re
ceiv
ed
from
DC/
Bong
aigao
n, D
C/Dh
ubri
and
DC/K
okra
jhar i
n
NORTHEAST FRONTIER RAILWAY
80
Ant
ici-
pate
dEx
pen-
ditu
reup
to
Bud
get
allo
t-m
ent
Ex.
durin
g20
15-1
6(u
pto
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
13Ne
w BG
line
from
1992
-93
321.
5026
6.50
30.6
040
.79
95.5
8Pr
oject
Com
plete
dDu
dhno
i to
Men
dipat
har
and
Com
miss
ioned
(19.
62 K
m)
Phys
ical
Prog
ress
:-100
%
Oct
ober
20
14.
MoE
F/
Shill
ong
has
reco
mm
ende
d th
e iss
uanc
e of
“ In
Pric
iple
Appr
oval
” on
17.
07.2
015
from
Boa
rd o
fM
inist
ry o
f Env
ironm
ent &
For
est,
Govt
. of
India
, New
Delh
i. The
pro
posa
l has
also
been
clear
ed b
y SBW
L on 1
9.09
.201
5 and
need
s to
be cl
eare
d by
Nat
ional
Wild
Life
Boa
rd.
S
BWL
mee
ting
unde
r the
Cha
irman
ship
ofCh
ief M
iniste
r of A
ssam
on
19.0
9.20
15 h
asre
com
men
ded
Gaur
ipur-A
bhay
apur
i sec
tion
com
ing
unde
r Ec
o Se
nsiti
ve Z
one
ofCh
akra
sila
Wild
Life
San
ctua
ry a
nd u
nder
proc
esss
for c
leara
nce
of N
BWL.
E
ngin
e Ro
lling
for
1st
10 K
M.
done
on
22.0
3.20
13
Eng
ine R
olling
for
the
balan
ce 9
.62
Km.
Leng
th d
one
on 3
1.03
.201
4
CRS
insp
ectio
n com
plete
d on 0
6.08
.201
4 and
auth
oriza
tion
rece
ived
for 6
5 Km
ph.
S
hri N
aren
dra
Mod
i, Pr
ime
Mini
ster
of I
ndia
inau
gura
ted
pass
enge
r tra
in s
ervic
e fro
mM
endip
atha
r to G
uwah
ati a
fter c
omm
ission
ingBG
line
pro
ject o
n 29
.11.
2014
at M
aliga
onRl
ySta
dium
com
plex,
Guw
ahat
i. Sh
ri Sh
riJ.
B.Pa
tnaik
, Hon
‘ble
Gove
rnor
of A
ssam
, Dr.
ANNUAL PERFORMANCE REPORT - 2015-16
81
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
14Ne
w BG
Line
from
Ara
ria20
06-0
783
7.73
54.9
111
0.00
306.
3243
.12
(Com
miss
ioning
)to
Galg
alia
(Tha
kurg
anj)
Mar
’2020
(110
.75
Km)
Phys
ical
Prog
ress
:- 2
.04%
15Ne
w BG
line
from
2010
-11
599.
9041
.63
4.00
3.73
7.56
Not F
ixed
Balur
ghat
to H
iliPh
ysic
al( 2
9.60
Km
)Pr
ogre
ss:-
5.86%
16Ne
w BG
line
from
2010
-11
467.
9125
.57
1.00
1.86
5.86
Not F
ixed
Kalia
ganj
to B
uniad
pur
Phys
ical
(33.
10 K
m)
Prog
ress
:- 8.6
3%
Krish
an K
ant
Paul
, Ho
n‘bl
e Go
vern
or o
fM
egha
laya
& M
izora
m, S
hri T
arun
Gog
oi,Ch
ief M
iniste
r of A
ssam
, Dr.
Muk
ul Sa
ngm
a,Ch
ief
Min
iste
r of
Meg
hala
ya,
Shri
Lal
Than
hawl
a, C
hief M
iniste
r of M
izora
m, S
hri
Sure
sh P
rabh
akar
Pra
bhu,
Unio
n M
inist
er o
fRa
ilway
s, Sh
ri Sa
rban
anda
Son
owal,
Unio
nM
inist
er o
f Sta
te (I
ndep
ende
nt C
harg
e) fo
rYo
uth a
ffairs
& S
ports
, Shr
i Kire
n Ri
jiju, U
nion
Min
ster
of
Stat
e fo
r Ho
me
affa
irs,
Shri
Arun
endr
a Ku
mar
, Cha
irman
, Rail
way
Boar
dan
d Sh
ri V.
K.Gu
pta,
Mem
ber E
ngine
ering
,Ra
ilway
Boa
rd w
ere
also
pre
sent
in t
heina
ugur
al fu
nctio
n.
T
he S
cope
show
n abo
ve is
for B
lock S
ectio
nof
Tha
kurg
anj-P
awak
hali S
ectio
n on
ly.*
Pauc
ity o
f fun
d
* Pau
city o
f fun
d
* Pau
city o
f fun
d
NORTHEAST FRONTIER RAILWAY
82
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
17Ne
w BG
line
from
2010
-11
435.
9923
3.46
75.0
00.
0053
.55
(Com
miss
ioning
)Jo
gban
i to
Bira
tnag
ar(M
ar’ 2
018)
(Nep
al)(1
8.60
1 Km
.)Ph
ysica
l(N
epal
13.1
56 K
m,
Prog
ress
:- 6
.59%
India
5.4
45 K
m)
18Ku
mar
ghat
to A
garta
la19
96-9
714
51.0
010
37.3
215
5.00
157.
2082
.32
(Com
miss
ioned
)(1
09 K
ms.)
(NAT
IONA
LM
ar’20
16 o
n BG
PROJ
ECT)
Phys
ical
Prog
ress
:-92.
56%
A
ll lan
d (km
0.0
0 to k
m 5
.45)
in In
dian
porti
onha
s be
en a
cquir
ed.
In
Nep
al po
rtion
, Bira
tnag
ar st
ation
yard
wor
kco
uld no
t be c
omm
ence
d due
to de
lay in
Land
acqu
isitio
n by
Gov
t. of
Nep
al. L
and
betw
een
Km 16
.80
to K
m. 1
8.60
has
not
been
acq
uired
by G
ON a
s th
e oc
cupa
nts
has
appe
aled
toco
urt a
gains
t less
land
com
pens
ation
fixed
by
Nepa
l Gov
t. fo
r the
land
plot
s .C
ourt
has
disp
osed
off
the
appe
al in
Jan
’15
and
auth
orize
d CD
O/M
oran
g to
act
on
the
issue
.W
ork o
f Bira
tnag
ar ya
rd is
held
up d
ue to
non-
acqu
isitio
n of la
nd fr
om K
m 16
.80 t
o Km
. 18.
60by
GON
.
Poli
tical
parti
es of
Nep
al ca
lled i
ndef
inite
strik
ew.
e.f.
16.0
8.20
15 f
or r
ewrit
ing
of d
raft
cons
titutio
n of N
epal
due
to w
hich
prog
ress
of
cons
tructi
on w
ork i
s bad
ly su
fferin
g.
P
rojec
t Com
miss
ioned
on
MG
in 20
08.
6
Mon
ths M
ega B
lock i
n Kum
argh
at - A
garta
last
arte
d on
01.
10.2
015.
Eng
ine
Rolli
ngco
mpl
eted
in
Kum
argh
at-A
mba
ssa
and
Amba
ssa-
Agar
tala
com
plete
d on
29.
12.2
015
& 11
.01.
2016
resp
ectiv
ely.
P
rojec
t com
miss
ioned
by ru
nning
com
mer
cial
freigh
t tra
in on
20.
02.2
016.
CRS
insp
ectio
n
ANNUAL PERFORMANCE REPORT - 2015-16
83
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
19Ne
w BG
Line
from
2012
-13
967.
850.
0014
8.40
0.00
0.00
(Com
miss
ioning
)Ag
arta
la to
Akh
ura
Mar
’2018
Phy
sical
(Ban
glade
sh) N
ew L
inePr
ogre
ss:-
0%Pr
oject
(15.
064
Km)
(India
5.0
5 Km
, Ban
gla
desh
10.
014
Km)
com
plet
ed
on
27/2
8.03
.201
6 an
dau
thor
izatio
n fo
r 10
0 Km
ph r
ecei
ved
on05
.04.
2016
.
1.M
OU ha
s bee
n sign
ed b
etwe
en G
ovt.
of In
diaan
d Ba
nglad
esh
on 1
6.02
.201
3.2.
IRCO
N ha
s be
en n
omina
ted
on 0
3.01
.201
4by
Mini
stry o
f Rail
ways
to ex
ecut
e the
wor
k in
India
por
tion
for w
hich
agre
emen
t has
bee
nsig
ned
with
N.F
.Rail
way/C
on o
n 12
.11.2
014.
3.Ba
nglad
esh
Govt
and
Mini
stry
of E
xter
nal
Affa
irs, G
ovt o
f Ind
ia ha
ve n
omina
ted
IRCO
Nto
act
as
tech
nical
advis
or fo
r Ban
glade
shpo
rtion
.4.
Last
Inte
r-mini
ster
ial m
eetin
g wa
s he
ld by
by
Advs
ior, T
rans
port,
NIT
I Aay
og, N
ew D
elhi o
n18
.6.1
5. C
onse
quen
t upo
n th
e m
eetin
g he
ldon
18.
06.1
5, J
oint S
pot v
isit w
as c
ondu
cted
on 27
.06.
2015
by R
ailwa
y, St
ate G
ovt, I
RCON
& CO
NCOR
offic
ials t
o exp
lore t
he p
ossib
ility
of co
nstru
ction
of e
levat
ed co
rrido
r to
redu
cere
quire
men
t of la
nd an
d its
cos
t.5.
LA p
ropo
sal f
or B
angl
ades
h sid
e alr
eady
subm
itted
by IR
CON
to B
angla
desh
Rail
way
on 3
0.12
.201
3.6.
Prop
osal
to e
ntru
st th
is pr
ojec
t fall
ing
inne
ighbo
ring
coun
try a
nd to
IRCO
N on
cos
tplu
s ba
sis a
ppro
ved
by M
R wi
th c
ondit
ions
surv
ey a
nd o
ther
pre
limina
ry w
orks
.
NORTHEAST FRONTIER RAILWAY
84
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
20Ne
w BG
line
from
2011
-12
412.
530.
561.
510.
230.
19No
t Fixe
dM
urko
ngse
lek to
Phys
ical
Pasig
hat (
26.1
5 Km
)Pr
ogre
ss:-
0%
to b
e fir
med
up
by H
AG le
vel c
omm
ittee
ofN.
F.R on
the b
assis
of ge
neric
term
s of c
onsti
onby
CAO
/USB
RL c
omm
ittee
. MoU
bet
ween
Gov
t. of
Ind
ia a
nd B
angl
ades
h sig
ned
inFe
b’201
3 as
per
whic
h In
dian
porti
on to
be
exec
uted
by
India
n Ra
ilway
and
Ban
glade
shpo
rtion
by
Bang
lades
h Ra
ilway
.7.
IRCO
N ha
s pre
pare
d rev
ised a
bstra
ct es
timat
e(In
dia p
ortio
n) a
t the
tota
l cos
t of R
s. 58
0.00
Crs.
with
elev
ated
corri
dor/v
iaduc
t of 3
.31
km.T
he d
etail
esti
mat
e als
o inc
ludes
cos
t of R
s16
.50
Crs.
Of ro
ad fr
om tr
anss
hipm
ent y
ard
toNH
44.
The
cos
t of B
angla
desh
por
tion
is R
s38
7.85
Crs
. DPR
for B
angla
desh
por
tion
has
alrea
dy b
een s
ubm
itted
by IR
CON
to M
EA fo
rap
prov
al.
a). L
and
Acqu
isitio
n: To
tal la
nd re
quire
d: 1
70.7
1ha
(a) I
n Ass
am: L
and r
equir
ed :
7.10
ha
(1.7
9Km
) Lan
d va
luatio
n of R
s. 11
.92
cror
es pa
id to
DC/D
hem
aji o
n 20
.03.
2014
Due
to e
nactm
ent
of ne
w La
nd A
ct, th
e ca
se is
kept
in ab
eyan
ce.
(b) I
n Aru
nach
al Pr
ades
h: L
and r
equir
ed: 1
63.6
1ha
(24.
36 k
m) A
s pe
r N e
w L
and
Act,
Socia
lIm
pact
Asse
ssm
ent G
roup
cons
titute
d by D
C/Pa
sigha
t to
justify
the
requ
irem
ent o
f pro
ject
and
land
rate
sen
t to
Itana
gar f
or a
ppro
val.
ANNUAL PERFORMANCE REPORT - 2015-16
85
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
21Ne
w BG
Line
from
2013
-14
4274
.00
0.00
0.01
0.00
0.00
Not F
ixed
Dim
apur
to T
izit
Phys
ical
(257
Km
.)Pr
ogre
ss:-
0%
(B) G
AUGE
CON
VERS
ION
1Lu
mdin
g –
Bada
rpur
–19
96-9
763
00.0
051
85.0
581
0.00
883.
2496
.32
i) Ka
rimga
nj-Si
lchar
, Aru
nach
al -
Mais
hash
an 1
0.00
Jiriba
m &
Bad
arpu
r -Km
(Com
miss
ion-
Kum
argh
at G
auge
ing) J
uly’20
16Co
nver
sion
(378
km.)
&ii)
Bara
igram
-M
M fo
r GC
of B
araig
ram
-Du
labch
era
& by
Dula
bche
ra (
29.4
0 km
),pa
ss 3
2.90
Km
Karim
ganj-
Mais
hash
an(C
omm
ission
ing)
and
Karim
ganj
bypa
ss28
.2.2
017
line
(13.
50 km
)Ph
ysic
al(T
otal-
420
.90
km)
Prog
ress
:-(N
ation
al Pr
oject
):97
.29%
1.Ne
w wo
rk s
anct
ioned
in 2
013-
14.
2.Pl
annin
g co
mm
ission
and
CCE
A cle
aran
ce is
await
ed.
3.Ap
prov
al fro
m p
lannin
g co
mm
ission
& C
CEA
clear
ance
is aw
aited
for t
aking
up fin
al loc
ation
durv
ey(F
LS) a
nd o
ther
pre
limina
ry w
orks
.
1.CR
S ins
pect
ion fr
om Lu
mdin
g to
New
Haf
long
(107
Km
) co
mpl
eted
on
21.0
3.20
15 a
ndau
thor
izatio
n re
ceive
d fro
m R
ly Bo
ard
on20
.05.
2015
.2.
CRS
inspe
ction
from
New
Haf
long
to S
ilcha
r(1
03 K
m)
com
plet
ed o
n 23
.06.
2015
and
auth
oriza
tion
rece
ived
from
Rly
Boar
d on
29.0
7.20
15.
3.Lu
mdi
ng-N
ew H
aflo
ng-S
ilcha
r (2
10 k
m):
Sect
ion o
pene
d by
runn
ing fr
eight
train
on
27.0
3.20
15. M
R fla
gged
off
the
Firs
t Fre
ight
Train
by re
mot
e fro
m N
ew D
elhi o
n 27.
03.2
015.
Pass
enge
r tra
in s
ervi
ce s
tarte
d fro
m21
.11.2
015
betw
een
Lum
ding-
Silch
ar s
ectio
n.4.
Bada
rpur
- Kum
argh
at (1
18 K
m) c
omm
ission
edby
run
ning
com
mer
cial
fre
ight
tra
in o
n20
.02.
2016
.5. C
RS in
spec
tion
of B
adar
pur -
Kum
argh
at (1
18 K
m) c
omple
ted
on 3
0/
NORTHEAST FRONTIER RAILWAY
86
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
2Ra
ngiya
-Mur
kong
selek
2003
-04
4300
.00
3537
.51
500.
0050
6.40
94.0
4Pr
oject
Com
plete
dalo
ngwi
th lin
ked
finge
rsPh
ysic
al(5
05.0
0 Km
)Pr
ogre
ss :-
100
%(N
ATIO
NAL
PROJ
ECT)
31.0
3.20
16 a
nd a
utho
rizat
ion
at 1
00 K
mph
rece
ived
on 0
5.04
.201
6.6.
Karim
ganj
-
Mai
shas
han
(10
Km)
com
miss
ioned
by
runn
ing c
omm
ercia
l fre
ight
train
on 3
1.03
.201
6.Ba
raigr
am-D
ullab
hche
rra S
ectio
n (1
9.17
Ha.
):Jo
int S
urve
y com
plete
d.
Notifi
catio
n fo
r 19.
17 H
a. P
ublis
hed
in As
sam
Gaze
tte o
n 15
.10.
2015
. Est
imat
e fo
r cos
t of
land o
f Rs 9
.11 C
rs su
bmitte
d by D
C/Ka
rimga
nj,Go
vt. o
f Ass
am 1
0.12
.201
5.
1.Ra
ngia-
Rang
apar
a No
rth-D
ekor
gaon
(144
.48
Km):
Engin
e Ro
lling
done
on
17/0
3/20
12 &
CRS
inspe
ction
Com
plete
d on
07/11
/201
3 and
Pass
enge
r Ser
vice
Star
ted
from
04/
01/2
014.
2.Ra
ngap
ara N
orth
-Har
mut
i(142
.76 K
M):
Engin
eRo
lling
done
on 2
6/03
/201
3 &
CRS
inspe
ction
Com
plete
d on
28/
03/2
014
and
Pass
enge
rSe
rvice
Sta
rted
from
07/
04/2
014.
3.Ha
rmut
i-Nor
th L
akhim
pur (
29.2
4 km
): En
gine
Rollin
g do
ne o
n 26
/03/
2013
betw
een
Harm
uti-
North
Lakh
impu
r & C
RS in
spec
tion c
omple
ted
on 1
6.12
.201
4 &
pass
enge
r ser
vice
Star
ted
from
14.
01.2
015.
4.No
rth L
akhim
pur-
Sripa
ni (8
2.00
Km
): En
gine
Rollin
g wa
s do
ne o
n 30
/03/
2014
bet
ween
ANNUAL PERFORMANCE REPORT - 2015-16
87
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
3Ne
w Ja
lpaigu
ri-Si
ligur
i-19
98-9
916
53.5
510
71.9
925
.50
23.9
464
.83
1. C
hals
- Nax
alNe
w Bo
ngaig
aon
(NL)
: No
t Fixe
dinc
luding
Bra
nch
lines
2. R
ajabh
atkh
uwa-
(419
.17
Kms)
and
Jaint
i (NL
): No
tM
ater
ial M
odific
ation
for
Fixe
d Ph
ysic
alCh
alsa-
Naxa
l(19.
85 K
m)
Prog
ress
:- 0
%an
d Ra
jabha
tkhow
a-Ja
inti (1
5.13
Km
)Ne
w lin
e(T
otal
= 45
4.15
Km
)
North
La
khim
pur-M
urko
ngse
lek.
CRS
insp
ectio
n wa
s do
ne o
n 13
.03.
2015
&Au
thor
izat
ion
issu
ed
on
30.0
3.20
15.
Pass
enge
r ser
vice
starte
d fro
m 1
0.8.
2015
.5.
Sripa
ni-M
urko
ngse
lek (7
2.00
Km
): Se
ction
open
ed b
y ru
nning
DM
T on
28.
03.2
015.
CRS
insp
ectio
n co
mpl
eted
07
.05.
2015
&
auth
oriz
atio
n re
ceiv
ed o
n 11
.05.
2015
.Pa
ssen
ger s
ervic
e sta
rted
from
10.
8.20
15.
6.Ba
lipar
a-Bh
aluk
pong
(34
.47K
M):
Engi
neRo
lling
done
on
15.1
0.20
14, S
ectio
n op
ened
by r
unni
ng D
MT
on 2
9.03
.201
5. C
RSin
spec
tion
com
plet
ed
08.0
5.20
15
&au
thor
izat
ion
rece
ived
on
11.0
5.20
15.
Pass
enge
r ser
vice
star
ted
from
10.
08.2
015.
T
he w
ork
of G
C of
Main
Line
fro
m N
ewJa
lpaigu
ri-Ne
w Bo
ngaig
aon,
Alip
urdu
ar J
n.-
Bam
anha
t & F
akira
ram
-Dhu
bri C
omm
ission
edfo
r Tra
in se
rvice
s.Ba
lance
of w
ork
Chals
a-Na
xal (
New
Line)
:- a
nd R
ajabh
atkh
uwa
-Ja
inti(N
L) W
ork c
ould
not s
tart
due t
o sho
rtage
of fu
nds.T
he lin
e th
roug
h th
e fo
rest
area
s of
Buxa
Tig
er R
eser
ve (
BTR)
may
not
be
cons
idere
d du
e to
the
area
falls
with
in th
ecr
itica
l Wild
Life
Hab
itat.T
his
has
been
conv
eyed
by A
ddl. P
CCF,
Govt
of W
est B
enga
lon
24.
07.2
013.
NORTHEAST FRONTIER RAILWAY
88
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
4Jo
gban
i – K
atih
ar –
2000
-01
1727
.27
750.
3832
.66
8.39
43.9
3Ra
iganj
Dalk
hola
Bars
oi –
Radh
ikapu
r and
Not F
ixed.
Katih
ar T
ezna
raya
npur
Phys
ical
secti
on (2
36.1
4Km
) and
Prog
ress
:-M
ater
ial M
odific
ation
for
30.6
2%Ne
w lin
e fro
m R
aigan
j toDa
lkhola
(43.
43 K
m)
(Tot
al 27
9.57
Km.)
5Ga
uge
Conv
ersio
n of
1998
-99
326.
5121
3.73
80.0
072
.35
87.6
2Pr
oject
com
plete
dKa
takh
al to
Bha
irabi
and
com
miss
ioned
.(8
4.00
Km
.)Ph
ysic
alPr
ogre
ss: 1
00%
6Ga
uge
Conv
ersio
n of
2006
-07
485.
0043
5.57
1.23
10.6
789
.74
Proje
ct Co
mple
ted
Alua
bari
Road
Silig
uri J
nan
d Co
mm
ission
edvia
Galg
alia
(76.
23 K
m)
Phys
ical
1.Ba
rsoi
- Ra
dhik
apur
(54
.42
Km):
CRS
Insp
ectio
n Co
mpl
eted
on
20.0
1.20
06 &
Com
miss
ioned
for P
asse
nger
Tra
ffic.
2.Ka
tihar
- Muk
urai
(34.
61 K
m):
CRS
Insp
ectio
nCo
mple
ted o
n 10.
10.2
007 &
Com
miss
ioned
for
Pass
enge
r Tra
ffic.
3.Ka
tihar
- Jog
bani
(108
.38 K
m):
CRS
Insp
ectio
nCo
mple
ted o
n 09.
05.2
008 &
Com
miss
ioned
for
Pass
enge
r Tra
ffic.
4.Ka
tihar
-Man
ihari
(24.
35 K
m):
CRS
Insp
ectio
nCo
mple
ted o
n 12.
09.2
011 &
Com
miss
ioned
for
Pass
enge
r Tra
ffic.
5.M
aniha
ri-Te
znar
ayan
pur (
10.1
8 Km
): CR
SIn
spec
tion
Com
plet
ed o
n 22
.03.
2013
&Co
mm
ission
ed fo
r Pas
seng
er T
raffic
.*
Pauc
ity o
f fun
d
1.52
.00
km E
ngin
e Ro
lling
com
plet
ed o
n31
.03.
2015
. Bala
nce E
ngine
Roll
ing of
( 32 K
m)
in be
twee
n Ka
tliche
rra -
Bhair
abi s
ectio
n on
10.0
3.20
16.
2.Pr
oject
com
miss
ioned
by r
unnin
g co
mm
ercia
lfre
ight t
rain
on 2
1.03
.201
6.
P
rojec
t Com
miss
ioned
and
han
ded
over
toOp
en L
ine
in O
ctob
er-2
011.
% C
ontra
ctua
lpa
ymen
ts :-
ANNUAL PERFORMANCE REPORT - 2015-16
89
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
(Com
plete
d)Pr
ogre
ss:-1
00%
7Lu
mdin
g-Di
brug
arh
1993
-94
971.
2283
36.
500.
4685
.88
Proje
ct Co
mple
ted
includ
ing S
ench
oa -
and
Com
miss
ioned
Silgh
at &
Haib
arga
on-
Phys
ical
Mair
abar
i bra
nch
lines
Prog
ress
:- 10
0%(6
28 K
m).
C
: DO
UBLI
NG:
1Ne
w Gu
waha
ti D
igaru
20
07-0
818
0.09
147.
795.
324.
8785
Proje
ct Co
mple
ted
Patch
dou
bling
and
Com
miss
ioned
(30.
18 K
m.)
(Com
plete
d)Ph
ysic
alPr
ogre
ss:-
100%
2Di
garu
-Hoja
i (10
2KM
)20
15-1
687
0.96
00.
010
0No
t Fixe
d ( N
ewwo
rk s
ancti
on20
15-1
6) P
hysi
cal
Prog
ress
:- 0%
i)Co
ntra
ct a
ward
ed fo
r 23
cror
e fo
r sick
line
atNJ
P.ii)
Resid
ual w
orks
: Y
conn
ectio
n for
SGU
T by
epa
ss lin
e he
ld up
due
to e
ncro
achm
ent
1. L
umdi
ng-D
ibru
garh
GC
com
plet
ed &
Com
mos
sione
d in
phas
es fr
om 1
995-
2002
.2.
Senc
hoa-
Silg
hat
Town
(61
.44
Km):
CRS
Insp
ectio
n Co
mpl
eted
On
20.0
8.20
08 &
com
miss
ioned
for P
asse
nger
traf
fic.
3.Ha
ibar
gaon
- M
aira
bari
(44.
53 K
m):
CRS
Insp
ectio
n Co
mpl
eted
On
23.1
2.20
09 &
com
miss
ioned
for P
asse
nger
traf
fic.
Ph-I:
NGC-
Nare
ngi=
5.12
KM
. CRS
insp
ectio
nco
mple
ted
on 1
4/12
/201
0.Ph
-II:T
haku
rkuc
hi-Di
garu
=15.
30 K
m. C
RSins
pecti
on c
omple
ted
on 3
0/01
/201
1.Ph
-III:N
aren
gi-Th
akur
kuch
i=9.
76 K
m. C
RSins
pecti
on c
omple
ted
on 1
9/05
/201
1.
Appr
oval
from
Plan
ning
Com
miss
ion
and
CCEA
clea
renc
e is
await
ed fo
r tak
ing u
p fin
alloc
ation
surv
ey a
nd o
ther
pre
limina
ry w
orks
.
NORTHEAST FRONTIER RAILWAY
90
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %
3Bo
ngaig
aon-
Goalp
ara-
2015
-16
2232
.32
00.
010
0Ta
rget
-Not
Guwa
hati
(176
KM)
Fixe
d Ph
ysic
alPr
ogre
ss:-
0%
4Co
ochB
ehar
Sam
ukta
la20
11-1
244
0.05
133.
958
165.
0019
4.28
74.5
9i)N
ew A
lipur
duar
–Ro
ad (D
oubli
ng P
rojec
t)Sa
muk
tala
Road
(29.
02 K
m.)
(10.
55 K
m)
(Com
miss
ioning
)30
.6.1
6 ii)
New
Ban
eswa
r-Ne
w Co
ochb
ehar
(7.7
1 Km
)(C
omm
ssion
ing)
Mar
’2017
iii) N
ew B
anes
hwar
-Ne
w Al
ipurd
uar
(10.
76 K
m)
(Com
miss
ioning
)M
ar’20
18Ph
ysic
alPr
ogre
ss:-
69.0
1%
5Co
ochb
ehar
– G
uman
i-20
12-1
328
8.11
23.7
4659
.00
63.9
0230
.42
1) N
CB -
Pund
ibari
hat P
atch
Dou
bling
10.2
9 Km
Proje
ct (2
9.32
Km
)Co
mm
ission
ing)
Mar
’2017
ANNUAL PERFORMANCE REPORT - 2015-16
91
Ant
ici-
pate
dco
st
Expe
n-di
ture
upto
31.0
3.20
15
Bud
get
allo
t-m
ent
2015
-16
Ex.
durin
g20
15-1
6(u
pto
31-0
3-16
SN
Nam
e of
Pro
ject
Year ofInclusion/Approval
Targ
etR
emar
ks
Presentfinan-cial
progress %ii) Pu
ndiba
ri -
Guma
nihat
19.03
Km(C
omm
ission
ing)
Mar
’2018
(iii) G
uman
ihat -
Ghok
soda
nga
7.07
Km
(Com
miss
ioning
)28
.2.2
017
Phys
ical
Prog
ress
:-7.1
3%
6Ne
w Bo
ngaig
aon
2013
-14
1798
.00
0.00
0.00
0.00
0.15
Not F
ixed
Rang
iya K
amak
hya
Phys
ical
Doub
ling
Proje
ctPr
ogre
ss :-
0%
( 142
Km
)
7Lu
mdin
g H
ojai P
atch
2012
-13
386.
680.
299
0.40
0.27
1.5
(Com
miss
ioning
)Do
ublin
g Pr
oject
Mar
’2018
Phy
sical
( 44.
92 K
m)
Prog
ress
:- 0
%
8Am
bari
Falak
ata
20
11-1
245
3.10
171.
0088
.35
117.
8663
.75
i) Be
lakob
a -
New
May
nagu
riRa
ninag
ar -
Doub
ling
Proje
ctJa
lpaaig
uri
( 36.
52 K
m.)
8.12
Km
CCEA
clea
renc
e an
d pla
nning
Com
miss
ionap
prov
al is
await
ed.
Deta
il esti
mat
e se
nt to
Rly
Boar
d fo
r san
ction
on 15
.11.1
3 Sch
emat
ic dia
gram
of al
l yar
d plan
of H
ojai
-Lum
ding
pat
ch d
oubl
ing
proj
ect
appr
oved
from
Lum
ding
divisi
on. F
LS a
lsoco
mple
ted.
* Ph
-I: A
mba
ri Fa
lakat
a - B
elako
ba S
ectio
n(1
0.30
Km
.) En
gine
Rol
ling
done
on
27.0
2.20
14 %
CRS
Insp
ectio
n co
mple
ted
on23
.05.
2014
in A
mba
ri Fa
lakat
a-Be
lakob
a
NORTHEAST FRONTIER RAILWAY
92
Ant
ici-
Expe
n-di
ture
upto
Bud
get
allo
t-m
ent
Ex.
durin
g20
15-1
6
Yearof
Presentfinan-cial (C
omm
ision
ed )
31.1
0.20
15ii)
New
Dom
ohan
i -Ne
w M
ayna
guri
3.86
Km
(Com
miss
ioning
)M
ar’20
17iii)
Ran
inaga
rJa
lpaigu
ri - N
ewDo
moh
ani
14.2
4 Km
(Com
miss
ioning
)M
ar’20
19 P
hysic
alPr
ogre
ss:-4
1.36
%
Secti
on a
nd P
asse
nger
Ser
vices
sta
rted
from
25.0
5.20
14.%
Bela
koba
-Ran
inaga
r Jalp
aigur
i-En
gine
rollin
g co
mpl
eted
on
31.0
1.20
15.%
CRS
Insp
ectio
n co
mple
ted
on 1
4.10
.201
5 in
Belak
oba-
Ranin
agar
Jalp
aigur
i Sec
tion
and
auth
oriza
tion
rece
ived
on 1
5.10
.201
5 an
dpa
ssen
ger s
ervic
es s
tarte
d fro
m 0
3.11
.201
5.*
Land
plan
subm
itted s
ubm
itted t
o DM
/Jalpa
iguri
for 8
.15
Ha.D
ue to
non
issue
of n
ew gu
idelin
esof
land
acq
uisi
tion
by S
tate
Gov
t. la
ndac
quisi
tion
is de
layed
.