ANNUALPERFORMANCEPLAN 2018/2019
SOUTH AFRICAN NATIONAL PARKS
ANNUAL PERFORMANCE PLAN FINANCIAL YEAR 2018/19
South African National Parks | Annual Performance Plan for 2018/19 2
South African National Parks | Annual Performance Plan for 2018/19 3
TABLE OF CONTENTS
ANNUALPERFORMANCE2018/2019 PLAN
1. LIST OF ACRONYMS 5
2. MINISTER’S FOREWORD 6
3. PART A: EXECUTIVE SUMMARY 9
3.1 Strategic Overview 9
3.2 Corporate Values 10
3.3 Legislative and other Mandate 10
3.3.1 Constitutional Mandate 10
3.3.2 SANParks National Mandate 10
3.3.3 International Mandate/Framework 10
4. UPDATE ON SITUATION ANALYSIS 13
4.1 Performance Delivery Environment (as at the end of Q3 of 2017/18) 13
4.2 Organisational Environment 15
4.3 Operations 16
4.4 Organisational Structure 17
4.5 SANParks Strategic Goals 18
5. PART B: PROGRAMME AND SUB-PROGRAMME PLANS 215.1 SANParks Strategy Map: 21
5.2 Revision to Legislative and other Mandates 22
5.3 Overview Of 2018/19 Budget And MTSF Estimates 22
5.4 Budget Allocation for the Year 2018/19 24
6. ANNUAL PERFORMANCE PLAN (INCLUSIVE OF CURRENT AND MEDIUM TERM TARGETS (3 OUTER YEARS) 25
7. PART C: 517.1 Risk Management 51
7.2 Public Private Partnerships 56
3.2 Technical Indicator Descriptors 63
South African National Parks | Annual Performance Plan for 2018/19 4
South African National Parks | Annual Performance Plan for 2018/19 5
1. LIST OF ACRONYMS
ACCNR African Convention on the Conservation of Nature and Natural Resources AENP Addo Elephant National ParkAPP Annual Performance PlanBMP Biodiversity Management Plan CBD Convention on Biological Diversity CCMA Council for Conciliation, Mediation and ArbitrationCEO Chief Executive Officer CITES Convention on International Trade in Endangered Species of Wild Fauna and Flora CYTD Current Year To DateDEA Department of Environmental AffairsDIFR Disability Injury Frequency Rate EE Employment Equity EMI Environmental Management Inspectorate EPWP Extended Public Works Programme ExCo Executive Committee FTE Full Time Equivalents GRNP Garden Route National Park HCM Human Capital ManagementHOD Head of Division ICT Information and Communication Technology ITS Integrated Transformation StrategyKNP Kruger National Park LDV Land Development Value LYTD Last Year To Date METT Management Effectiveness Tracking ToolM:F Male: Female MPA Marine Protected AreaMPNP Mapungubwe National ParkMTEF Medium Term Expenditure Framework MTSF Medium Term Strategic Framework NDP National Development Plan NECER National Environmental Compliance and Enforcement ReportsPAIA Promotion of Access to Information PFMA Public Finance Management ActPMPs Park Management PlansPWD People with Disabilities SANBI South African Biodiversity InstituteSANParks South African National ParksSCBR South Central Black Rhino SED Socio-Economic DevelopmentSoAIM State of Area Integrity Assessment SoB State of Biodiversity ManagementSMMEs Small Medium and Micro Enterprise SWBR South Western Black Rhino SWR Southern White Rhino TBD To be determined UNCCD United National Convention on Combating Desertification UNFCCC United Nations Framework Convention on Climate Change WHC World Heritage ConventionTFCA Transfrontier Conservation AreaYoY Year on Year
South African National Parks | Annual Performance Plan for 2018/19 6
The business of SANParks is founded on three core pillars that flow to the organisational structure. These are:
• Conservation: The conservation of South Africa’s biodiversity, landscapes and associated cultural heritage assets through a system of national parks is the organisation’s primary mandate. The conservation pillar is therefore the organisation’s pivot, and is the basis upon which the programmes and activities of the other two core pillars are directed.
• Responsible Tourism: The promotion of eco-tourism in the country’s conservation estate is the second pillar for the organisation. Eco-tourism is the pivot of the business architecture of the organisation and provides for the generation of revenues for the funding of conservation management.
• Socio Economic Development: Building synergistic and mutually beneficial relationships with communities and neighbouring national parks has become a core strategic driver for SANParks. As such, the near future will reveal a notable increase in SANParks’ initiated community educational projects in support of the conservation and those that have socioeconomic benefit for affected communities.
SANParks has adopted a Balanced Scorecard tool as the framework for the execution of its strategy. This tool defines the key strategic objectives necessary for the effective and efficient delivery of the organisation’s mandate. Each of the 13 identified strategic objectives are accompanied by a set of performance indicators and targets to be met annually. These indicators and targets are outlined in the APP for the 2018/19 financial year.
2. MINISTER’S FOREWORD
It is my pleasure to present the Annual Performance Plan for the 2018/19 financial year for South African National Parks (SAN Parks).
As an entity of the Department of Environmental Affairs (DEA), SANParks endeavours at all times to deliver on its mandate of managing a sustainable system of national parks with distinction.
To maintain its exemplary reputation in the conservation and the promotion of the heritage and biodiversity assets of South Africa, it is incumbent on SANParks to ensure that sound governance, compliance and execution of best practice is at the core of both its strategy and operations.
The framework for SANParks operations and activities is outlined in its 2016 - 2020 Strategic Plan. This is premised on the DEA programme on Conservation and Sustainable Use of Biodiversity. It is also aligned to the National Development Plan‘s Vision 2030 (NDP); the Government’s Medium Term Strategic Framework and the Nine Point Plan for Economic Growth.
This Annual Performance Plan (APP) consolidates SAN Parks’ strategic objectives and priorities for the medium term and reflects the attendant performance indicators, targets and budgets as set out in the Strategic Plan.
MINISTER’S FOREWORD
Dr B E E Molewa, MP
SANParks has adopted the Balanced Scorecard
tool as the framework for the execution of its strategy.
The Performance Plan for 2018/19 demonstrates very clearly SANParks’ focus and commitment to radical social-economic development. Incorporated into this APP are measures pertaining to improving SMME spend, the transformation of the wildlife economy and the execution of the Kruger National Park land claimants’ beneficiation scheme.
South African National Parks | Annual Performance Plan for 2018/19 7
Emphasis is also being placed on another aspect of SANParks’ core mandate in this financial year - the conservation of cultural heritage. To this end, SANParks will start the process this year of determining the scope and state of the heritage assets under its custodianship as part of the first ‘State of Cultural Heritage Assessment’.
In tandem with these new focus areas, SANParks continues to give attention to its established and core performance indicators, which include reduction of fossil fuel and water consumption, a reduction of wildlife crime, especially poaching, an increase in tourism volumes and revenues by increasing the number of black visitors to national parks. Further it will embark on increasing the number of participants in its environmental education programme, as well as continued scientific research. TheAPP includes the expansion of the SAN Parks conservation estate by 6000 ha over the next three years and the rehabilitation of land and wetlands in national parks.
This year will also harbour in attention to enhancing stakeholder relations, especially among communities living adjacent to our national parks.
The SANParks APP for 2018/19 is hereby presented to Parliament and the people of South Africa, in accordance with the relevant legislation and requirements of the National Treasury.
_____________________________________
Dr B E E Molewa, MP Minister of Environmental Affairs
South African National Parks | Annual Performance Plan for 2018/19 8
PART A
South African National Parks | Annual Performance Plan for 2018/19 9
3. EXECUTIVE SUMMARY
SANParks is pleased to present its Annual Performance Plan (APP) for the financial year 2018/19. This document was prepared in line with the current SANParks’ Strategic Plan for 2015/16 – 2019/20, and accurately reflects the performance targets which SANParks will endeavour to achieve given the resources made available in the fiscal budget for 2018/19.
3.1 STRATEGIC OVERVIEW:
This SANParks APP for the fiscal year 2018/19 has been aligned with the five year strategic plan for the period 2015/16 – 2019/20. It sets out SANParks strategic objectives, performance indicators and targets, which the organisation seeks to achieve in the upcoming fiscal year in relation to its policy priorities, programmes and project plans within the scope of its mandate and available resources, towards implementing its Strategic Plan. This plan includes forward projections for the future three years, consistent with the medium-term expenditure framework (MTEF) period, with annual and quarterly performance targets where appropriate.
SANParks will also strive to make a meaningful contribution to South Africa relating to the recent State of the Nation Address (SONA) delivered by the new president, through its four goals, which includes equitable economic development through tourism, the wildlife, blue and green economy, radical socio-economic development, youth education, employment and ensuring public entity efficiency and sustainable funding.
As a public entity SANParks planning framework is informed by Government strategies and frameworks and this strategic plan is guided inter alia by Governments
9 Point Plan, the Medium Term Strategic Framework (MTSF), and the delivery of DEA’s programme on the Conservation and Sustainable Use of Biodiversity and the National Development Plan (NDP) 2030 long-term goals. In addition the Five Year Strategic Plan is informed by the provisions, principles and guidelines of several multilateral environmental agreements that have a bearing on environmental and conservation issues in South Africa.
Concerted efforts have been undertaken to ensure that all performance indicators and targets in this plan are presented in a specific, measurable, relevant and time-bound (SMART) format, hence enabling us to effectively monitor and to evaluate progress and to timeously take corrective action when necessary. Monitoring and evaluation of the achievements made against this plan will be undertaken through quarterly performance reviews and annual performance audits, of which the latter will entail closer involvement by both internal and external auditors.
Since the information is presented on a Balanced Scorecard approach to strategic management it is necessary to give contextualisation to some of the general aspects that may not be expressly indicated in the plan.
Vision
A Sustainable National Park System Connecting Society
Mission
To develop, expand, manage and promote a system of sustainable national parks that represents biodiversity and heritage assets, through innovation and best practice for the just and equitable benefit of current and future generations
South African National Parks | Annual Performance Plan for 2018/19 10
3.3 LEGISLATIVE AND OTHER MANDATE
3.3.1 Constitutional Mandate
The SANParks mandate is underpinned by Section 24(b) of the Constitution of the Republic of South Africa, Act 108 of 1996 which states that:
Everyone has the right –
(a) To an environment that is not harmful to their health or well- being; and
(b) To have the environment protected for the benefit of present and future generations through reasonable legislative and other measures that:(i) prevent pollution and ecological degradation;(ii) promote conservation; and(iii) secure ecologically sustainable development
and use of natural resources while promoting justifiable economic and social development.
3.3.2 SANParks National Mandate
SANParks was initially established in terms of the now repealed National Parks Act, 57 of 1976 and continues to exist in terms of the National Environmental Management: Protected Areas Act, 57 of 2003; with the mandate to conserve; protect; control; and
3.2 CORPORATE VALUES
SANParks has adopted 11 corporate values, which serve as guiding principles around which all employees behaviour and actions are governed and shaped. These corporate values are reflected in the table below:
Leadership We shall demonstrate leadership in all we do;
Environmental Ethics We shall embrace, and be guided by environmental ethics in all we do;
Transformation We shall promote transformation within, and outside of the organisation;
Scientific and Service Excellence We shall strive for scientific and service excellence at all times;
Professionalism We shall act with professionalism at all times;
Initiative and Innovation We shall adopt, and encourage initiative and innovation by all;
Equity and Justice We shall treat all our stakeholders with equity and justice;
Discipline We shall exercise discipline at all times;
Respect We shall show respect to all;
Honesty We shall act with honesty and integrity;
Transparency and Open Communication
We shall strive for transparency and open communication at all times
manage national parks and other defined protected areas and their biological diversity (Biodiversity). As a public entity, SANParks is also governed by the Public Finance Management Act, Act 1 of 1999 (as amended by Act 29 of 1999), and it is listed as a Schedule 3 Part A: 25 public entity. In accordance with revised Treasury Regulations Section 5 and 30, issued in terms of the Public Finance Management Act (PFMA), to provide the necessary legal basis for implementation of the Framework for Managing Programme Performance Information, South African National Parks (SANParks) as a public entity listed in the Public Finance Management Act, Act 1 of 1999; Schedule 3 Part A: 25 is expected to submit a five year Strategic Plan, ideally subsequent to every national election cycle, linked to the identified outcomes of the Presidency, for approval by the Ministry of the Department of Environmental Affairs (DEA) as an executive authority.
3.3.3 International Mandate/Framework
Section 55(1) (aC) of the National Environmental Management: Protected Areas Act (Act 57 of 2003) includes participation in international, regional and national initiatives relevant to its mandate identified by the Minister as part of SANParks responsibilities. Section 55(1) (b) further stipulates that SANParks is responsible for the biodiversity of the protected areas assigned to it, and by implication, honouring the international commitments South Africa has in this regard. South
South African National Parks | Annual Performance Plan for 2018/19 11
Africa is a signatory to several international conventions tasked with environmental regulation functions to guide national environmental protection policies, programmes and legislation by member states. Section 55(1) (b) of the National Environmental Management Act.
The following conventions are relevant to SANParks:
3.3.3.1 Convention on Biological Diversity (CBD)
The CBD sets out commitments for national and international measures aimed at conserving vital ecosystems and biological resources on which humanity depends for survival. The CBD’s three main goals are the conservation of biological diversity, the sustainable use of natural resources and the fair and equitable sharing of benefits from the use of genetic resources. SANParks’ strategic plan, management plans and conservation policies are informed by the CBD’s Programme of Action on Protected Areas.
3.3.3.2 United Nations Framework Convention on Climate Change (UNFCCC)
Adopted in 1992, the UNFCCC sets an overall framework for intergovernmental efforts to tackle the challenge posed by climate change. It recognises that the climate system is a shared responsibility whose stability can be affected by industrial and other emissions of carbon dioxide and other greenhouse gases. The ultimate goal of the convention is to stabilise greenhouse gas concentrations in the atmosphere at a level that will prevent dangerous human interference with the climate system, hence assisting countries in adapting to the inevitable effects of climate change. SANParks, through its policies, ecosystem management frameworks and management plans, is adopting mitigating and adaptation interventions to protect species that might become extinct as a result of climate change effects.
3.3.3.3 Convention on Migratory Species of Wild Animals (CMS)
The CMS, also known as the Bonn Convention, aims at conserving terrestrial, marine and avian migratory species throughout their natural range. CMS Parties strive towards strictly protecting these animals, conserving or restoring their habitat, mitigating obstacles to migration and controlling other factors that might control them. The Convention encourages Parties to co-operate through regional and local agreements for the good of migratory species. Several national parks serve as sanctuaries of
migratory species from across continents. South Africa is a terminus for many of the migratory species including the Palaearctic (birds) and the Antarctic species (whales and birds). SANParks policies and wildlife management plans are informed by the principles and provisionsof CMS where appropriate.
3.3.3.4 Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES)
CITES is an international agreement between governments and aims at ensuring that international trade in species and specimens of wild animals does not threaten their survival. Because trade in wild animals crosses borders between countries, the effort to regulate it requires international cooperation to safeguard listed species from overexploitation. CITES accords varying degrees of protection to over 30,000 species of animals and plants. South Africa co-operates with CITES in the management of both black and white rhinoceros, the African Elephant, Cheetah and Cycads to mention but a few CITES listed species. CITES principles, provisions and procedures are integrated in the policies and management plans designed to manage these species in national parks. In addition, SANParks is implementing and compliant with the Threatened or Protected Species Regulations of 2007.
3.3.3.5 The Ramsar Convention (RAMSAR)
South Africa is home to more than 21 Ramsar sites and three of these occur in national parks under the jurisdiction of SANParks viz Langebaan (West Coast National Park), Wilderness Lakes in the Garden Route National Park and the Makuleke Wetlands. The broad aim of this convention is to stem the loss and promote the wise use of all wetlands. The convention addresses one of the most important issues in South Africa viz the conservation of the country’s water supplies for the use of both the natural and human environments. SANParks’ Fresh Water Ecology programme is premised on the principles and guidelines of the Ramsar Convention.
3.3.3.6 World Heritage Convention (WHC)
The World Heritage Convention aims to promote cooperation among nations to protect all forms of natural and cultural heritage that are of such outstanding universal value that their conservation is of concern to all people. SANParks is the custodian of the Mapungubwe World Heritage Site. The principles and guidelines of this convention are used by SANParks to guide its policies and plans on the management of cultural heritage assets associated with the national parks that are not classified as World Heritage Sites but boast invaluable heritage
South African National Parks | Annual Performance Plan for 2018/19 12
qualities worth conserving. A number of national parks have also been listed as components of the Cape Floral Region World Heritage Site based on the outstanding universal values associated with the fynbos biome.
3.3.3.7 African Convention on the Conservation of Nature and Natural Resources (ACCNR)
South Africa is a founding member of the African Union and a signatory of the Convention on the Conservation of Nature and Natural Resources. Under this Convention member states should adopt measures necessary to ensure conservation, utilization and development of soil, water, and flora and faunal resources in accordance with scientific principles and with due regard to the best interests of the people.
3.3.3.8 United Nations Convention on Combating Desertification (UNCCD)
Desertification, along with climate change and loss of biodiversity, were identified as the greatest challenges to sustainable development during the 1992 Rio Earth Summit resulting in the establishment of the United Nationals Convention on Combating Desertification (UNCCD) in 1994. The Convention addresses specifically the arid, semiarid and dry sub-humid areas, known as dry lands, where some of the most vulnerable ecosystems and peoples can be found. South Africa ratified the UNCCD during September 1997 and was party to the adoption of the 10-Year Strategy of the UNCCD that was adopted in 2007. SANParks, in its Arid and Frontier regions has several parks (including Richtersveld, Kalahari-Gemsbok, Namaqua, Tankwa Karoo, Karoo and Mokala) that form part of the areas regulated by the UNCCD and the goals of the Convention as well as of the 10 Year Strategy are integrated to the management plans of the affected parks. In addition, the expansion of these parks and associated rehabilitation and appropriate ecological management thereof give effect to the obligations and commitments made by South Africa in the National Action Plan of 2004.
3.3.3.9 SADC Protocol on Wildlife Conservation and Law Enforcement (1999)
This protocol is an interstate regulation affirming that member states have the sovereign right to manage their wildlife resources and corresponding responsibilities sustainably. It promotes sustainable use of natural resources and effective protection of the environment. It also encourages co-operation among member states to promote protection of ecosystems across borders and encourages cooperation in tourism development for socio-economic development of regional economies and their people. This protocol is the foundation for the concept of Transfrontier Conservation Area which in the Protocol is defined as “the area or component of a large ecological region that straddles the boundaries of two or more countries, encompassing one or more protected areas that could have different forms of conservation status such as national parks, private game reserves, communal natural resource management areas, etc.”. We refer to areas with different conservation status as TFCA’s whilst areas where in both countries the areas affected are declared national parks as Transfrontier parks. SANParks is an implementer of the following Transfrontier Conservation Areas and Parks; Great Limpopo, Greater Mapungubwe, Ai-Ais Richtersveld (Transfrontier Park), Kgalagadi (Transfrontier Park) and Maloti-Drakensberg Transfrontier Areas. In addition to participating in the management of TFCAs, SANParks provides technical expertise and exchange programmes with several African countries on rhino meta-population management viz North-Luanga Valley (Zambia), Serengeti (Tanzania) and other African countries.
South African National Parks | Annual Performance Plan for 2018/19 13
4. UPDATE ON SITUATION ANALYSIS
This section of the Annual Performance Plan, presents the organisational performance towards implementation of its Medium Term Strategic Framework (MTSF) Strategic Plan as on 31 December 2017.
4.1 Performance Delivery Environment ( as at the end of Q 3 of 2017/18)
SANParks is pleased to present its annual performance report at the end of quarter 3 of the 2017/18 financial year which reflects on the performance of the organisation against pre-determined objectives as contained in the organisation’s Annual Performance Plan (APP). In this executive summary, we provide a selection of highlights including those that may not be apparent in the detailed main report.
SANParks reflects a net surplus of R224, 032m against a budgeted net surplus of R118, 183m, which reflects a favourable variance of R105, 849m. The favourable variance of R105, 849m emanates from more income generated than expected and a saving in costs. This is evidenced by the income to cost ratio which of 1.16: 1.
Total revenue, for the year to date, amounts to R1, 567, 406b (R1, 914, 032b), and is R85, 538m more than the anticipated R1, 480, 868b. The positive variance is as a result of more conservation fees, concession fees, and more tourism income generated than budgeted for.
SANParks own revenue generated as a percentage of total revenue equals 84%. Conservation fees for the period under review total R413, 475m (R342, 958m), and are 12% above the budgeted R368, 733m. Year on year there is a 21% increase due to tourism tariff hikes (8.2% on average) and an increase in the number of guests to Parks. Concession fees are 19% above budget as a result of more income generated by concessionaires than anticipated. This performance is directly correlated to the increase in number of visitors through SANParks gates. The top performing concessionaires amongst others are as follows:
· Table Mountain Aerial Company· Jock of the Bushveld (KNP)· Tinga (KNP)· Imbali (KNP)· Singita (KNP)
Tourism income for the year to date, amounts to R667, 899m (R597, 718m) against a budget of R642, 896m. YOY there is a 12% positive variance due to tourism tariff hikes (8.2% on average) and an increase in visitor numbers. For the period under review, total Guests to Parks increased by 6.8% from 4 852 773 to 5 182 230 persons through SANParks gates. For Kruger the number is up 7.7% from 1 445 679 to 1 557 121 and for Parks increased by 6.4% from 3 407 094 to 3 625 109 persons.
Grant income is R47, 762m below budget as a result of less infrastructure grant income realised than anticipated. Infrastructure grant income is accounted for in accordance with GRAP 23, which makes it challenging to accurately budget for the grant income that will qualify as revenue during the financial year. Accounting for conditional grants in terms of GRAP 23, requires an entity to recognise infrastructure grant received as income only when the asset (for which the grant has been granted), has been acquired/constructed and is ready for use.
With that said, a bulk of the infrastructure grant will realise in the current financial year, making way for the Skukuza hotel construction to take effect, which is what the bulk of the infrastructure grant will be used for.
Total expenditure to date shows a R52, 031m favourable variance when compared to the budget as a result of a saving in human resources, maintenance and operating costs, after the deduction of the special projects expenditure amount. Strategic objective number 13.2 requires the percentage expenditure budget variance to be less than or equal to 0%. For the period under review, it is -7%. Human Resource costs reflect a saving of R37, 385m. The budget for human resources includes vacant posts which are yet to be filled. It is expected, however, that SANParks should remain within budget even after the vacant posts have been filled. Human Resources Costs make up 54% of SANParks normal operations total costs.
Maintenance costs to date are R30, 509m below budget. The reason for this underspending could be as a result of the long procurement processes. The budget is however expected to be used in full by the end of the financial year.
Depreciation is above budget due to the insourcing of the vehicle fleet. The trend is expected to remain until the end of the financial year.
Operating costs are below budget, and reflect a saving of R64, 507m. The main contributor to the positive variance amongst other things, is a saving in consumable stock to the tune of R8, 889m, a budget of R16, 095m for
South African National Parks | Annual Performance Plan for 2018/19 14
transfer to reserves which has not been used, operating leases to the tune of R42, 294m due to the Vuswa lease agreement having ended, and commission received amounting to R4, 987m that has been incorrectly credited against the insurance expense account.
The saving in operating leases will however be absorbed by the operating costs of insourcing (instead of leasing) SANParks vehicle fleet. The costs associated with the insourcing should result in an overall saving in operating costs.
SANParks is expected to generate more revenue than budgeted. This is evidenced by the revenue generated in the current year to date, which is 5.84% above budget. The trend is expected to continue until the end of the financial year, because the budget was based only on the increase in the tourism tariff hikes, using the same number of visitors as in the previous financial year. The number of visitors has however increased as documented in the tourism synopsis report. Past experience has also proven this to be true. SANParks expects to utilise part of the infrastructure grant during the current year, even though the projects may not be completed in full by the end of the year.
A saving from total expenditure is anticipated during the current financial year. Human resources costs will remain at R1, 084, 618b which is still within the budgeted figure of R1, 109, 789b. The effects of the voluntary early retirements in the organisation are observable, with a decrease in salary cost and retirement funding in December 2017. The forecast is however kept at R1, 084, 618b due to the uniform issues that are expected to be made in January 2018. An overspending in depreciation is anticipated due to the insourcing of the vehicle fleet. SANParks forecasts a saving in operating costs due to the Vuswa vehicle fleet contract which ended at the beginning of the current financial year.
The Land Inclusion Plan was approved by the Board in October 2017 and submitted to DEA. The valuations of the 23,000 ha Soetkraal property in the Garden Route has been finalised. SANParks provided input at a Phakisa MPA workshop with DEA: Oceans and Coasts, to discuss DMR concerns and technical issues, regarding the gazetted MPAs. The State of Biodiversity (SOB) assessments for 17 of the 19 national parks have been completed. Corrective measures for the Management Effectiveness Tracking Tool (METT) were updated in all parks and 100% of the identified corrective actions were implemented with a score of 76% achieved for Quarter 3. A total number of 45 SoAIM assessments were completed for 18 parks – Parks Division in Q1-2. All the completed assessments were moderated and corrective actions identified.
No rhinos were poached in the six parks outside of KNP, however the incidence of rhino poaching in areas of close proximity to these parks (4 successful attempts close to Addo; 3 to Mapungubwe; 8 to Mokala and 2 to Marakele) highlights the very imminent threat of poaching. The Rhino Protection Plan for Parks is being effectively implemented and assists immensely towards efforts to protect rhinos in the parks. There has been a 16.7% reduction in recorded fatalities of rhinos and elephants poached as a ratio of recorded number of poaching activities in KNP. The positive reduction of 16.7% has come about due mainly to
Ranger efficiencies relating to deployment of technologies, early detection of poachers, good tracking skills and rapid deployment of both K9 and air reaction support. Support from Operation Rhino (NATJOINTS) joint operations both internal and external to park. There has also been a decrease of 3.5% in poaching activities.
Approval was granted for the change of the annual targets to be in line with approved business plans for the various Expanded Public Works Programmes implemented by SANParks. 21,731 ha Initial ha were rehabilited. The rehabilitation of initial hectares is lower than the planned figures for the quarter, i.e. 84%, but an improvement on the previous quarter of 78% achievement. The performance was impacted by capacity challenges in Garden Route National Park and KNP where availability of rifles impact on teams working in the park. Some of the KNP teams were moved to new areas outside the park where there is no need for protection against dangerous animals. 152,814 follow-up ha were rehabilitated. This is 8% more than the planned revised target for the third quarter. The Working for Water and Working for Ecosystems programmes who are implemented to the alien vegetation clearing and land rehabilitation, are on track to achieve the planned targets. 4,681 m³ (53 sites) of wetlands were rehabilitated. This is 15% more than the planned revised target for Quarter 3. The total achieved to date includes 1,813m³ wetland rehabilitation to complete the previous year project in May 2017 – the late approval of the project impacted on the implementation in 2016/17, and the project had to be completed in this financial year. The 2017/18 project, which started in July 2017, is on track to achieve the planned outputs for the year.
5,267 Full-time Equivalent (FTE) Jobs were created, which is 11% above the target. 690 SMMEs / Enterprises Supported to date. A total of R173.287 million was spent on SMMEs, through the EPWP.
South African National Parks | Annual Performance Plan for 2018/19 15
For the SANParks one Blue Economy project, i.e. Tsitsikamma Marine Protected Area registration of fishermen has been revised and as for the 1st September 2017 – the permit is valid for a year. 175 fishermen has been registered to date. Fish catches are monitored at 4 entry/exit points associated with the 3 open zones. Workshops with DEA and community were held in October 2017. 8 Rangers, 18 EMs, and 24 DEA People and Parks workers allocated to MP + 3 Boats & 5 vehicles.
The DEA Minister attended the symbolic release of red hartebeest to the farm Erin of the Khomani San where a MOA was also signed between the Khomani San and SANParks.
The total number of learners participating in SANParks Environmental Education Programmes were 200 577, which constitutes 44% above the target.
4.2 Organisational Environment
SANParks’ business operations are founded on three important core pillars:
Conservation – the primary mandate of the organisation is the conservation of South Africa’s biodiversity, landscapes and associated cultural heritage assets through a system of national parks.
Responsible Tourism – the organisation has a significant role in the promotion of South Africa’s nature-based tourism, or ecotourism business targeted at both international and domestic tourism markets. The eco-tourism pillar of the business architecture provides for the organisation’s self-generated revenues from commercial operations that are necessary to supplement government funding of conservation management. A significant element of the ecotourism pillar is the Commercialisation
Strategy which (through the implementation of Public Private Partnerships) SANParks has adopted to expand tourism products and the generation of additional revenue for funding of conservation and socio economic development. This will also see to the accelerated transformation in our concessionaire network as well as the creation of sustainable tourism businesses for the land claimants in KNP.
Socio Economic Development – SANParks has taken a strategic decision to expand it’s role in the developmental support provided to neighbouring communities as an entity of the developmental state. In addition SANParks is required to build constituencies at international, national and local levels, in support of conservation of the natural and cultural heritage of South Africa through its corporate social investment. It has to ensure that a broad base of South Africans participate and get involved in biodiversity initiatives, and further that all its operations have a synergistic existence with neighbouring or surrounding communities for their educational and socio-economic benefit, hence enabling the broader society to be connected to national parks. The mandate of the organisation is derived from its biodiversity conservation role, thus the conservation pillar, is regarded as the basis upon which the other two core pillars’ programmes and activities are directed. In addition to the core functions (Conservation, Tourism and Socio Economic Development) that provide SANParks with a level of uniqueness, the organisation has generic support functions of the Chief Operating Officer (which includes Human Capital Management; Risk Management and Strategy & Performance Management) and the Chief Financial Officer (which includes Finance; and Supply Chain Management) and Corporate Services (which includes Information Technology; Enterprise Applications; Corporate Communications and Legal Services).
South African National Parks | Annual Performance Plan for 2018/19 16
4.3 Operations
The operational component of SANParks is delivered through the current 19 national parks – these being organised under two divisions namely, Kruger National Park and the Parks Division (Note: Groenkloof and Graspan/Vaalbos are declared national parks in legislation but are not operationally functional national parks).
1. Addo Elephant National Park 11.Mapungubwe National Park
2. Agulhas National Park 12.Marakele National Park
3. Augrabies Falls National Park 13.Mokala National Park
4. Bontebok National Park 14.Mountain Zebra National Park
5.Camdeboo National Park 15.Namaqua National Park
6.Garden Route National Park ( Wilderness, Knysna, Tsitsikamma) 16.Richtersveld National Park
7.Golden Gate Highlands National Park 17. Table Mountain National Park
8.Karoo National Park 18.Tankwa National Park
9.Kalahari Gemsbok National Park 19. West Coast National Park
10. Kruger National Park
South African N
ational Parks | Annual Perform
ance Plan for 2018/1917
Minister:
Dr B E E Molewa
Board Chair:
J Yawitch
CEO:
F Mketeni
Head CEO & COO Offices:
L Zepe
COO:
L McCourt
CFO:
D Dlamini
ME: Corporate
Services:
Vacant
ME: Parks
P Mokoena
ME: KNP
G Phillips
ME: Conservation
Services
L. Dziba
ME: Tourism &
Marketing
H Sello
HOD: Socio-Economic
Development
R Pillay
Board Secretary:
M Mathabathe
4.4 Organisational Structure
South African National Parks | Annual Performance Plan for 2018/19 18
4.5 SANPARKS STRATEGIC GOALS
SG1: Sustainable conservation assetTo ensure that environmental assets and natural resources are well protected and continually enhanced through an adaptive and effective National Parks System.
SG2: Diverse and responsible tourismTo enhance the tourism plant in order to maximise economic returns, social and environmental benefits, by creating diversified and better tourism products for people to enjoy, visit and appreciate.
SG3: Progressive, equitable and fair socio-economic transformationTo foster an efficient, effective and development oriented public service and an empowered, fair and inclusive citizenship that will enable the creation of decent employment through inclusive economic growth, vibrant, equitable and sustainable rural communities.
SG4: Effective resource utilisation and good governanceTo create and maintain a conducive workplace for skilled and capable workforce that will form a responsive, accountable, effective and efficient National Parks System.
To foster an efficient, effective and development oriented public service and an empowered, fair and inclusive citizenship that will enable the creation of decent employment through inclusive economic growth, vibrant, equitable and sustainable rural communities.
SG4: Effective resource utilisation and good governanceTo create and maintain a conducive workplace for skilled and capable workforce that will form a responsive, accountable, effective and efficient National Parks System.
South African National Parks | Annual Performance Plan for 2018/19 19
South African National Parks | Annual Performance Plan for 2018/19 20
PART B
South African National Parks | Annual Performance Plan for 2018/19 21
5. PROGRAMME AND SUB-PROGRAMME PLANS
This section of the Annual Performance Plan sets the performance indicators and targets that will facilitate the assessment of the overall organisational performance for the upcoming budget year and over the MTSF period for each strategic objective identified in Part B of the Strategic Plan for 2016/17 – 2019/20. Furthermore this provides strategic issues of equity and value for money in relation to the use of resources within the organisational reach.
The Balanced Scorecard tool for strategy execution has been followed to ensure a strategic and performance driven organisation. SANParks strategy map is an overview of the organisations’ key strategic objectives necessary for the effective and efficient delivery of the organisation’s mandate.
5.1 SANParks Strategy Map:
A sustainable National Parks System connecting society
G4: Eff ective Resources utilisation and Good Governance
G1: Sustainable Conservation Asset
SO1: Improved representativeconservation estate
SO4: Enhanced tourism returnsSO6: Optimised contribution to
the green and blue economy
SO2: Eff ectively managed ecosystem,species and cultural heritage
assets
SO9: Adequate,appropriately skilled,
transformed and diverse
human capital
SO11: Optimised business
processes and knowledge
management systems
SO12: Accountablecorporate governance
SO13: Financialsustainability
SO10: Conduciveworking environment
SO7: Enhanced awareness and skills
SO5: Diversified and enhancedtourism opportunities and
experiences
G2: Diverse & Responsible TourismG3: Radical (equitable and fair)
Socio-Economic Transformation
VIS
ION
Out
com
esIn
tern
al P
roce
ssLe
arni
ng &
Gro
wth
Conservation Asset Management
Responsible and DiverseTourism
ACHIEVE SYNERGIES, EFFECTIVENESS AND EFFICIENCIES, THROUGH SYSTEMS AND COMMUNICATION
Radical Socio-EconomicTransformation
SO3: Enhanced knowledge for decision making
SO8: Enhanced Stakeholder Engagement
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 22
5.2 REVISION TO LEGISLATIVE AND OTHER MANDATES
There are no significant legislative and mandates changes since the development and submission of the 2015/16 to 2019/20 Strategic Plan to the DEA. Furthermore, there was no court ruling that might have had significant on-going impact on SANParks’ operations and/or service delivery obligations, as it has been presented on the Strategic Plan.
5.3 OVERVIEW OF 2018/19 BUDGET AND MTSF ESTIMATES:
Budget Forecast Budget Budget Budget
2017/2018 2017/2018 2018/2019 2019/2020 2020/21
A001 - Conservation Fees (507,931,273) (569,146,193) (640,850,435) (692,118,470) (747,487,948)
A005 - Concession Fees (110,828,897) (131,833,793) (132,079,415) (140,004,180) (148,404,431)
A010 - Retail Gross Profit (43,787,513) (43,484,218) (47,344,683) (50,185,364) (53,196,486)
A010 - Sales-Trading (237,965,357) (242,992,951) (262,860,061) (278,631,664) (295,349,564)
A020 - Cost of Sales-Trading 194,177,844 199,508,733 215,515,378 228,446,301 242,153,079
Gross Profit% 18.40% 17.90% 18.01% 18.01% 18.01%
B010 - Tourism income (830,255,006) (862,101,523) (930,427,607) (1,004,861,815) (1,085,250,761)
B010 - Accommodation (699,537,556) (722,918,749) (780,321,514) (842,747,235) (910,167,014)
B011 - Entrance Fees (569,969) (929,428) (929,235) (1,003,574) (1,083,859)
B012 - Trail Fees (36,023,363) (37,779,383) (39,971,466) (43,169,183) (46,622,718)
B014 - Drive Fees (57,736,302) (58,863,775) (63,144,321) (68,195,867) (73,651,536)
B015 - Sundry Tourism Income (19,249,079) (24,377,003) (27,902,418) (30,134,611) (32,545,380)
B016 - Cancellations & Forfeitures (17,138,737) (17,233,185) (18,158,653) (19,611,345) (21,180,253)
C010 - Other income (51,050,178) (105,376,762) (251,407,338) (271,519,925) (293,241,519)
D010 - Grant:Conservation–DEA (381,804,824) (318,122,515) (345,932,458) (290,962,135) (308,850,438)
D020 - Grant:Roads-DEA (12,904,000) (12,904,386) (13,591,228) (14,270,789) (14,556,205)
D030 - Grant:Forestry-DEA (20,263,000) (20,263,158) (21,478,947) (22,552,895) (23,003,953)
Total Income (1,958,824,691) (2,063,232,546) (2,383,112,111) (2,486,475,574) (2,673,991,740)
Total Expenditure 1,898,347,268 1,846,006,336 2,274,253,555 2,418,367,490 2,571,894,134
South African N
ational Parks | Annual Perform
ance Plan for 2018/1923
Budget Forecast Budget Budget Budget
2017/2018 2017/2018 2018/2019 2019/2020 2020/21
M010 - Human resourcecosts 1,109,789,249 1,084,617,977 1,181,731,276 1,252,635,153 1,327,793,262
M020 - Maintenance costs 152,936,937 113,715,771 191,468,057 210,614,863 231,676,349
M030 - Depreciation 111,329,408 129,652,526 161,139,719 170,808,102 181,056,588
M040 - Operating Costs 524,291,673 518,020,062 739,914,503 784,309,373 831,367,935
NOI before Interest (60,477,423) (217,226,211) (108,858,557) (68,108,083) (102,097,606)
M050 - Interest Received (37,112,180) (56,956,386) (49,712,109) (43,389,230) (37,870,558)
M055 - Finance Costs 874,280 3,688,483 30,536,975 32,369,194 34,311,345
Net Operating Income (96,715,323) (270,494,114) (128,033,690) (79,128,120) (105,656,818)
P020 - Grant: Land Acquisition (17,531,578) (17,531,578) (18,508,772) (19,434,211) (19,822,895)
P030 - Sales Fauna & Flora–LDV (21,000,000) (8,660,921) (5,760,000) (16,000,000) (16,000,000)
P060 - Donation (26,268,664) (3,091,782) (3,070,332) (3,239,200) (3,417,356)
Net Income (161,515,565) (299,778,395) (155,372,794) (117,801,531) (144,897,070)
Less Future Depreciation for Grant Assets, Special Project Expenses 161,515,565 299,778,395 155,372,794 117,801,531 144,897,070
Plus Utilisation of Retained Earnings - - - -
Net (Surplus)/Deficit - - - - -
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 24
5.4 Budget Allocation for the Year 2018/19:
Strategic Objective (SO) Budget % of total expenditure
SO1: Improved Conservation Estate 278,112,261 11.50%
SO2: Effectively Managed Ecosystem, Species & Cultural Heritage Management 268,438,791 11.10%
SO3: Enhanced knowledge for decision making 72,551,025 3.00%
SO4: Enhanced Tourism Returns 273,275,526 11.30%
SO5: Diversified and Enhanced Tourism Opportunities and Experiences 249,091,851 10.30%
SO6: Optimised contribution to the green and blue economy 241,836,749 10.00%
SO7: Enhanced Awareness and Skills 45,948,982 1.90%
SO9: Adequate, Appropriately skilled and transformed and diverse human capital 55,622,452 2.30%
SO10: Conducive working environment 77,387,760 3.20%
SO11: Optimised Business Processes and Knowledge Management Systems 266,020,424 11.00%
SO12: Accountable Corporate Governance 261,183,689 10.80%
SO13: Financial Accountability 278,112,261 11.50%
TOTAL 2,418,367,490 100%
South African N
ational Parks | Annual Perform
ance Plan for 2018/1925
6. ANNUAL PERFORMANCE PLAN (INCLUSIVE OF CURRENT AND MEDIUM TERM TARGETS (3 OUTER YEARS)
STRATEGIC OBJECTIVE 1: IMPROVED REPRESENTATIVE CONSERVATION ESTATE:
Performance indicators
Audited/ Actual Performance Estimated Performance
Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total Area Added to National Parks
Terrestrial 6 125.00 ha
Terrestrial : 3,791 ha
Terrestrial: 3 873 ha Terrestrial = 1 387 ha 2395 ha 2 300 840 ha
Provide inputs towards the establishmentof three MPAs
New Indicator
New Indicator Marine = 0 km2 Marine = 0 km2 Engage, provide inputs and give technical input as required by DEA and Phakisa Task team, and
other processes towards declaration of SANParks
MPAs Robben Island Namaqua Addo Elephant
100% Implementation of planned management
actions for declared SANParks MPAs
100% Implementation
of planned management
actions for declared SANParks MPAs
% implementation of annual State of Biodiversity Management (SoB) improvement plan.
New Indicator New Indicator State of Biodiversity Baseline has been determined at a
score 53%.
State of Biodiversity Baseline determined
100% implementation of SOB implementation plan.
100% of activities delivered
100% of activities delivered
% of National Parks assessed with a METT Score of above 67%
New Indicator New Indicator The Mid-term METT report has been
submitted to DEA.
70% 77% of National Parks assessed have a METT score
of≥ 67%
% progress against all identified corrective
actions
79% of National Parks
assessed have a METT
score of ≥ 67%
State of Area Integrity Assessments (SoAIM)
New Indicator New Indicator SoAIMbaseline determined at 69%
State of Area IntegrityBaseline determined with new audit tool.
≥ 2.8(2017-2018baseline figure)
Score of ≥ 2.9 Score of ≥ 3.0
% Reduction of fossil fuel generated energy consumption
New Indicator New Indicator 3 parks have been identified as ready
to be auditedReadiness audit of5 identified parks and prepare for baseline determination for subsequent year
*** Readiness audit of 4 identified parks. Prepare
for baseline determination for five parks (17/18). 2%
Reduction on 16/17 baseline - for three parks.
Readiness audit of 4 identified parks. Prepare
for baseline determination for five parks (18/19).
2% Reduction on 17/18 baseline - for three parks.
Readiness audit of 4 identified parks.
Prepare for baseline determination for five parks (19/20).2% Reduction on
18/19 baseline - for three parks.
New Indicator New Indicator 9% reduction on baseline for KNP
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 26
STRATEGIC OBJECTIVE 1: IMPROVED REPRESENTATIVE CONSERVATION ESTATE:
Performance indicators
Audited/ Actual Performance Estimated Performance
Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
% Reduction of water consumption
New Indicator
New Indicator 3 parks have been identified as ready
to be audited
Readiness audit of 5 identified parks and prepare for baseline determination for subsequent year.
*** Readiness audit of 4 identified parks. Prepare
for baseline determination for five parks (17/18). 2%
Reduction on 16/17 baseline - for three parks.
Readiness audit of 4 identified parks. Prepare
for baseline determination for five parks (17/18).
2% Reduction on 17/18 baseline - for three parks.
Readiness audit of 4 identified parks.
Prepare for baseline determination for five parks (19/20).2% Reduction on
18/19 baseline - for three parks.
New Indicator New Indicator 11% reduction on baseline for KNP
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
STRATEGIC OBJECTIVE 2: Effectively managed ecosystem, species and cultural heritage assets
Performance indicators Audited/ Actual Performance Estimated Performance
Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total Hectares of Land Rehabilitated / Restored
Initial = 50 086 ha.
Initial = 46 902 ha.
Initial = 43 697 ha. Initial = 31 323 ha. Initial = 33 195 ha. Initial = 33 195 ha. Initial = 33 195 ha.
Follow-up = 212 678 ha.
Follow-up = 241 936 ha.
Follow-up = 196 341 ha. Follow-up = 188 120 ha. Follow-up = 199 381 ha.
Follow-up = 199 381 ha. Follow-up = 199 381 ha.
Wetlands = 16 128 m³
Wetlands = 14 926 m³
Wetlands = 6 600m³ Wetlands = 6 329 m³ Wetlands = 5980 m³ Wetlands = 5980 m³ Wetlands = 5980 m³
Total Number of Park Management Plans Reviewed and Submitted per annum
2 2 2 Revised Park Management Plans
for Karoo and Mokala NPs have
been submitted to DEA for technical
review.
2 Draft/ Revised Management Plans for Kruger and Richtersveld National Parks submitted
to DEA for technical review
2 Draft/ Revised Management Plans for Garden Route and Mapungubwe
National Parks submitted to DEA
for technical review
2Park Management Plans Reviewed and submitted
to DEA for technical review
2 Park Management Plans Reviewed and submitted
to DEA for technical review
% reduction in recorded rhino & elephant poached in the KNP
New Indicator New Indicator
7.2% reduction (YOY) in recorded
fatalities of rhino and elephant poached in
KNP.
*** 2% reduction in recorded rhino and
elephants poached in KNP
2% reduction from baseline (YoY)
2% reduction from baseline (YoY)
2% reduction frombaseline (YoY)
South African N
ational Parks | Annual Perform
ance Plan for 2018/1927
STRATEGIC OBJECTIVE 2: Effectively managed ecosystem, species and cultural heritage assets
Performance indicators Audited/ Actual Performance Estimated Performance
Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Number of rhinos poached per annum in 6 Rhino Parks (other than KNP)
27,6% 42.8% 0 Between 0 and 2 (as per rhino sustainability
threshold)
Between 0 and 2 (as per rhino sustainability
threshold)
Between 0 and 2 (as per rhino sustainability
threshold)
Between 0 and 2 ( as per rhino sustainability
threshold)
% Implementation of the Annual Rhinoceros Plan
New Indicator New Indicator
30% of activities planned and prioritised for
2016/2017 have been implemented
*** 100% implementation of the annual rhinoceros plan
100% implementation of annual rhinoceros
plan
100% implementation of annual rhino
implementation plan
100% implementation of annual rhino
implementation plan
% Implementation of the Annual Elephant Plans
New Indicator New Indicator
New Indicator Elephant Management Implementation Plan
approved by CE
100% Implementation of the Annual Elephant Plans
100% Implementation of the Annual Elephant
Plans
100 % Implementation of the Annual Elephant
Plans
% Increase in SANParks EMI fines (J534) (+total) and arrests for key spp (+total)
New Indicator New Indicator
There was a 47.54% reduction in SANParks EMI J534 fines issued
by Rangers in 2016/2017 when compared to the
baseline
2% increase YoY on J534 fines issued
2% increase year-on year J534 fines
issued
2 % increase year-on year J534 fines issued
2 % increase year-on year J534 fines issued
New Indicator New Indicator
There was a 59.62% increase in EMI
arrests for key species in 2016/17
*** 2% increase year-on-year arrest for key
species
2% increase in arrests for key
species
2% increase in arrests for key species
2 % increase in arrests for key species
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 28
STRATEGIC OBJECTIVE 2: Effectively managed ecosystem, species and cultural heritage assets
Performance indicators Audited/ Actual Performance Estimated Performance Medium- term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2019/20
% Progress Against the Annual Biodiversity Monitoring Plan
New Indicator New Indicator New Indicator ≥ 95% implementation of planned annual biodiversity monitoring
activities
≥ 95% implementation
of planned annual biodiversity monitoring activities
≥ 95% implementation of planned annual
biodiversity monitoring activities
≥95% implementation
of planned annual biodiversity monitoring
activities
% Implementation of the Annual Wildlife Utilisation Plan
New Indicator New Indicator The Wildlife Strategy has
been finalised
100% Delivery of the Annual Wildlife Utilisation Plan
100% Delivery of the Annual Wildlife
Utilisation Plan
100% Delivery of the Annual Wildlife
Utilisation Plan
100% Delivery of the Annual Wildlife
Utilisation Plan
% Implementation of the Cultural Heritage Management Plan
85% 86% The Cultural Heritage
Management Strategy has
been finalised
100% implementation of planned annual activities
100% Implementation
of activities in the Annual
Cultural Heritage Implementation
Plan
100% Implementation of activities
in the Annual Cultural Heritage
Implementation Plan
100% Implementation
of activities in the Annual
Cultural Heritage Implementation
Plan
STRATEGIC OBJECTIVE 3: Enhanced Knowledge for Decision-Making
Performance indicators Audited/ Actual Performance Estimated Performance Medium- term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
% of research projects relevant to SANParks key issues
78.3% 75,6% 80% ≥ 75% ≥ 75% of registered projects rated as essential or important
≥ 75% of registered projects rated as essential or important
≥ 75% of registered projects rated as essential or important
Total Number of Peer Reviewed SANPARKS Research Publications
New Indicator 53 41 ≥ 30 ≥ 30 ≥ 30 ≥ 30
South African N
ational Parks | Annual Perform
ance Plan for 2018/1929
STRATEGIC OBJECTIVE 4: ENHANCED TOURISM RETURNS
Performance indicators Audited/ Actual Performance Estimated Performance
Medium- term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
% growth in Tourism Revenue (YoY) 10.5% 14,3% 14.5% 10% 8% 8% 10% on previous year
actual
Total Number of Visitors to National Parks 5 578 532 5 , 917,741 6 750 083. (3% YoY) 3 % YoY on actual 3% YoY on actual 3% on previous year
actual
% Growth in Total Number of local Black Visitors
506,273 554,565 9,9 % (7.7 % above target)
2% (YoY) 2% (YoY) 2% (YoY) 3% (YoY)
% Growth in Over Night local Black Visitors 40,584 45,821 16.7 % 4% (YoY) 4% 4% 4% (YoY)
% Accommodation Occupancy 72.1% 73,4% 74 % 72.5% 75.0% 75.0% 75%
Total Number of Accommodation Unit Nights Sold
552,240 571,362 576 289 573 000 585 000 587 000 6000 000
Customer Satisfaction Index 80.5% 82.1% 81.90% 82,0% 82% 82% 84%
STRATEGIC OBJECTIVE 5: DIVERSIFIED TOURISM OPPORTUNITIES
Performance indicators Audited/ Actual Performance Estimated Performance
Medium- term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total Number of Revenue Generating Products Implemented
8 8 11 12 12 5 5
Total Number of Park Visitor Management and Interpretation Plans Implemented
New Indicator New indicator
8 6 6 6 6
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 30
STRATEGIC OBJECTIVE 6: Optimised contribution to the green and blue economy
Performance indicators Audited/ Actual Performance Estimated Performance
Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total Number of Full-time Equivalent Jobs Created
Permanent 19Temporary
305
EPWP = 7942 EPWP = 6 013 (93%) EPWP = 6 729 EPWP = 5 904 EPWP = 5 904 EPWP = 5 904
Total Number of SMMEs / Enterprises Supported
EPWP = 830 EPWP = 540 EPWP = 856 SMME’s (159%)
EPWP = 480 EPWP = 400 EPWP = 400 EPWP = 400
Rand value spent on SMME’s through EPWP
New Indicator New Indicator New Indicator R203 million R159 million R159 million R159 million
Integrated Transformation Strategy Developed and Implemented
New Indicator New Indicator New Indicator *** Integrated Transformation
Strategy Developed
100% of annual activities as per implementation
plan
100% of annual activities as per
implementation plan
100% of annual activities as per implementation
plan
Total Number of Green & Blue Economy Project Implemented
New Indicator 3 Green Economy Projects
Implemented
2 Green projects implemented, namely
Mashishimale and Khomani San.Access to fishing at
Tsitsikamma National park was implemented as of 24th
December 2016
3 Green economy projects
3 Green economy projects
3 Green economy projects
3 Green economy projects
Number of social legacy projects implemented
New Indicator New Indicator The construction of four science labs and 1 E-learning
centre was completed, bringing to five the total number of social legacy projects implemented.
5 5 5 5
Beneficiation package implemented as per land claims identified
New Indicator New Indicator New Indicator Approved KNP land claimants Beneficiation
Package
Beneficiation package
implemented as per land claims
identified
Beneficiation package implemented as per
land claims identified
TBD
South African N
ational Parks | Annual Perform
ance Plan for 2018/1931
STRATEGIC OBJECTIVE 7: ENHANCED AWARENESS AND SKILLS
Performance indicators Audited/ Actual Performance Estimated Performance Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total Number of Participants in Environmental Education Programme
213 744 215 338 205 815 *** Reduced to 208 000 218 000 218 000 218 000
Total Number of Free Access Entrants during SANParks week and other planned events
53 251 53 028 62 312 Register has been compiled of all free entrance events.
77 340 (This figure has been taken from actual
performance captured on room seeker)
80 000 81 500 82 000
STRATEGIC OBJECTIVE 8: ENHANCED STAKEHOLDER ENGAGEMENT
Performance indicators Audited/ Actual Performance Estimated Performance Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total Number of Proactive Media Engagements
New Indicator Media releases: 42 239 Media Articles = 150 Media Releases = 160 Media Releases = 170
Media Releases =
175
Media Events: 21 126 Media Events: 10 Media Events: 10 Media Events: 15 Media Events: 20
Media Reputation rating New indicator New Indicator Positive/Neutral > 99%
Positive/ Neutral > 95% Positive/ Neutral > 95%
Positive/ Neutral > 95%
Positive/ Neutral >
95%
% of PAIA Requests Responded to within time frames
New indicator New indicator 100% 100% 100% 100% 100%
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 32
STRATEGIC OBJECTIVE 9: Adequate, appropriately skilled, transformed and diverse human capital
Performance indicators Audited/ Actual Performance Estimated Performance
Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
% of Employees from Designated EE Groups Black as % of Management Women as % of Management; People with Disabilities; Total Male: Female Ratio
Woman of Management = 35.0% People
with disabilities = 1.2%
Black as % of Management =
56.4% ; Women as % of Management
= 36.1% People with Disabilities = 1.3% ; Total Male:
Female Ratio = 1.78:1
Black: 56.7% Women: 37,2 % PwD: 2.1% Total Male to Female
Ratio: 1:0.6
Black as % of Management =
60% Women as % of Management = 50% People with Disabilities = 2%
Total Male to Female Ration:1:0.8
Black as % of Management =
60% Women as % of Management= 42 % People with Disabilities = 2%
Total Male to Female Ration:1:0.8
Black as % of Management =
60% Women as % of Management= 45% People with Disabilities = 2%
Total Male to Female Ration:1:0.8
Black as % of Management =
60% Women as % of Management=
45%People with
Disabilities = 2%Total Male to Female
Ration:1:0.8
% of Employees Meeting Minimum Educational Requirements (C and Upper)
New Indicator 96% 74% 75% 75% 75% 75%
% of payroll spent on the Skills Development Programme
New Indicator New Indicator 0,29% 1% 1, 3% 2% 2%
STRATEGIC OBJECTIVE 10: Conducive Working Environment
Performance indicators Audited/ Actual Performance Estimated Performance Medium-term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
% Staff Turnover New Indicator ≤ 5% 4,2 % ≤ 5% ≤ 5% ≤ 5% ≤ 5%
% Success Rate at CCMA New Indicator 85% 100 % 85% 85% 85% 85%
% reduction in average number of sick leave days taken annually per capita
New Indicator 2% reduction 1.57 average days
2% reduction 2% reduction 2% reduction 2% reduction
South African N
ational Parks | Annual Perform
ance Plan for 2018/1933
STRATEGIC OBJECTIVE 11: Optimised business processes and knowledge management Systems
Performance indicators Audited/ Actual Performance Estimated Performance Medium- term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Total number of business processes reviewed
New Indicator New Indicator
Mapped: 5 (cumulative); Automated: 5 (cumulative)
Mapped = 4 Automated = 4
Mapped = 4 Automated = 4
Mapped = 4 Automated = 4
Mapped = 4
Automated = 4
Number of ICT Strategy projects implemented
New Indicator New Indicator
4 4 4 4 4
STRATEGIC OBJECTIVE 12: Accountable Corporate Governance
Performance indicators Audited/Actual Performance Estimated Performance Medium-term targets
2015/16 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
% Compliance with Governance Requirements
100% 100% 100% 100% 100% 100% 100%
STRATEGIC OBJECTIVE 13: Financial Sustainability
Performance indicators Audited/ Actual Performance Estimated Performance Medium- term targets
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Income-to-Cost Ratio 1:12 1:11 1.11: 1 1:1 1:1 1:1 1:1
% Expenditure Budget Variance 3% -21% 3% ≤ 0% ≤ 0% ≤ 0% ≤ 0%
Direct HR cost as % of Total Costs 56% 63% 52% 53% ≤ 53% ≤ 53% ≤ 53%
Own revenue generated as % of Total Revenue
New Indicator New Indicator 82% 70% 72% 75% 75%
Average number of days: Debtor collection
New Indicator New Indicator 25 ≤ 30 ≤ 30 ≤ 30 ≤ 30
Average number of days: Creditor payment
New Indicator New Indicator 29 ≤ 30 ≤ 30 ≤ 30 ≤ 30
Total Revenue (cash and in kind) generated from Fundraising per annum
New Indicator New Indicator R17, 122,662 R50,4 million R50,4 million TBD TBD
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 34
ANNUAL PERFORMANCE PLAN (INCL. ANNUAL & QUARTERLY TARGETS, ENABLING CONDITIONS, AND MEANS OF VERIFICATION
STRATEGIC OBJECTIVE 1: IMPROVED REPRESENTATIVE CONSERVATION ESTATE:
Performance indicators
Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
1.1 Total Area Added to National Parks
Terrestrial = 3715 ha 2395 ha Q1: Implementation plan for 2018/19 developed
Adequate financial resources; Successful negotiations with land-owners
Valuation Reports; Negotiation Reports; Quarterly reports; Purchase agreements; Total Area Added to National Parks
Q2: 100% delivery of planned activities as per implementation plan
Q3: 100% delivery of planned activities as per implementation plan
Q4: The agreements for 2395 ha completed
1.2 Provide inputs towards the establishment of three MPAs
Marine = 0 km2 Engage, provide inputs and give technical input as required by DEA and Phakisa Task team, and other processes towards declaration of SANParks MPAs Robben Island Namaqua Addo Elephant
Q1: Engage, provide inputs and give technical input as required by DEA and Phakisa Task team, and other processes towards declaration of SANParks MPAs
Open to variability depending on the role of and progress made with government departments and key stakeholders. The availability of resources for the implementation of the proposed MPAs
Quarterly and annual reports, evidence of engagements, comments and response documents
Q2: Engage, provide inputs and give technical input as required by DEA and Phakisa Task team, and other processes towards declaration of SANParks MPAs
Q3: Engage, provide inputs and give technical input as required by DEA and Phakisa Task team, and other processes towards declaration of SANParks MPAs
Q4: Engage, provide inputs and give technical input as required by DEA and Phakisa Task team, and other processes towards declaration of SANParks MPAs
1.3 % implementation of annual State of Biodiversity Management (SoB) improvement plan.
State of Biodiversity (SoB) Baseline determined
100% implementation of SoB improvement plan.
Q1: Development of the SoB annual improvement plan implementation plan
Adequate Human CapitalAdequate financial resources
Improvement measures consolidated for each park Engagement with parks through science management meetings Minutes and other possible forums / meetings /correspondence
Q2: - 100% delivery of planned activities as per improvement plan
Q3: - 100% delivery of planned activities as per improvement plan
Q4: 100% completion of the annual improvement plan
South African N
ational Parks | Annual Perform
ance Plan for 2018/1935
STRATEGIC OBJECTIVE 1: IMPROVED REPRESENTATIVE CONSERVATION ESTATE:
Performance indicators
Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
1.4 % of National Parks assessed with a METT Score of above 67%
≥ 67% 77% of National Parks assessed have a METT score of ≥ 67%
Q1: Compilation of the METT SA 3 Report Adequate Human Capital;Adequate financial resources
Quarterly Progress reports; METT Assessment Report Q2: Identification of park-specific improvement
measures based on the Report
Q3: 100% of improvement measures implemented
Q4: 100% of improvement measures implemented
1.5 State of Area Integrity Assessments (SoAIM)
State of Area Integrity Baseline determined
>- 2.8 ( Park) > -3.2 (KNP)
Q1: Undertake SoAim Assessments in 10 parks to determine baseline.
Adequate Human Capital; adequate financial resources
SoAim Assessments undertaken:18 Parks – 45 Sections KNP - 22 SectionsAssessment reports with corrective actions. Annual Progress Report
Q2: Undertake SoAim Assessments in 9 parks to determine baseline for all parks.
Q3: Identify corrective actions for all parks and report against progress.
Q4: Report against progress for identified corrective measures/actions.
1.6 % Reduction of fossil fuel generated energy consumption in Parks
Readiness audit of 5 identified parks and prepare for baseline determination for subsequent year
Readiness audit of 4 identified parks. Prepare for baseline determination for five parks (17/18). 2% Reduction on 16/17 baseline for three parks
Q1: Identify four parks for readiness audit. Baseline determination for five parks. 2% Reduction of energy consumption for three parks.
Adequate Human Capital; adequate financial resources
Quarterly Reports; Energy Audit and baseline Report.
Q2: Initiate audit in two parks. Baseline determination for five parks. 2% Reduction of energy consumption for three parks.
Q3: Initiate audit in two parks. Baseline determination for five parks. 2% Reduction of energy consumption for three parks.
Q4: Technical report: Identified parks & baseline information for five parks measured in 2017/2018 2% reduction in Energy Consumption for three parks
1.7 % Reduction of fossil fuel generated energy consumption in Kruger
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
Q1: 2% reduction on baseline for Kruger
Q2: 2% reduction on baseline for Kruger
Q3: 2% reduction on baseline for Kruger
Q4: 2% reduction on baseline for Kruger
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 36
STRATEGIC OBJECTIVE 1: IMPROVED REPRESENTATIVE CONSERVATION ESTATE:
Performance indicators
Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
1.8 % Reduction of water consumption in Parks
Readiness audit of 5 identified parks and prepare for baseline determination for subsequent year.
Readiness audit of 4 identified parks. Prepare for baseline determination for five parks (17/18). 2% Reduction on 16/17 baseline for three parks.
Q1: Identify four parks for readiness audit. Baseline determination for five parks. 2% Reduction of water consumption for three parks.
Adequate Human Capital; adequate financial resources
Quarterly Reports; Water consumption Audit Report and baseline Report approved by EXCO
Q2: Initiate audit in two parks. Baseline determination for five parks. 2% Reduction of water consumption for three parks.
Q3: Initiate audit in two parks. Baseline determination for five parks. 2% Reduction of water consumption for three parks.
Q4: Technical report: Identified parks & baseline information for five parks measured in 2017/2018 2% reduction in Water Consumption for three Parks.
1.9 % Reduction of water consumption in Kruger
2% reduction on baseline for Kruger
2% reduction on baseline for Kruger
Q1: 2% reduction on baseline for Kruger
Q2: 2% reduction on baseline for Kruger
Q3: 2% reduction on baseline for Kruger
Q4: 2% reduction on baseline for Kruger
South African N
ational Parks | Annual Perform
ance Plan for 2018/1937
STRATEGIC OBJECTIVE 2: EFFECTIVELY MANAGED ECOSYSTEM, SPECIES AND CULTURAL HERITAGE MANAGEMENT
Performance indicators
Baseline 2017/18 (Forecast)
Annual Target 2018/19 Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
2.1 Total Hectares of Land Rehabilitated / Restored
Initial: 38 537 ha Initial = 33 195ha Q1: 6 639 ha. Timely approval of project plans; Adequate budget
Quarterly SANParks and EPWP reports;Q2: 14 938 ha.
Q3: 24 896 ha.
Q4: 33 195 ha.
Follow up = 209 630 ha (Including alien
vegetation clearing, erosion rehabilitation &
bush encroachment)
Follow up = 199 381ha Q1: 31 174 ha. Timely approval of project plans; Adequate budget
Quarterly SANParks and EPWP reports;Q2: 89 721 ha.
Q3: 149 536 ha.
Q4: 199 381 ha.
Wetlands = 6 600m³ (26 sites)
Wetlands = 5 980m³ Q1: 897 m³ Timely approval of project plans; Adequate budget
Quarterly SANParks and EPWP reports;Q2: 2 392 m³
Q3: 4 186 m³
Q4: 5 980 m³
2.2 Total Number of Park Management Plans Reviewed and Submitted per annum
2 Draft/ Revised Management Plans for Kruger and Richtersveld
National Parks submitted to DEA for
technical review
2 draft revised management plans for GRNP + MPNP
submitted to DEA for technical review
Q1: Desired state and hierarchical objectives for GRNP and MPNP completed.
Adequate Human Capital Quarterly Reports; Draft Management Plans and Submission Letters to DEA
Q2: Lower level plans for GRNP and MPNP completed
Q3: Draft revised PMPs for GRNP and MPNP prepared for stakeholder participation
Q:4 Draft revised PMPs for GRNP + MPNP submitted to DEA for technical review
2.3 % reduction in recorded rhino poached in the KNP
2% reduction (YoY) 2% reduction (YoY) Q1: 0.5% decrease Adequate Human and Financial Resources
CMORE Report; EMI Annual ReportQ2: 0.5% decrease
Q3: 0.5% decrease
Q4: 0.5% decrease
2.4 % reduction in recorded elephant poached in the KNP
2% reduction (YoY) 2% reduction (YoY) Q1: 0.5% decrease Adequate Human and Financial Resources
CMORE Report; EMI Annual ReportQ2: 0.5% decrease
Q3: 0.5% decrease
Q4: 0.5% decrease
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 38
STRATEGIC OBJECTIVE 2: EFFECTIVELY MANAGED ECOSYSTEM, SPECIES AND CULTURAL HERITAGE MANAGEMENT
Performance indicators
Baseline 2017/18 (Forecast)
Annual Target 2018/19 Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
2.5 Number of rhinos poached per annum in 6 Rhino Parks (other than KNP)
0 0 – 2 Q1: Variable Adequate Human and Financial Resource
Quarterly performance reports; EMI annual report
Q2: Variable
Q3: Variable
Q4: Between 0-2
2.6 % Implementation of the Annual Rhinoceros Plan
100% Implementation of the Annual Rhinoceros Plan
100% Implementation of the Annual Rhinoceros Plan
Q1: Development of the annual Rhinoceros Plan Adequate human and financial resources
Annual Implementation Plan with predetermined quarterly activities ; Quarterly and Annual Performance Reports
Q2: 100% implementation of planned quarterly activities
Q3: 100% implementation of planned quarterly activities
Q4: 100% implementation of planned annual activities
2.7% Implementation of the Annual Elephant Plans
New Indicator 100 % Implementation of the Annual Elephant Plans
Q1: Development of the annual Elephant Plan Adequate Human and Financial Resource
Quarterly performance reports; annual Elephant Plan and Annual Report
Q2: 100% implementation of planned quarterly activities
Q3: 100% implementation of planned quarterly activities
Q4: 100% implementation of planned annual activities
2.8 % Increase in SANParks EMI fines (J534) (+total) and arrests for key spp (+total)
2% increase year-on-year arrests for Key species.
2% increase year-on-year in SANParks EMI arrests for Key species.
Q1: YOY Baseline +2 % Adequate Human Capital; adequate financial resources.
Quarterly Performance ReportQ2: YOY Baseline +2 %
Q3: YOY Baseline +2 %
Q4: YOY Baseline +2 % Adequate Human Capital; adequate financial resources.
Quarterly Performance Report
South African N
ational Parks | Annual Perform
ance Plan for 2018/1939
STRATEGIC OBJECTIVE 2: EFFECTIVELY MANAGED ECOSYSTEM, SPECIES AND CULTURAL HERITAGE MANAGEMENT
Performance indicators
Baseline 2017/18 (Forecast)
Annual Target 2018/19 Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
2.9 % progress against the Annual Biodiversity Monitoring Plan
≥ 95% implementation of planned annual biodiversity monitoring activities
≥ 95% implementation of planned annual biodiversity monitoring activities
Q1: Development of the annual biodiversity monitoring plan
Adequate human and financial resources Unforeseen natural events or other logistical limitations
Annual Biodiversity Monitoring Plan, Quarterly performance and Annual repots
Q2: ≥ 95% implementation of planned quarterly biodiversity monitoring activities
Q3: ≥ 95% implementation of planned quarterly biodiversity monitoring activities
Q4 :≥ 95% implementation of planned annual biodiversity monitoring activities
2.10 % Implementation of SANParks Wildlife Utilisation Strategic Plan
100% Delivery of planned annual activities as per Wildlife Utilization Strategic Plan
100% Delivery of the Annual Wildlife Utilisation Plan
Q1: 100% Delivery of planned quarterly activities
Adequate human and financial resources
Quarterly performance reports; Draft Strategy and consultation report; Final Strategy and Board minutes
Q2: 100% Delivery of planned quarterly activities
Q3: 100% Delivery of planned quarterly activities
Q4: 100% Delivery of planned annual activities
2.11 % implementation of Cultural Heritage Management Plan
100% implementation of annual activities in the Cultural Heritage Management Plan
100% Implementation of activities in the Annual Cultural Heritage Implementation Plan
Q1: Development of cultural Heritage annual implementation plan
Adequate human and financial resources
Quarterly and Annual Performance reports, Annual implementation plan
Q2: 100% Implementation of planned quarterly activities
Q3:100% Implementation of planned quarterly activities
Q4: 100% Implementation of planned annual activities
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 40
STRATEGIC OBJECTIVE 3: ENHANCED KNOWLEDGE FOR DECISION MAKING:
Performance Indicator Baseline 2017/18(Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/Resource Considerations
Evidence (Means of Verification)
3.1 % of research projects relevant to SANParks key issues
≥ 75% ≥ 75% of registered projects rated as essential or important
Q1: ≥ 75% Adequate human and financial resources SANParks to be desirable research destination Research infrastructure in Parks Funding conditions of external academic partners /
Data base of registered research projects Q2: ≥ 75%
Q3: ≥ 75%
Q4: ≥ 75%
3.2 Total Number of Peer Reviewed SANPARKS Research Publications
30 ≥ 30 Q1: Variable Adequate human andfinancial resourcesCarrying scientific publication costs at a variety of national and internal journals
Publication data base; PDF copies of publications and or ScientificJournals websites
Q2: Variable
Q3: Variable
Q4: ≥ 30 publications (total cumulative for the year)
STRATEGIC OBJECTIVE 4: ENHANCED TOURISM RETURNS
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
4.1 % growth in Tourism Revenue (YoY)
10% + 8% Q1: +8% YoY Responsible Tourism Strategy; new revenue generating products implemented
Financial Statements
Q2: +8% YoY
Q3: +8% YoY
Q4: +8% YoY
4.2 Total Number of Visitors to National Parks
3% Y0Y) on actuals
+3% YoY vs 2017/18 Q1: +3% YoY Responsible Tourism Strategy; Effective Marketing; Maintenance of Infrastructure
RoomSeeker and Manual ReportsQ2: +3% YoY
Q3: +3% YoY
Q4: +3% YoY
4.3 % Growth in Total Number of local Black Visitors
2% YoY increase on actuals
+3% YoY vs 2017/18 Q1: +3% YoY Diversification of product; Responsible tourism strategy; Effective Marketing
RoomSeeker and Manual ReportsQ2: +3% YoY
Q3: +3% YoY
Q4: +3% YoY
4.5 % Growth in Over Night local Black Visitors
4% YoY increase on actuals
4% YoY increase on actuals
Q1: +4% YoY Diversification of product; Responsible tourism strategy; Effective Marketing
RoomSeeker and Manual ReportsQ2: +4% YoY
Q3: +4% YoY
Q4: +4% YoY
South African N
ational Parks | Annual Perform
ance Plan for 2018/1941
STRATEGIC OBJECTIVE 4: ENHANCED TOURISM RETURNS
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
4.6 % Accommodation Occupancy
72,5% 75% Q1: 71% Diversification of product; Responsible tourism strategy; Effective Marketing
RoomSeeker and Manual ReportsQ2: 77%
Q3: 77%
Q4: 75%
4.7 Total No of Accommodation Unit Nights Sold
573,000 585,000 Q1: 140 000 Responsible Tourism Strategy; Effective Marketing; Maintenance of Infrastructure
RoomSeeker and Manual ReportsQ2: 305 000
Q3: 460 000
Q4: 585 000
4.8 Customer Satisfaction Index
82,1% 82% Q1: 82% Adequately skilled Human Capital; Implementation of Customer Service Improvement Strategy
Touchwood Report
Q2: 82%
Q3: 82%
Q4: 82%
STRATEGIC OBJECTIVE 5: Diversified and enhanced tourism opportunities and experiences
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
5.1 Total Number of Revenue Generating Products Implemented
12 12 Q1: 1 No EIA delays due to public resistance • Funding required • Market interest on PPP’s and Events • Sponsorship partnerships for event Implementation
Product development complete and available on SANParks reservations system • PPP Agreements Conclusion of Event sponsorship Agreement
Q2: 3 (cumulative: 4)
Q3: 4 (cumulative: 8)
Q4: 4 (cumulative: 12)
5.2 Total Number of Park Visitor Management and Interpretation Plans Implemented
6 : *3 Parks – Visitor Plans and 3 Interpretation
Plans
6 : *3 Parks – Visitor Plans and 3 Interpretation Plans
Q1: 1 Park and Hospitality management commitment and action from three target parks
6 : *3 Parks – Visitor Plans and 3 Interpretation PlansQ2: 2 (cumulative: 3)
Q3: 2 (cumulative: 5)
Q4: 1 (cumulative: 6)
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 42
STRATEGIC OBJECTIVE 6: Optimised contribution to the green and blue economy
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
6.1 Total Number of Full-time Equivalent Jobs Created
EPWP = 5225 EPWP = 5 904 Q1: 1181 Adequate Human and Financial Resources; Timeous approval of Project Plans
Performance Reports; Reports from DEA Project PortalQ2: 2362
Q3: 4133
Q4: 5904
6.2 Total Number of SMMEs / Enterprises Supported
EPWP = 430 cumulative EPWP: 400 SMMEs Q1: 360 Adequate Human and Financial Resources
Reports SED Strategy, EXCO Minutes; Board Committee Minutes
Q2: 400
Q3: 400
Q4: 400
6.3 Rand Value Spent on SMMEs through EPWP
R154 million R159 million Q1: R31.8 million Adequate Human and Financial Resources
Reports SED Strategy, EXCO Minutes; Board Committee Minutes
Q2: R63.6 million
Q3: R111.3 million
Q4: R159 million
6.4 Integrated Transformation Strategy (ITS) developed and approved
Integrated Transformation Strategy
Developed
Integrated Transformation
Strategy developed and approved
Q1: Tender awarded to consultants to develop the ITS
Adequate Human and Financial Resources
Reports SED Strategy, EXCO Minutes; Board Committee MinutesQ2: Desktop analysis completed
and interviews with relevant stakeholders commenced.
Q3: Draft ITS submitted for approval
Q4: ITS approved
6.5 Total Number of Green & Blue Economy Project Implemented
3 Green Economy Projects
3 Green Economy Projects
Q1: Prospective participants for the development of the business entity identified
Adequate Human and Financial Resources
Reports Implementation Plan for Green and Blue Economy Projects; Quarterly and Annual Performance Reports Q2: Capacity building for
prospective entities completed
Q3: Business entities for each project established
Q4: 3 Green economy projects implemented
South African N
ational Parks | Annual Perform
ance Plan for 2018/1943
STRATEGIC OBJECTIVE 6: Optimised contribution to the green and blue economy
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
6.6 Number of social legacy projects implemented
5 5 Q1: Tender processes initiated Adequate Human and Financial Resources
Quarterly and Annual Performance Reports; Project Launch reports
Q2: Tenders awarded
Q3: Construction commenced
Q4: 5 social legacy projects implemented
6.7 Beneficiation package implemented as per land claim identified
Approved KNP land claimants Beneficiation Scheme.
Beneficiation package implemented as per land claims identified
Q1:Community Consultation with identified communities
Adequate Human and Financial Resources
Quarterly and Annual Performance Reports; Land claimants meeting minutes Q2: Community Consultation
with identified communities
Q3: Beneficiation Scheme to EXCO for EXCO recommendation to the Board for approval
Q4: Beneficiation scheme approved by the Board and implemented as per land claim/s identified
STRATEGIC OBJECTIVE 7 : Enhanced awareness and skills
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
7.1 Total Number of Participants in Environmental Education Programme
208 000 218 000 Q1: 54 500 Adequate Human and Financial Resources
Quarterly and Annual Performance ReportsQ2: 130 800
Q3: 139 200
Q4: 218 000
7.2 Total Number of Free Access Entrants during SANParks week
54 000 80 000 Q1: N/A Adequate Human and Financial Resources; System for recording Free Access Entrants entering on mass
Room Seeker and Manual ReportsQ2: 80 000
Q3: N/A
Q4: N/A
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 44
EGIC OBJECTIVE 8: Enhanced Stakeholder engagement
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
8.1 Total Number of Proactive Media Engagements
Articles = 125 Media Releases: 160 Q1: 40 Adequate financial and human resources; publication of submitted articles
Quarterly and Annual Performance Reports; published
articlesQ2 40
Q3: 40
Q4: 40 ( 160 cumulative)
Media Events = 10 Media Events = 12 Q1: 2 Adequate financial and human resources
Quarterly and Annual Performance ReportsQ2: 4
Q3: 4
Q4: 2
8.2 Media Reputation rating
Positive/ Neutral > 95%
Positive/ Neutral > 95%
Q1 Positive/Neutral >95 Adequate financial and human resources, pro-active media engagement
Reputational Database and Online ReportQ2 Positive/Neutral >95
Q3 Positive/Neutral >95
Q4 Positive/Neutral >95
% of PAIA Requests Responded to within time frames
100% 100% Q1: 100% Adequate financial and human Resources
PAIA Register
Q2: 100%
Q3: 100%
Q4: 100%
South African N
ational Parks | Annual Perform
ance Plan for 2018/1945
STRATEGIC OBJECTIVE 9: Adequate, appropriately skilled, transformed and diverse human capital
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/Resource Considerations
Evidence (Means of Verification)
9.1 % of Employees from Designated EE Groups: Black as % of total Management
Black = 60% Black = 60% Q1 : 58.3 Implementation of EE Plan and recruitment strategy Aligned to national targets
Human Capital Management Reports; EE ReportQ2: 58.9
Q3 : 59.4
Q4: 60.0
9.2 % of Employees from Designated EE Groups Women as % of total Management
Women = 50% Women = 40% Q1 : 38.5%
Q2 : 39%
Q3 : 39.5%
Q4 : 40%
9.3 % of Employees from Designated EE Groups: People with Disabilities as a % of all employees
PwD = 2% PwD = 2% Q1 : 1.8%
Q2 : 1.9%
Q3 : 2.0%
Q4: 2.0%
9.4 % of Employees from Designated EE Groups: Total Male: Female Ratio of all employees
M:F ratio: 1:08 M: F ratio: 1:08 Q1: 1:05
Q2: 1:06
Q3: 1:07
Q4: 1:08
9.5 % of Employees Meeting Minimum Educational Requirements (C and Upper) (HCM)
75% 75% Q1: 75% Adequate Human and Financial Resources; Implementation of Skills Development Plan
Human Capital Management Quarterly and Annual Reports
Q2: 75%
Q3: 75%
Q4: 75%
9.6 % of payroll spent on the Skills Development Programme (HCM)
1% 1.3 % Q1: Procurement processes for training finalised
Adequate Human and Financial Resources; Implementation of Skills Development Plan (National Skills , budget)
Skills Development Plan; Human Capital Management Quarterly and Annual Reports; SANParks Financial Reports (Portal Tracking System)
Q2: Training conducted as per plan
Q3: Training conducted as per plan
Q4: 100% of the annual target of 1.3 %
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 46
STRATEGIC OBJECTIVE 10 : Conducive Working Environment
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
10.1 % Staff Turnover ≤ 5% ≤ 5% Q1: ≤ 5% Adequate Human and Financial Resources; Implementation of Vacancy Management and Retention Plan
Human Capital Management Quarterly and Annual ReportsQ2: ≤ 5%
Q3: ≤ 5%
Q4: ≤ 5%
10.2 % Success Rate at CCMA
85% 85% Q1: 85% Management compliance with grievance and disciplinary policies; adequate Human and Financial Reports
Human Capital Management Quarterly and Annual Report;
CCMA reportsQ2: 85%
Q3: 85%
Q4: 85%
10.3 % reduction in average number of sick leave days taken annually per capita
2% reduction 2% reduction Q1: 2% reduction Adequate financial and human resources; VIP functional, measure morale
Quarterly and Annual HCM Reports; VIPQ2: 2 % reduction
Q3: 2% reduction
Q4: 2% reduction
STRATEGIC OBJECTIVE 11: Optimised business processes and knowledge management Systems
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
11.1 Total number of business processes reviewed
Mapped = 4 Automated = 4
Mapped = 4 Automated = 4
Q1: Mapped 1; Automated 1 Adequate Human and Financial Resources; ICT systems (based on client request/ need?
COO Quarterly Reports; ERDMS Audit ReportsQ2: Mapped 1; Automated 1
Q3: Mapped 1; Automated 1
Q 4: Mapped 1; Automated 1
11.2 Number of ICT Strategy projects implemented
4 4 Q1: 1 Adequate Human and Financial Resources
ICT Strategy Implementation Plan; ICT Quarterly and Monthly Reports
Q2: 1
Q3: 1
Q4: 1
South African N
ational Parks | Annual Perform
ance Plan for 2018/1947
STRATEGIC OBJECTIVE 12: Accountable Corporate Governance
Performance indicators Baseline 2016/17 (Forecast)
Annual Target 2017/18
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
% Compliance with Governance Requirements
100% 100% Q1: 100% Human and Financial Resources
Governance Compliance Tracking System; DEA / Treasury Submissions;
DEA Governance FrameworkQ 2: 100%
Q3: 100%
Q4: 100%
STRATEGIC OBJECTIVE 13: Financial Accountability
Performance indicators Baseline 2016/17 (Forecast)
Annual Target 2017/18
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence ( Means of Verification)
12.1 % Compliance with Governance Requirements
100% 100% Q1: 100% Human and Financial Resources
Governance Compliance Tracking System; DEA / Treasury Submissions;
DEA Governance FrameworkQ 2: 100%
Q3: 100%
Q4: 100%
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 48
STRATEGIC OBJECTIVE 13: Financial Accountability
Performance indicators Baseline 2017/18 (Forecast)
Annual Target 2018/19
Quarterly Targets Enabling Conditions/ Resource Considerations
Evidence (Means of Verification)
13.1 Income-to-Cost Ratio
1:1 1:1 Q1: 1:1 Financial System Financial Reports
Q2: 1:1
Q3: 1:1
Q4: 1:1
13.2 % Expenditure Budget Variance
≤ 0% ≤ 0% Q1: ≤ 0% Financial System Financial Reports
Q2: ≤ 0%
Q3: ≤ 0%
Q4: ≤ 0%
13.3 Direct HR cost as % of Total Costs
≤ 53% ≤ 53% Q1: ≤53% Financial system; conducive salary
Financial Reports
Q2: ≤53%
Q3: ≤53%
Q4: ≤53%
13.4 Own revenue generated as % of Total Revenue
70% 72% Q1: 72% Income generating projects; Fund raising; effective
marketing
Financial Reports
Q2: 72%
Q3: 72%
Q4: 72%
13.5 Average number of days: Debtor collection
≤ 30 ≤ 30 Q1: ≤30 Adequate human and Financial resources
Financial Reports
Q2: ≤30
Q3: ≤30
Q4: ≤30
13.6 Average number of days: Creditor payment
≤ 30 ≤ 30 Q1: ≤30 Adequate human and Financial resources
Financial Reports
Q2: ≤30
Q3: ≤30
Q4: ≤30
13.7 Total Revenue generated from Fundraising per annum
R50,4 million R50,4 million Q1:R12.6 million Human Resources; Fund Raising Strategy
Quarterly and Monthly Reports; Financial SystemQ2:R12.6 million
Q3:R12.6 million
Q4:R50.4 million
South African National Parks | Annual Performance Plan for 2018/19 49
South African National Parks | Annual Performance Plan for 2018/19 50
PART C
South African National Parks | Annual Performance Plan for 2018/19 51
7. Link to other plans
7.1 RISK MANAGEMENT
Risk management forms an integral part of the organisational strategic management. It is the process where the organisation both methodically and intuitively addresses the risk attached to the activities with the goal of achieving sustainable benefit within each activity and across the portfolio of activities. SANParks has adopted an Enterprise Risk Management (ERM) approach and this has become an integral part of sound organisational management and enables management to effectively deal with uncertainly and associated risk and opportunity, enhancing the capacity to build value. SANParks risk management framework dictates that risks are assessed at least biannually within the context of legal and regulatory requirements, economic climate, operating environment and strategic objectives, the results of which are used to ensure that the level of risk accepted remains within the risk appetite of the organisation. The framework also ensures that appropriate reporting is done at management and Board level
STRATEGIC OBJECTIVES
STRATEGIC RISK
RISK CONSEQUENCE MITIGATION PLAN
SO 2: Effectively managed eco-system, species and cultural heritage assets
Threat to bio-diversity – Escalating wildlife crime on key species
Depleting species/ecosystemsDecline in tourism numbersLoss of reputationRevenue lossVisitor and employee safety compromisedArea Integrity compromised
1. Ops Rhino Joint Operations ongoing with SANParks, SAPS & SANDF units deployed in the KNP; 2. Ongoing development of Alliance partnerships & protocols both along western and eastern (Moz) boundaries of KNP; 3. State of Area Integrity Management (SoAIM) assessments to establish baseline scoring ongoing and remedial action implemented; 4. Rhino Management Strategy being implemented; 5. Safety & Security Low Level Plan completed and included in KNP Management Plan; 6. Early detection Technologies including WASS Radar, Fence Mounted Seismic System, Magnetic Detection System, River Gap Detection system and Gate Access Control Systems (Additional budget still necessary); 7. Deployment of K9 at Gates & Reaction follow up operations; 8. Enhanced air support night capability; Implementation of Integrity management Policy & SOP’s; 9. Implementing ongoing P&C - education programs in communities; 10. Implementation of SANParks Safety & Security Strategy; Implementation of Strategy which will include: a. Compiling Park specific Safety & Security Plans; b. Develop & implement strategic interventions; c. Monitor & Evaluate interventions; d. Ongoing Technology researched, developed and deployed to assist in the management of wildlife crime incidents, collecting of data and transforming it to intelligence, management and prevention of incidents 11. Implementation of Ranger Capacity Building Strategy
South African National Parks | Annual Performance Plan for 2018/19 52
STRATEGIC OBJECTIVES
STRATEGIC RISK
RISK CONSEQUENCE MITIGATION PLAN
SO 2: Effectively managed eco-system, species and cultural heritage assets
Wildlife Diseases:Inability to translocate or sell wildlife from National Parks with a health risk to other animals, staff and visitors
Stand-still notice and/or quarantine issued by State Vet DepartmentInability to generate income from wildlife salesNo movement of wildlife out of National ParksNegative effect on tourist experience Health of staff working in bomas compromisedLoss of reputation
1. Stand still notice issued on affected National Parks. 2. Application of quarantine regulations to affected National Parks. 3. Disease testing of animals in bomas. 4. Culling operation instead of live sale from National Parks 5. Disease Action Plan with State Vet Department. 6. To upgrade quarantine facilities at bomas. 7. To develop a Standard Operating Procedures for Treatment of Disease Animals. 8. Provide OHS clothing to boma staff.
SO 11: Optimised business processes and knowledge management systems
Inadequate Enterprise Applications:Lack of enterprise applications in support of information management. Enterprise Applications developed on legacy technology platforms.
Loss of informationNo single repository for informationPoor intra-organisational communication.Poor business efficiencyLoss of revenueAccess to timeous/accurate informationReputational RiskDevelopment of ineffective work-around
1. Information Maintained on multiple systems. 2. Automating of processes on the Business Process Management technology platform. 3. Implementation of IT Strategy
SO 2: Effectively managed eco-system, species and cultural heritage assets
Poor Infrastructure Maintenance
Poor reputation. Drop in visitor numbers. Loss of revenue. Safety of visitors and staff Staff morale (i.e. housing)
1. Capital Development Plan for 5 Years - Infrastructure 2. Technical Services Capacity & skills development 3. Enhanced reporting on maintenance spent 4. Condition assessment of infrastructure (Roads Pavement Management System) Buildings & Services to be addressed 5. Improved planning and project management - skilled workforce. 6. Proper contractor management. 7. Annual increase on baseline amount in addition to inflation increases. 8. Lobbing with DEA to sustain grant funding 9. Reduce turnaround time on SCM and contracting processes
South African National Parks | Annual Performance Plan for 2018/19 53
STRATEGIC OBJECTIVES
STRATEGIC RISK
RISK CONSEQUENCE MITIGATION PLAN
SO 10: Conducive working environment
Compromised Ranger health and wellness due to increasing militarisation of ranger corps in KNP
Labour unrest. Employee wellness compromised. Ineffective law enforcement.
1. Implementation of Ranger Services Ranger Wellness Plan. 2. Approval & Implementation of the Game Rangers Association of Africa (GRAA) Pro-active support programme (EXCO 17/11) - through provision of Psychologist etc. 3. Sustainable livelihoods post retirement. 4. Working with Department of Human Settlements for permanent residence. 5. Honorary Ranger’s providing support to Ranger families. 6. Monthly Formal information exchange sessions RR interaction with SR’s (monthly) and SR interaction with FR’s (monthly); 7. Psychological Support facility in place and operational for general support and for all post shooting incidents; 8. Sky JOC Ops Room operational 24/7 for emergencies; 9. Ongoing FR First Aid training interventions; 10. Ongoing Firearm training as per Legal requirement; 11. All FR’s have been issued with Bullet Proof jackets & have them available when required; 12. Improved Radio communications 13. External Emergency Medical Services (EMS) (Nelspruit) available to assist day time medical evacuations; 14. SANParks Helicopters equipped & pilots trained for night flight operations to assist medical evacuations;
1. Legal Rep Service Provider contracted in to provide: a. Dedicated & consistent support; b. Quarterly “Roadshows” with Regional Rangers; c. Training (Rules of Engagement & Legal aspects entrenched in all Ranger training curricula, both Basic and Advanced)2. Engagement with Legal Services for assisting to remedy the current situation with Wellness service provider - advice on possible action to terminate contract for non-performance.3.Implement Succession Planning for Rangers to ensure that they are retrained when they reach age 55 and transferred to sections that are not physically demanding4. HCM to explore possibility of ‘one ranger corps’. Possible rotation plan of ranger corps
South African National Parks | Annual Performance Plan for 2018/19 54
STRATEGIC OBJECTIVES
STRATEGIC RISK
RISK CONSEQUENCE MITIGATION PLAN
SO 8: Enhanced Stakeholder Engagement
Breakdown in relationship of Neighboring communities
Blocking access to the parks. Increased poaching. Public disturbances. Loss of protection and cooperation. Negativity between affluent and poor communities. Adverse decisions in court cases. Death/injuries of community members/Ranger in anti-poaching activities.
1. Re-evaluation of the target groups and relevant content of the Environmental Education programmes (children vs. adults target programs) 2. Identify evaluation method to determine impact of Environmental Education programmes - survey. 3. Re-constitute park forums. 4. Improve communication - Annual Forum meetings (AGM) 5. P&C and SED focus need revision - workshops 6. Implementation of Socio-Economic Development Strategy 7. Development of the Integrated Transformation Strategy (Enterprise Development Strategy) to further assist to ensure benefits flows to communities a. Due Diligence Audit on awarded contracted tenderers to ensure appointments made from communities. 8. Align lower-level Park Management Plans with gap mitigation. 9. Review, amend and implement - APP’s (and KPA’s).
10. Implementation of Environmental Education programmes. 11. Sustainable use programs (harvesting of firewood, thatching grass/reeds, sour figs, etc.)12. Community beneficiation plans (Land Claims).13. Stakeholder engagement plans.14. Implementation of Wildlife Economy programs.15. Approved Socio-Economic Development Strategy
SO 9: Adequate, appropriately skilled, transformed and diverse human capital
SO 3: Enhanced knowledge for decision making
Inadequate skills, knowledge and experience of staff
Poor visitor experiences Decline in visitor numbers Poor science base for decision-making Poor performance Over-use of certain staff High turnover of staff Loss of loyalty Lack of sufficient contribution to the strategy
1. Annual Workplace Skills Plan; 2. SANParks Attraction and Retention Policy 3. Succession Planning Framework 4. Management & Leadership Development Initiative 5. Junior scientist programme 6. Ensuring all service providers are appropriately accredited. 7. Employee Bursary Programs. 8. MOU with Universities (Pull of conservationist readily available) 9. (Wits program); Executive Development and Coaching 10. Approved Attraction and Retention Policy. 11. HCM to implement the following Strategic Initiatives: - a. Learning and Development Strategy (Management & Leadership Development); b. Organisational Design Process c. Development of a Competency Framework.
South African National Parks | Annual Performance Plan for 2018/19 55
STRATEGIC OBJECTIVES
STRATEGIC RISK
RISK CONSEQUENCE MITIGATION PLAN
SO 2: Effectively managed eco-system, species and cultural heritage assets
SO 6: Optimised contribution to the green and blue economy
SO 13: Financial Sustainability
Unsustainability of EPWP funding:Key component of mandate execution currently being funded by EPWP project funding with no guarantee of continuation
Degradation of biodiversity Reduced working capital for infrastructure Loss of job opportunities Loss of communities’ support
1. Optimising utilisation of funding. 2. Continued liaison with National Treasury and DEA. 3. Implementation according to approved Business Plans & Annual Plans of Operations 4. Park Management Plan Lower level rehabilitation plans for biodiversity projects 5. 5 Year Strategic Infrastructure Plan for infrastructure project prioritisation 6. Progress monitoring and evaluation 7. Re-packaging of the EPWP Funding request to DEA - aligned to DEA Objectives: a. To include SED related programmes such a Wildlife Economy b. Collaboration on broader initiatives (GEF- & Integrated Zone projects) 8. Project Advisory Committee meetings to inform communities on projects & progress 9. Quarterly Review meetings with DEA
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 56
7.2 PUBLIC PRIVATE PARTNERSHIPS
SANParks approaches its Commercialisation Strategy through implementation of the Public Private Partnerships (PPP), with an objective of reducing delivery costs, and improving service levels by focusing on core business competencies and leveraging private capital and expertise. The commercialisation strategy has yielded more than 40 contractual agreements with infrastructure developments worth over R758 million, a total revenue of R934 million as at 31 March 2017, and 2100 permanent decent jobs. It is also SANParks’ intention and an objective of job retention and creation that once the PPP agreement expires, such human capital will be absorbed within the organisation.
The following presents a list and a brief description of each public-private partnerships under SANParks management for the duration of the 5 year Strategic Plan.
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
Tinga Private Game Lodge – KNP
To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R41 million - BEE and job creation, 89 jobs
R2,733,910 31 March 2024
Jock Safari Lodge – KNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R12 million - BEE and job creation, 54 jobs
R2,241,420 30 September 2021
Lukimbi Safari Lodge – KNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R10 million - BEE and job creation, 37 jobs
R1,540,834 30 September 2022
Imbali Safari Lodge – KNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R22 million - BEE and job creation, 64 jobs
R2,259,340 31 October 2022
Rhino Walking Safaris – KNP
To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R10 million - BEE and job creation, 31 jobs
R610,455 30 September 2023
Singita Lebombo – KNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R60 million - BEE and job creation, 150 jobs
R6,737,500 30 September 2023
South African N
ational Parks | Annual Perform
ance Plan for 2018/1957
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
Shishangeni Lodge – KNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrade R33 million - BEE and job creation, 64 jobs
R2,644,240 31 January 2025
Skukuza Airport - KNP To source specialised skills to manage the airport and provide scheduled flights to and from the airport which enables SANParks to access a broader market and additional funding
-Revenue generation - Tourism promotion - Infrastructure upgrade R25 million - BEE and job creation, 23 jobs
R879,483 31 May 2024
Gorah Elephant Camp – KNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrades - BEE and job creation, 38 jobs
R1,295,735 31 December 2030
Kuzuko Lodge – KNP Land incorporation agreement for biodiversity purposes whilst generating income for conservation
-Land incorporation - Revenue generation - Diversification of tourism offering - BEE and job creation, 40 jobs
R337,000 30 September 2013
Riverbend Country Lodge – KNP
Land incorporation agreement for biodiversity purposes whilst generating income for conservation
-Land Incorporation - Revenue generation - Diversification of tourism offering - BEE and job creation, 24 jobs
R481,728 30 September 2079
Tintswalo Atlantic – TMNP To source specialised skills to operate upmarket full service accommodation facilities which enables SANParks to access a broader market and additional funding
- Revenue generation - Diversification of tourism offering - Infrastructure upgrades - BEE and job creation, 28 jobs
R382,901 30 September 2028
!Xhaus Lodge – KTP To promote the local economic development of the communities in the KTP and aid in poverty alleviation of such communities
- Community project, poverty alleviation - Diversification of tourism offering - BEE and job creation, 19 jobs
R80,000 30 April 2026
TMACC – TMNP To source specialised skills to operate tourism facilities at Cape Point and the Table Mountain aerial cableway in order to promote tourism and generate revenue
- Revenue generation - Tourism promotion - Infrastructure upgrades - BEE and job creation, 255 job
R26,369,900 25 November 2025 Tender process for the appointment of an operator to be concluded prior to termination for TMACC
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 58
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
Cape Point Lease To source specialised skills to operate tourism facilities at Cape Point in order to promote tourism and generate revenue
- Revenue generation - Tourism promotion - Infrastructure upgrades - BEE and job creation, 118 jobs
R2,445,600 30 June 2021. There is an option for the operator to request an extension at 6 months before termination for an additional 10 years, but SANParks is not obligated to extend
Roundhouse Restaurant – TMNP
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 48 jobs
R185,088 31 August 2030
Quay 4 Restaurant – GRNP To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - BEE and job creation, 39 jobs
R645,270 28 February 2025
KNP Retail – Tigers Eye To source specialised skills to operate retail facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 184 jobs
R25,322,957 1 February 2023
KNP Retail and Restaurant – Tshokwane Picnic site
To source specialised skills to operate retail and restaurant facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 15 jobs
R98,400 1 October 2031
KNP Retail and Restaurant – Afsaal Picnic site
To source specialised skills to operate retail and restaurant facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 10 jobs anticipated
R206,400 1 October 2031
KNP Restaurants , Mopani Camp – Tindlovu
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 30 jobs
R144,900 1 December 2022
KNP Restaurants, Berg en Dal – Tindlovu
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 35 jobs
R418,854 1 December 2023
South African N
ational Parks | Annual Perform
ance Plan for 2018/1959
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
KNP Restaurants, Skukuza Main Restaurant ,Cattle Baron Grilll and Bistro – Tourvest
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 130 jobs
R1,514,967 1 March 2024
KNP Restaurants, Lower Sabie Restaurant, Mugg and Bean – Aspigon 273 CC
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 70 jobs
R1,567,602 1 March 2024
KNP Restaurants, Pretoriuskop Restaurant, Wimpy – Aspigon 273 CC
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 21 jobs
R309,306 1 April 2024
KNP Restaurants, Satara Restaurant, Mugg and Bean – Ringgold Investments 477 (Pty) Ltd
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 67 jobs
R920,229 1 April 2024
KNP Restaurants, Olifants Restaurant, Mugg and Bean – Ringgold Investments 474 (Pty) Ltd
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 39 jobs
R578,832 1 May 2024
KNP Restaurants, Letaba Restaurant, Mugg and Bean – Ringgold Investments 470 (Pty) Ltd
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 32 jobs
R678,072 1 May 2024
Geelbek Restaurant – WCNP To source specialised skills to operate restaurant and retail facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 12 jobs
R147,444 28 February 2018
Addo Shop – Tigers Eye To source specialised skills to operate retail facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 12 jobs
R2,058,761 1 February 2023
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 60
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
Cattle Barron Grill and Bistro - Addo Elephant National Park
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 50 jobs
R1,115,151 31 March 2024
Tsitsikamma Shop – Tigers Eye
To source specialised skills to operate retail facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 9 jobs
R1,015,672 1 February 2023
Cattle Barron Seafood - Tsitsikamma Section of the GRNP
To source specialised skills to operate restaurant facilities and to enable SANParks to focus on its core activity of conservation
-Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation,50 jobs
R1,058,946 31 July 2024
Augrabies Shop & Restaurant – Quivertree
To source specialised skills to operate restaurant and retail facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 10 jobs
R427,324 15 November 2022
Karoo Shop & Restaurant – Jan Viljoen
To source specialised skills to operate restaurant and retail facilities and to enable SANParks to focus on its core activity of conservation
- Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 13 jobs
R255,102 1 December 2023
Duinepos Chalets _ WCNP To source specialised skills to operate accommodation and conference facilities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 6 jobs
R75,977 23 March 2019
Rhodes Memorial Tea Garden – Groote Schuur Estate –TMNP
To source specialised skills to operate restaurant and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades; BEE and job creation, 7 permanent jobs
R834,800 31 October 2020
Marakele Park (Pty) Ltd – Marakele National Park
Land incorporation agreement for biodiversity purposes whilst generating income for conservation
-Land Incorporation - Revenue generation - Diversification of tourism offering - BEE and job creation,
R877,000 01 December 2030
Abseiling - TMNP To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation,05 jobs
R193,375 31 May 2020
South African N
ational Parks | Annual Perform
ance Plan for 2018/1961
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
Untouched Adventures – Tsitsikamma Section of the GRNP
To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation - BEE and job creation 6 permanent 8 temps
R274,373 01 June 2020
Kwakhanyisa Co – op To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation 19
R629,856 01 January 2021
Tsitsikamma Forest Income (various operators)
To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 51 jobs
R629,856 The Canopy Tours Zipline Project tender has been completed and is at a stage where the PPP agreement is being signed. It is 10 Year agreement until 2027
Goudveld Tea Room To source specialised skills to operate restaurant and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades; BEE and job creation, 4 permanent jobs
R21,600 The agreement expires on the 30th November but will be extended by another year and four months to end on the 31st March 2017 whilst the PPP process is put in place
Canoe Trails – Augrabies Falls National Park
To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 6 jobs
R9,953 Monthly
Gannaga Lodge – Tankwa Karoo National Park
Land incorporation agreement for biodiversity purposes whilst generating income for conservation
-Land Incorporation - Revenue generation - Diversification of tourism offering - BEE and job creation,4 jobs
R23,320 Contract renewable every 2 years – extended with condition that either party can terminate within six months’ notice
Segways Bike Tours – Tsitsikamma Section of the GRNP
To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 6 jobs
R81,900 Currently operating on a 5 year PPP agreement that expires on 1st June 2020
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 62
Name of the PPP Purpose of the PPP Output of the PPP Current Value of Agreement (per annum)
Date when the Agreement Expires
SPA facility – Skukuza Camp in the Kruger National Parks
To source specialised skills to operate activities and to enable SANParks to focus on its core activity of conservation
Improved efficiencies - Quality Service Delivery - Revenue generation - Infrastructure upgrades - BEE and job creation, 10 jobs anticipated
R120,000 10 years from operation commencement (which will be within the next 6 months)
South African N
ational Parks | Annual Perform
ance Plan for 2018/1963
3.2 TECHNICAL INDICATOR DESCRIPTORS
Strategic Objective: SO 1: Improved, representative conservation estate
Indicator title Total Area Added to National Parks
Short definition
Our national parks systems remains biologically under-represented, fragmented and in many cases ecologically compromised. Some inclusions may be driven by economic or social objectives. Each parks desired expansion state have been set together with short term expansion plans as part of the park management planning process. Expansions to parks are through acquisition, contractual relationships, donations and co-management arrangements. This indicator focuses on the additions to the terrestrial -areas of our parks. Terrestrial expansions through acquisition will largely (given issues associated with availability, unpredictability of sellers, & opportunity) be aligned with national priorities in under-represented vegetation types and ecosystems as well as providing further habitat for threatened species such as rhinos and elephants.
Purpose/importance
The intention is to increase the national park estate through the acquisition of land to improve the parks suite of objectives mentioned above. To monitor and evaluate the addition to the park system in terms of the acquisition process (planning, identification, motivation, valuation, negotiation, acquisition or walk-away) and see how these acquisitions contribute to achieving national protected areas expansion targets and further the conservation of threatened species.
Source/collection of data Valuation Reports; Negotiation Reports; Quarterly reports; Purchase agreements, approved land inclusion plan
Method of calculation Absolute number of hectors
Data limitationsData is managed manually. Open to annual variability given willing buyer willing seller issues and the need to respond to opportunities. Prices of properties vary considerably depending upon size, demand (competition), habitat (productive verses unproductive), transformed verses untransformed, location and importance to the buyer (SANParks).
Type of indicator Output
Calculation type Absolute
Reporting cycle Annual
New indicator Amended Indicator
Desired performance Actual performance that is on target or higher than the targeted performance is desirable
Indicator responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 64
Strategic Objective: SO 1: Improved, representative conservation estate
Indicator title Inputs provided towards the establishment of new Marine Protected Areas
Short definition
The South African government has proposed the establishment of 22 new marine protected areas (MPAs) within South Africa’s Exclusive Economic Zone (EEZ), through the rollout of Operation Phakisa. These proposed MPAs have been designed to protect important marine ecosystems and habitats that are necessary to ensure the sustainability of South Africa’s marine living resources. Each MPA has set management objectives, and collectively they will increase South Africa’s formally protected ocean space from 0.5% to 5%. SANParks has been proposed as the Management Authority for at least three of these Marine Protected Areas.
Purpose/importanceThe purpose is to provide technical expertise and input towards the establishment of three new MPAs (namely Robben Island, Namaqua and Addo Elephant) in South Africa. These MPAs are adjacent to existing national parks and support SANParks’ legislative mandate.
Source/collection of data Quarterly and annual reports, evidence of engagements, comments and response documents.
Method of calculationDelivery measured by collaboration and inputs into the process towards establishing the Robben Island, Namaqua and Addo Elephant MPAs.
Data limitationsOpen to variability depending on the role of and progress made with government departments and key stakeholders. The availability of resources for the implementation of the proposed MPAs
Type of indicator Output
Calculation typeCumulative, noting the inputs made to various processes towards the establishment of Robben Island, Namaqua and Addo Elephant MPAs.
Reporting cycle Annual
New indicator Amended Indicator
Desired performance Contribution made towards the establishment of the Robben Island, Namaqua and Addo Elephant MPAs adjacent to National Parks
Indicator responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/1965
Strategic Objective SO 1: Improved, representative conservation estate
Indicator Title % of National Parks assessed with a METT Score of above 67%
Short Definition
The METT is a nationally adapted international questionnaire assessing high level management effectiveness of protected areas. It identifies high level gaps or inadequacies in management at the protected area level. It provides a score for each park and an average for the 19 parks under SANParks jurisdiction. An average Management Effectiveness rating of (≥67%) indicates that parks are effectively managed.
Purpose/ImportanceTo assess at a high level the state of management effectiveness of national parks and identify gaps or areas for potential improvement
Source/Collection of Data Quarterly Progress reports and METT Assessment Report
Method of CalculationAs per METT-SA 3 rating system 77% of National Parks to achieve a METT score of ≥ 67%. Implementation of 100% of prioritised annual corrective measures
Data Limitation Data is not automated
Type of Indicator Outputs
Calculation Type The biennial METT assessment is non-cumulative. The prioritised corrective measures are cumulative.
Reporting Cycle Biennial for METT assessment. Annually, with progress reported quarterly, for annual corrective measures
New indicator Modified Indicator
Desired PerformanceAchieve a METT Score of ≥ 67% biennially and implement 100% of identified corrective measures annually Annually although progress is reported quarterly
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 66
Strategic Objective SO 1: % implementation of annual State of Biodiversity Management (SoB) improvement plan.
Indicator Title State of Biodiversity Management
Short DefinitionA broad qualitative assessment of a park’s effectiveness in managing a suite of biodiversity related criteria. Biodiversity remains a difficult concept to consolidate into a single metric as biodiversity ranges from the gene through to populations and landscape scales and involves interrelated patterns and processes.
Purpose/Importance
To assess the effectiveness of SANParks’ management of biodiversity. The State of Biodiversity Management (SOB) is used as a mechanism to enhance effective and adaptive park management decision making on biodiversity related issues, clarifying the linkages between objectives and actions and providing a means of communicating the effectiveness of park management of its biodiversity assets in a transparent, repeatable manner across all national parks.
Source/Collection of Data State of Biodiversity Management Assessment Reports and SoB improvement plan
Method of Calculation As per prescribed rating system.
Data Limitation
A mixture of non-weighted multiple qualitative and quantitative metrics are used. Given that limited change is expected from annually, the SOB Management Assessment will be repeated every five years. Intermediate years will be used to engage with parks, identify and prioritise issues requiring attention. Engagements will be aligned with the review of Park Management Plans and Science Management Forums. With the SOB repeated every five years, the interim years will include an assessment of delivery of the SOB annual implementation plans. These would include the identification of criteria for attention by park and an assessment of their delivery as part of brief reports and an interim report in year three. This type of assessment remains a much evolving science given our growing understanding of biodiversity and how to measure it and as such the next assessment may take a different approach. Moreover, it is worth stating that although a percentage rating per park and average across parks may be produced the value of the assessment is the knowledge transfer and awareness of issues requiring attention.
Type of Indicator Output
Calculation Type Non-cumulative
Reporting CycleEvery 5 years, with interim years dedicated to feedback and adaptive changes assessed through the delivery against an annual SOB implementation plan. This delivery can be quarterly.
New Indicator Amended Indicator
Desired Performance State of Biodiversity Assessment Rating ≥ 50%
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/1967
Strategic Objective: SO 1: Improved, representative conservation estate
Indicator title State of Area Integrity Management Assessments (SoAim).
Short definition SoAim is a conservation assessment tool based upon indicators and verifiers in order to evaluate management of Safety, Security and Biodiversity for National Parks.
Purpose/importance This assessment ensures that people, systems, processes, and resources are in place to achieve the desired ecological and security requirements of a Park.
Source/collection of data Individual Park assessment reports
Method of calculation YoY increase on assessment results
Data limitations Excel format – manual capturing
Type of indicator Impact
Calculation type Non-cumulative
Reporting cycle Annually
New indicator No – Revised assessment tool.
Desired performance > 2.8 on a 5 point scale. 2017/2018 assessment baseline.
Indicator responsibility Managing Executives Operations (Parks & KNP)
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 68
Strategic Objective: SO 1: Improved, representative conservation estate
Indicator title % Reduction of fossil fuel generated energy consumption.
Short definition Measurement of utilisation of fossil fuel consumption
Purpose/importance To reduce environmental footprint by increasing utilisation of renewable energy resources and improving energy efficiencies.
Source/collection of data Identified individual parks – based upon readiness.
Method of calculation % reduction on baseline (year on year)
Data limitations Manual recording system – metered
Type of indicator Impact
Calculation type Non-cumulative
Reporting cycle Annually
New indicator No
Desired performance 2% Reduction on baseline
Indicator responsibility Managing Executives Operations (Parks & KNP)
South African N
ational Parks | Annual Perform
ance Plan for 2018/1969
Strategic Objective: SO 1: Improved, representative conservation estate
Indicator title % Reduction of water consumption.
Short definition Measurement of utilisation of water.
Purpose/importance To reduce environmental footprint by improving water management efficiency
Source/collection of data Identified individual parks – based upon readiness.
Method of calculation % reduction on baseline (year on year)
Data limitations Manual recording system – metered
Type of indicator Impact
Calculation type Non-cumulative
Reporting cycle Annually
New indicator No
Desired performance 2% Reduction on baseline
Indicator responsibility Managing Executives Operations (Parks & KNP)
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 70
Strategic Objective: SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator title Total Hectares of Land Rehabilitated/Restored
Short definition Total size of terrestrial (including wetlands) protected areas rehabilitated of alien and invasive vegetation species and land restored, through the EPW Programme. This will involve new, follow-up and wetland areas planned each year.
Purpose/importance To improve state of biodiversity conservation in the national parks, while responding socio-economic challenges faced by local communities through job creation. SANParks corporate social investment initiations for job creation.
Source/collection of data DEA Project Reporting Portal and the Quarterly Performance Report.
Method of calculation Absolute Value (ha) for initial and follow-up restoration/rehabilitation. Absolute Value of m³ for obWetlands
Data limitations Data is in the DEA system
Type of indicator Output
Calculation type Cumulative
Reporting cycle Quarterly
New indicator No
Desired performance To rehabilitate a cumulative area of more than 1 500 000 ha over a period of 5 years.
Indicator responsibility HOD: Socio-Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/1971
Strategic Objective SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator Title Total Number of Park Management Plans Reviewed and Submitted
Short Definition The total number of Park Management Plans revised and submitted to DEA per annum for technical review
Purpose/Importance To monitor and improve the management of national parks as required by the organisations legislative mandate
Source/Collection of Data Quarterly reports, Draft management plans and Submission letters to DEA
Method of Calculation Absolute value
Data Limitation Data is managed manually
Type of Indicator Output
Calculation Type Annual target, which is achieved through cumulative quarterly progress towards overall target (i.e. submission of plan)
Reporting Cycle Annual but progress is reported quarterly
New Indicator Continues without change
Desired Performance 2 revised park management plans submitted to DEA for Technical Review per annum
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 72
Strategic Objective SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator Title % Implementation of the Annual Elephant Plans
Short Definition
SANParks manage the effects of elephants on conservation values, rather than elephant numbers. The ways elephants impact on value are largely through how they use landscapes which is influenced by availability of food, water, comfort resources and perceptions of danger. Management approaches thus focus on restoring or mimicking ecological processes such as water distribution, fire regimes, spatial environmental gradients and/or danger landscapes
Purpose/ImportanceThis indicator tracks progress in implementing actions identified in the annual elephant plans to enhance the conservation of elephants and manage the effects they have on various conservation values in 5 national parks.
Source/Collection of Data Quarterly performance reports, Annual Elephant Plan and Annual report
Method of Calculation [Number of implemented activities ÷ total number of prioritized quarterly activities] X 100%
Data Limitation Data is managed manually
Type of Indicator Outputs
Calculation Type Cumulative quarterly achievements towards achieving overall annual target
Reporting Cycle Annually although progress against identified actions is reported quarterly
New Indicator Continues without change
Desired Performance 100% implementation of prioritised annual activities
Indicator Responsibility Managing Executive: Conservation Services, Managing Executive: Parks, Managing Executive: Kruger NP
South African N
ational Parks | Annual Perform
ance Plan for 2018/1973
Strategic Objective SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator Title % Implementation of the Annual Rhinoceros Plan
Short Definition
The Annual Rhinoceros Plan supports compulsory interventions that protect rhinos using zones with technology-lead, intelligence-based and rhino guardianships supported by robust legal systems and penalties. Biological management interventions use strategic removals and the creation of rhino strongholds to off-set poaching. Long-term sustainability interventions focus on sustainability options for people, creating sustainable demand and considering horn trade options when governance conditions are conducive. Game changing interventions integrate disrupting organized crime with creating opportunities for equitable benefit sharing with local stakeholders and neighbours. International and national cooperation underpins all four pillars.
Purpose/ImportanceTo restore and maintain viable populations of white and black rhino in national parks through best management practice in collaboration with national and regional conservation partners
Source/Collection of DataAnnual Implementation, Plan with predetermined, quarterly activities; Quarterly and Annual PerformanceReports
Method of Calculation [Number of implemented activities ÷ total number of prioritized annual activities] X 100%
Data Limitation Data is managed manually
Type of Indicator Output
Calculation Type Annual target is achieved through cumulative quarterly progress
Reporting Cycle Annually although progress is reported quarterly
New Indicator Continues without change
Desired Performance 100% implementation of prioritised annual activities
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 74
Strategic Objective SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator Title % Progress Against the Annual Biodiversity Monitoring Plan
Short Definition The percentage of biodiversity monitoring actions achieved against planned deliverables
Purpose/ImportanceTo evaluate progress made on planned biodiversity monitoring initiatives. Outputs of these monitoring programmes contribute to improved documentation and understanding of biodiversity responses and/or changes
Source/Collection of Data Annual Biodiversity Monitoring Plan, Quarterly performance and Annual repots
Method of Calculation [Actual monitoring actions achieved ÷ Planned monitoring actions scheduled] x 100
Data Limitation
Data is not automated/ Monitoring actions may be influenced by changing natural circumstances (for example drought, fire or floods) and additional opportunistic monitoring may be required under such circumstances. This may lead to slightly altered prioritisation of resources during such times. In addition, availability of key resources can be a constraint to achieving specific monitoring actions (for example helicopter availability for a census, or reliance on external partners to effect certain programmes).
Type of Indicator Output
Calculation Type Cumulative quarterly achievements towards achievement of overall annual target
Reporting Cycle Annually although progress is reported quarterly
New Indicator Continues without change
Desired Performance≥ 95% implementation of prioritised annual activities, although there may be some transferring of focus in response to unexpected natural events or resource constraints.
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/1975
Strategic Objective SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator Title % Implementation of the Annual Wildlife Utilisation Plan
Short Definition
Wildlife management focuses on biodiversity, genetic diversity and promoting ecosystem processes that provide resilience. Conserving wildlife populations by maintaining, restoring or mimicking ecological processes, protecting species of special concern and reducing risks associated with damage-causing animals provide opportunities that can contribute to the Green Economy. Optimizing financial sustainability and contribution to socio-economic development maximizes income through wildlife sales and tourism, creating equitable and fair opportunities for wildlife use and participating in national wildlife economy plans, while reducing risks to the persistence of wildlife populations.
Purpose/Importance To enhance the conservation benefits from wildlife in national parks through sustainable utilization.
Source/Collection of Data Quarterly reports, census data, wildlife removal data
Method of Calculation [Number of implemented activities ÷ total number of prioritized annual activities] X 100%
Data Limitation Data is managed manually
Type of Indicator Outputs
Calculation Type Cumulative quarterly achievements towards overall annual target
Reporting Cycle Annual although progress is reported quarterly
New Indicator Amended Indicator
Desired Performance 100% implementation of prioritised annual activities
Indicator Responsibility Managing Executive: Conservation Services and HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 76
Strategic Objective SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator Title % implementation of Cultural Heritage Management Plan
Short Definition
SANParks Cultural Heritage Management Plan provides leadership in enhanced cultural heritage resources management through identification, conservation, protection and awareness of South Africa’s diverse heritage for all South Africans. As such, the parameters that inform SANParks Cultural Heritage Management Plan include; (1) research, (2) public participation, (3) human capital management, (4) interpretation, (5) access, (6) documentation and mapping and (7) conservation and maintenance.
Purpose/ImportanceTo improve and maintain cultural heritage value and assets through management, monitoring and evaluation as require by the organisational legislative mandate (international & national).
Source/Collection of Data Quarterly and Annual Performance reports, Annual implementation plan
Method of Calculation [Actual activities implemented ÷ Planned Scheduled activities] X 100
Data Limitation Data is managed manually
Type of Indicator Output
Calculation Type Cumulative quarterly achievements towards overall annual target
Reporting Cycle Annually although progress is reported quarterly
New Indicator Amended Indicator
Desired Performance Maintain 100% achievement per annum on all planned key deliverables and milestones, over a period of 5 years.
Indicator Responsibility Managing Executive: Conservation Services & Managing Executives: Operations (Parks & KNP)
South African N
ational Parks | Annual Perform
ance Plan for 2018/1977
Strategic Objective: SO 2: Effectively managed eco-systems, species and cultural heritage assets
Indicator title Reduced Environmental Crime
Short definition Reduction in fatalities of rhinos poached and poaching of other identified priority species.
Purpose/importance To reduce the success rate of poachers in KNP and maintain status quo in other parks.
Source/collection of data Daily recording of fatalities and losses, as well as poaching activities i.e. CMore, Cybertracker, incident reports and other.
Method of calculation The ratio between the fatalities of rhinos (and other key species) and the number of poaching incidents (Expressed as a %)Strategic interventions implemented (Expressed as a %) & Actual recorded figures of fines and arrests. Total number of rhinos poached in 6 rhino parks.
Type of indicator Impact
Calculation type Cumulative
Reporting cycle Annually
New indicator No
Desired performance 2.3.1: 2% Decrease year on year rhino poaching rate in KNP (carcasses : poaching incidents) ;2.3.2: Between 0-2 Rhinos poached in 6 Rhino Parks (full year);2.3.3: Implementation of Rhinoceros Management Strategy; 2.3.4: 2% Increase in SANParks EMI arrests for key spp (+total).
Indicator responsibility Managing Executives Operations (Parks & KNP) & CSD
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 78
Strategic Objective SO 3: Enhanced Knowledge for decision-making
Indicator Title % of Research Projects Relevant to SANParks Key Issues
Short Definition The percentage of registered research projects addressing SANParks’ key needs in national parks
Purpose/ImportanceTo maintain the focus of research projects undertaken in national parks to address issues relevant to the strategic benefit of SANParks, while also enabling research of national importance or cutting edge blue-sky research
Source/Collection of Data SANParks’ Scientific Services Research Projects Database
Method of Calculation [Number of essential & important research projects] ÷ [Total research projects registered in SANParks] X 100
Data LimitationData is managed manually across 3 research nodes, with some projects registered across multiple parks. The majority of these projects are conducted and funded by external research collaborators, resulting in some anticipated variability associated with the numbers of projects registered and their focal areas.
Type of Indicator Output – with a specific focus on essential and important registered research projects
Calculation Type Cumulative quarterly achievements towards overall annual target
Reporting Cycle Annually although progress is reported quarterly
New Indicator Continues without change
Desired PerformanceTo retain the number of essential and important research projects at ≥75% of the total number of registered projects over a 5-year period. This is done in the context of recognising the role of SANParks in facilitating access to parks as learning spaces, providing intellectual ecosystem services, and contributing to national R&D and tertiary education.
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/1979
Strategic Objective SO 3: Enhanced Knowledge for decision-making
Indicator Title Number of Peer Reviewed SANParks Research Publications
Short DefinitionAn evaluation of the number of peer reviewed research papers published in scientific journals or scientific books per annum with SANParks authorship or co-authorship
Purpose/ImportanceTo monitor the SANParks’ scientific contribution, learning and credibility through publication outputs, while promoting the transfer of knowledge to management.
Source/Collection of Data SANParks scientific publications data base (and various scientific journals including on-line journals)
Method of Calculation Absolute Value
Data Limitation
Data is managed manually. Due to multiple stages in the scientific publication process, it is not possible to predetermine the publishing date of peer reviewed articles. In addition, publication outputs are dependent on scientists’ career stages (with senior researchers being most productive) and outputs are highly variable and/or clumped. This is the best indicator, according to scientific practice, for this strategic objective, reflecting on formalised knowledge generated.
Type of Indicator Output
Calculation Type Cumulative quarterly achievements towards overall annual target
Reporting CycleAnnual (reflecting papers published in the preceding calendar year, which aligns with academic and publishing years Jan - Dec) although progress is reported quarterly
New Indicator Continues without change
Desired PerformanceTo produce ≥ 150 scientific publications with SANParks’ authorship over a 5- year period, as a formalised reflection of knowledge generated. It is desirable for this indicator to be exceeded as a measure of significant scientific output and excellence.
Indicator Responsibility Managing Executive: Conservation Services
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 80
SO 4: ENHANCED TOURISM RETURNS
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title % growth in Tourism Revenue (YoY)
Short Description Annual Revenue from Conservation Fees, Concessions, Retail, Accommodation (including camping) and Activities
Purpose/Importance To monitor and increase revenue from highlighted channels
Data Source SANParks Financial System
Method of Calculation [(CYTD-LYTD) ÷ LYTD] X 100 Where: CYTD = Current Year To Date and LYTD = Last Year To Date
Data Limitation Availability of reports from financial system
Type of Indicator Output
Reporting Cycle Monthly, Quarterly & Annually
New Indicator No
Desired Performance Annual increase of 8% maintained to 2020/21
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/1981
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title Total Number of Visitors to National Parks
Short Description Total number of visitors to the national parks per annum.
Purpose/Importance To monitor and increase visitor numbers to national parks per annum
Data Source SANParks Reservation System Database (RoomSeeker) and other systems in use at Parks
Method of Calculation [(CYTD-LYTD) ÷ LYTD] X 100 Where: CYTD = Current Year To Date and LYTD = Last Year To Date
Data Limitation Availability of the network in remote parks
Type of Indicator Outcome
Reporting Cycle Monthly, Quarterly & Annually
New Indicator No
Desired Performance To improve overall visitor numbers by 8.3% (from 5 440 000 to 5 890 000) over a period of 5 years.
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 82
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title % Growth in the trend of observed local Black Visitors to the National Parks
Short Description Measuring the growth in the trend of Black visitors to national parks through voluntary disclosure, reporting and monitoring.
Purpose/Importance To improve Black visitors access and utilisation of national parks in order for park access to be increasingly more aligned with South Africa’s demographic composition
Data Source RoomSeeker
Method of Calculation As voluntarily disclosedAs this is new method of calculation the margin of disclosure is unknown and 2018/9 will therefore be baseline.
Data Limitation As voluntarily disclosed. Margin of disclosure unknown. TMNP, West Coast & Open access parks currently not on RoomSeeker and therefore demographics not measured
Type of Indicator Quantitative - Trend analysis
Reporting Cycle Quarterly & Annually
New Indicator Yes
Desired Performance 2% increase per annum
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/1983
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title % Growth in the trend of local Black Overnight Visitors to National Parks
Short Description Measuring the growth in the trend of Black overnight visitors to national parks through voluntary disclosure, reporting andmonitoring.
Purpose/Importance To improve Black visitors access and utilisation of national parks in order for park access to be increasingly more aligned with South Africa’s demographic composition
Data Source RoomSeeker
Method of Calculation As voluntarily disclosed. As this is new method of calculation the margin of disclosure is unknown and 2018/9 will therefore be baseline.
Data Limitation As voluntarily disclosed. Margin of disclosure unknown. TMNP, West Coast & Open access parks currently not on RoomSeeker and therefore demographics not measured.
Type of Indicator Output
Reporting Cycle Quarterly and Annually
New Indicator No
Desired Performance 4% increase per annum
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 84
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title % Accommodation Occupancy
Short Description The percentage difference between the occupied (rented) accommodation units and the total number of available accommodation units.
Purpose/Importance To monitor and evaluate occupancy levels in the parks tourism accommodation.
Data Source SANParks Reservation System Database (RoomSeeker) & Starlight
Method of Calculation (Units Occupied / Units Available) X 100
Data Limitation Network reliability, especially in remote parks
Type of Indicator Outcome – with specific focus to occupancy
Reporting Cycle Quarterly
New Indicator No
Desired Performance To improve overall unit accommodation occupancy rate by 4.1% points (from 70.9% to 75.0%) over a period of 5 years.
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/1985
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title Total Number of Accommodation Unit Nights Sold
Short Description Measurement of the total number of accommodation units occupied and paid in relation to the total number of accommodation units available across all Parks
Purpose/Importance To monitor and evaluate the amount of tourism accommodation inventory sold.
Data Source SANParks Reservation System Database (RoomSeeker) & Starlight
Method of Calculation Simple Count Number
Data Limitation Network reliability, especially in remote parks
Type of Indicator Outcome – with specific focus to occupancy
Reporting Cycle Quarterly
New Indicator No
Desired Performance 595 000 per annum by 2019/20
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 86
Strategic Objective SO 4: Enhanced Tourism Returns
Performance Indicator Title Customer Satisfaction Index
Short Description Percentage of total customers whose reported experience on product and/or service offered in the national parks meeting or exceeds specific satisfaction goals. Key tourism services and products offered by SANParks are: Reservation; Gate entry, Reception, Accommodation, Shopping & Dining Experiences and Game Activities.
Purpose/Importance To monitor and evaluate customer satisfaction levels, hence provided the organisation with areas for improvement for offering value for money for customers.
Data Source Touchwork Report (Online application)
Method of Calculation [(CYTD-LYTD) ÷ LYTD] X 100Where: CYTD = Current Year To Date andLYTD = Last Year To Date
Data Limitation The application and database in which the captured data is stored not hosted with the organisation. Touchwork contract has come to an end and it is envisaged that new measurement tool will be in Customer Relationship Management (CRM) solution.
Type of Indicator Outcome
Reporting Cycle Quarterly
New Indicator No
Desired Performance Improvement of overall customers’ satisfaction level to 80% by the year 2019/20.
Indicator Responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/1987
Strategic Objective: SO5: Diversified Tourism Opportunities
Indicator title Total Number of Revenue Generating Products Implemented
Short definition The total income tourism-based revenue generating products implemented per annum – calculated on an absolute value
Purpose/importance To monitor performance relating to strategic initiatives that enhance the organisational revenue streams and tourism product diversification
Source/collection of data Tourism Development & Marketing Monthly Reports
Method of calculation Calculated on an absolute value
Data limitations No specific limitations
Type of indicator Outcome – with specific focus on tourism products for revenue generation
Calculation type The reported performance is cumulative per annum
Reporting cycle Quarterly and Annually
New indicator No
Desired performance Achieve 60 revenue generating products by 2019/20, cumulatively
Indicator responsibility Managing Executive: Tourism Development & Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 88
Strategic Objective: SO5: Diversified Tourism Opportunities
Performance Indicator Title Total Number of Park Visitor Management and Interpretation Plans
Short Description To develop Visitor Management and Interpretation Plans in 6 Parks Input
Purpose/Importance To enhance visitor experience in National Park
Data Source Completed Plans
Method of Calculation Absolute number
Data Limitation None
Type of Indicator Input
Reporting Cycle Quarterly
New Indicator No
Desired Performance Achieve 18 plans (9 parks) by 2019/20, cumulatively
Indicator Responsibility Managing Executive: Tourism Development and Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/1989
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Indicator title Total Number of Full-time Equivalent Jobs Created
Short definition Total number of Full Time Equivalent (FTE) jobs created for individuals through EPWP and other SANParks programmes.
Purpose/importance To monitor the number of temporary jobs (expressed as FTEs) created though both externally funding and internal initiatives, hence facilitating socio-economic development around Parks’ communities. This includes job creation for women, youth and people with disabilities.
Source/collection of data DEA Project Reporting Portal and the Quarterly Performance Report.
Method of calculation Number of person days divided by 230 to give a Full Time Equivalent (FTE) Data Limitation
Data limitations Data is in the DEA system and SANParks HR Management System
Type of indicator Outcome - with specific focus on EPWP
Calculation type Cumulative
Reporting cycle Quarterly
New indicator No
Desired performance To create 5 904 FTEs through EPWP in 2018/19 and to increase this number annually through incorporating other programmes into this measure (budget reliant).
Indicator responsibility HOD: Socio-Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 90
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Indicator title Total Number of SMMEs / Enterprises Supported
Short definition Total number of small medium and micro enterprise (SMMEs) supported through the EPWP and other programmes.
Purpose/importance To monitor the number of SMMEs supported through externally funded projects such as the EPWP and other programmes, hence facilitating socio-economic development around Parks’ communities.
Source/collection of data DEA Project Reporting Portal and the Quarterly Performance Report.
Method of calculation Absolute Number of SMMEs Supported
Data limitations Data is in the DEA system
Type of indicator Outcome - with specific focus on EPWP
Calculation type Cumulative
Reporting cycle Quarterly
New indicator No
Desired performance To support 400 SMMEs in 2018/19 through the EPWP and to increase this number annually incorporating other programmes into this measure (budget reliant).
Indicator responsibility HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/1991
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Indicator title Amount paid to SMMEs in the EPWP Programme
Short definition Total amount paid to small medium and micro enterprise (SMMEs) supported through the EPWP and other programmes.
Purpose/importance To monitor the amount paid to SMMEs supported through externally funded projects such as the EPWP and other programmes, hence facilitating socio-economic development around Parks’ communities.
Source/collection of data DEA Project Reporting Portal, WIMS Database, Financial system and the Quarterly Performance Report.
Method of calculation Absolute amount paid to SMMEs Supported
Data limitations Data is in the DEA system
Type of indicator Outcome - with specific focus on EPWP
Calculation type Cumulative.
Reporting cycle Quarterly
New indicator Yes
Desired performance To pay out as amount of R159 million in 2018/19 through the EPWP and to increase this amount annually incorporating other programmes into this measure (budget reliant).
Indicator responsibility HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 92
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Indicator title An Integrated Transformation Strategy (ITS) Developed and approved
Short definition An integrated Transformation Strategy that will include all aspects of the SANParks business to ensure fair and equitable transformation.
Purpose/importance To ensure fair and equitable transformation takes place within SANParks
Source/collection of data Scoping report; Draft ITS, approved ITS
Method of calculation Absolute
Data limitations None
Type of indicator Outcome - with specific focus on Integrated Transformation
Calculation type Cumulative.
Reporting cycle Quarterly
New indicator No
Desired performance Fair and equitable Transformation within SANParks
Indicator responsibility HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/1993
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Performance Indicator Title Total Number of Green Projects Implemented
Short Description Total number of green initiatives implemented contributing towards local economic development
Purpose/Importance To implement and support green economy initiatives implemented in local communities
Data Source Quarterly performance reports
Method of Calculation Percentage measure ( 100% Performance against implementation plan)
Data Limitation No specific limitations
Type of Indicator Outcome- specific reference to green and blue economy initiatives
Reporting Cycle Quarterly
New Indicator No
Desired Performance To implement and support green economy projects
Indicator Responsibility HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 94
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Performance Indicator Title Total Number of Social Legacy Projects Implemented
Short Description Total number of legacy projects implemented in support of social development of local communities
Purpose/Importance To monitor and evaluate the contribution and support made by SANParks towards community development
Data Source Quarterly performance reports, letters of acceptance of donations from schools/ provincial departments of education
Method of Calculation Percentage measure (100% Implementation of plans)
Data Limitation No specific limitations
Type of Indicator Outcome- specific reference to legacy projects
Reporting Cycle Quarterly
New Indicator No
Desired Performance To provide social legacy projects in the 2018/19 financial year
Indicator Responsibility HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/1995
Strategic Objective: SO 6: Optimised contribution to the green and blue economy
Performance Indicator Title Land Claims beneficiation package developed and approved
Short Description The finalisation of land claims and implementation of settlement agreements
Purpose/ Importance To negotiate and settle land claims in national parks as well as ensuring implementation of settlement agreements for the benefit of claimant communities
Data Source Quarterly and Annual Performance Reports; Land claimants meeting minutes
Method of Calculation 100% achievement of set work plan
Data Limitation Data on potential benefits is based on estimates, actual data on actual benefits may be different
Type of Indicator Consultation Outcome- with specific Land Claimants
Reporting Cycle Quarterly
New Indicator Yes
Desired Performance Finalised land claims and settlement agreements implemented
Indicator Responsibility HOD: Socio Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 96
Strategic Objective SO 7: Enhanced Awareness and Skills
Performance Indicator Title Total number of Environmental Education Programmes and participants
Short DescriptionImplementation of environmental education programmes, formal and non- formal aimed at raising awareness among school learners and local communities about environmental issues and promote action taking. The number of programmes and participants in the programmes will be measured.
Purpose/ImportanceTo enhance corporate social investment, community knowledge and awareness about conservation matters, particularly the youth at school level.
Data Source SED portal, quarterly and annual performance reports, entry permits and attendance registers
Method of Calculation Absolute Number
Data Limitation Accuracy of data at parks levels
Type of Indicator Outcome – with specific focus on junior rangers and school learners
Reporting Cycle Quarterly
New Indicator No
Desired PerformanceTo improve annual figures of participants in environmental education programme by 5% (216 000 to 227 000) by the year 2018/19.
Indicator Responsibility HOD: Socio-Economic Development
South African N
ational Parks | Annual Perform
ance Plan for 2018/1997
Strategic Objective SO 7: Enhanced Awareness and Skills
Performance Indicator Title Total Number of Free Access Entrants during SANParks week
Short Description Collective number of people who are given free access entrants to the national parks during SANParks week.
Purpose/ImportanceIn line with SANParks’ vision statement, this will enhance the connectivity with the society through corporate social investment, community knowledge and awareness about conservation matters.
Data Source RoomSeeker
Method of Calculation Absolute Number with variance from previous year actuals
Data Limitation Accuracy of data at parks levels
Type of Indicator Outcome – with specific events focusing on neighbouring communities.
Reporting Cycle Quarter 2 and Annual (SANParks week takes place during Q2
New Indicator No
Desired Performance To improve annual figures of free entrants to the national parks to 100 000 per annum by the year 2020/21.
Indicator Responsibility Managing Executive: Tourism Development and Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 98
Strategic Objective SO 8: Enhanced Stakeholder Engagement
Performance Indicator Title Total Number of Proactive Media Engagements
Short Description The total number of proactive media undertaking such as media articles and events, in support of public engagement.
Purpose/Importance To enhance the organisational public participation and relevant stakeholders.
Data Source Quarterly Performance Reports
Method of Calculation Absolute Number
Data Limitation Data is not automated
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator No
Desired PerformanceTo improve the number of proactive media engagements implemented to 100 Media Release and 10 events per annum, in 5 years
Indicator Responsibility Managing Executive: Tourism Development and Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/1999
Strategic Objective SO 8: Enhanced Stakeholder Engagement
Performance Indicator Title Media Reputation Rating
Short Description Measurement of organisational reputation and perceptions as reported in the media by various stakeholder groupings.
Purpose/Importance To measure, assess and evaluate the reputation based on a collective of opinions that stakeholders hold about the organisation.
Data Source Reputational Database and Report (Online service)
Method of Calculation As per Standard Rating System
Data Limitation Accuracy of the Reputational Reports
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator No
Desired Performance Maintain rating of ≥ 95%
Indicator Responsibility Managing Executive: Tourism Development and Marketing
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 100
Strategic Objective SO 8: Enhanced Stakeholder Engagement
Performance Indicator Title % of PAIA Requests Responded to
Short Description Measurement of organisational response to external stakeholders as outlined in the PAIA
Purpose/Importance To measure the organisation’s compliance with the provisions of PAIA
Data Source PAIA Register
Method of Calculation Number of PAIA requests received against completion
Data Limitation Inadequate human resources
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator No
Desired Performance Maintain 80% compliance rating
Indicator Responsibility Chief Financial Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19101
Strategic Objective SO 9: Adequate, appropriately skilled, transformed and diverse human capital
Performance Indicator Title % of Employees from Designated Employment Equity Groups
Short Description Percentage difference between designated employment equity groups and the total employees of the organisation.
Purpose/Importance To monitor and enhance organisational transformation through effective employment equity.
Data Source Human Capital Information System
Method of Calculation [Number of Employees from Designated EE Groups ÷ Total Employees] X 100 per annum
Data Limitation Accuracy of the HR database to reflect designated EE groupings
Type of Indicator Output - with specific focus management gender composition and people with disabilities
Reporting Cycle Quarterly
New Indicator No
Desired PerformanceTo improve Black to 60% of management positions; the women in management posts from 36% to 40% ; staff compliment of people with disabilities from 1% to 2% and the ratio between Male and Female to 1:0.8 over a period of 5 years.
Indicator Responsibility Chief Operating Officer & Head of Human Capital Management
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 102
Strategic Objective SO 9: Adequate, appropriately skilled, transformed and diverse human capital
Performance Indicator Title % of Employees Meeting Minimum Educational Requirements
Short Description The percentage management meeting minimum educational requirements
Purpose/Importance To improve skills levels of our staff particularly those in management positions (C and Upper).
Data Source Human Capital Information System
Method of Calculation (Staff meeting educational requirements / Total Staff Compliment on C and Upper Band) X 100)
Data Limitation Availability of the internet in remote parks
Type of Indicator Output – with specific focus to occupancy
Reporting Cycle Quarterly
New Indicator No
Desired Performance To improve overall staff skills and educational levels over a period of 5 years.
Indicator Responsibility Chief Operating Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19103
Strategic Objective SO 9: Adequate, appropriately skilled, transformed and diverse human capital
Performance Indicator Title % of payroll spent on the Skills Development Programme
Short DescriptionMeasurement of the amount of money spend towards Skills Development Programme against the amount of spent on payroll for the reporting
Purpose/Importance To monitor skills development implementation in the organisation
Data Source Financial Management System, Training Tracking document, Training
Method of Calculation [Actual Spent towards Skills Development Programmes÷ Total Spent towards Payroll] X 100
Data Limitation Data is not automated
Type of Indicator Output
Reporting Cycle Annually
New Indicator No
Desired PerformanceTo achieve at least equivalent of 3% of payroll spent towards Skills Development Programme per annum, over the next 5 year period.
Indicator Responsibility Chief Operating Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 104
Strategic Objective SO 10: Conducive Working Environment
Performance Indicator Title % Staff Turnover Rate
Short Description Measure the rate at which employees exit the organisation
Purpose/Importance To monitor and improve on the retention of employees
Data Source Human Capital Information System
Method of Calculation (Number of employee exits / total staff compliment) x 100
Data Limitation Data is not automated
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator Yes
Desired Performance 5% or less
Indicator Responsibility Chief Operating Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19105
Strategic Objective SO 10: Conducive Working Environment
Performance Indicator Title % Success Rate at CCMA
Short Description The percentage of successful CCMA cases versus those launched by disputing employee.
Purpose/Importance To improve fair and transparent HR relations practices within the organisation and to boost staff morale.
Data Source SANParks Human Recourses Relations Monthly Report
Method of Calculation (Number of successful (won or settlements) CCMA cases/Total registered cases) X 100
Data Limitation Data is managed manually
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator No
Desired Performance 85% Success Rate per annum
Indicator Responsibility Chief Operating Officer
Strategic Objective SO 10: Conducive Working Environment
Performance Indicator Title % Reduction in the average Number of Sick Leave Days per capita per annum
Short Description Measure the number of sick leave days taken by employees against the baseline
Purpose/ImportanceTo improve Wellness programme efficiency and effectiveness through improved employee health and accordingly, employee productivity.
Data Source SANParks Human Recourses Relations Monthly Report; VIP
Method of Calculation(Average sick leave days per capita LYTD - Average sick leave days per capita CYTD) X 100 Where: Total number of Sick Leave days Average Number of sick leave per capita = Total number of employees
Data Limitation Data retrieved from the system depends on capturing
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator No
Desired Performance 2% reduction in sick leave per annum
Indicator Responsibility Chief Operating Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 106
Strategic Objective SO 11: Optimised business processes and knowledge management Systems
Performance Indicator Title Total Number of Business Processes Reviewed
Short Description Review, map and where appropriate prioritised business processes
Purpose/Importance To improve business efficiency and information management through governance of business processes
Data Source Business Process Review System
Method of Calculation Absolute number reviewed and approved by EXCO
Data Limitation None
Type of Indicator Output
Reporting Cycle Annually
New Indicator No
Desired Performance 4 Business Processes per annum (4 mapped and 4 automated)
Indicator Responsibility Chief Operating Officer and Chief Information Technology Officer
Strategic Objective SO 11: Optimised business processes and knowledge management Systems
Performance Indicator Title Number of implemented ICT Strategy Projects
Short Description ICT strategy projects in line with business requirements and needs and in compliance with ICT Governance Framework.
Purpose/Importance To enhance the organisational operations efficiencies, systems controls and making ICT a strategic delivery enabler.
Data Source Business Process Review System
Method of Calculation Review of implementation against implementation plan as assessed by internal audit
Data Limitation None
Type of Indicator Output
Reporting Cycle Quarterly
New Indicator No
Desired Performance Completion of the implementation of the ICT Strategy as per the approved implantation plan
Indicator Responsibility Chief Operating Officer & Chief Information Technology Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19107
Strategic Objective SO 12: Accountable Corporate Governance
Performance Indicator Title % Compliance with Governance Requirements.
Short Description The percentage complying against the National Treasury and PFMA governance checklist
Purpose/Importance To improve corporate governance and compliance status of the organisation.
Data Source Quarterly Performance Report
Method of Calculation Simple Count
Data Limitation Data is management manually
Type of Indicator Output - with specific focus on Essential and Important research projects
Reporting Cycle Quarterly
New Indicator No.
Desired Performance To retaining desired compliance level to 100% in 5 years
Indicator Responsibility Chief Operating Officer
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title Income-to-Cost Ratio (Break- even)
Short DescriptionThe financial ratio to determine the organisational operational efficiency in terms revenue generation and cost containment, by expressing the expenses incurred against the revenue
Purpose/Importance To improve cost efficiency and financial sustainability
Data Source SANParks Financial System
Method of Calculation Actual income compared to actual costs expressed as a ratio
Data Limitation No specific limitations
Type of Indicator Outcome – with specific focus on expenditure and income
Reporting Cycle Quarterly
New Indicator No
Desired Performance To retain organisational ratio of income to costs within 1:1
Indicator Responsibility Chief Financial Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 108
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title % variance of Expenditure against Budget
Short Description The percentage difference between the actual amount of expenditure incurred and the corresponding budgeted amount.
Purpose/Importance To improve organisational effectiveness and ability to budget, manage and perform against the budgeted expenditure amounts.
Data Source SANParks Financial System (SPSS)
Method of Calculation [Absolute Value (Actual- Budget) ÷ Budget] X 100
Data Limitation No specific limitations
Type of Indicator Outcome – with specific focus on expenditure and income
Reporting Cycle Quarterly
New Indicator No
Desired Performance 0% variance.
Indicator Responsibility Chief Financial Officer
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title Direct HR as % of Total Cost ( include cost of sales)
Short Description The ratio to determine the cost of direct human resources as a percentage of total operational expenditure
Purpose/Importance Improve cost efficiency and financial sustainability
Data Source SANParks Financial System
Method of Calculation The expenditure related to direct HR cost (Compensation and fixed benefits)
Data Limitation No specific limitations
Type of Indicator Outcome – with specific focus on the percentage of direct HR expenditure
Reporting Cycle Annually
New Indicator No
Desired Performance ≤ 53%
Indicator Responsibility Chief Financial Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19109
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title Own revenue generated as % of Total Revenue
Short Description The financial ratio of revenue generated through normal exchange transactions expressed as a percentage of total revenue generated
Purpose/Importance To improve financial sustainability
Data Source SANParks Financial System
Method of Calculation Actual own revenue divided by the total revenue generated
Data Limitation No specific limitations
Type of Indicator Outcome – with specific focus on own revenue percentage
Reporting Cycle Quarterly
New Indicator No
Desired Performance ≥ 72%
Indicator Responsibility Chief Financial Officer
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title Average Number of days: Debtor Collection
Short Description To determine the number of days it take to collect monies due to the organisation
Purpose/Importance To improve efficiency and financial sustainability
Data Source SANParks Financial System
Method of Calculation Calculate the average trade debtors and express that as a factor based on the credit sales
Data Limitation No specific limitations
Type of Indicator Outcome – with specific focus on the number of days to collect
Reporting Cycle Quarterly
New Indicator No
Desired Performance ≤ 30 days
Indicator Responsibility Chief Financial Officer
South African N
ational Parks | Annual Perform
ance Plan for 2018/19 110
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title Average number of days: Creditor Payment
Short Description To determine the number of days it take to pay suppliers
Purpose/Importance To improve efficiency
Data Source SANParks Financial System
Method of Calculation Calculate the average trade creditors and express that as a factor based on procurement
Data Limitation No specific limitations
Type of Indicator Outcome – with specific focus on the number of days to pay
Reporting Cycle Quarterly
New Indicator No
Desired Performance ≤ 30 days
Indicator Responsibility Chief Financial Officer
Strategic Objective SO 13: Financial Accountability
Performance Indicator Title Total Revenue generated from Fundraising
Short Description The amount of cash and in kind generated from donors
Purpose/Importance To generate cash from donors in order to assist in the achievement of SANParks strategy and to fund specific projects
Data Source SANParks Financial System; Honorary Ranger Reports; Special Projects Reports
Method of Calculation Simple count
Data Limitation No specific limitations
Type of Indicator Outcome
Reporting Cycle Monthly
New Indicator No
Desired Performance To achieve target donation for the period = R50, 4m
Indicator Responsibility ME: Tourism Development and Marketing
SOUTH AFRICAN NATIONAL PARKS—